RoofUnder Construction12p · 4 filings · 20 docs
ArchitectureDMElectricalMechanicalStructural
Issued Permit Scope
Antenna · Protection and Mechanical Methods
Installation of a temporarily construction fence, supported scaffold, sidewalk shed, roof protection and needle beam per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application
On file for this project
3 documents · 3 drawing sheets
Installation of debris chute as per plans filed herewith. This application is filed in conjunction with DM M00974121-I1.
On file for this project
29 documents · 5 drawing sheets
MODIFICATION TO EXISTING AT&T TELECOMMUNICATIONS SITE. INSTALL (4) ION-M23 SDARS (RRH) WITH RELATED EQUIPMENT AND INSTALL (1) EQUIPMENT CABINET WITH RELATED EQUIPMENT ON ROOF. ALL IN CONFORMANCE WITH TPPN 5/98. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
5 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 11Under Construction6p · 3 filings · 20 docs
Fire ProtectionStructural
Issued Permit Scope
Protection and Mechanical Methods · Standpipe · Structural
Install temporary fire standpipe pressurized alarm system for building being demolished under DM#M00974121-I1. Cut/cap standpipe riser floor by floor as building is being demolished. No change to use egress or occupancy filed under this SD application.
On file for this project
4 documents
Installation of debris chute as per plans filed herewith. This application is filed in conjunction with DM M00974121-I1.
On file for this project
29 documents
Partial and interior demolition of 11 story building as per plans filed herewith.
On file for this project
7 documents
Floor 10Under Construction6p · 3 filings · 20 docs
Fire ProtectionStructural
Issued Permit Scope
Protection and Mechanical Methods · Standpipe · Structural
Install temporary fire standpipe pressurized alarm system for building being demolished under DM#M00974121-I1. Cut/cap standpipe riser floor by floor as building is being demolished. No change to use egress or occupancy filed under this SD application.
On file for this project
4 documents
Installation of debris chute as per plans filed herewith. This application is filed in conjunction with DM M00974121-I1.
On file for this project
29 documents
Partial and interior demolition of 11 story building as per plans filed herewith.
On file for this project
7 documents
Floor 9Under Construction6p · 3 filings · 20 docs
Fire ProtectionStructural
Issued Permit Scope
Protection and Mechanical Methods · Standpipe · Structural
Install temporary fire standpipe pressurized alarm system for building being demolished under DM#M00974121-I1. Cut/cap standpipe riser floor by floor as building is being demolished. No change to use egress or occupancy filed under this SD application.
On file for this project
4 documents
Installation of debris chute as per plans filed herewith. This application is filed in conjunction with DM M00974121-I1.
On file for this project
29 documents
Partial and interior demolition of 11 story building as per plans filed herewith.
On file for this project
7 documents
Floor 8Under Construction6p · 3 filings · 20 docs
Fire ProtectionStructural
Issued Permit Scope
Protection and Mechanical Methods · Standpipe · Structural
Install temporary fire standpipe pressurized alarm system for building being demolished under DM#M00974121-I1. Cut/cap standpipe riser floor by floor as building is being demolished. No change to use egress or occupancy filed under this SD application.
On file for this project
4 documents
Installation of debris chute as per plans filed herewith. This application is filed in conjunction with DM M00974121-I1.
On file for this project
29 documents
Partial and interior demolition of 11 story building as per plans filed herewith.
On file for this project
7 documents
Floor 7Under Construction6p · 3 filings · 20 docs
Fire ProtectionStructural
Issued Permit Scope
Protection and Mechanical Methods · Standpipe · Structural
Install temporary fire standpipe pressurized alarm system for building being demolished under DM#M00974121-I1. Cut/cap standpipe riser floor by floor as building is being demolished. No change to use egress or occupancy filed under this SD application.
On file for this project
4 documents
Installation of debris chute as per plans filed herewith. This application is filed in conjunction with DM M00974121-I1.
On file for this project
29 documents
Partial and interior demolition of 11 story building as per plans filed herewith.
On file for this project
7 documents
Floor 6Under Construction6p · 3 filings · 20 docs
Fire ProtectionStructural
Issued Permit Scope
Protection and Mechanical Methods · Standpipe · Structural
Install temporary fire standpipe pressurized alarm system for building being demolished under DM#M00974121-I1. Cut/cap standpipe riser floor by floor as building is being demolished. No change to use egress or occupancy filed under this SD application.
