← Back
BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
Artists Condominium
521 WEST 23RD STREET · BIN 1012349
💬 Discuss this project
1914Year Built
10Stories
RMBuilding Class
C6-3AZoning
36,866 sfGross Floor Area
14Units
LL97 CoveredRent Stabilized28 Active Violations 1 old, status unconfirmed ▸FISP: SAFE
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 4,938 sf lot · 7.47 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsAbc Realty2 filings
RoofAbc Realty1p · 1 filing · 5 docs
Floor 9Levy-goldberg4p · 6 filings · 20 docs
Floor 8Levy-goldberg, Unit 8F, Unit 8R8 filings · 8 docs
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
Site & exteriorJerrick Associates, INC.3 filings · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Artists Condominium6303/21/2026
ABC Realty5707/08/2026
Jerrick Associates1807/08/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Code803/21/2026
Big Orange Expediting603/21/2026
William Vitacco Associates1603/21/2026
AE Design Solution603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Hudson Green CraftGeneral Contractor2207/08/2026
M DaddioGeneral Contractor1203/21/2026
Jerrick AssociatesScaffold1107/08/2026
PMC Construction and HomeGeneral Contractor303/21/2026
Jerrick AssociatesGeneral Contractor307/08/2026
Superior Plumbing, Heating & MechanicalPlumbing207/08/2026
Thomas FayFire Protection203/21/2026
Superb Plumbing & HeatingPlumbing207/08/2026
Hydrokinetic Plumbing & Heating IPlumbing107/08/2026
Emelec ElectricElectrical103/21/2026
Anesis ServicesFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Christian L. Martos Engineering5965801/30/2024
Hottenroth & Joseph Architects1160701/30/2024
Bergman Consulting Engineering253408/05/2021
NY Restoration Technology6187103/25/2021
Building Lifecycle
All (204)Filed (19)Permit Issued (36)Signed Off (10)Facade (FISP) (15)Violation (60)Inspection (10)Objection (24)Special Inspection (30)
06/20/2026
Violation issued (HPD, open)
B
06/20/2026
Violation issued (HPD, open)
C
06/20/2026
Violation issued (HPD, open)
A
06/20/2026
Violation issued (HPD, open)
A
06/20/2026
Violation issued (HPD, open)
A
06/20/2026
Violation issued (HPD, open)
A
06/20/2026
Violation issued (HPD, open)
A
06/20/2026
Violation issued (HPD, open)
A
06/20/2026
Violation issued (HPD, open)
A
06/20/2026
Violation issued (HPD, open)
A
06/20/2026
Violation issued (HPD, open)
A
06/20/2026
Violation issued (HPD, open)
A
06/20/2026
Violation issued (HPD, open)
C
06/20/2026
Violation issued (HPD, open)
B
11/05/2025
Inspection — Fail-Final PL - Up to 9 Requested Floors
Fail
View inspection ↗
10/10/2025
Filed — Alteration
Modification of exist gas piping, replacement of exist gas riser cellar - 3rd floor, Cap & remove 8 gas meters on 4,5,6,7,8,8,9,10, Installation of new gas meter in cellar as per plans attached herewith. No change in use, egress and occupancy.
M01041747-P2
10/10/2025
Special inspection requirement — Tenant Protection Plan Compliance
07/31/2025
Special inspection requirement — Tenant Protection Plan Compliance
07/28/2025
Signed off — Alteration
Modifications to existing mechanical systems. No change in use, egress or occupancy.
M00759386-I1
07/03/2025
Signed off — Alteration
COMBINATION OF APARTMENT. CREATE OPENING IN SLAB BETWEEN LEVELS AND ADD A CONVENIENCESTAIR. REMOVE/RELOCATE NON STRUCTURAL PARTITIONS ON BOTH LEVELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00762536-I1
07/02/2025
Signed off — Alteration
Modifications to existing plumbing systems. No change in use, egress or occupancy,
M00759435-I1
07/02/2025
Signed off — Alteration
M00769366-I1
07/02/2025
Signed off — Alteration
Creation of the new stair opening in existing concrete slab and design of a custom steel convenience stair.
