Condo, office space
Mer Prop/521-533 W 57th St Condominium
521 WEST 57TH STREET · BIN 1027074
💬 Discuss this project
1927Year Built
10Stories
RBBuilding Class
M1-5Zoning
332,376 sfGross Floor Area
2Units
LL97 Covered0 Active ViolationsFISP: SAFE
Condo, office space · 42,677 sf lot · 7.79 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsMount Sinai Health SystemUnder Construction5 filings
RoofThe International Multiple Sclerosis Management Practice - I17p · 10 filings · 20 docs
Bulkhead521-533 West 57th Street AssociatesUnder Construction1p · 1 filing · 7 docs
Floor 10Meringoff Properties, INC.1 filing · 12 docs
Floor 9Meringoff Properties, INC.1 filing · 12 docs
Floor 8IFF1p · 3 filings · 12 docs
Floor 7IFF3p · 5 filings · 12 docs
Floor 6Meringoff Properties, INC.10p · 5 filings · 12 docs
Floor 5Meringoff Properties, INC.2p · 2 filings
Floor 4Meringoff Properties, INC.1 filing
Floor 3Meringoff Properties, INC.1 filing
Floor 2Dcas / NYPD21p · 7 filings
Floor 1Dcas / NYPD15p · 8 filings · 12 docs
CellarMeringoff Properties, INC.1p · 4 filings · 15 docs
Site & exteriorMeringoff PropertiesUnder Construction10 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Meringoff Properties11707/08/2026
521-533 West 57th St Associates7810/02/2026
521-533 W 57 St Condominium5903/21/2026
IFF1709/13/2026
521-533 LLC1503/21/2026
Jerrick Associates603/22/2026
Mer Properties 521-533 W 57th St Condo403/21/2026
57 Street Luce203/21/2026
521-533 W 57th103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Jack Green Associates203/25/2026
Socotec303/05/2026
Paul Perdek, Prof. Engineering211/05/2025
Imtiaz Mulla209/29/2025
Rimkus109/24/2025
KN3 Engineering108/26/2025
Jaros Baum & Bolles807/25/2025
Perkins and Will207/16/2025
Gilsanz Murray Steficek407/11/2025
Urban Integrations103/03/2025
Andres Diaz Architect211/19/2024
Galligan Associates105/07/2024
Robert Derector Associates505/02/2023
Enthink Engineers302/17/2023
Ospino Engineering101/24/2023
Vocon107/28/2022
Mottola Rini Engineers411/10/2021
Wavic Engineering310/07/2021
VL Architects208/26/2021
Green Design303/10/2021
MG Engineering208/14/2020
Royal T&E311/07/2019
Scalar Architecture103/05/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE Design Solution803/21/2026
Socotec203/21/2026
Kma Designs203/21/2026
United Safety Consultants103/21/2026
Municipal Building Consultants203/21/2026
Metropolis Group4203/21/2026
Conroy Construction103/21/2026
Code203/21/2026
Skyline Access103/21/2026
Rybak Development203/21/2026
PS Engineers403/21/2026
Jme Building Consulting203/21/2026
New York Phyle103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Everest ScaffoldingScaffold1110/04/2026
Avarga ConstructionScaffold604/09/2026
Andamio ScaffoldingScaffold507/08/2026
Reyco ServicesGeneral Contractor507/08/2026
Benchmark BuildersGeneral Contractor403/21/2026
D&E Refrigeration & Airspecialty_contractor303/21/2026
Spring ScaffoldingScaffold303/21/2026
KlaraconGeneral Contractor307/08/2026
MetroFire Protection307/08/2026
Phoenix Plumbing & MechanicalFire Protection207/08/2026
East Coast PetroleumGeneral Contractor203/21/2026
Gem Air Conditioningspecialty_contractor203/21/2026
James E FitzgeraldGeneral Contractor207/08/2026
