← Back
Office with commercial, 7-19 stories
525 BROADWAY
MANHATTAN · BIN 1007248
💬 Discuss this project
1920Year Built
8Stories
O6Building Class
M1-5/R9XZoning
45,000 sfGross Floor Area
15Units
LL97 Covered16 Open Violations 9 unresolved · 7 paperwork only ▸FISP: SAFE
Office with commercial, 7-19 stories · Owner of record: JPMORGAN CHASE BANK, N.A. · 5,004 sf lot · 8.99 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
Roof5p · 4 filings · 20 docs
BulkheadUnder Construction2p · 2 filings · 19 docs
Floor 87p · 6 filings · 20 docs
Floor 77p · 6 filings · 20 docs
Floor 610p · 7 filings · 20 docs
Floor 58p · 5 filings · 20 docs
Floor 46p · 4 filings · 20 docs
Floor 35p · 4 filings · 20 docs
Floor 26p · 5 filings · 20 docs
Floor 17p · 5 filings · 20 docs
Mezzanine2p · 2 filings · 9 docs
Cellar7p · 4 filings · 20 docs
Basement1p · 1 filing · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TRI BOROUGH SCAFFOLDING1107/08/2026
JPMORGAN CHASE BANK NA3907/08/2026
VIK XS SERVICES1007/08/2026
MORRIS GOLDMAN REAL ESTATE803/22/2026
525 REALTY COMPANY503/22/2026
M GOLDMAN REAL ESTATE103/22/2026
525 BROADWAY REALTY COMPANY603/21/2026
CHASE MANHATTAN BANK403/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TRI BOROUGH SCAFFOLDINGGeneral Contractor1907/08/2026
AFFINITY BUILDING SOLUTIOGeneral Contractor1207/08/2026
FIVE BORO ASSOCIATES INCFire Protection1107/08/2026
INTERSYSTEMS INSTAL S&SGeneral Contractor607/08/2026
VERICON CONSTRUCTION COGeneral Contractor507/08/2026
PAR FIRE PROTECTION LLCFire Protection407/08/2026
VIK XS SERVICES INCGeneral Contractor307/08/2026
PRO STAR PLBG,HTG&MECH INPlumbing307/08/2026
SOLUTION MECH CONTNG LLCPlumbing207/08/2026
PAR PLUMBING CO., INCPlumbing207/08/2026
COGEN ELEC'L SERVICES,INCElectrical103/22/2026
CRAFT DESIGN CONSTR CORPGeneral Contractor107/08/2026
INTERSYSTEM CONSTRUCTIONGeneral Contractor107/02/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MERRITT ENGINEERING CONSU460109/21/2023
DOMANI INSPECTION SERVICE8431408/03/2021
SPECIAL INSPECTION SERVIC12001007/16/2021
Building Lifecycle
All (252)Filed (34)Permit Issued (52)Signed Off (22)Facade (FISP) (18)Violation (60)Objection (36)Special Inspection (30)
08/17/2026
Signed off — Alteration
M01376231-I1
08/17/2026
Signed off — Alteration
M08036892-I1
07/09/2026
Cycle 9 facade report signed — SAFE
06/02/2026
Cycle 9 facade report submitted
05/22/2026
Signed off — Alteration
FACADE RESTORATION AS PER PLANS SUBMITTED HEREWITH. REPAIR AND/OR REPLACE EXISTING DAMAGED,CRACKED AND SPALLED SILLS, LINTELS, BRICKS AND STONE THROUGHOUT SPECIFIC AREAS OF THE FACADE. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M00847392-I1
05/19/2026
Permit issued — General Construction
M01376231-I1-GC
05/19/2026
Cycle 9 facade inspection completed
05/18/2026
Filed — Alteration
M01376231-I1
03/31/2026
Special inspection requirement — Interior lighting power
Fabian Jabro
03/31/2026
Special inspection requirement — Energy Code Compliance Inspections
Fabian Jabro
03/23/2026
Special inspection requirement — Final
Fabian Jabro
01/15/2026
Permit issued — Sidewalk Shed
M08036892-I1-SH
10/29/2025
Filed — Alteration
FACADE RESTORATION AS PER PLANS SUBMITTED HEREWITH. REPAIR AND/OR REPLACE EXISTING DAMAGED,CRACKED AND SPALLED SILLS, LINTELS, BRICKS AND STONE THROUGHOUT SPECIFIC AREAS OF THE FACADE. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M00847392-S2
10/29/2025