M00759469-I1
05/27/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
05/09/2025
Violation issued (HPD, open)
B
05/09/2025
Violation issued (HPD, open)
C
05/09/2025
Violation issued (HPD, open)
C
05/09/2025
Violation issued (HPD, closed)
A
05/09/2025
Violation issued (HPD, open)
C
05/09/2025
Violation issued (HPD, open)
B
05/09/2025
Violation issued (HPD, open)
B
05/09/2025
Violation issued (HPD, open)
B
05/09/2025
Violation issued (HPD, open)
C
05/09/2025
Violation issued (HPD, closed)
B
05/09/2025
Violation issued (HPD, closed)
B
05/09/2025
Violation issued (HPD, closed)
B
05/09/2025
Violation issued (HPD, open)
B
04/30/2025
Filed — Alteration
Modification of exist gas piping, replacement of exist gas riser cellar - 3rd floor, Cap & remove 8 gas meters on 4,5,6,7,8,8,9,10, Installation of new gas meter in cellar as per plans attached herewith. No change in use, egress and occupancy.
M01041747-P1
03/07/2025
Inspection — Fail-Final PL - Up to 9 Requested Floors
Fail
View inspection ↗
03/07/2025
Special inspection requirement — Tenant Protection Plan Compliance
01/29/2025
Permit issued — Plumbing
M01041747-I1-PL
10/25/2024
Permit issued — Plumbing
M01041747-I1-PL
10/01/2024
Filed — Alteration
Modification of exist gas piping, replacement of exist gas riser cellar - 3rd floor, Cap & remove 8 gas meters on 4,5,6,7,8,8,9,10, Installation of new gas meter in cellar as per plans attached herewith. No change in use, egress and occupancy.
M01041747-I1
06/03/2024
Permit issued — General Construction
M00762536-I1-GC
06/03/2024
Permit issued — Structural
M00769366-I1-ST
06/03/2024
Permit issued — Structural
M00759469-I1-ST
06/03/2024
Permit issued — Mechanical Systems
M00759386-I1-MS
04/30/2024
Violation issued (HPD, closed)
C
04/30/2024
Violation issued (HPD, open)
B
04/30/2024
Violation issued (HPD, closed)
C
04/30/2024
Violation issued (HPD, open)
B
04/30/2024
Violation issued (HPD, open)
C
04/05/2024
Violation issued (ECB, open)
Boilers
03/11/2024
Signed off — Alteration
M00460879-I1
02/28/2024
Permit issued — General Construction
M00762536-I1-GC
02/27/2024
Permit issued — Mechanical Systems
M00759386-I1-MS
02/27/2024
Permit issued — Structural
M00769366-I1-ST
02/27/2024
Permit issued — Structural
M00759469-I1-ST
01/31/2024
Special inspection requirement — Post-installed Anchors
Christian Martos
01/31/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
David Hottenroth
Latest 60 of 204 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedSuperb Plumbing & Heating01/29/2025
DOB NOWPlumbingPermit IssuedSuperb Plumbing & Heating10/25/2024
DOB NOWGeneral ConstructionSigned-offHudson Green Craft06/03/2024
DOB NOWStructuralSigned-offHudson Green Craft06/03/2024
DOB NOWStructuralSigned-offHudson Green Craft06/03/2024
DOB NOWMechanical SystemsSigned-offHudson Green Craft06/03/2024
DOB NOWGeneral ConstructionSigned-offHudson Green Craft02/28/2024
DOB NOWMechanical SystemsSigned-offHudson Green Craft02/27/2024
DOB NOWStructuralSigned-offHudson Green Craft02/27/2024
DOB NOWStructuralSigned-offHudson Green Craft02/27/2024
DOB NOWGeneral ConstructionSigned-offHudson Green Craft06/17/2023
DOB NOWStructuralSigned-offHudson Green Craft05/26/2023
DOB NOWMechanical SystemsSigned-offHudson Green Craft05/26/2023
DOB NOWStructuralSigned-offHudson Green Craft05/26/2023
DOB NOWPlumbingSigned-offHydrokinetic Plumbing & Heating I03/31/2023
DOB NOWSprinklersSigned-offThomas Fay03/29/2023
DOB NOWStructuralSigned-offHudson Green Craft02/24/2023
DOB NOWGeneral ConstructionSigned-offHudson Green Craft02/23/2023
DOB NOWStructuralSigned-offHudson Green Craft02/23/2023
DOB NOWMechanical SystemsSigned-offHudson Green Craft02/23/2023
DOB NOWStructuralSigned-offM Daddio01/30/2023