Jerrick AssociatesScaffold203/21/2026
Kings Group NYScaffold209/25/2026
Armon MechanicalFire Protection207/08/2026
Orbit SprinklerFire Protection207/08/2026
Update Systems ElectricalElectrical103/22/2026
Full Capacity FireFire Protection107/08/2026
Schlesinger Elect'l ContractingElectrical103/21/2026
Pinpoint ElectricElectrical103/22/2026
A&A PlumbingPlumbing107/08/2026
Armon MechanicalPlumbing107/08/2026
Borowide Elect'l ContractorsElectrical103/21/2026
Conroy ConstructionGeneral Contractor104/09/2026
Citiline Restorationspecialty_contractor104/09/2026
Cannon Mechanicalspecialty_contractor107/08/2026
Citiline RestorationScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Jack Green Associates422203/25/2026
Socotec301303/05/2026
A&B World Consulting5704209/29/2025
Mohammad Ahead - Professi9286108/26/2025
Milrose Consultants20032007/25/2025
Francisco D. Perez PE3306211/19/2024
PSI Agency254105/07/2024
Special Inspection Services1200305/02/2023
Mottola Rini Engineers, P3251411/10/2021
Wavic Engineering1733310/07/2021
Building Lifecycle
All (280)Filed (58)Permit Issued (51)Signed Off (27)Facade (FISP) (12)Violation (60)Inspection (19)Objection (23)Special Inspection (30)
10/01/2026
Permit issued — Suspended Scaffold
M01274142-I1-SC
09/24/2026
Permit issued — Sidewalk Shed
M01291254-I1-SH
07/02/2026
Signed off — Alteration
M01197592-I1
04/23/2026
Objection raised — Admin
04/23/2026
Objection raised — Mechanical
04/23/2026
Objection raised — Mechanical
04/23/2026
Objection raised — Mechanical
04/23/2026
Objection raised — Fire_Protection
04/23/2026
Objection raised — Mechanical
04/23/2026
Objection raised — Cost
04/23/2026
Objection raised — Fire_Protection
04/23/2026
Objection raised — Mechanical
04/23/2026
Objection raised — Inspections
04/23/2026
Objection raised — Mechanical
04/23/2026
Objection raised — Mechanical
04/23/2026
Objection raised — Energy
04/08/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
03/26/2026
Violation issued (ECB, closed)
Unknown
03/25/2026
Filed — Alteration
INSTALLATION OF 275 GALLON DAY TANK FOR EMERGENCY GENERATOR INSTALLED ON THE ROOF AS PER PLANS SUBMITTED HEREWITH, NO CHANGE IN USE, EGRESS OR OCCUPANCY GROUP.
M01368150-I1
03/09/2026
Special inspection requirement — Final
Stanford Chan
03/09/2026
Special inspection requirement — Masonry
Stanford Chan
03/05/2026
Filed — Alteration
Facade repairs as per drawings. No change to use, egress or occupancy.
M01261178-P2
01/27/2026
Signed off — Alteration
M00813718-I1
01/26/2026
Permit issued — Sidewalk Shed
M00813718-I1-SH
01/23/2026
Permit issued — Mechanical Systems
M01197592-I1-MS
01/16/2026
Special inspection requirement — Final
Stanford Chan
01/16/2026
Special inspection requirement — Masonry
Stanford Chan
11/05/2025
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01310324-I1
11/05/2025
Permit issued — Supported Scaffold
M01310324-I1-SF
10/20/2025
Permit issued — General Construction
M01261178-I1-GC
10/17/2025
Signed off — Alteration
MODIFICATIONS TO PLUMBING FIXTURES AND PIPING AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00848287-I1
10/15/2025
Filed — Alteration
Facade repairs as per drawings. No change to use, egress or occupancy.