Permit issued — Suspended Scaffold
M00847392-S2-SC
09/30/2025
Permit issued — Sidewalk Shed
M08036892-I1-SH
09/05/2025
Permit issued — Suspended Scaffold
M00847392-S1-SC
09/05/2025
Permit issued — General Construction
M00847392-I1-GC
05/06/2025
Permit issued — General Construction
M00847392-I1-GC
04/16/2025
Permit issued — Suspended Scaffold
M00847392-S1-SC
02/28/2025
Permit issued — Suspended Scaffold
M00847392-S1-SC
02/26/2025
Filed — Alteration
FACADE RESTORATION AS PER PLANS SUBMITTED HEREWITH. REPAIR AND/OR REPLACE EXISTING DAMAGED,CRACKED AND SPALLED SILLS, LINTELS, BRICKS AND STONE THROUGHOUT SPECIFIC AREAS OF THE FACADE. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M00847392-S1
01/08/2025
Violation issued (ECB, open)
Construction
12/01/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/02/2024
Permit issued — Sidewalk Shed
M08036892-I1-SH
09/26/2024
Violation issued (ECB, open)
Construction
03/12/2024
Violation issued (ECB, open)
Local Law
11/06/2023
Violation issued (ECB, open)
Construction
11/01/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/31/2023
Permit issued — Sidewalk Shed
M08036892-I1-SH
09/21/2023
Filed — Alteration
FACADE RESTORATION AS PER PLANS SUBMITTED HEREWITH. REPAIR AND/OR REPLACE EXISTING DAMAGED,CRACKED AND SPALLED SILLS, LINTELS, BRICKS AND STONE THROUGHOUT SPECIFIC AREAS OF THE FACADE. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M00847392-I1
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/21/2023
Special inspection requirement — Masonry
Christopher Krepcio
03/21/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Christopher Krepcio
03/21/2023
Special inspection requirement — Final
Christopher Krepcio
02/10/2023
Cycle 9 facade report submitted
02/10/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/08/2023
Cycle 9 facade inspection completed
02/08/2023
Cycle 9 facade report signed — UNSAFE
01/17/2023
Violation issued (ECB, open)
Local Law
12/01/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/09/2022
Permit issued — Sidewalk Shed
M08036892-I1-SH
11/08/2022
Filed — Alteration
M08036892-I1
07/22/2022
Violation issued (ECB, open)
Construction
02/22/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/10/2022
Signed off — Alteration
Provide domestic water & sanitary piping to PL fixtures (Sk, WC, Lav, Mop Sk). Tap off existing PL for supply. Provide SP fl. control valve assembly & connect to existing combined SP/SD riser. Provide SP drain & connect to existing drain on fl.
M00198871-I1
01/07/2022
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00287659-I1
11/24/2021
Signed off — Alteration
INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00285374-I1
11/19/2021
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD, SYSTEM SCAFFOLDING AND OVERHEAD PROTECTION AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00408658-I1
08/11/2021
Signed off — Alteration
Mechanical work as shown on plans.
M00237403-I1
08/09/2021
Signed off — Alteration
Plumbing work as shown on plans.
M00237415-I1
08/04/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
STEPHEN WOODCHEKE
08/04/2021
Special inspection requirement — Final
STEPHEN WOODCHEKE
08/04/2021
Special inspection requirement — Mechanical Systems
STEPHEN WOODCHEKE
08/03/2021
Filed — Alteration
Mechanical work as shown on plans.
M00237403-P1
07/26/2021
Signed off — Alteration
Respectfully requesting to amend ST drawings.
