Condo, residential unit in elevator building
Belaire
524 EAST 72 STREET · Upper East Side-Lenox Hill-Roosevelt Island · BIN 1072695
💬 Discuss this project
1989Year Built
39Stories
R4Building Class
R9Zoning
154,610 sfGross Floor Area
146Units
LL97 CoveredRent Stabilized42 Open Violations 40 unresolved · 2 paperwork only ▸FISP: UNSAFE
Condo, residential unit in elevator building · Owner of record: BELAIRE CONDOMINIUM ASSOC · 25,542 sf lot · 6.05 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Permit Issued — active, not yet Signed-off
Roof14p · 6 filings · 20 docs
Floor 4814p · 1 filing · 18 docs
Floor 47
Floor 46
Floor 45
Floor 44
Floor 431p · 1 filing · 6 docs
Floor 4238p · 3 filings · 20 docs
Floor 41
Floor 40
Floor 391p · 1 filing · 6 docs
Floor 38
Floor 37Under Construction11p · 2 filings · 6 docs
Floor 36
Floor 357p · 2 filings · 7 docs
Floor 343p · 2 filings · 12 docs
Floor 335p · 2 filings · 16 docs
Floor 32
Floor 316p · 1 filing · 13 docs
Floor 30
Floor 29
Floor 28
Floor 27
Floor 26
Floor 251p · 1 filing · 3 docs
Floor 24
Floor 23
Floor 22
Floor 21
Floor 20
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 41p · 1 filing · 6 docs
Floor 31p · 1 filing · 6 docs
Floor 2
Floor 1
Site & exteriorUnder Construction21p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BELAIR CONDOMIMIUM CORP C O4603/22/2026
100 UNITED NATIONS PLAZA CONDO2207/08/2026
GUMLEY HAFT1404/09/2026
17 EAST 12TH STREET707/08/2026
INTERSYSTEMS703/21/2026
AMMAS409/23/2026
H S S PROPERTIES403/22/2026
BELAIRE CONDO C O CHARLES H303/21/2026
GUMLEY HAFT REAL ESTATE PM303/21/2026
BERGLASS ASSOCIATES203/21/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AMMAS303/21/2026
SYNERGY BUILDING CONSULTANTS303/21/2026
THERESA VOLTAGGIO103/21/2026
SEAY-YARBROUGH803/21/2026
CLARKE CONSTRUCTION CONSULTANTS703/21/2026
ELCHERBINI ARCHITECTS P.C.403/21/2026
JAM CONSULTANTS, INC.1203/21/2026
J A EXPEDITING203/21/2026
ART OF FORM ARCHITECTS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ANDAMIO SCAFFOLDING LLCGeneral Contractor2507/08/2026
SCORDIO CONSTRUCTION INCGeneral Contractor907/08/2026
NEW YORK FLOORMAN, LLCGeneral Contractor707/08/2026
AM&G WATERPROOFING LLCGeneral Contractor607/08/2026
CRYSTAL COMFORT INCGeneral Contractor507/08/2026
EXECUTECH INTERIORS CORPGeneral Contractor407/08/2026
ORBIT PLBG & HTG INCPlumbing307/08/2026
JC CONSULTING & MANAGEMENTGeneral Contractor303/21/2026
CONSTRUCTION GURU CORPGeneral Contractor303/21/2026
BRUNI ELECTRIC INCElectrical303/22/2026
AIR ZONE HVAC INCGeneral Contractor207/08/2026
APOLLO PLBG & HTG INCPlumbing207/08/2026
HI-TECH PLUMBING & HEATINGPlumbing207/08/2026
VERTEX P & H CORPPlumbing203/22/2026
HELLO CHAPTER LLCGeneral Contractor104/09/2026
GLENDALE ELECTL CONTNG INElectrical103/22/2026
LINA ELECTRIC, CORP.Electrical103/22/2026
LIU JINFARElectrical103/21/2026
RM ELECTRIC CO., INC.Electrical103/22/2026
EVEREADY DESIGN CORPGeneral Contractor107/08/2026
ABE HIMELFARBElectrical103/21/2026
PALMER ENTERPRISES OF ROCKLANDGeneral Contractor107/08/2026
WOJTAS' CONTRACTING COMPANYGeneral Contractor107/08/2026
AMC PLBG, HTG & CLNG, INCPlumbing107/08/2026
HUDSON PLMBING & MCH, LLCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KZ ENGINEERING, P.C.4665405/18/2026
MB INSPECTIONS, CORP.8703101/07/2026
CATALPA SPECIAL INSPECTIO2004604/04/2024
CMSC, INC6098108/25/2023
ENTHINK ENGINEERS LLC6247108/24/2023
SYNTHESIS ARCHITECTURE4252303/02/2023
COWLEY ENGINEERING186102/17/2023
WINTON GROUP ARCHITECTURE4343203/22/2022
BRIAN ILL DEVELOPMENT LLC1402201/06/2022
GROUP-S LLC5216111/01/2021
Building Lifecycle
All (242)Filed (43)Permit Issued (57)Signed Off (20)Facade (FISP) (3)Violation (60)Inspection (29)Special Inspection (30)
