Elevator apt, semi-fireproof without stores
521 WEST 134 STREET
MANHATTAN · Manhattanville-West Harlem · BIN 1091687
💬 Discuss this project
2023Year Built
8Stories
D1Building Class
R7AZoning
19,071 sfGross Floor Area
28Units
Rent Stabilized0 Open Violations
Elevator apt, semi-fireproof without stores · Owner of record: MANHATTANVILLE RE PARTNERS LLC · 4,796 sf lot · 3.98 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Roof2p · 2 filings
Site & exterior6 filings
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HAUSSMANN DEVELOPMENT9607/08/2026
COSAN CONSTRUCTION407/08/2026
MANHATTANVILLE RE PARTNERS LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/20/2021$2.9M—WEST ONE TWELVE HOUSING COMPANY, INC. → MANHATTANVILLE RE PARTNERS LLC— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A1 EXPEDITING SERVICE1803/21/2026
JM ZONING, LLC.2703/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PROMETHEAN BUILDERS LLCGeneral Contractor3407/08/2026
TRI BOROUGH SCAFFOLDINGGeneral Contractor1007/08/2026
S&E BRIDGE & SCAFFOLD LLC.General Contractor907/08/2026
MC SUPERSTRUCTURE INCGeneral Contractor403/21/2026
UPRIGHT FIRE PROTCTN LLCFire Protection407/08/2026
ALMAR PLUMBING & HTG CORPPlumbing307/08/2026
COSAN CONSTRUCTION CORPGeneral Contractor307/08/2026
CHRIS M SIDERISElectrical203/21/2026
NDKAZALAS ARCHITECTUREGeneral Contractor103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CONCRETE SOLUTIONS LAB CO53441504/25/2024
GEOTECHNICAL ENGINEERING734208/03/2021
Building Lifecycle
All (171)Filed (29)Permit Issued (39)Signed Off (15)Violation (2)Inspection (16)Objection (40)Special Inspection (30)
12/18/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/11/2024
Signed off — New Building
Installation of new combined sprinkler/standpipe system filed in conjunction with ALT-CO# M00551052-I1. No change to use, egress, or occupancy.
M00551052-S5
05/06/2024
Special inspection requirement — Standpipe Systems
MINA HANNA
05/06/2024
Special inspection requirement — Sprinkler Systems
MINA HANNA
04/25/2024
Filed — New Building
Installation of new combined sprinkler/standpipe system filed in conjunction with ALT-CO# M00551052-I1. No change to use, egress, or occupancy.
M00551052-A2
04/22/2024
Special inspection requirement — Sprinkler Systems
MINA HANNA
04/22/2024
Special inspection requirement — Standpipe Systems
MINA HANNA
02/02/2024
Signed off — New Building
Installation of new combined sprinkler/standpipe system filed in conjunction with ALT-CO# M00551052-I1. No change to use, egress, or occupancy.
M00551052-S2
11/21/2023
Signed off — New Building
Installation of new combined sprinkler/standpipe system filed in conjunction with ALT-CO# M00551052-I1. No change to use, egress, or occupancy.
M00551052-S4
11/20/2023
Permit issued — Earth Work
M00551052-S2-EA
10/25/2023
Permit issued — Plumbing
M00551052-S4-PL
10/10/2023
Permit issued — Earth Work
M00551052-S2-FO
10/06/2023
Signed off — New Building
Installation of new combined sprinkler/standpipe system filed in conjunction with ALT-CO# M00551052-I1. No change to use, egress, or occupancy.
M00551052-S1
10/02/2023
Filed — New Building
Installation of new combined sprinkler/standpipe system filed in conjunction with ALT-CO# M00551052-I1. No change to use, egress, or occupancy.