M00199493-I1
07/22/2021
Permit issued — Sprinklers
M00198871-I1-PL
07/20/2021
Signed off — Alteration
Installation of new VRF system including ductwork and controls and new exhaust ductwork and fan. No change in use, egress occupancy.
M00198619-I1
07/17/2021
Special inspection requirement — Structural Cold-Formed Steel
Christopher Drutjons
Latest 60 of 252 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offCRAFT DESIGN CONSTR CORP05/19/2026
DOB NOWSidewalk ShedSigned-offINTERSYSTEM CONSTRUCTION01/15/2026
DOB NOWSuspended ScaffoldPermit IssuedVIK XS SERVICES INC10/29/2025
DOB NOWSidewalk ShedSigned-offINTERSYSTEMS INSTAL S&S09/30/2025
DOB NOWSuspended ScaffoldPermit IssuedVIK XS SERVICES INC09/05/2025
DOB NOWGeneral ConstructionSigned-offVIK XS SERVICES INC09/05/2025
DOB NOWGeneral ConstructionSigned-offVIK XS SERVICES INC05/06/2025
DOB NOWSuspended ScaffoldPermit IssuedVIK XS SERVICES INC04/16/2025
DOB NOWSuspended ScaffoldPermit IssuedVIK XS SERVICES INC02/28/2025
DOB NOWSidewalk ShedSigned-offINTERSYSTEMS INSTAL S&S10/02/2024
DOB NOWSidewalk ShedSigned-offINTERSYSTEMS INSTAL S&S10/31/2023
DOB NOWSidewalk ShedSigned-offINTERSYSTEMS INSTAL S&S11/09/2022
DOB NOWSprinklersSigned-offPAR PLUMBING CO., INC07/22/2021
DOB NOWSidewalk ShedSigned-offTRI BOROUGH SCAFFOLDING04/01/2021
DOB NOWSupported ScaffoldSigned-offTRI BOROUGH SCAFFOLDING03/31/2021
DOB NOWSprinklersSigned-offFIVE BORO ASSOCIATES INC03/28/2021
DOB NOWPlumbingSigned-offLAWRENCE J. LEVINE03/01/2021
DOB NOWPlumbingSigned-offLAWRENCE J. LEVINE03/01/2021
DOB NOWSprinklersSigned-offFIVE BORO ASSOCIATES INC02/22/2021
DOB NOWStandpipeSigned-offFIVE BORO ASSOCIATES INC02/17/2021
DOB NOWStandpipeSigned-offFIVE BORO ASSOCIATES INC02/17/2021
DOB NOWPlumbingSigned-offPRO STAR PLBG,HTG&MECH IN02/08/2021
DOB NOWPlumbingSigned-offSOLUTION MECH CONTNG LLC01/19/2021
DOB NOWStandpipeSigned-offFIVE BORO ASSOCIATES INC01/18/2021
DOB NOWStandpipeSigned-offFIVE BORO ASSOCIATES INC01/18/2021
DOB NOWSprinklersSigned-offFIVE BORO ASSOCIATES INC12/21/2020
DOB NOWMechanical SystemsSigned-offAFFINITY BUILDING SOLUTIO12/09/2020
DOB NOWSupported ScaffoldSigned-offTRI BOROUGH SCAFFOLDING11/30/2020
DOB NOWMechanical SystemsSigned-offAFFINITY BUILDING SOLUTIO11/06/2020
DOB NOWSprinklersSigned-offFIVE BORO ASSOCIATES INC10/22/2020
DOB NOWSupported ScaffoldSigned-offTRI BOROUGH SCAFFOLDING10/22/2020
DOB NOWPlumbingSigned-offSOLUTION MECH CONTNG LLC10/15/2020
DOB NOWMechanical SystemsSigned-offAFFINITY BUILDING SOLUTIO09/24/2020
DOB NOWConstruction FenceSigned-offAFFINITY BUILDING SOLUTIO09/24/2020
DOB NOWConstruction FenceSigned-offAFFINITY BUILDING SOLUTIO07/12/2020
DOB NOWSprinklersSigned-offFIVE BORO ASSOCIATES INC06/22/2020
