| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01176235 ↗ | 682 BROADWAY MANHATTAN | Alteration | Signed-off | 02/12/2025 | 02/13/2026 | Design SYNTHESIS ARCHITECTURE Owner Daisy Management Contractor O'MALLEY INTERIORS INC | WORK SHOWN WAS PERFORMED IN 2005 UNDER APPLICATION 104167303 AND COULD NOT BE CLOSED OUT DUE TO VIOLATIONS ON THE BUILDING. DOB HELP SESSION… |
| M00870548 ↗ | 134 GRAND STREET MANHATTAN | Alteration | Permit Issued | 05/18/2023 | 11/24/2025 | Design SYNTHESIS ARCHITECTURE Owner MACK EDGE MGMT LLC Contractor KING ROSE OF NY, INC | REBUILD EXISTING ELEVATOR WITH MODIFICATIONS TO THE SHAFT FOR NEW OPENINGS. WORK IN SUB CELLAR RELATED TO SHAFT OPENINGS. REDUCED SCOPE OF W… |
| M01176278 ↗ | 682 BROADWAY MANHATTAN | Alteration | Signed-off | 05/20/2025 | 11/06/2025 | Design SYNTHESIS ARCHITECTURE Owner Daisy Management Contractor R.J.C. MECHANICAL CORP | JOB WAS FILED AND WORK WAS DONE IN 2005 AS JOB 104167303. THIS JOB IS FILED TO ENABLE A SIGN OFF SINCE THE PRIOR APPLICATION WAS BLOCKED BY … |
| M01073206 ↗ | 134 GRAND STREET MANHATTAN | Alteration | Signed-off | 07/01/2024 | 06/11/2025 | Design SYNTHESIS ARCHITECTURE Owner MACK EDGE MGMT LLC Contractor R.J.C. MECHANICAL CORP | Create one new mezzanine bathroom. Modify sprinkler piping and add three new sprinkler heads. Relocate existing fixtures in modified kitchen… |
| M01057690 ↗ | 134 GRAND STREET MANHATTAN | Alteration | Signed-off | 06/27/2024 | 03/26/2025 | Design SYNTHESIS ARCHITECTURE Owner MACK EDGE MGMT LLC Contractor GOODWILL MECHANICAL | Interior alteration to apartment 2ef. Addition of a mezzanine, bathroom and central air conditioning system. No change to use, egress or occ… |
| M01122035 ↗ | 134 GRAND STREET MANHATTAN | Alteration | Filed — no permit on record | 02/25/2025 | — | Design SYNTHESIS ARCHITECTURE Owner MACK EDGE MGMT LLC | — |
| Name | Projects together | Most recent |
|---|---|---|
| WQB ARCHITECTURE PLLC | 4 | 07/31/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| GOOD-WILL MECHANICAL CORP | 4 | 06/27/2024 |
| R.J.C. MECHANICAL CORP | 4 | 12/08/2025 |
| AAA TOTAL PLUMBING, INC | 2 | 07/31/2024 |
| PALMER ENTERPRISES OF ROC | 2 | 09/06/2022 |
| AP. TEK RESTORATION INC | 1 | 08/16/2023 |
| KING ROSE OF NY, INC | 1 | 12/05/2024 |
| O'MALLEY INTERIORS INC | 1 | 02/12/2025 |
| SCUTARI RENOVATIONS LLC | 1 | 09/23/2021 |
| Name | Projects together | Most recent |
|---|---|---|
| MACK EDGE MGMT LLC | 4 | 06/03/2025 |
| PENNYBACKER CAPITAL | 3 | 07/31/2024 |
| DAISY MANAGEMENT LLC | 2 | 12/08/2025 |
| 28 WEST 89TH STREET | 1 | 09/23/2021 |
| Axio Property Management | 1 | 11/12/2020 |
| BROWNSTONE PROFESSIONAL SERVICES CO | 1 | 10/04/2021 |
| PARAGON SPORTS | 1 | 08/16/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| CONVERSANO ASSOCIATES, INC. | 3 | 07/31/2024 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01176235 ↗ | 682 BROADWAY MANHATTAN | Alteration | Signed-off | 02/12/2025 | 02/13/2026 | Design SYNTHESIS ARCHITECTURE Owner Daisy Management Contractor O'MALLEY INTERIORS INC | WORK SHOWN WAS PERFORMED IN 2005 UNDER APPLICATION 104167303 AND COULD NOT BE CLOSED OUT DUE TO VIOLATIONS ON THE BUILDING. DOB HELP SESSION… |