M00551052-A1
10/02/2023
Special inspection requirement — Lighting controls
MINA HANNA
10/02/2023
Special inspection requirement — Protection of exposed foundation insulation
MINA HANNA
10/02/2023
Special inspection requirement — Sprayed fire-resistant materials
MINA HANNA
10/02/2023
Special inspection requirement — Fenestration air leakage
MINA HANNA
10/02/2023
Special inspection requirement — Lighting in dwelling units
MINA HANNA
10/02/2023
Special inspection requirement — Metering
MINA HANNA
10/02/2023
Special inspection requirement — Air barrier - visual inspection
MINA HANNA
10/02/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
MINA HANNA
10/02/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Ziad Maad
10/02/2023
Special inspection requirement — Air barrier — testing
MINA HANNA
10/02/2023
Special inspection requirement — Fenestration areas
MINA HANNA
10/02/2023
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
MINA HANNA
10/02/2023
Special inspection requirement — Interior lighting power
MINA HANNA
10/02/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MINA HANNA
09/28/2023
Signed off — New Building
Installation of new combined sprinkler/standpipe system filed in conjunction with ALT-CO# M00551052-I1. No change to use, egress, or occupancy.
M00551052-S6
09/28/2023
Signed off — New Building
Installation of new combined sprinkler/standpipe system filed in conjunction with ALT-CO# M00551052-I1. No change to use, egress, or occupancy.
M00551052-S3
09/27/2023
Signed off — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00662859-I1
09/27/2023
Signed off — Alteration
INSTALLATION OF PYLWOOD FENCE AS PER PLANS. PLYWOOD FENCE SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00699886-I1
09/27/2023
Special inspection requirement — Lighting controls
MINA HANNA
09/27/2023
Special inspection requirement — Fenestration areas
MINA HANNA
09/27/2023
Special inspection requirement — Lighting in dwelling units
MINA HANNA
09/27/2023
Special inspection requirement — Air barrier - visual inspection
MINA HANNA
09/27/2023
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
MINA HANNA
09/27/2023
Special inspection requirement — Interior lighting power
MINA HANNA
09/27/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MINA HANNA
09/27/2023
Special inspection requirement — Fenestration air leakage
MINA HANNA
09/27/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Ziad Maad
09/27/2023
Special inspection requirement — Air barrier — testing
MINA HANNA
09/27/2023
Special inspection requirement — Metering
MINA HANNA
09/27/2023
Special inspection requirement — Sprayed fire-resistant materials
MINA HANNA
09/22/2023
Permit issued — General Construction
M00551052-I1-GC
09/08/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY DEBRIS CHUTE AS PER DRAWINGS. DEBRIS CHUTE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M08028279-I1
09/08/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M08027702-I1
08/25/2023
Signed off — Alteration
Install temporary dry standpipe system during construction activity as per plans filed. No change to use, egress oroccupancy. Filed in conjunction with NB# M00551052
M00666007-I1
08/11/2023
Permit issued — Sidewalk Shed
M00662859-I1-SH
08/10/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY ROOF PROTECTION AT ADJACENT PROPERTIES DURING NB BLDG CONST, FILED SEP. ROOF PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M08000586-I1
08/10/2023
Signed off — Alteration
INSTALLATION OF CONSTRUCTION FENCE AS PER DRAWINGS DURING NB CONST, FILED SEP. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M08000520-I1
08/08/2023
Filed — New Building
Installation of new combined sprinkler/standpipe system filed in conjunction with ALT-CO# M00551052-I1. No change to use, egress, or occupancy.
M00551052-P8
07/25/2023
Permit issued — Construction Fence
M00699886-I1-FN
07/21/2023
Signed off — Alteration
Installation of Two point suspended scaffolding to comply with Chapter 33 of NYC Building Code. No change in use, egress, or occupancy.