DOB NOWStructuralSigned-offM Daddio01/30/2023
DOB NOWSidewalk ShedSigned-offGE 2A Construction01/20/2023
DOB NOWMechanical SystemsSigned-offM Daddio01/19/2023
DOB NOWGeneral ConstructionSigned-offM Daddio01/06/2023
DOB NOWGeneral ConstructionSigned-offGE 2A Construction05/04/2022
DOB NOWSupported ScaffoldSigned-offGE 2A Construction01/25/2022
DOB NOWSidewalk ShedSigned-offGE 2A Construction01/25/2022
DOB NOWPlumbingSigned-offSuperior Plumbing, Heating07/13/2021
DOB NOWGeneral ConstructionSigned-offGE 2A Construction04/30/2021
DOB NOWSidewalk ShedSigned-offGE 2A Construction02/01/2021
DOB NOWSupported ScaffoldSigned-offGE 2A Construction02/01/2021
DOB NOWMechanical SystemsSigned-offPMC Construction and Home02/01/2021
DOB NOWPlumbingSigned-offSuperior Plumbing, Heating08/03/2020
DOB NOWSidewalk ShedPermit IssuedGE 2A Construction03/17/2020
DOB NOWSidewalk ShedPermit IssuedGE 2A Construction06/13/2019
BISOTISSUEDPMC Construction and Home07/21/2020
BISSPISSUEDNonstop Plumbers10/01/2018
BISPLISSUEDAuthentic Plumbing10/01/2018
BIS—ISSUEDNTS Contractors05/18/2018
+ 46 more permits on file
1 project · most recent 06/23/2022
FiledStatusContractorScope
06/23/2022Signed-offThomas Fay29 heads
1 project · most recent 10/10/2025
Gas
FiledStatusContractorScope
10/10/2025Permit IssuedSuperb Plumbing & HeatingGas
2 projects · most recent 07/20/2020
General Wiring
FiledStatusContractorScope
07/20/2020CompleteA.davino Electrical Cont'g CoGeneral Wiring
06/11/2019CompleteBorowide Elect'l Contractors—
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
11/05/2025Fail-Final PL - Up to 9 Requested FloorsFailView ↗
05/27/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
03/07/2025Fail-Final PL - Up to 9 Requested FloorsFailView ↗
12/28/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/19/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/13/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/06/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/17/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/13/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/28/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
10/10/2025Tenant Protection Plan Compliance—special
07/31/2025Tenant Protection Plan Compliance—special
03/07/2025Tenant Protection Plan Compliance—special
01/31/2024Post-installed AnchorsChristian Martosspecial
01/31/2024Fire-Resistant Penetrations and JointsDavid Hottenrothspecial
01/26/2024Fire-Resistant Penetrations and JointsDavid Hottenrothspecial
01/26/2024Post-installed AnchorsChristian Martosspecial
09/08/2023Fire-Resistant Penetrations and JointsDavid Hottenrothspecial
09/08/2023Post-installed AnchorsChristian Martosspecial
08/15/2022Structural Stability – Alterations of existing buildingsChristian Martosspecial
08/12/2022Structural Stability – Alterations of existing buildingsChristian Martosspecial
06/27/2022Structural Steel - High Strength BoltingChristian Martosspecial
06/27/2022Structural Steel - WeldingChristian Martosspecial
06/27/2022Post-installed AnchorsChristian Martosspecial
06/27/2022Structural Steel - DetailsChristian Martosspecial
06/23/2022Post-installed AnchorsChristian Martosspecial
06/23/2022Fire-Resistant Penetrations and JointsDavid Hottenrothspecial
06/23/2022Maintenance informationDavid Hottenrothenergy_progress
06/23/2022HVAC-R and service water heating equipmentDavid Hottenrothenergy_progress
06/23/2022HVAC-R and service water piping design and insulationDavid Hottenrothenergy_progress
06/23/2022HVAC-R and service water heating system controlsDavid Hottenrothenergy_progress
06/23/2022Fire-Resistant Penetrations and JointsDavid Hottenrothspecial
06/23/2022Post-installed AnchorsChristian Martosspecial