| M00870548 ↗ | 134 GRAND STREET MANHATTAN | Alteration | Permit Issued | 05/18/2023 | 11/24/2025 | Design SYNTHESIS ARCHITECTURE Owner MACK EDGE MGMT LLC Contractor KING ROSE OF NY, INC | REBUILD EXISTING ELEVATOR WITH MODIFICATIONS TO THE SHAFT FOR NEW OPENINGS. WORK IN SUB CELLAR RELATED TO SHAFT OPENINGS. REDUCED SCOPE OF W… |
| M01176278 ↗ | 682 BROADWAY MANHATTAN | Alteration | Signed-off | 05/20/2025 | 11/06/2025 | Design SYNTHESIS ARCHITECTURE Owner Daisy Management Contractor R.J.C. MECHANICAL CORP | JOB WAS FILED AND WORK WAS DONE IN 2005 AS JOB 104167303. THIS JOB IS FILED TO ENABLE A SIGN OFF SINCE THE PRIOR APPLICATION WAS BLOCKED BY … |
| M01073206 ↗ | 134 GRAND STREET MANHATTAN | Alteration | Signed-off | 07/01/2024 | 06/11/2025 | Design SYNTHESIS ARCHITECTURE Owner MACK EDGE MGMT LLC Contractor R.J.C. MECHANICAL CORP | Create one new mezzanine bathroom. Modify sprinkler piping and add three new sprinkler heads. Relocate existing fixtures in modified kitchen… |
| M01057690 ↗ | 134 GRAND STREET MANHATTAN | Alteration | Signed-off | 06/27/2024 | 03/26/2025 | Design SYNTHESIS ARCHITECTURE Owner MACK EDGE MGMT LLC Contractor GOODWILL MECHANICAL | Interior alteration to apartment 2ef. Addition of a mezzanine, bathroom and central air conditioning system. No change to use, egress or occ… |
| M01122035 ↗ | 134 GRAND STREET MANHATTAN | Alteration | Filed — no permit on record | 02/25/2025 | — | Design SYNTHESIS ARCHITECTURE Owner MACK EDGE MGMT LLC | — |
| M00906251 ↗ | 19 EAST 17 STREET MANHATTAN | Alteration | Signed-off | 08/16/2023 | 10/24/2024 | Design SYNTHESIS ARCHITECTURE Owner PARAGON SPORTS Contractor AP. TEK RESTORATION INC | MASONRY INFILL OF OPENING BETWEEN BUILDINGS 19 AND 21 EAST 17TH STREET. MISC. FACADE REPAIR ITEMS. |
| M00670539 ↗ | 305 2 AVENUE MANHATTAN | Alteration | Signed-off | 12/05/2022 | 04/14/2023 | Design WQB ARCHITECTURE PLLC Contractor GOODWILL MECHANICAL | Propose renovation at apartment 901. Removal and installation of non load bearing partitions and related finishes all as per plans herewith … |
| M00541823 ↗ | 305 2 AVENUE MANHATTAN | Alteration | Signed-off | 02/06/2023 | 04/12/2023 | Design WQB ARCHITECTURE PLLC Owner PENNYBACKER CAPITAL Contractor AAA TOTAL PLUMBING, INC | Propose plumbing modifications at apartment 702 all as per plans herewith filed. No change in use, egress or occupancy filed under this appl… |
| M00541816 ↗ | 305 2 AVENUE MANHATTAN | Alteration | Signed-off | 02/06/2023 | 04/06/2023 | Design WQB ARCHITECTURE PLLC Owner PENNYBACKER CAPITAL Contractor GOODWILL MECHANICAL | Propose apartment renovation of unit 702 and combination as per TPPN3/97. Removal and installation of non load bearing partitions and relate… |
| M00670547 ↗ | 305 2 AVENUE MANHATTAN | Alteration | Signed-off | 12/06/2022 | 04/05/2023 | Design WQB ARCHITECTURE PLLC Owner PENNYBACKER CAPITAL Contractor AAA TOTAL PLUMBING, INC | Propose plumbing modifications at apartment 901 all as per plans herewith filed. No change in use, egress or occupancy filed under this appl… |
| M07997603 ↗ | 36 PARK ROW MANHATTAN | Alteration | Signed-off | 09/06/2022 | 03/07/2023 | Design SYNTHESIS ARCHITECTURE Contractor R.J.C. MECHANICAL CORP | REMOVE ONE TUB AND REPLACE WITH A SHOWER ON EXISTING ROUGH PIPING. REPLACE ONE LAVATORY AND ONE TOILET ON EXISTING ROUGH PIPING. INSTALL SHU… |