09/04/2026
Filed — Alteration
Plumbing work includes modifying branch piping and adding new plumbing connections within apartment 37AB on the 037 floor. Work remains within existing riser locations; no change to existing risers. No structural work. No change to use, occupancy, or egre
M01343042-P1
08/19/2026
Signed off — Alteration
M01027777-I1
05/18/2026
Filed — Alteration
M01027777-P3
04/30/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/20/2026
Violation issued (ECB, open)
Local Law
04/16/2026
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
04/14/2026
Permit issued — Suspended Scaffold
M01027777-I1-SC
04/10/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/02/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/02/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/11/2026
Permit issued — Plumbing
M01343042-I1-PL
03/04/2026
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
02/03/2026
Permit issued — General Construction
M01327431-I1-GC
01/07/2026
Filed — Alteration
Plumbing work includes modifying branch piping and adding new plumbing connections within apartment 37AB on the 037 floor. Work remains within existing riser locations; no change to existing risers. No structural work. No change to use, occupancy, or egre
M01327431-I1
01/07/2026
Filed — Alteration
Plumbing work includes modifying branch piping and adding new plumbing connections within apartment 37AB on the 037 floor. Work remains within existing riser locations; no change to existing risers. No structural work. No change to use, occupancy, or egre
M01327431-S1
01/07/2026
Filed — Alteration
Plumbing work includes modifying branch piping and adding new plumbing connections within apartment 37AB on the 037 floor. Work remains within existing riser locations; no change to existing risers. No structural work. No change to use, occupancy, or egre
M01343042-I1
11/25/2025
Violation issued (ECB, closed)
Unknown
11/25/2025
Violation issued (ECB, closed)
Unknown
11/25/2025
Violation issued (ECB, closed)
Unknown
11/19/2025
Permit issued — Sidewalk Shed
M00651366-I1-SH
10/30/2025
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01310616-I1
10/30/2025
Permit issued — Supported Scaffold
M01310616-I1-SF
10/21/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY SKYLIGHT PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE.
M00920113-I1
10/14/2025
Filed — Alteration
M01027777-P2
10/14/2025
Filed — Alteration
M01302158-I1
10/14/2025
Permit issued — Protection and Mechanical Methods
M01302158-I1-PMM
10/10/2025
Special inspection requirement — Post-installed Anchors
Karol Zdancewicz
10/10/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Karol Zdancewicz
10/10/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Karol Zdancewicz
10/07/2025
Permit issued — General Construction
M00828528-I1-GC
10/02/2025
Violation issued (ECB, closed)
Construction
09/12/2025
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY LIGHT DUTY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00920108-I1
08/18/2025
Permit issued — Protection and Mechanical Methods
M00920113-I1-PMM
08/18/2025
Permit issued — Supported Scaffold
M00920108-I1-SF
04/17/2025
Filed — Alteration
M01027777-P1
04/14/2025
Permit issued — Suspended Scaffold
M01027777-I1-SC
11/29/2024
Permit issued — Sidewalk Shed
M00651366-I1-SH
11/13/2024
Permit issued — General Construction
M00828528-I1-GC
09/19/2024
Signed off — Alteration
MH SYSTEMS IN PH2 FILED IN CONJUNCTION WITH DOB NOW GC AND PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00639152-S2
09/05/2024
Signed off — Alteration
MODIFICATION OF DUCTWORK AND RELATED MECHANICAL PIPING. INSTALLATION OF AC UNITS.