M01261178-P1
10/06/2025
Permit issued — Suspended Scaffold
M01274142-I1-SC
10/03/2025
Objection resolved — Addressed
10/02/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/30/2025
Signed off — Alteration
MODIFICATIONS TO HVAC EQUIPMENT AND INSTALLATION OF EMERGENCY GENERATOR, COOLING TOWERS AND CHILLERS AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00848230-I1
09/29/2025
Filed — Alteration
M01197592-I1
09/25/2025
Permit issued — Sidewalk Shed
M01291254-I1-SH
09/24/2025
Filed — Alteration
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. all work shall comply with chapter 33 of nycbc
M01291254-I1
09/18/2025
Special inspection requirement — HVAC-R and service water heating equipment
Christopher Drutjons
09/18/2025
Special inspection requirement — Lighting controls
Christopher Drutjons
09/18/2025
Special inspection requirement — Metering
Christopher Drutjons
09/18/2025
Special inspection requirement — Final
Christopher Drutjons
09/18/2025
Special inspection requirement — Electrical motors and elevators
Christopher Drutjons
09/18/2025
Special inspection requirement — Energy Code Compliance Inspections
Christopher Drutjons
09/18/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Christopher Drutjons
09/18/2025
Special inspection requirement — Duct leakage testing, insulation and design
Christopher Drutjons
09/18/2025
Special inspection requirement — Interior lighting power
Christopher Drutjons
09/18/2025
Special inspection requirement — HVAC-R and service water heating system controls
Christopher Drutjons
09/18/2025
Special inspection requirement — Mechanical Systems
Christopher Drutjons
09/18/2025
Special inspection requirement — Shutoff dampers
Christopher Drutjons
09/18/2025
Special inspection requirement — Maintenance information
Christopher Drutjons
09/18/2025
Special inspection requirement — Emergency and Standby Power Systems (Generator)
Christopher Drutjons
09/18/2025
Special inspection requirement — Post-installed Anchors
Christopher Drutjons
09/18/2025
Special inspection requirement — Heating Systems
Christopher Drutjons
09/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Drutjons
09/12/2025
Signed off — Alteration
MODIFICATIONS TO EXISTING SPRINKLER SYSTEM AND RELATED PIPING ON 1ST FLOOR, 6TH FLOOR AND ROOF AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00848250-I1
09/09/2025
Filed — Alteration
Facade repairs as per drawings. No change to use, egress or occupancy.
M01261178-I1
09/08/2025
Objection raised — Structural
09/08/2025
Objection resolved — Addressed
Latest 60 of 280 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedCitiline Restoration10/01/2026
DOB NOWSidewalk ShedPermit IssuedKings Group NY09/24/2026
DOB NOWSidewalk ShedSigned-offAvarga Construction01/26/2026
DOB NOWMechanical SystemsSigned-offConroy Construction01/23/2026
DOB NOWSupported ScaffoldPermit IssuedCitiline Restoration11/05/2025
DOB NOWGeneral ConstructionPermit IssuedCitiline Restoration10/20/2025
DOB NOWSuspended ScaffoldPermit IssuedCitiline Restoration10/06/2025
DOB NOWSidewalk ShedPermit IssuedKings Group NY09/25/2025
DOB NOWBoiler EquipmentSigned-offRanshaw Plumbing & Heating08/04/2025
DOB NOWBoiler EquipmentSigned-offRanshaw Plumbing & Heating06/17/2025
DOB NOWSuspended ScaffoldPermit IssuedSkyline Restoration03/17/2025
DOB NOWProtection and Mechanical MethodsSigned-offSpring Scaffolding03/04/2025
DOB NOWSidewalk ShedSigned-offAvarga Construction01/22/2025
DOB NOWSprinklersSigned-offFull Capacity Fire01/09/2025
DOB NOWPlumbingSigned-offA&A Plumbing01/09/2025
DOB NOWMechanical SystemsSigned-offCannon Mechanical01/07/2025
DOB NOWStructuralSigned-offBenchmark Builders01/06/2025
DOB NOWGeneral ConstructionSigned-offBenchmark Builders01/06/2025
DOB NOWSuspended ScaffoldPermit IssuedTribute Restoration10/11/2024
DOB NOWSprinklersSigned-offMetro07/10/2024