DOB NOWSprinklersSigned-offFIVE BORO ASSOCIATES INC06/22/2020
DOB NOWSprinklersSigned-offFIVE BORO ASSOCIATES INC06/05/2020
DOB NOWMechanical SystemsSigned-offAFFINITY BUILDING SOLUTIO06/03/2020
DOB NOWMechanical SystemsSigned-offAFFINITY BUILDING SOLUTIO05/07/2020
+ 47 more permits on file
9 projects · most recent 08/11/2026
General Wiring
FiledStatusContractorScope
08/11/2026Permit IssuedLTC ELEC'L CONTR'G LLCGeneral Wiring
05/05/2026Permit IssuedGLENDALE ELECTL CONTNG INGeneral Wiring
10/07/2025Permit IssuedAURORA ELECL CONTG INC—
11/14/2022Permit IssuedSNJ ELECTL CONTRG LLC—
11/30/2021Permit IssuedCOGEN ELEC'L SERVICES,INCGeneral Wiring
07/21/2021CompleteUNITY ELECTRIC CO INC—
08/06/2020CompleteCOGEN ELEC'L SERVICES,INCGeneral Wiring
12/19/2019CompleteV. VASS ELECTRIC CORP—
10/11/2019CompleteUNITY ELECTRIC CO INC—
1 project · most recent 10/29/2025
Suspended Scaffold
FiledStatusContractorScope
10/29/2025Permit IssuedVIK XS SERVICES INCSuspended Scaffold
1 project · most recent 10/29/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
10/29/2025Permit IssuedVIK XS SERVICES INCSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 75
DateRequirementInspectorRole
03/31/2026Energy Code Compliance InspectionsFabian Jabroprogress
03/31/2026Interior lighting powerFabian Jabroenergy_progress
03/23/2026FinalFabian Jabroprogress
03/21/2023FinalChristopher Krepcioprogress
03/21/2023Structural Stability – Alterations of existing buildingsChristopher Krepciospecial
03/21/2023MasonryChristopher Krepciospecial
08/04/2021Fire-Resistant Penetrations and JointsSTEPHEN WOODCHEKEspecial
08/04/2021FinalSTEPHEN WOODCHEKEprogress
08/04/2021Mechanical SystemsSTEPHEN WOODCHEKEspecial
07/17/2021FinalChristopher Drutjonsprogress
07/17/2021Structural Steel - High Strength BoltingChristopher Drutjonsspecial
07/17/2021Structural Steel - DetailsChristopher Drutjonsspecial
07/17/2021Structural Cold-Formed SteelChristopher Drutjonsspecial
07/17/2021Post-installed AnchorsChristopher Drutjonsspecial
07/17/2021Structural Steel - WeldingChristopher Drutjonsspecial
06/08/2021Sprinkler SystemsChristopher Drutjonsspecial
06/08/2021Standpipe SystemsChristopher Drutjonsspecial
06/01/2021Mechanical SystemsChristopher Drutjonsspecial
06/01/2021Maintenance informationChristopher Drutjonsenergy_progress
06/01/2021HVAC and service water heating system controls Christopher Drutjonsenergy_progress
06/01/2021Electrical motorsChristopher Drutjonsenergy_progress
06/01/2021HVAC and service water heating equipment Christopher Drutjonsenergy_progress
06/01/2021FinalChristopher Drutjonsprogress
06/01/2021Permanent certificateChristopher Drutjonsenergy_progress
06/01/2021HVAC insulation and sealing Christopher Drutjonsenergy_progress
Latest 25 of 75.
