RoofUnder Construction13p · 9 filings · 20 docs
ArchitectureEquipmentFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural · Supported Scaffold
HEREWITH FILING FOR REMOVAL OF OLD CHILLER AND INSTALLATION OF NEW CHILLER ON EXISTING DUNAGE AS PER PLANS. NO CHANGE TO USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
4 documents · 1 drawing sheet
Facade repairs as per drawings. No change to use, egress or occupancy.
On file for this project
16 documents · 1 drawing sheet
MODIFICATIONS TO EXISTING SPRINKLER SYSTEM AND RELATED PIPING ON 1ST FLOOR, 6TH FLOOR AND ROOF AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
9 documents · 1 drawing sheet
Latest 3 of 9 filings on this floor.
BulkheadUnder Construction1p · 1 filing · 7 docs
Equipment
Installation of suspended scaffold for facade work or inspection
On file for this project
7 documents · 1 drawing sheet
Floor 101 filing · 12 docs
ArchitectureEquipmentMechanicalStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Structural · Supported Scaffold
MODIFICATIONS TO HVAC EQUIPMENT AND INSTALLATION OF EMERGENCY GENERATOR, COOLING TOWERS AND CHILLERS AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
15 documents
Floor 91 filing · 12 docs
ArchitectureEquipmentMechanicalStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Structural · Supported Scaffold
MODIFICATIONS TO HVAC EQUIPMENT AND INSTALLATION OF EMERGENCY GENERATOR, COOLING TOWERS AND CHILLERS AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
15 documents
Floor 81p · 3 filings · 12 docs
ArchitectureEquipmentFire ProtectionMechanicalStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Sprinklers · Structural · Supported Scaffold
MODIFICATIONS TO HVAC EQUIPMENT AND INSTALLATION OF EMERGENCY GENERATOR, COOLING TOWERS AND CHILLERS AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
15 documents
PROPOSED WALK-IN FREEZER ON 8TH FLOOR. THERE IS NO CHANGE OCCUPANCY, USE OR EGRESS.
On file for this project
5 documents
PROPOSED TO INSTALL, RELOCATE AND REPLACE SPRINKLER HEADS ON PART OF THE 8TH FLOOR AS INDICATED. THERE IS NO CHANGE OF OCCUPANCY, USE OR EGRESS.
On file for this project
9 documents · 1 drawing sheet
Floor 73p · 5 filings · 12 docs
ArchitectureEquipmentFire ProtectionMechanicalStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Sprinklers · Structural · Supported Scaffold
MODIFICATIONS TO HVAC EQUIPMENT AND INSTALLATION OF EMERGENCY GENERATOR, COOLING TOWERS AND CHILLERS AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
15 documents
INSTALL OR RELOCATE THE SPRINKLE HEADS AT BOOTH AREA AS THE PLAN SHOWN. THERE IS NO CHANGE OCCUPANCY, USE OR EGRESS
On file for this project
5 documents · 1 drawing sheet
TENANT IMPROVEMENT FIT OUT OF TENANT SPACE AT PART OF 7TH FLOOR AS THE PLAN SHOWN. WORK TO INCLUDE BOOTHS AREAS. THERE IS NO CHANGE OCCUPANCY, USE OR EGRESS.
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 68p · 5 filings · 12 docs
ArchitectureDMEquipmentFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural · Supported Scaffold
MODIFICATIONS TO EXISTING SPRINKLER SYSTEM AND RELATED PIPING ON 1ST FLOOR, 6TH FLOOR AND ROOF AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
9 documents · 4 drawing sheets
MODIFICATIONS TO PLUMBING FIXTURES AND PIPING AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
14 documents · 1 drawing sheet
MODIFICATIONS TO HVAC EQUIPMENT AND INSTALLATION OF EMERGENCY GENERATOR, COOLING TOWERS AND CHILLERS AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
15 documents · 3 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 52p · 2 filings
ArchitectureDMEquipmentFire ProtectionMechanicalStructural
Issued Permit Scope
Boiler Equipment · General Construction · Sprinklers · Structural · Supported Scaffold
Modification to sprinkler system on the CEL, 1, 2,5,6 FLRS. Removal of SP heads on Cel, 1,5 and 6 FLRS and install a new Temporary Sprinkler system on CEL, 1,2,5,6 FLRS. No change to egress and occupancy.