M00809491-I1
07/17/2023
Inspection — Certified StandPipe - SD - Alarm Sys 64/09 - Finish
Certified
View inspection ↗
07/17/2023
Inspection — Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)
Certified
View inspection ↗
07/17/2023
Inspection — Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)
Certified
View inspection ↗
07/14/2023
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING NB CONST, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00795532-I1
07/12/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/12/2023
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
Latest 60 of 171 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWEarth WorkSigned-offPROMETHEAN BUILDERS LLC11/20/2023
DOB NOWPlumbingSigned-offALMAR PLUMBING & HTG CORP10/25/2023
DOB NOWEarth WorkSigned-offPROMETHEAN BUILDERS LLC10/10/2023
DOB NOWGeneral ConstructionPermit IssuedPROMETHEAN BUILDERS LLC09/22/2023
DOB NOWSidewalk ShedSigned-offMC SUPERSTRUCTURE INC08/11/2023
DOB NOWConstruction FenceSigned-offMC SUPERSTRUCTURE INC07/25/2023
DOB NOWStandpipeSigned-offH.J. FLOOD INC.06/14/2023
DOB NOWConstruction FenceSigned-offTRI BOROUGH SCAFFOLDING03/06/2023
DOB NOWProtection and Mechanical MethodsSigned-offCOSAN CONSTRUCTION02/24/2023
DOB NOWProtection and Mechanical MethodsSigned-offCOSAN CONSTRUCTION01/09/2023
DOB NOWSidewalk ShedSigned-offTRI BOROUGH SCAFFOLDING01/03/2023
DOB NOWPlumbingSigned-offALMAR PLUMBING & HTG CORP11/16/2022
DOB NOWProtection and Mechanical MethodsSigned-offS&E BRIDGE & SCAFFOLD LLC10/29/2022
DOB NOWSupported ScaffoldSigned-offS&E BRIDGE & SCAFFOLD LLC10/27/2022
DOB NOWGeneral ConstructionPermit IssuedPROMETHEAN BUILDERS LLC10/12/2022
DOB NOWStructuralSigned-offPROMETHEAN BUILDERS LLC10/11/2022
DOB NOWFoundationSigned-offPROMETHEAN BUILDERS LLC10/11/2022
DOB NOWSupport of ExcavationSigned-offPROMETHEAN BUILDERS LLC10/11/2022
DOB NOWMechanical SystemsSigned-offPROMETHEAN BUILDERS LLC10/04/2022
DOB NOWStandpipeSigned-offH.J. FLOOD INC.09/30/2022
DOB NOWStructuralSigned-offPROMETHEAN BUILDERS LLC09/26/2022
DOB NOWMechanical SystemsSigned-offPROMETHEAN BUILDERS LLC09/26/2022
DOB NOWEarth WorkSigned-offPROMETHEAN BUILDERS LLC09/24/2022
DOB NOWSupport of ExcavationSigned-offPROMETHEAN BUILDERS LLC09/24/2022
DOB NOWProtection and Mechanical MethodsSigned-offS&E BRIDGE & SCAFFOLD LLC09/09/2022
DOB NOWConstruction FenceSigned-offS&E BRIDGE & SCAFFOLD LLC09/09/2022
DOB NOWSidewalk ShedSigned-offS&E BRIDGE & SCAFFOLD LLC08/23/2022
DOB NOWMechanical SystemsSigned-offPROMETHEAN BUILDERS LLC07/27/2022
DOB NOWSprinklersSigned-offH.J. FLOOD INC.07/01/2022
DOB NOWStandpipeSigned-offH.J. FLOOD INC.07/01/2022
DOB NOWGeneral ConstructionPermit IssuedPROMETHEAN BUILDERS LLC06/28/2022
DOB NOWStructuralSigned-offPROMETHEAN BUILDERS LLC06/03/2022
DOB NOWSupport of ExcavationSigned-offPROMETHEAN BUILDERS LLC05/25/2022
DOB NOWEarth WorkSigned-offPROMETHEAN BUILDERS LLC05/25/2022
DOB NOWPlumbingSigned-offALMAR PLUMBING & HTG CORP05/21/2022
DOB NOWFoundationSigned-offPROMETHEAN BUILDERS LLC03/30/2022
DOB NOWSupport of ExcavationSigned-offPROMETHEAN BUILDERS LLC03/29/2022
DOB NOWConstruction FenceSigned-offTRI BOROUGH SCAFFOLDING03/17/2022
DOB NOWSidewalk ShedSigned-offTRI BOROUGH SCAFFOLDING01/21/2022
1 project · most recent 04/25/2024
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/25/2024Signed-offPROMETHEAN BUILDERS LLCAir Conditioning Systems, Ventilation Systems
Cooling
Lg ARUN024GSS4 270,000 BTU · Vrf Outdoor ×27
ARUN038GSS4 42,000 BTU · Vrf Outdoor ×1