06/22/2022Fire-Resistant Penetrations and JointsDavid Hottenrothspecial
06/16/2022Sprinkler SystemsDavid Hottenrothspecial
Latest 25 of 37.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Levy-goldbergResidentialFloors 8, 9
Project M00759435 Alteration · LOC Issued · 06/24/2022
Project M00759386 Alteration · LOC Issued · 06/23/2022
Project M00759408 Alteration · Permit Entire · 06/23/2022
Project M00762536 Alteration · LOC Issued · 06/23/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 733 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch12
09/04/2026M00479153-I1Request digital key ↗
09/02/2026M00759386-I1Request digital key ↗
09/02/2026M00759408-I1Request digital key ↗
Showing 3 of 12 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/05/2026M00317246-P1Request digital key ↗
08/14/2026M00317246-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/05/2026M00178458-I1Request digital key ↗
09/04/2026M00460864-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/05/2026M00317247-I1Request digital key ↗
08/15/2026M00317247-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/04/2026M00460879-I1Request digital key ↗
▸Applications & Permits127
▸BISPLAN / WORK APPROVAL APPLICATION72
03/29/2023101991695Open ↗
03/17/2023104860571Open ↗
03/17/2023101991695Open ↗
Showing 3 of 72 on file for this type
▸BISWORK PERMIT APPLICATION53
07/21/2020123841414Open ↗
05/18/2018123090528Open ↗
08/15/2017123090528Open ↗
Showing 3 of 53 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
11/27/2018123090528Open ↗
Showing 1 of 2 on file for this type
▸Seals & Professional Certifications152
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION68
03/13/2020123724639Open ↗
02/18/2020123841414Open ↗
02/18/2020123841414Open ↗
Showing 3 of 68 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature22
09/28/2026M00759386-I1Open ↗
09/28/2026M00759386-I1Open ↗
09/28/2026M00759386-I1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature19
09/05/2026M00178458-I1Open ↗
09/05/2026M00317247-P1Open ↗
09/05/2026M00317247-I1Open ↗
Showing 3 of 19 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/28/2026M00759386-I1Open ↗
09/28/2026M00759386-I1Open ↗
09/28/2026M00759386-I1Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment57
▸BISSCHEDULE B - PLUMBING15
03/02/2018140636088Open ↗
Showing 1 of 15 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE13
09/17/2018123090528Open ↗
03/06/2018123090528Open ↗
Showing 2 of 13 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT10
06/05/2019123090528Open ↗
12/18/2018121331549Open ↗
11/02/2018121331549Open ↗
Showing 3 of 10 on file for this type
▸BISEQUIPMENT USE PERMITS9
06/05/2019123090528Open ↗
12/18/2018121331549Open ↗
11/02/2018121331549Open ↗
Showing 3 of 9 on file for this type
▸BISSELF-CERT PLUMBING NOTICE7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION3
12/18/2018121331549Open ↗
12/18/2018121331549Open ↗
11/02/2018121331549Open ↗
▸Safety & Tenant Protection44
▸DOB NOWHPD-1: Anti-Harassment Area Checklist19
09/02/2026M00759386-I1Open ↗
08/15/2026M00759469-I1Open ↗
08/14/2026M00317246-I1Open ↗
Showing 3 of 19 on file for this type
▸BISANTI-HARASSMENT CHECKLIST8
04/07/2020123724639Open ↗
02/18/2020123841414Open ↗
Showing 2 of 8 on file for this type
▸BISHPD-1 - Anti-Harassment Area Checklist6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISTenant Protection Plan and Notes5
03/13/2020123724639Open ↗
02/18/2020123841414Open ↗
Showing 2 of 5 on file for this type
▸DOB NOWTenant Protection Plan4
08/14/2026M00317246-I1Open ↗
08/13/2026M00317247-P1Open ↗
08/13/2026M00317246-P1Open ↗
Showing 3 of 4 on file for this type