▾Documents — 556 on file (BIS + DOB NOW)
▸Plans & Drawings39
▸DOB NOWPlans/Sketch - Mechanical Systems13
09/05/2026M00198245-I1Request digital key ↗
09/05/2026M00237403-P1Request digital key ↗
09/05/2026M00198619-P1Request digital key ↗
Showing 3 of 13 on file for this type
▸DOB NOWPlans/Sketch - Plumbing5
09/05/2026M00237415-I1Request digital key ↗
09/04/2026M00334984-I1Request digital key ↗
09/03/2026M00198871-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch5
09/01/2026M08036892-I1Request digital key ↗
08/21/2026M00847392-S2Request digital key ↗
08/21/2026M00847392-S1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler5
09/05/2026M00199359-I1Request digital key ↗
09/04/2026M00334988-I1Request digital key ↗
09/03/2026M00198871-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Structural4
09/04/2026M00199493-I1Request digital key ↗
08/15/2026M00199493-P1Request digital key ↗
08/15/2026M00199493-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Standpipe3
09/05/2026M00199359-I1Request digital key ↗
09/03/2026M00198871-P1Request digital key ↗
09/03/2026M00198871-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold2
09/05/2026M00287659-I1Request digital key ↗
09/04/2026M00408658-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/04/2026M00362487-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00285374-I1Request digital key ↗
▸Applications & Permits98
▸BISPLAN / WORK APPROVAL APPLICATION51
07/08/2025121207372Open ↗
07/01/2025121207372Open ↗
06/20/2025120804095Open ↗
Showing 3 of 51 on file for this type
▸BISWORK PERMIT APPLICATION23
12/08/2020140982676Open ↗
12/08/2020140982649Open ↗
10/14/2020121207372Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWLPC Approval/Permit22
09/05/2026M00198619-P1Open ↗
09/05/2026M00198619-I1Open ↗
09/05/2026M00198619-P2Open ↗
Showing 3 of 22 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
01/29/2021121207372Open ↗
▸DOB NOWState DEC Permit1
08/13/2026M00192235-I1Open ↗
▸Seals & Professional Certifications170
▸DOB NOWProgress Inspector Seal & Signature37
09/02/2026M00362487-I1Open ↗
09/01/2026M00192177-P1Open ↗
09/01/2026M01376231-I1Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature35
09/01/2026M00192177-P1Open ↗
09/01/2026M00192177-P1Open ↗
09/01/2026M00192177-I1Open ↗
Showing 3 of 35 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature34
09/05/2026M00199359-I1Open ↗
09/05/2026M00199374-I1Open ↗
09/05/2026M00198619-P2Open ↗
Showing 3 of 34 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION30
06/15/2020123830630Open ↗
06/15/2020123830630Open ↗
03/27/2020123830630Open ↗
Showing 3 of 30 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST11
03/27/2020123830630Open ↗
Showing 1 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT8
12/03/2020140982676Open ↗
12/01/2020140982649Open ↗
10/05/2020140892210Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
12/03/2020140982676Open ↗
12/01/2020140982649Open ↗
10/05/2020140892210Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
12/03/2020140982676Open ↗
12/01/2020140982649Open ↗
10/05/2020140892210Open ↗
Showing 3 of 4 on file for this type
▸BISProfessional and Owner Certification (POC3)2
03/27/2020123830630Open ↗
03/27/2020123830630Open ↗
▸Trade Schedules & Equipment4
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSCHEDULE B - PLUMBING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
12/24/2020123772970Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST1
10/06/2020121207372Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTenant Protection Plan and Notes1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos36
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form16
09/05/2026M00199359-I1Open ↗
09/05/2026M00198619-I1Open ↗
09/04/2026M00334980-I1Open ↗
Showing 3 of 16 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)9
12/08/2020140982676Open ↗
12/08/2020140982649Open ↗