LSU120HSV2 13,600 BTU · Condensing Unit ×1
LUU249HV 27,000 BTU · Condensing Unit ×1
Ventilation
Greenheck RV-10-41-C 900 CFM · Makeup Air ×1
1 project · most recent 04/25/2024
Sprinkler System
FiledStatusContractorScope
04/25/2024Signed-offUPRIGHT FIRE PROTCTN LLCSprinkler System
1 project · most recent 04/25/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
04/25/2024Signed-offALMAR PLUMBING & HTG CORPGas, Storm, Water/Sanitary
4 projects · most recent 01/09/2024
General Wiring
FiledStatusContractorScope
01/09/2024CompleteA2K ELECTRIC CORPGeneral Wiring
10/28/2022CompleteTUXEDO ELEC'L CONTR'G INC—
08/22/2022CompleteNASH ELECTRIC SERVICES IN—
01/05/2022CompleteV. VASS ELECTRIC CORP—
1 project · most recent 04/25/2024
Concrete Masonry
FiledStatusContractorScope
04/25/2024Signed-offPROMETHEAN BUILDERS LLCConcrete, Masonry
1 project · most recent 04/25/2024
Earthwork
FiledStatusContractorScope
04/25/2024Signed-offPROMETHEAN BUILDERS LLCEarthwork
▾Field Inspections (DOB CAP) — 16
DateTypeResultReport
12/18/2024Pass-Final CND-Occupancy InspectionPassView ↗
07/17/2023Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
07/17/2023Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)CertifiedView ↗
07/17/2023Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
07/12/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/12/2023Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
07/06/2023Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
07/06/2023Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
06/30/2023Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
06/28/2023Pass-Final CND-Occupancy InspectionPassView ↗
05/22/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/02/2022Fail-Final House ConnectionFailView ↗
07/29/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/29/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/03/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/03/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 99
DateRequirementInspectorRole
05/06/2024Sprinkler SystemsMINA HANNAspecial
05/06/2024Standpipe SystemsMINA HANNAspecial
04/22/2024Sprinkler SystemsMINA HANNAspecial
04/22/2024Standpipe SystemsMINA HANNAspecial
10/02/2023Lighting controlsMINA HANNAenergy_progress
10/02/2023MeteringMINA HANNAenergy_progress
10/02/2023Fenestration air leakageMINA HANNAenergy_progress
10/02/2023Air barrier - visual inspectionMINA HANNAenergy_progress
10/02/2023Fenestration areasMINA HANNAenergy_progress
10/02/2023Fire-Resistant Penetrations and JointsMINA HANNAspecial
10/02/2023Interior lighting powerMINA HANNAenergy_progress
10/02/2023Protection of exposed foundation insulationMINA HANNAenergy_progress
10/02/2023Air barrier — testing MINA HANNAenergy_progress
10/02/2023Fenestration and door U-factor and product ratingsMINA HANNAenergy_progress
10/02/2023Lighting in dwelling unitsMINA HANNAenergy_progress
10/02/2023Wall Panels, Curtain Walls, and VeneersMINA HANNAspecial
10/02/2023Sprayed fire-resistant materialsMINA HANNAspecial
10/02/2023Subsurface Investigations (Borings/Test Pits)Ziad Maadspecial
09/27/2023Fenestration air leakageMINA HANNAenergy_progress
09/27/2023Air barrier - visual inspectionMINA HANNAenergy_progress
09/27/2023Fenestration and door U-factor and product ratingsMINA HANNAenergy_progress
09/27/2023Lighting controlsMINA HANNAenergy_progress
09/27/2023Lighting in dwelling unitsMINA HANNAenergy_progress
09/27/2023Fire-Resistant Penetrations and JointsMINA HANNAspecial
09/27/2023Sprayed fire-resistant materialsMINA HANNAspecial
Latest 25 of 99.