| M07997487 ↗ | 36 PARK ROW MANHATTAN | Alteration | Signed-off | 09/06/2022 | 03/01/2023 | Design SYNTHESIS ARCHITECTURE Contractor PALMER ENTERPRISES OF ROCKLAND | INSTALLATION OF CENTRAL AIR CONDITIONING AND BATHROOM RENOVATION |
| M00671997 ↗ | 524 EAST 72 STREET MANHATTAN | Alteration | Signed-off | 02/08/2022 | 04/01/2022 | Design SYNTHESIS ARCHITECTURE Contractor R.J.C. MECHANICAL CORP | REPLACEMENT OF FIXTURES IN THREE BATHROOMS, ADDITION OF ONE STALL SHOWER, RELOCATION OF EXISTING LAUNDRY. PAA-1 CHANGE TO GAS METER LOCATIO… |
| M00671973 ↗ | 524 EAST 72 STREET MANHATTAN | Alteration | Signed-off | 02/08/2022 | 03/25/2022 | Design SYNTHESIS ARCHITECTURE Contractor PALMER ENTERPRISES OF ROCKLAND | Renovation of three bathrooms, kitchen and relocation of laundry closet. |
| M00599178 ↗ | 28 WEST 89 STREET MANHATTAN | Alteration | Signed-off | 09/23/2021 | 11/01/2021 | Design SYNTHESIS ARCHITECTURE Owner 28 WEST 89TH STREET Contractor SCUTARI RENOVATIONS LLC | COMBINATION OF UNIT 1 AND UNIT 3 INTO A DUPLEX APARTMENT. NO CHANGE TO THE CERTIFICATE OF OCCUPANCY. RENOVATION OF UPSTAIRS PORTION TO INCLU… |
| M00603728 ↗ | 150 ORCHARD STREET MANHATTAN | Alteration | Filed — no permit on record | 10/04/2021 | — | Design SYNTHESIS ARCHITECTURE | — |
| M00372358 ↗ | 134 GRAND STREET MANHATTAN | Alteration | Signed-off | 11/12/2020 | 12/11/2020 | Design SYNTHESIS ARCHITECTURE Owner Axio Property Management Contractor GOODWILL MECHANICAL | INSTALLATION OF CENTRAL AC SYSTEM. 2 CONDENSERS AND 7 AIR HANDLERS |
| Building | Filings | Most Recent |
|---|---|---|
| 682 BROADWAY ↗ | 3 | 12/08/2025 |
| 134 GRAND STREET ↗ | 3 | 06/03/2025 |
| 305 2 AVENUE ↗ | 11 | 07/31/2024 |
| 134 GRAND STREET ↗ | 6 | 07/01/2024 |
| 19 EAST 17 STREET ↗ | 1 | 08/16/2023 |
| 524 EAST 72 STREET ↗ | 3 | 03/02/2023 |
| 36 PARK ROW ↗ | 2 | 09/06/2022 |
| 150 ORCHARD STREET ↗ | 1 | 10/04/2021 |
| 28 WEST 89 STREET ↗ | 1 | 09/23/2021 |
| Date | Requirement | Building | Inspector | Role |
|---|---|---|---|---|
| 12/09/2025 | Fire-Resistant Penetrations and Joints | 682 BROADWAY | Daniel Kohs | special |
| 11/21/2025 | Fire-Resistant Penetrations and Joints | 682 BROADWAY | Daniel Kohs | special |
| 06/27/2025 | Sprinkler Systems | 134 GRAND STREET | Gregory Benazzi | special |
| 06/27/2025 | Fire-Resistant Penetrations and Joints | 134 GRAND STREET | Daniel Kohs | special |
| 06/27/2025 | Tenant Protection Plan Compliance | 134 GRAND STREET | Daniel Kohs | special |
| 05/20/2025 | Fire-Resistant Penetrations and Joints | 134 GRAND STREET | Daniel Kohs | special |
| 05/20/2025 | Sprinkler Systems | 134 GRAND STREET | Gregory Benazzi | special |
| 05/20/2025 | Tenant Protection Plan Compliance | 134 GRAND STREET | Daniel Kohs | special |
| 12/04/2024 | Interior lighting power | 134 GRAND STREET | Daniel Kohs | energy_progress |
| 12/04/2024 | Fire-Resistant Penetrations and Joints | 134 GRAND STREET | Daniel Kohs | special |
| 12/04/2024 | Structural Cold-Formed Steel | 134 GRAND STREET | Daniel Kohs | special |
| 12/04/2024 | Structural Stability – Alterations of existing buildings | 134 GRAND STREET | Daniel Kohs | special |
| 12/04/2024 | Structural Steel - Details | 134 GRAND STREET | — | special |
| 12/04/2024 | Tenant Protection Plan Compliance | 134 GRAND STREET | — | special |
| 12/04/2024 | Final | 134 GRAND STREET | Daniel Kohs | progress |