DOB NOWMechanical SystemsSigned-offD&E Refrigeration & Air07/03/2024
DOB NOWMechanical SystemsSigned-offEast Coast Petroleum05/08/2024
DOB NOWSidewalk ShedSigned-offAvarga Construction01/22/2024
DOB NOWStructuralSigned-offKlaracon12/18/2023
DOB NOWStructuralSigned-offKlaracon11/06/2023
DOB NOWSidewalk ShedSigned-offAvarga Construction01/25/2023
DOB NOWSupported ScaffoldSigned-offAndamio Scaffolding11/17/2022
DOB NOWMechanical SystemsSigned-offGem Air Conditioning09/16/2022
DOB NOWPlumbingSigned-offArmon Mechanical09/12/2022
DOB NOWStandpipeSigned-offArmon Mechanical09/12/2022
DOB NOWSprinklersSigned-offArmon Mechanical09/12/2022
DOB NOWMechanical SystemsSigned-offJames E Fitzgerald08/23/2022
DOB NOWGeneral ConstructionSigned-offJames E Fitzgerald08/22/2022
DOB NOWSprinklersSigned-offMetro11/18/2021
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding09/17/2021
DOB NOWGeneral ConstructionSigned-offReyco Services09/16/2021
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding09/16/2021
DOB NOWMechanical SystemsPermit IssuedReyco Services09/09/2021
DOB NOWSprinklersPermit IssuedOrbit Sprinkler09/03/2021
DOB NOWGeneral ConstructionSigned-offReyco Services07/21/2021
+ 60 more permits on file
1 project · most recent 08/25/2021
Associated Ducts and Piping
FiledStatusContractorScopeMake / Model / Capacity
08/25/2021Permit IssuedReyco ServicesAssociated Ducts and Piping
Ducts & Piping
Acme Sheet Metal SHEETMETAL DUCTWORK 4 tons · Ductwork ×1
3 projects · most recent 11/10/2021
FiledStatusContractorScope
11/10/2021Signed-offMetro92 heads
10/07/2021Permit IssuedOrbit Sprinkler24 heads
06/30/2020Permit IssuedGW Mechanical335 heads
1 project · most recent 06/30/2020
FiledStatusContractorScope
06/30/2020———
21 projects · most recent 05/19/2026
General Wiring Boiler Controls
FiledStatusContractorScope
05/19/2026CompleteLive Wire Electric 1General Wiring
04/22/2026Permit IssuedDenmar ElectricGeneral Wiring
04/22/2026Permit IssuedDenmar ElectricGeneral Wiring
04/21/2026Permit IssuedFirst Choice Electrical—
04/07/2026Permit IssuedHigh Quality Electric of NYC—
03/19/2026Permit IssuedDenmar ElectricGeneral Wiring
01/08/2026Permit IssuedPinpoint ElectricGeneral Wiring
08/10/2023CompleteTeam ElectricGeneral Wiring
07/14/2023Permit IssuedCogen Electrical Services—
07/14/2023Permit IssuedCogen Electrical ServicesGeneral Wiring
02/06/2023Permit IssuedSolas Electrical—
10/24/2022Permit IssuedAlliance Elevator Company—
10/28/2021Permit IssuedR.C.M. Electric—
11/18/2020Permit IssuedUpdate Systems ElectricalGeneral Wiring
08/14/2020CompleteRomcon ElectricBoiler Controls
2 projects · most recent 11/05/2025
Scaffold Sidewalk Shed
FiledStatusContractorScope
11/05/2025Permit IssuedCitiline RestorationScaffold
09/24/2025Permit IssuedKings Group NYSidewalk Shed
1 project · most recent 08/26/2025
Suspended Scaffold
FiledStatusContractorScope
08/26/2025Permit IssuedCitiline RestorationSuspended Scaffold
2 projects · most recent 08/26/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
08/26/2025Permit IssuedCitiline RestorationSuspended Scaffold (SC)
11/19/2024Permit IssuedTribute RestorationSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 19
DateTypeResultReport
04/08/2026Pass-Final Boiler Equipment InspectionPassView ↗
10/02/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/20/2025Pass-Final Boiler Equipment InspectionPassView ↗
08/12/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/11/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/05/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/05/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/09/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/16/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/19/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/14/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/13/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/13/2023Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