M00582205-I1
09/05/2024
Signed off — Alteration
REMOVAL, REPLACEMENT AND INSTALLATION OF PLUMBING FIXTURES.
M00582213-I1
09/05/2024
Signed off — Alteration
REMOVAL AND INSTALLATION OF INTERIOR PARTITIONS AND FINISHES.NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00582200-I1
08/19/2024
Permit issued — General Construction
M00828528-I1-GC
08/19/2024
Permit issued — Supported Scaffold
M00920108-I1-SF
08/19/2024
Permit issued — Protection and Mechanical Methods
M00920113-I1-PMM
07/02/2024
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY LIGHT DUTY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00920108-P3
06/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/27/2024
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY LIGHT DUTY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00920108-P2
05/17/2024
Signed off — Alteration
MH SYSTEMS IN PH2 FILED IN CONJUNCTION WITH DOB NOW GC AND PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00639152-I1
05/17/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/15/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/03/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/18/2024
Permit issued — Suspended Scaffold
M01027777-I1-SC
04/11/2024
Signed off — Alteration
MH SYSTEMS IN PH2 FILED IN CONJUNCTION WITH DOB NOW GC AND PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00639152-S1
04/04/2024
Filed — Alteration
REMOVAL, REPLACEMENT AND INSTALLATION OF PLUMBING FIXTURES.
M00582213-P2
04/01/2024
Filed — Alteration
M01027777-I1
04/01/2024
Filed — Alteration
MH SYSTEMS IN PH2 FILED IN CONJUNCTION WITH DOB NOW GC AND PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00639152-P3
03/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ERIC BERLENT
03/22/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
03/15/2024
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY LIGHT DUTY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00920108-P1
Latest 60 of 242 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offAM&G WATERPROOFING LLC04/14/2026
DOB NOWPlumbingPermit IssuedHUDSON PLMBING & MCH, LLC03/11/2026
DOB NOWGeneral ConstructionPermit IssuedHELLO CHAPTER LLC02/03/2026
DOB NOWSidewalk ShedPermit IssuedANDAMIO SCAFFOLDING LLC11/19/2025
DOB NOWSupported ScaffoldSigned-offANDAMIO SCAFFOLDING LLC10/30/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedANDAMIO SCAFFOLDING LLC10/14/2025
DOB NOWGeneral ConstructionSigned-offAM&G WATERPROOFING LLC10/07/2025
DOB NOWProtection and Mechanical MethodsSigned-offANDAMIO SCAFFOLDING LLC08/18/2025
DOB NOWSupported ScaffoldSigned-offANDAMIO SCAFFOLDING LLC08/18/2025
DOB NOWSuspended ScaffoldSigned-offAM&G WATERPROOFING LLC04/14/2025
DOB NOWSidewalk ShedPermit IssuedANDAMIO SCAFFOLDING LLC11/29/2024
DOB NOWGeneral ConstructionSigned-offAM&G WATERPROOFING LLC11/13/2024
DOB NOWGeneral ConstructionSigned-offAM&G WATERPROOFING LLC08/19/2024
DOB NOWSupported ScaffoldSigned-offANDAMIO SCAFFOLDING LLC08/19/2024
DOB NOWProtection and Mechanical MethodsSigned-offANDAMIO SCAFFOLDING LLC08/19/2024
DOB NOWSuspended ScaffoldSigned-offAM&G WATERPROOFING LLC04/18/2024
DOB NOWProtection and Mechanical MethodsSigned-offANDAMIO SCAFFOLDING LLC01/22/2024
DOB NOWSidewalk ShedPermit IssuedANDAMIO SCAFFOLDING LLC12/08/2023
DOB NOWGeneral ConstructionSigned-offSCORDIO CONSTRUCTION INC09/29/2023
DOB NOWMechanical SystemsSigned-offSCORDIO CONSTRUCTION INC09/29/2023
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC09/19/2023
DOB NOWGeneral ConstructionSigned-offAM&G WATERPROOFING LLC09/15/2023
DOB NOWGeneral ConstructionSigned-offWOJTAS' CONTRACTING COMPA09/07/2023
DOB NOWSupported ScaffoldSigned-offANDAMIO SCAFFOLDING LLC08/25/2023
DOB NOWProtection and Mechanical MethodsSigned-offANDAMIO SCAFFOLDING LLC08/24/2023