On file for this project
7 documents · 2 drawing sheets
Removal of the Pre-action sprinkler system on the 2nd and 6th FLRS. No change to use, egress or occupancy.
On file for this project
5 documents
Floor 41 filing
ArchitectureEquipmentFire ProtectionMechanicalStructural
Issued Permit Scope
Boiler Equipment · General Construction · Sprinklers · Structural · Supported Scaffold
Removal of the Pre-action sprinkler system on the 2nd and 6th FLRS. No change to use, egress or occupancy.
On file for this project
5 documents
Floor 31 filing
ArchitectureEquipmentFire ProtectionMechanicalStructural
Issued Permit Scope
Boiler Equipment · General Construction · Sprinklers · Structural · Supported Scaffold
Removal of the Pre-action sprinkler system on the 2nd and 6th FLRS. No change to use, egress or occupancy.
On file for this project
5 documents
Floor 221p · 7 filings
ArchitectureEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural · Supported Scaffold
LOADING DOCK REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
14 documents
REMOVE AND INSTALL FIRE PROTECTION EQUIPMENT AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
9 documents · 4 drawing sheets
INSTALLATION OF NEW PLUMBING FIXTURES AND ASSOCIATED PIPING AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
6 documents · 1 drawing sheet
Latest 3 of 7 filings on this floor.
Floor 115p · 8 filings · 12 docs
ArchitectureEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Supported Scaffold
MODIFICATIONS TO EXISTING SPRINKLER SYSTEM AND RELATED PIPING ON 1ST FLOOR, 6TH FLOOR AND ROOF AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
9 documents · 1 drawing sheet
MODIFICATIONS TO HVAC EQUIPMENT AND INSTALLATION OF EMERGENCY GENERATOR, COOLING TOWERS AND CHILLERS AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
15 documents · 1 drawing sheet
HEREWITH FILING MECHANICAL WORK AS PER PLANS. NO CHANGE TO USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
6 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Cellar3 filings · 15 docs
ArchitectureFire ProtectionMechanicalStructural
Issued Permit Scope
Boiler Equipment · Mechanical Systems · Protection and Mechanical Methods · Sprinklers
INSTALLATION OF TEMPORARY WORKING PLATFORM AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. THE WORK PLATFORM INSIDE THE EXISTING SHAFT COLUMN FROM THE CELLAR LEVEL TI THE MAIN ROOF LEVEL.
On file for this project
3 documents
HEREWITH FILING MECHANICAL WORK AS PER PLANS. NO CHANGE TO USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
6 documents
Modification to sprinkler system on the CEL, 1, 2,5,6 FLRS. Removal of SP heads on Cel, 1,5 and 6 FLRS and install a new Temporary Sprinkler system on CEL, 1,2,5,6 FLRS. No change to egress and occupancy.
On file for this project
7 documents
Site & exteriorUnder Construction10 filings · 20 docs
ArchitectureElectricalEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Sidewalk Shed · Supported Scaffold
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. all work shall comply with chapter 33 of nycbc
On file for this project
3 documents · 4 drawing sheets
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
3 documents · 9 drawing sheets
Facade repairs as per drawings. No change to use, egress or occupancy.
On file for this project
16 documents · 12 drawing sheets
Latest 3 of 10 filings on this floor.
Filed — no permit issued1 filing · 3 docs
Mechanical
INSTALLATION OF 275 GALLON DAY TANK FOR EMERGENCY GENERATOR INSTALLED ON THE ROOF AS PER PLANS SUBMITTED HEREWITH, NO CHANGE IN USE, EGRESS OR OCCUPANCY GROUP.
On file for this project
3 documents · 3 drawing sheets