03/08/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/08/2023Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
11/29/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/10/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/01/2021Pass-Final SP - Up to 9 Requested FloorsPassView ↗
08/31/2021Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
03/09/2026MasonryStanford Chanspecial
03/09/2026FinalStanford Chanprogress
01/16/2026FinalStanford Chanprogress
01/16/2026MasonryStanford Chanspecial
09/18/2025HVAC-R and service water piping design and insulationChristopher Drutjonsenergy_progress
09/18/2025HVAC-R and service water heating system controlsChristopher Drutjonsenergy_progress
09/18/2025Duct leakage testing, insulation and designChristopher Drutjonsenergy_progress
09/18/2025MeteringChristopher Drutjonsenergy_progress
09/18/2025Lighting controlsChristopher Drutjonsenergy_progress
09/18/2025Electrical motors and elevatorsChristopher Drutjonsenergy_progress
09/18/2025Post-installed AnchorsChristopher Drutjonsspecial
09/18/2025Heating SystemsChristopher Drutjonsspecial
09/18/2025Mechanical SystemsChristopher Drutjonsspecial
09/18/2025Interior lighting powerChristopher Drutjonsenergy_progress
09/18/2025HVAC-R and service water heating equipmentChristopher Drutjonsenergy_progress
09/18/2025Shutoff dampersChristopher Drutjonsenergy_progress
09/18/2025Maintenance informationChristopher Drutjonsenergy_progress
09/18/2025Emergency and Standby Power Systems (Generator)Christopher Drutjonsspecial
09/18/2025Fire-Resistant Penetrations and JointsChristopher Drutjonsspecial
09/18/2025Energy Code Compliance InspectionsChristopher Drutjonsprogress
09/18/2025FinalChristopher Drutjonsprogress
08/19/2025Post-installed AnchorsMOHAMMAD AHEADspecial
08/19/2025Alternative Materials - OTCR Buildings Bulletin NumberMOHAMMAD AHEADspecial
08/04/2025Post-installed AnchorsChristopher Drutjonsspecial
08/04/2025HVAC-R and service water heating system controlsChristopher Drutjonsenergy_progress
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
International Fragrance and FlowersRetailRoof
Project M01368150 Alteration · Approved · 03/25/2026
The International Multiple Sclerosis Management Practice - ImsmpMedical / HealthcareRoof
Project M01197592 Alteration · LOC Issued · 09/29/2025
Project M08031018 Alteration · LOC Issued · 06/15/2023
Mount Sinai Health SystemMedical / HealthcareFloors 1–10, Roof
Project M00834798 Alteration · LOC Issued · 04/28/2023
Project M00849552 Alteration · LOC Issued · 04/26/2023
Dcas / NYPDGovernment / CivicFloors 1, 2, Roof
Project M00719128 Alteration · LOC Issued · 08/03/2022
Project M00719148 Alteration · LOC Issued · 08/01/2022
Project M00719162 Alteration · LOC Issued · 08/01/2022
IFFOfficeFloors 7, 8
Project M00566928 Alteration · Permit Entire · 08/26/2021
Project M00575200 Alteration · Permit Entire · 08/25/2021
Project M00575260 Alteration · LOC Issued · 08/25/2021
Project M00520354 Alteration · Permit Entire · 07/07/2021
Project M00534736 Alteration · LOC Issued · 07/07/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 1,350 on file (BIS + DOB NOW)
▸Plans & Drawings58
▸DOB NOWPlans/Sketch46
09/04/2026M00483668-I1Request digital key ↗
09/03/2026M00520354-P1Request digital key ↗
09/03/2026M00520354-I1Request digital key ↗
Showing 3 of 46 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler5
09/04/2026M00341370-I1Request digital key ↗
09/03/2026M00334242-I1Request digital key ↗
08/15/2026M00334242-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed4
09/05/2026M00109850-I1Request digital key ↗
09/05/2026M00234807-I1Request digital key ↗
09/05/2026M00290583-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold2