DOB NOWPlumbingSigned-offHI-TECH PLUMBING & HEATIN03/13/2023
DOB NOWGeneral ConstructionSigned-offNEW YORK FLOORMAN, LLC03/07/2023
DOB NOWPlumbingSigned-offAMC PLBG, HTG & CLNG, INC02/13/2023
DOB NOWPlumbingSigned-offAPOLLO PLBG & HTG INC02/09/2023
DOB NOWGeneral ConstructionSigned-offJC CONSULTING & MANAGEME*02/02/2023
DOB NOWProtection and Mechanical MethodsSigned-offANDAMIO SCAFFOLDING LLC01/25/2023
DOB NOWGeneral ConstructionSigned-offEXECUTECH INTERIORS12/28/2022
DOB NOWSidewalk ShedPermit IssuedANDAMIO SCAFFOLDING LLC12/16/2022
DOB NOWGeneral ConstructionSigned-offNEW YORK FLOORMAN, LLC12/09/2022
DOB NOWGeneral ConstructionSigned-offEXECUTECH INTERIORS11/02/2022
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC10/19/2022
DOB NOWMechanical SystemsSigned-offAIR ZONE HVAC INC09/08/2022
DOB NOWMechanical SystemsSigned-offCRYSTAL COMFORT08/04/2022
DOB NOWGeneral ConstructionSigned-offEVEREADY DESIGN CORP06/19/2022
DOB NOWMechanical SystemsSigned-offAIR ZONE HVAC INC05/31/2022
+ 60 more permits on file
3 projects · most recent 09/04/2026
Water/Sanitary Gas
FiledStatusContractorScope
09/04/2026Permit IssuedHUDSON PLMBING & MCH, LLCWater/Sanitary
01/07/2026——Water/Sanitary
01/06/2022Signed-offPARAMOUNT PIPING INCGas, Water/Sanitary
25 projects · most recent 05/26/2026
General Wiring Lighting
FiledStatusContractorScope
05/26/2026CompleteWATTS UP ELECTRIC NY LLCGeneral Wiring
03/30/2026Permit IssuedRACK ELECTRIC INCGeneral Wiring
02/25/2026CompleteBRUNI ELECTRIC INCGeneral Wiring
02/03/2026CompleteBRUNI ELECTRIC INCGeneral Wiring
01/21/2026CompleteBRUNI ELECTRIC INCGeneral Wiring
12/05/2025CompleteRJ ELECTRICAL CONTRACTORS—
08/14/2025Permit IssuedL J ELEC'L SERV. INC.General Wiring
08/12/2025CompleteACCURATE ELEC'L CORP.General Wiring
08/08/2025Permit IssuedTRIPLE H ELECTRICAL CORPGeneral Wiring
06/25/2025CompleteBRUNI ELECTRIC INCGeneral Wiring
06/12/2025CompleteBRUNI ELECTRIC INCGeneral Wiring
05/08/2025CompleteRM ELECTRIC CO., INC.General Wiring
04/16/2025Permit IssuedLERCO ELECTRIC LLCGeneral Wiring
04/16/2024CompleteBRUNI ELECTRIC INCGeneral Wiring
04/15/2024Permit IssuedBRUNI ELECTRIC INCGeneral Wiring
1 project · most recent 10/30/2025
Scaffold
FiledStatusContractorScope
10/30/2025Signed-offANDAMIO SCAFFOLDING LLCScaffold
▾Field Inspections (DOB CAP) — 29
DateTypeResultReport
04/30/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/16/2026Pass-Final SP - Up to 9 Requested FloorsPassView ↗
04/10/2026Pass-Final General Construction Non-Directive 14PassView ↗
04/02/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/02/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/04/2026Fail-Final CND-Occupancy InspectionFailView ↗
05/17/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/15/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/22/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/28/2023Pass-Final General Construction Non-Directive 14PassView ↗
08/24/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/24/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/28/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/15/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/10/2023Pass-Final PL - More than 10 Requested FloorsPassView ↗
03/08/2023Pass-Final PL - More than 10 Requested FloorsPassView ↗
03/02/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/02/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/17/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/13/2023No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
01/12/2023Pass-Final PL - More than 10 Requested FloorsPassView ↗
09/27/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/15/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/13/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/07/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
Latest 25 of 29.