| 12/04/2024 | Fenestration and door U-factor and product ratings | 134 GRAND STREET | Daniel Kohs | energy_progress |
| 12/04/2024 | Insulation placement and R values | 134 GRAND STREET | Daniel Kohs | energy_progress |
| 12/04/2024 | Fenestration areas | 134 GRAND STREET | Daniel Kohs | energy_progress |
| 10/16/2024 | Final | 134 GRAND STREET | — | progress |
| 10/04/2024 | Tenant Protection Plan Compliance | 134 GRAND STREET | Daniel Kohs | special |
| 08/14/2024 | Fire-Resistant Penetrations and Joints | 305 2 AVENUE | Daniel Kohs | special |
| 08/14/2024 | Tenant Protection Plan Compliance | 305 2 AVENUE | Gregory Benazzi | special |
| 07/26/2024 | Fire-Resistant Penetrations and Joints | 305 2 AVENUE | Daniel Kohs | special |
| 07/26/2024 | Tenant Protection Plan Compliance | 305 2 AVENUE | Gregory Benazzi | special |
| 07/18/2024 | Fire-Resistant Penetrations and Joints | 305 2 AVENUE | Daniel Kohs | special |
| 06/28/2024 | Fire-Resistant Penetrations and Joints | 305 2 AVENUE | Daniel Kohs | special |
| 06/28/2024 | Tenant Protection Plan Compliance | 305 2 AVENUE | Gregory Benazzi | special |
| 06/28/2024 | Fire-Resistant Penetrations and Joints | 305 2 AVENUE | Daniel Kohs | special |
| 05/30/2024 | Interior lighting power | 134 GRAND STREET | Daniel Kohs | energy_progress |
| 05/30/2024 | Interior lighting power | 134 GRAND STREET | Daniel Kohs | energy_progress |
| 05/30/2024 | HVAC-R and service water heating system controls | 134 GRAND STREET | Daniel Kohs | energy_progress |
| 05/30/2024 | HVAC-R and service water heating system controls | 134 GRAND STREET | Daniel Kohs | energy_progress |
| 05/30/2024 | HVAC-R and service water piping design and insulation | 134 GRAND STREET | Daniel Kohs | energy_progress |
| 05/30/2024 | HVAC-R and service water piping design and insulation | 134 GRAND STREET | Daniel Kohs | energy_progress |
| 05/28/2024 | Final | 134 GRAND STREET | Daniel Kohs | progress |
| 05/28/2024 | Final | 134 GRAND STREET | Daniel Kohs | progress |
| 05/28/2024 | Structural Cold-Formed Steel | 134 GRAND STREET | Daniel Kohs | special |
| 05/28/2024 | Structural Cold-Formed Steel | 134 GRAND STREET | Daniel Kohs | special |
| 05/28/2024 | Mechanical Systems | 134 GRAND STREET | Daniel Kohs | special |
| 05/28/2024 | Mechanical Systems | 134 GRAND STREET | Daniel Kohs | special |
| 05/28/2024 | Tenant Protection Plan Compliance | 134 GRAND STREET | Daniel Kohs | special |
| 05/28/2024 | Tenant Protection Plan Compliance | 134 GRAND STREET | Daniel Kohs | special |
| 05/28/2024 | Fire-Resistant Penetrations and Joints | 134 GRAND STREET | Daniel Kohs | special |
| 05/28/2024 | Fire-Resistant Penetrations and Joints | 134 GRAND STREET | Daniel Kohs | special |
| 02/22/2024 | Tenant Protection Plan Compliance | 305 2 AVENUE | Gregory Benazzi | special |
| 02/22/2024 | Fire-Resistant Penetrations and Joints | 305 2 AVENUE | Daniel Kohs | special |
| 07/18/2023 | Fire-Resistant Penetrations and Joints | 19 EAST 17 STREET | Daniel Kohs | special |
| 07/18/2023 | Final | 19 EAST 17 STREET | Daniel Kohs | progress |
| 07/18/2023 | Fire-Resistance Rated Construction | 19 EAST 17 STREET | Daniel Kohs | progress |
| 05/24/2023 | Fire-Resistant Penetrations and Joints | 305 2 AVENUE | Daniel Kohs | special |