09/04/2026M00365397-I1Request digital key ↗
08/15/2026M00365397-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/05/2026M00234905-I1Request digital key ↗
▸Applications & Permits245
▸BISPLAN / WORK APPROVAL APPLICATION135
03/04/2025124039986Open ↗
08/09/2024100813871Open ↗
07/26/2024123829884Open ↗
Showing 3 of 135 on file for this type
▸BISWORK PERMIT APPLICATION109
10/24/2020120428858Open ↗
10/05/2020140925435Open ↗
Showing 2 of 109 on file for this type
▸DOB NOWHPD Certification Letter or CPC Special Permit1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications306
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION107
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 107 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature57
09/05/2026M00109850-I1Open ↗
09/05/2026M00234905-I1Open ↗
09/05/2026M00234807-P1Open ↗
Showing 3 of 57 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature42
09/27/2026M00848230-P1Open ↗
09/23/2026M00850451-I1Open ↗
09/21/2026M00848287-I1Open ↗
Showing 3 of 42 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT32
12/21/2020140979056Open ↗
Showing 1 of 32 on file for this type
▸DOB NOWProgress Inspector Seal & Signature30
10/03/2026M00566928-I1Open ↗
09/27/2026M00848230-P1Open ↗
09/27/2026M00848230-P1Open ↗
Showing 3 of 30 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST24
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 24 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
12/21/2020140979056Open ↗
Showing 1 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
12/21/2020140979056Open ↗
Showing 1 of 4 on file for this type
▸Trade Schedules & Equipment82
▸BISSCHEDULE B - PLUMBING23
11/21/2023120428858Open ↗
02/06/2023120428858Open ↗
02/03/2023120428858Open ↗
Showing 3 of 23 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸BISSELF-CERT PLUMBING NOTICE13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISEQUIPMENT USE PERMITS9
05/15/2024120428858Open ↗
05/15/2024120428858Open ↗
05/15/2024120428858Open ↗
Showing 3 of 9 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT4
05/15/2024120428858Open ↗
05/09/2024120428858Open ↗
02/04/2022123898425Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSTANDPIPE SYSTEMS2
12/01/2023120428858Open ↗
04/08/2021123897113Open ↗
▸BISSPRINKLER SYSTEMS2
12/01/2023120428858Open ↗
04/08/2021123897113Open ↗
▸Safety & Tenant Protection86
▸DOB NOWHPD-2: Clinton Special District Anti-Harassment Checklist52
09/05/2026M00234905-I1Open ↗
09/03/2026M00534736-I1Open ↗
09/03/2026M00575260-I1Open ↗
Showing 3 of 52 on file for this type
▸BISANTI-HARASSMENT CHECKLIST: CLINTON27
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 27 on file for this type
▸DOB NOWTenant Protection Plan3
09/05/2026M00234905-I1Open ↗
Showing 1 of 3 on file for this type
▸BISCLINTON DISTRICT: ANTI-HARASSMENT CHECKLIST2
07/11/2022123915521Open ↗
Showing 1 of 2 on file for this type
▸BISHPD-2 - Clinton Special district Anti-Harassment Checklist1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWCertificate of No Harassment1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos75
▸DOB NOWDEP ACP-5: Asbestos Assessment Report36
09/04/2026M00344809-I1Open ↗
09/03/2026M00520354-P1Open ↗
09/03/2026M00520354-I1Open ↗
Showing 3 of 36 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)24
12/21/2020140979056Open ↗
Showing 1 of 24 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS: EXEMPTION (ASB4)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
01/24/2022140907464Open ↗
▸Energy Compliance73
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS35
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 35 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY14
02/14/2022123518345Open ↗
02/14/2022140925435Open ↗
02/14/2022140925435Open ↗
Showing 3 of 14 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS12