▾Special Inspection Requirements (DOB NOW) — 48
DateRequirementInspectorRole
10/10/2025Post-installed AnchorsKarol Zdancewiczspecial
10/10/2025Alternative Materials - OTCR Buildings Bulletin NumberKarol Zdancewiczspecial
10/10/2025Structural Stability – Alterations of existing buildingsKarol Zdancewiczspecial
03/25/2024Fire-Resistant Penetrations and JointsERIC BERLENTspecial
12/01/2023Sprayed fire-resistant materialsERIC BERLENTspecial
12/01/2023Interior lighting powerERIC BERLENTenergy_progress
12/01/2023Energy Code Compliance InspectionsERIC BERLENTprogress
12/01/2023Lighting in dwelling unitsERIC BERLENTenergy_progress
12/01/2023FinalERIC BERLENTprogress
12/01/2023Fire-Resistance Rated ConstructionERIC BERLENTprogress
12/01/2023Fire-Resistant Penetrations and JointsERIC BERLENTspecial
11/01/2023Sprayed fire-resistant materialsERIC BERLENTspecial
11/01/2023FinalERIC BERLENTprogress
11/01/2023Fire-Resistance Rated ConstructionERIC BERLENTprogress
11/01/2023Interior lighting powerERIC BERLENTenergy_progress
11/01/2023Lighting in dwelling unitsERIC BERLENTenergy_progress
11/01/2023Fire-Resistant Penetrations and JointsERIC BERLENTspecial
11/01/2023Energy Code Compliance InspectionsERIC BERLENTprogress
11/01/2023Fire-Resistant Penetrations and JointsERIC BERLENTspecial
08/16/2023Structural Stability – Alterations of existing buildingsSunil Saigalspecial
07/19/2023Concrete - PrecastEDUARD GRINFELDspecial
07/19/2023Concrete - Cast-In-PlaceEDUARD GRINFELDspecial
07/19/2023MasonryEDUARD GRINFELDspecial
07/19/2023Tenant Protection Plan ComplianceEDUARD GRINFELDspecial
03/02/2023Fire-Resistant Penetrations and JointsDaniel Kohsspecial
Latest 25 of 48.
▾Documents — 621 on file (BIS + DOB NOW)
▸Plans & Drawings42
▸DOB NOWPlans/Sketch42
09/03/2026M00582205-I1Request digital key ↗
09/03/2026M00614775-I1Request digital key ↗
09/03/2026M00639152-P3Request digital key ↗
Showing 3 of 42 on file for this type
▸Applications & Permits117
▸BISWORK PERMIT APPLICATION62
02/06/2019120441584Open ↗
01/24/2019123243784Open ↗
01/23/2019123243784Open ↗
Showing 3 of 62 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION55
12/23/2024104824004Open ↗
12/10/2024104824004Open ↗
04/09/2019123243784Open ↗
Showing 3 of 55 on file for this type
▸Seals & Professional Certifications164
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION55
08/19/2019123243784Open ↗
01/08/2019123243784Open ↗
09/19/2017123179498Open ↗
Showing 3 of 55 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature43
09/27/2026M01343042-P1Open ↗
09/03/2026M00582205-I1Open ↗
09/03/2026M00651366-I1Open ↗
Showing 3 of 43 on file for this type
▸DOB NOWProgress Inspector Seal & Signature18
09/02/2026M00582200-P1Open ↗
09/02/2026M00582200-P1Open ↗
09/01/2026M00619566-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature16
09/30/2026M00582213-P2Open ↗
09/23/2026M00906940-I1Open ↗
09/02/2026M01027777-P2Open ↗
Showing 3 of 16 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST13
04/09/2014121971802Open ↗
03/13/2014121917863Open ↗
08/14/2013121740786Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM11
08/14/2013121740786Open ↗
03/22/2013121559795Open ↗
Showing 2 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
04/09/2014121971802Open ↗
03/13/2014121917863Open ↗
09/11/2013140114007Open ↗
▸BISPC FULL REPORT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
09/11/2013140114007Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/11/2013140114007Open ↗
▸Trade Schedules & Equipment55
▸BISSELF-CERT PLUMBING NOTICE19
11/24/2014122113266Open ↗
10/23/2014122113266Open ↗
07/09/2014121971802Open ↗
Showing 3 of 19 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE16