▸BISHPD: CERTIFICATE OF NO HARASSMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISST-1: Street Tree Checklist1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos39
▸DOB NOWDEP ACP-5: Asbestos Assessment Report16
09/05/2026M00317247-I1Open ↗
09/02/2026M00759386-I1Open ↗
08/28/2026M00759435-P1Open ↗
Showing 3 of 16 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)10
03/13/2020123724639Open ↗
02/18/2020123841414Open ↗
Showing 2 of 10 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance41
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS24
03/13/2020123724639Open ↗
02/18/2020123841414Open ↗
04/23/2019123090528Open ↗
Showing 3 of 24 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS7
10/15/2021123090528Open ↗
08/18/2021123841414Open ↗
10/10/2018122927315Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
08/18/2021123841414Open ↗
08/18/2021123841414Open ↗
08/18/2021123841414Open ↗
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWEN2: As Built Energy Analysis2
09/02/2026M00759386-I1Open ↗
08/13/2026M00479153-I1Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports18
▸BISTECHNICAL REPORT: RESPONSIBILITY14
11/21/2023103857195Open ↗
11/21/2023103857195Open ↗
11/03/2023103857195Open ↗
Showing 3 of 14 on file for this type
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19752
03/08/2023104860571Open ↗
03/01/2023103857195Open ↗
▸BIS* STRUCTURAL STABILITY 1 RCNY:16-011
03/08/2023103857195Open ↗
▸BISBORINGS / TEST PITS (TR-4) 27-7201
07/12/2019123090528Open ↗
▸Approvals, Objections & Sign-offs78
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST45
11/22/2023103857195Open ↗
03/27/2023104860571Open ↗
10/15/2021123090528Open ↗
Showing 3 of 45 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION12
10/15/2021123090528Open ↗
07/12/2019123090528Open ↗
06/17/2019123090528Open ↗
Showing 3 of 12 on file for this type
▸BISADMINISTRATIVE OBJECTIONS10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE8
07/30/2019123090528Open ↗
05/09/2019123090528Open ↗
Showing 2 of 8 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
09/04/2026M00460864-I1Open ↗
08/13/2026M00460879-I1Open ↗
▸BISSUPERSEDING LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership44
▸BISCOST AFFIDAVIT41
10/15/2021123090528Open ↗
08/18/2021123841414Open ↗
03/13/2020123724639Open ↗
Showing 3 of 41 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
03/08/2023103857195Open ↗
02/22/2023104860571Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
08/18/2021123841414Open ↗
▸Filing & Intake Forms94
▸BISBOROUGH INTAKE FORM33
10/15/2021123090528Open ↗
10/07/2021121331549Open ↗
10/07/2021121331549Open ↗
Showing 3 of 33 on file for this type
▸BISADDITIONAL INFORMATION32
09/19/2019123090528Open ↗
09/24/2018123090528Open ↗
03/23/2018123090528Open ↗
Showing 3 of 32 on file for this type
▸BISEFILING COVER SHEET22
03/13/2020123724639Open ↗
02/18/2020123841414Open ↗
Showing 2 of 22 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸Other Documents16
▸BISPLOT DIAGRAM6
12/18/2018121331549Open ↗
11/02/2018121331549Open ↗
07/11/2018121331549Open ↗
Showing 3 of 6 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
07/12/2019123090528Open ↗
06/17/2019123090528Open ↗
11/02/2018121331549Open ↗
Showing 3 of 4 on file for this type
▸BIS* VENT. SYS.-ENGINEER/INSTALLER 27-136,7791
08/18/2023103857195Open ↗
▸BISDepartment of Consumer Affairs (DCA) Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BIS* FIRE STOPS 27-3451
03/08/2023104860571Open ↗
▸BISTax Abatement Miscellaneous1
10/15/2021123090528Open ↗
▸DOB NOWMultiple Dwelling Special District Feasibility of Government Funded Rehabilitation1
08/13/2026M00178458-I1Open ↗
▸DOB NOWMultiple Dwelling Special District Notice to Community Board1
08/13/2026M00178458-I1Open ↗