01/21/2022140907464Open ↗
04/23/2021123571125Open ↗
11/19/2020123029748Open ↗
Showing 3 of 12 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS3
07/25/2024123829884Open ↗
02/14/2022123518345Open ↗
02/14/2022140925435Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)3
02/14/2022123518345Open ↗
02/14/2022140925435Open ↗
04/09/2021123898425Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
12/21/2020140979056Open ↗
Showing 1 of 2 on file for this type
▸BISENERGY CODE 2ND REVIEW1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
04/23/2021123571125Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports45
▸BISTECHNICAL REPORT: RESPONSIBILITY30
05/08/2024120428858Open ↗
05/08/2024120428858Open ↗
03/11/2024120428858Open ↗
Showing 3 of 30 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)5
05/08/2024120428858Open ↗
02/14/2022123518345Open ↗
02/14/2022123518345Open ↗
Showing 3 of 5 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISCONCRETE - CAST-IN-PLACE2
07/29/2024123829884Open ↗
02/05/2021123898425Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING2
07/29/2024123829884Open ↗
05/08/2024120428858Open ↗
▸BISSTRUCTURAL STEEL - WELDING2
07/29/2024123829884Open ↗
05/08/2024120428858Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
05/08/2024120428858Open ↗
▸Approvals, Objections & Sign-offs95
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST59
07/30/2024123829884Open ↗
05/13/2024120428858Open ↗
02/15/2022123518345Open ↗
Showing 3 of 59 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION12
05/16/2025124039986Open ↗
05/16/2025124039986Open ↗
05/16/2025124039986Open ↗
Showing 3 of 12 on file for this type
▸BISADMINISTRATIVE OBJECTIONS10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISFINAL5
07/25/2024123829884Open ↗
05/08/2024120428858Open ↗
02/14/2022123518345Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE4
02/24/2021120214357Open ↗
Showing 1 of 4 on file for this type
▸BISSUPERSEDING LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Cost, Insurance & Ownership102
▸BISCOST AFFIDAVIT92
02/01/2022123898425Open ↗
01/21/2022140907464Open ↗
04/26/2021123571125Open ↗
Showing 3 of 92 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW36
07/29/2024123829884Open ↗
05/08/2024120428858Open ↗
02/14/2022123518345Open ↗
Showing 3 of 6 on file for this type
▸BISDEPT OF FINANCE VERIFICATION4
03/04/2025124039986Open ↗
07/08/2022123915521Open ↗
06/15/2022123915521Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms135
▸BISEFILING COVER SHEET57
03/04/2025124039986Open ↗
06/02/2022123915521Open ↗
Showing 2 of 57 on file for this type
▸BISADDITIONAL INFORMATION48
05/16/2025124039986Open ↗
03/11/2024120428858Open ↗
11/28/2023120428858Open ↗
Showing 3 of 48 on file for this type
▸BISBOROUGH INTAKE FORM24
06/02/2022123915521Open ↗
Showing 1 of 24 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET6
12/21/2020140979056Open ↗
Showing 1 of 6 on file for this type
▸Other Documents23
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION10
05/16/2025124039986Open ↗
05/16/2025124039986Open ↗
05/16/2025124039986Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWManufacturer's Specifications3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWCalculations3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSHUTOFF DAMPERS1
02/01/2022123898425Open ↗
▸BISCLINTON DIST: HPD CERT COMPLETION LOW-INCOME HOUSING1
05/19/2025124039986Open ↗
▸BISPlot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWMultiple Dwelling Special District Feasibility of Government Funded Rehabilitation1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWIRA Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWMultiple Dwelling Special District Notice to Community Board1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type