▾Documents — 228 on file (BIS + DOB NOW)
▸Plans & Drawings31
▸DOB NOWPlans/Sketch31
09/03/2026M00551052-P3Request digital key ↗
09/03/2026M00551052-S5Request digital key ↗
09/03/2026M00551052-S4Request digital key ↗
Showing 3 of 31 on file for this type
▸Applications & Permits3
▸BISBPP-5 - Authorization to the Department of Transportation2
06/09/2023141005098Open ↗
09/21/2021141005098Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
09/20/2021141005098Open ↗
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram5
09/03/2026M00551052-I1Open ↗
09/03/2026M00551052-A1Open ↗
08/13/2026M00551052-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
09/03/2026M00551052-I1Open ↗
▸Seals & Professional Certifications122
▸DOB NOWProgress Inspector Seal & Signature58
09/07/2026M00551052-S3Open ↗
09/07/2026M00551052-S3Open ↗
09/07/2026M00551052-S3Open ↗
Showing 3 of 58 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature33
09/23/2026M00551052-S5Open ↗
09/23/2026M00551052-S5Open ↗
09/07/2026M00551052-S3Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature29
09/03/2026M00551052-S6Open ↗
09/03/2026M00551052-P2Open ↗
09/03/2026M00551052-P1Open ↗
Showing 3 of 29 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
09/20/2021141005098Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/20/2021141005098Open ↗
▸Trade Schedules & Equipment6
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)5
09/03/2026M00551052-I1Open ↗
09/03/2026M00551052-A1Open ↗
08/13/2026M00551052-P8Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWStandpipe Alarms Drawings1
09/03/2026M00551052-I1—
▸Safety & Tenant Protection9
▸DOB NOWStreet Tree Checklist5
09/03/2026M00551052-I1Open ↗
09/03/2026M00551052-A1Open ↗
09/03/2026M00551052-P8Open ↗
Showing 3 of 5 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
09/20/2021141005098Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
09/03/2026M00551052-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
09/03/2026M00551052-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
09/03/2026M00551052-I1Open ↗
▸Environmental & Asbestos21
▸DOB NOWOER: Notice to Proceed13
09/03/2026M00551052-I1Open ↗
09/03/2026M00551052-A1Open ↗
08/13/2026M00551052-S4Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWOER: Notice of Satisfaction6
09/03/2026M00551052-I1Open ↗
08/13/2026M00551052-S2Open ↗
08/13/2026M00551052-S3Open ↗
Showing 3 of 6 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
08/28/2024141005098Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
01/28/2022141005098Open ↗
▸Energy Compliance4
▸DOB NOWEN2: As Built Energy Analysis.3
09/03/2026M00551052-I1Open ↗
Showing 1 of 3 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification1
09/03/2026M00551052-I1Open ↗
▸Inspections & Test Reports7
▸DOB NOWSOIL REPORT5
09/03/2026M00551052-I1Open ↗
09/03/2026M00551052-A1Open ↗
08/13/2026M00551052-P8Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram1
09/03/2026M00551052-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
09/03/2026M00551052-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
09/11/2024141005098Open ↗
▸Cost, Insurance & Ownership2
▸DOB NOWCertification by Insurance Broker or Agency1
09/03/2026M00551052-I1Open ↗
▸DOB NOWCertificate of Insurance1
09/03/2026M00551052-I1Open ↗
▸Filing & Intake Forms3
▸BISADDITIONAL INFORMATION2
06/09/2023141005098Open ↗
01/28/2022141005098Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
09/20/2021141005098Open ↗
▸Other Documents13
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
09/03/2026M00551052-I1Open ↗
09/03/2026M00551052-A1Open ↗
Showing 2 of 5 on file for this type
▸DOB NOWSite Survey: Initial4
09/03/2026M00551052-I1Open ↗
09/03/2026M00551052-A1Open ↗
08/13/2026M00551052-P5Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWAdjoining Owners Notification2
08/13/2026M00551052-S1Open ↗
08/13/2026M00551052-S2Open ↗
▸DOB NOWAdditional Insured Authorizations1
09/03/2026M00551052-I1Open ↗
▸DOB NOWFinal Survey1
09/03/2026M00551052-I1Open ↗