On file for this project
4 documents
Installation of debris chute as per plans filed herewith. This application is filed in conjunction with DM M00974121-I1.
On file for this project
29 documents
Partial and interior demolition of 11 story building as per plans filed herewith.
On file for this project
7 documents
Floor 5Under Construction6p · 3 filings · 20 docs
Fire ProtectionStructural
Issued Permit Scope
Protection and Mechanical Methods · Standpipe · Structural
Install temporary fire standpipe pressurized alarm system for building being demolished under DM#M00974121-I1. Cut/cap standpipe riser floor by floor as building is being demolished. No change to use egress or occupancy filed under this SD application.
On file for this project
4 documents
Installation of debris chute as per plans filed herewith. This application is filed in conjunction with DM M00974121-I1.
On file for this project
29 documents
Partial and interior demolition of 11 story building as per plans filed herewith.
On file for this project
7 documents
Floor 4Under Construction6p · 3 filings · 20 docs
Fire ProtectionStructural
Issued Permit Scope
Protection and Mechanical Methods · Standpipe · Structural
Install temporary fire standpipe pressurized alarm system for building being demolished under DM#M00974121-I1. Cut/cap standpipe riser floor by floor as building is being demolished. No change to use egress or occupancy filed under this SD application.
On file for this project
4 documents
Installation of debris chute as per plans filed herewith. This application is filed in conjunction with DM M00974121-I1.
On file for this project
29 documents
Partial and interior demolition of 11 story building as per plans filed herewith.
On file for this project
7 documents
Floor 3Under Construction6p · 3 filings · 20 docs
Fire ProtectionStructural
Issued Permit Scope
Protection and Mechanical Methods · Standpipe · Structural
Install temporary fire standpipe pressurized alarm system for building being demolished under DM#M00974121-I1. Cut/cap standpipe riser floor by floor as building is being demolished. No change to use egress or occupancy filed under this SD application.
On file for this project
4 documents
Installation of debris chute as per plans filed herewith. This application is filed in conjunction with DM M00974121-I1.
On file for this project
29 documents
Partial and interior demolition of 11 story building as per plans filed herewith.
On file for this project
7 documents
Floor 2Under Construction6p · 3 filings · 20 docs
Fire ProtectionStructural
Issued Permit Scope
Protection and Mechanical Methods · Standpipe · Structural
Install temporary fire standpipe pressurized alarm system for building being demolished under DM#M00974121-I1. Cut/cap standpipe riser floor by floor as building is being demolished. No change to use egress or occupancy filed under this SD application.
On file for this project
4 documents
Installation of debris chute as per plans filed herewith. This application is filed in conjunction with DM M00974121-I1.
On file for this project
29 documents
Partial and interior demolition of 11 story building as per plans filed herewith.
On file for this project
7 documents
Floor 1Under Construction6p · 3 filings · 20 docs
Fire ProtectionStructural
Issued Permit Scope
Protection and Mechanical Methods · Standpipe · Structural
Install temporary fire standpipe pressurized alarm system for building being demolished under DM#M00974121-I1. Cut/cap standpipe riser floor by floor as building is being demolished. No change to use egress or occupancy filed under this SD application.
On file for this project
4 documents
Installation of debris chute as per plans filed herewith. This application is filed in conjunction with DM M00974121-I1.
On file for this project
29 documents
Partial and interior demolition of 11 story building as per plans filed herewith.
On file for this project
7 documents
CellarUnder Construction8p · 3 filings · 20 docs
DMFire ProtectionMechanicalStructural
Issued Permit Scope
Protection and Mechanical Methods · Standpipe · Structural
Install temporary fire standpipe pressurized alarm system for building being demolished under DM#M00974121-I1. Cut/cap standpipe riser floor by floor as building is being demolished. No change to use egress or occupancy filed under this SD application.
On file for this project
4 documents
Installation of debris chute as per plans filed herewith. This application is filed in conjunction with DM M00974121-I1.
On file for this project
29 documents · 1 drawing sheet
Partial and interior demolition of 11 story building as per plans filed herewith.
On file for this project
7 documents · 1 drawing sheet