04/09/2019123243784Open ↗
03/27/2019123243784Open ↗
03/04/2019120441584Open ↗
Showing 3 of 16 on file for this type
▸BISSCHEDULE B - PLUMBING12
12/17/2013121559795Open ↗
08/14/2013121740786Open ↗
Showing 2 of 12 on file for this type
▸BISEQUIPMENT USE PERMITS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
07/02/2018122843726Open ↗
05/08/2018122843726Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Safety & Tenant Protection4
▸BISTenant Protection Plan and Notes2
01/08/2019123243784Open ↗
09/19/2017123179498Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
03/13/2014121917863Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
03/22/2013121559795Open ↗
▸Environmental & Asbestos54
▸DOB NOWDEP ACP-5: Asbestos Assessment Report23
09/03/2026M00582205-I1Open ↗
09/03/2026M00619612-I1Open ↗
09/03/2026M00619566-I1Open ↗
Showing 3 of 23 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)9
01/08/2019123243784Open ↗
09/19/2017123179498Open ↗
09/14/2016122843726Open ↗
Showing 3 of 9 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER6
03/22/2013121559795Open ↗
Showing 1 of 6 on file for this type
▸Energy Compliance28
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS10
08/19/2019123243784Open ↗
01/08/2019123243784Open ↗
09/19/2017123179498Open ↗
Showing 3 of 10 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS6
08/19/2019123243784Open ↗
09/13/2016121740786Open ↗
01/19/2016122113266Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.5
09/03/2026M00582205-I1Open ↗
08/13/2026M00582200-I1Open ↗
08/13/2026M00614775-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTR8: Energy Code Progress Inspections3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00639152-S2Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
02/21/2025104824004Open ↗
09/11/2013140114007Open ↗
▸Approvals, Objections & Sign-offs48
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST19
03/28/2025104824004Open ↗
08/19/2019123243784Open ↗
03/07/2019120441584Open ↗
Showing 3 of 19 on file for this type
▸BISADMINISTRATIVE OBJECTIONS17
03/22/2013121559795Open ↗
Showing 1 of 17 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION8
08/19/2019123243784Open ↗
09/14/2015120352545Open ↗
10/15/2014121559795Open ↗
Showing 3 of 8 on file for this type
▸BISSUPERSEDING LETTER2
03/07/2016121740786Open ↗
06/18/2014121395686Open ↗
▸BISSHED LETTER1
10/15/2014121559795Open ↗
▸BISCCD1-Construction Code Determination1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership46
▸BISCOST AFFIDAVIT45
03/28/2025104824004Open ↗
03/28/2025104824004Open ↗
03/05/2025104824004Open ↗
Showing 3 of 45 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms44
▸BISEFILING COVER SHEET25
01/08/2019123243784Open ↗
09/19/2017123179498Open ↗
09/14/2016122843726Open ↗
Showing 3 of 25 on file for this type
▸BISBOROUGH INTAKE FORM10
08/19/2019123243784Open ↗
03/27/2019123243784Open ↗
03/07/2019120441584Open ↗
Showing 3 of 10 on file for this type
▸BISADDITIONAL INFORMATION6
04/09/2019123243784Open ↗
12/12/2018123179498Open ↗
10/13/2017123179498Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
09/11/2013140114007Open ↗
Showing 1 of 2 on file for this type
▸BISHPD-3 - SRO MD ANTI-HARASSEMENT CHECKLIST1
12/17/2013121559795Open ↗
▸Other Documents17
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION9
02/12/2014121559795Open ↗
Showing 1 of 9 on file for this type
▸DOB NOWManufacturer's Specifications4
08/17/2026M01027777-P3Open ↗
08/13/2026M01027777-P1Open ↗
08/13/2026M01027777-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWCalculations4
08/17/2026M01027777-P3Open ↗
08/13/2026M01027777-P1Open ↗
08/13/2026M01027777-P2Open ↗
Showing 3 of 4 on file for this type