10/05/2020140892210Open ↗
Showing 3 of 9 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM5
12/03/2020140982676Open ↗
12/01/2020140982649Open ↗
09/24/2020121207372Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/17/2026M01376231-I1Open ↗
▸Energy Compliance19
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISENERGY CODE 1ST REVIEW COMPLETE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
05/18/2021123886544Open ↗
03/18/2021123830630Open ↗
02/22/2021123886535Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
05/18/2021123886544Open ↗
03/18/2021123830630Open ↗
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026M00406723-I1Open ↗
08/13/2026M00192177-I1Open ↗
▸BISNYCECC EXEMPTION1
10/05/2020140892210Open ↗
▸Inspections & Test Reports37
▸BISTECHNICAL REPORT: RESPONSIBILITY30
05/18/2021123886544Open ↗
04/27/2021123803045Open ↗
04/27/2021123803045Open ↗
Showing 3 of 30 on file for this type
▸BISSTRUCTURAL STEEL - WELDING1
01/03/2022123788311Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
01/03/2022123788311Open ↗
▸BISSTRUCTURAL STEEL - DETAILS1
01/03/2022123788311Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
01/03/2022123788311Open ↗
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
01/03/2022123788311Open ↗
▸BISPOST-INSTALLED ANCHORS1
01/03/2022123788311Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
01/03/2022123788311Open ↗
▸Approvals, Objections & Sign-offs54
▸BISLANDMARKS APPROVAL18
04/20/2021123886544Open ↗
12/03/2020140982676Open ↗
12/01/2020140982649Open ↗
Showing 3 of 18 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST16
06/24/2025123788311Open ↗
06/24/2025121594738Open ↗
06/24/2025121241502Open ↗
Showing 3 of 16 on file for this type
▸BISLANDMARKS SIGNOFF6
06/24/2025123788311Open ↗
04/27/2021123803045Open ↗
03/31/2021140982649Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE4
03/02/2021121207372Open ↗
02/26/2021121207372Open ↗
09/24/2020121207372Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
10/22/2025121207372Open ↗
06/26/2020123788311Open ↗
Showing 2 of 3 on file for this type
▸BISSHED LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION1
05/20/2020121207372Open ↗
▸Cost, Insurance & Ownership34
▸BISCOST AFFIDAVIT31
05/18/2021123886544Open ↗
04/27/2021123803045Open ↗
03/31/2021140982649Open ↗
Showing 3 of 31 on file for this type
▸BISOK TO ISSUE TCO PENDING RESOLUTION OFOPEN FACADE VIOLATION - AFFIDAVIT ATTACHED2
01/13/2026121207372Open ↗
06/12/2025121207372Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
01/03/2022123788311Open ↗
▸Filing & Intake Forms46
▸BISEFILING COVER SHEET17
05/20/2021121207372Open ↗
06/26/2020123788311Open ↗
06/01/2020123788311Open ↗
Showing 3 of 17 on file for this type
▸BISADDITIONAL INFORMATION15
07/22/2021121207372Open ↗
04/26/2021123803045Open ↗
04/20/2021123886544Open ↗
Showing 3 of 15 on file for this type
▸BISBOROUGH INTAKE FORM10
10/14/2020121207372Open ↗
09/14/2020123788311Open ↗
06/12/2020123830630Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
12/03/2020140982676Open ↗
12/01/2020140982649Open ↗
10/05/2020140892210Open ↗
Showing 3 of 4 on file for this type
▸Other Documents15
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION5
02/05/2021123819136Open ↗
09/24/2020121207372Open ↗
08/25/2020123788311Open ↗
Showing 3 of 5 on file for this type
▸BISTCO - Supporting Documents2
03/10/2023121207372Open ↗
01/13/2023121207372Open ↗
▸DOB NOWManufacturer's Specifications2
08/13/2026M00847392-S1Open ↗
08/13/2026M00847392-S2Open ↗
▸DOB NOWCalculations2
08/13/2026M00847392-S1Open ↗
08/13/2026M00847392-S2Open ↗
▸BISPROVIDE DEP CERTIFICATION THAT TANK ANDBOILER HAS BEEN REMIVED AND DISPOSED LEGALLY.1
02/05/2021123819136Open ↗
▸BISBPP - DOT Builders Pavement Unit Waiver Request Form1
04/06/2020123830630Open ↗
▸BISPLOT DIAGRAM1
10/06/2020121207372Open ↗
▸DOB NOWProof of Historic Building1
08/13/2026M00847392-I1Open ↗