← Back
Miscellaneous two family
528 8 STREET
BROOKLYN · BIN 3025941
💬 Discuss this project
1902Year Built
2Stories
B9Building Class
R7BZoning
3,024 sfGross Floor Area
2Units
Miscellaneous two family · 1,830 sf lot · 1.65 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof6p · 4 filings · 20 docs
Floor 25p · 4 filings · 20 docs
Floor 12p · 2 filings · 18 docs
Cellar9p · 4 filings · 20 docs
Basement11p · 4 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/09/2021$3.3M—Private party → Private party$1,076/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LEVELEIGHT ARCHITECTURE DESIGN PLLC204/18/2025
RAAD512/09/2024
AS ENGINEERING SERVICES PC106/07/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J A EXPEDITING1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CNS CONSTRUCTION INCGeneral Contractor903/21/2026
DPH PLUMBING & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
VALERIO ASSOCIATES, P.C.1379304/18/2025
RAAD7727512/09/2024
Building Lifecycle
All (51)Filed (8)Permit Issued (4)Signed Off (4)Inspection (5)Special Inspection (30)
08/06/2025
Signed off — Alteration
B01042088-I1
07/08/2025
Signed off — Alteration
HEREBY FILING FOR THE REMOVAL, REPLACEMENT, RELOCATION AND INSTALLATION OF PLUMBING FIXTURES. NO CHANGE TO USE OCCUPANCY OR EGRESS.
B01042095-I1
07/08/2025
Signed off — Alteration
HEREBY FILING FOR THE INSTALLATION OF MECHANICAL EQUIPMENT IN EXISTING TWO FAMILY DWELLING. NO CHANGE TO USE OCCUPANCY OR EGRESS.
B01042093-I1
06/03/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/23/2025
Special inspection requirement — Air barrier - visual inspection
Otto Ruano
04/23/2025
Special inspection requirement — Fenestration areas
Otto Ruano
04/23/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Otto Ruano
04/23/2025
Special inspection requirement — Lighting in dwelling units
Otto Ruano
04/23/2025
Special inspection requirement — Metering
Otto Ruano
04/23/2025
Special inspection requirement — Energy Code Compliance Inspections
Otto Ruano
04/23/2025
Special inspection requirement — Fenestration air leakage
Otto Ruano
04/23/2025
Special inspection requirement — Maintenance information
Otto Ruano
04/23/2025
Special inspection requirement — Final
Otto Ruano
04/23/2025
Special inspection requirement — Permanent certificate
Otto Ruano
04/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN VALERIO
04/18/2025
Filed — Alteration
B01042088-P1
04/18/2025
Special inspection requirement — Fenestration areas
Otto Ruano
04/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN VALERIO
04/18/2025
Special inspection requirement — Energy Code Compliance Inspections
Otto Ruano
04/18/2025
Special inspection requirement — Final
Otto Ruano
04/18/2025
Special inspection requirement — Metering
Otto Ruano
04/18/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Otto Ruano
04/18/2025
Special inspection requirement — Air barrier - visual inspection
Otto Ruano
04/18/2025
Special inspection requirement — Maintenance information
Otto Ruano
04/18/2025
Special inspection requirement — Fenestration air leakage
Otto Ruano
04/18/2025
Special inspection requirement — Permanent certificate
Otto Ruano
04/18/2025
Special inspection requirement — Lighting in dwelling units
Otto Ruano
03/26/2025
Signed off — Alteration
B01042091-I1
03/11/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/11/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/10/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
NICHOLAS AZADIAN
12/10/2024
Special inspection requirement — HVAC-R and service water heating system controls
NICHOLAS AZADIAN
12/10/2024
Special inspection requirement — HVAC-R and service water heating equipment
NICHOLAS AZADIAN
12/10/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
NICHOLAS AZADIAN
12/10/2024
Special inspection requirement — Energy Code Compliance Inspections
NICHOLAS AZADIAN
12/09/2024
Filed — Alteration
HEREBY FILING FOR THE REMOVAL, REPLACEMENT, RELOCATION AND INSTALLATION OF PLUMBING FIXTURES. NO CHANGE TO USE OCCUPANCY OR EGRESS.
B01042095-P2
12/05/2024
Special inspection requirement — Energy Code Compliance Inspections
NICHOLAS AZADIAN
12/05/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
NICHOLAS AZADIAN
12/05/2024
Special inspection requirement — HVAC-R and service water heating equipment
NICHOLAS AZADIAN
12/04/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/04/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/26/2024
Filed — Alteration
HEREBY FILING FOR THE INSTALLATION OF MECHANICAL EQUIPMENT IN EXISTING TWO FAMILY DWELLING. NO CHANGE TO USE OCCUPANCY OR EGRESS.
B01042093-P1
11/26/2024
Filed — Alteration
HEREBY FILING FOR THE REMOVAL, REPLACEMENT, RELOCATION AND INSTALLATION OF PLUMBING FIXTURES. NO CHANGE TO USE OCCUPANCY OR EGRESS.
B01042095-P1
09/24/2024
Permit issued — Mechanical Systems
B01042093-I1-MS
09/12/2024
Filed — Alteration
HEREBY FILING FOR THE INSTALLATION OF MECHANICAL EQUIPMENT IN EXISTING TWO FAMILY DWELLING. NO CHANGE TO USE OCCUPANCY OR EGRESS.
B01042093-I1
08/15/2024
Permit issued — Plumbing
B01042095-I1-PL
06/11/2024
Permit issued — Structural
B01042091-I1-ST
06/07/2024
Filed — Alteration
HEREBY FILING FOR THE REMOVAL, REPLACEMENT, RELOCATION AND INSTALLATION OF PLUMBING FIXTURES. NO CHANGE TO USE OCCUPANCY OR EGRESS.
B01042095-I1
06/07/2024
Filed — Alteration
B01042091-I1
06/06/2024
Permit issued — General Construction
B01042088-I1-GC
06/04/2024
Filed — Alteration
B01042088-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offCNS CONSTRUCTION INC09/24/2024
DOB NOWPlumbingSigned-offDPH PLUMBING & HTG CORP08/15/2024
DOB NOWStructuralSigned-offCNS CONSTRUCTION INC06/11/2024
DOB NOWGeneral ConstructionSigned-offCNS CONSTRUCTION INC06/06/2024
1 project · most recent 10/31/2025
General Wiring
FiledStatusContractorScope
10/31/2025CompleteRIVIERA ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
06/03/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/11/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/11/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/04/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/04/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 52
DateRequirementInspectorRole
04/23/2025Air barrier - visual inspectionOtto Ruanoenergy_progress
04/23/2025Fenestration areasOtto Ruanoenergy_progress
04/23/2025Fenestration and door U-factor and product ratingsOtto Ruanoenergy_progress
04/23/2025Lighting in dwelling unitsOtto Ruanoenergy_progress
04/23/2025MeteringOtto Ruanoenergy_progress
04/23/2025Energy Code Compliance InspectionsOtto Ruanoprogress
04/23/2025Fenestration air leakageOtto Ruanoenergy_progress
04/23/2025Maintenance informationOtto Ruanoenergy_progress
04/23/2025FinalOtto Ruanoprogress
04/23/2025Permanent certificateOtto Ruanoenergy_progress
04/23/2025Fire-Resistant Penetrations and JointsJOHN VALERIOspecial
04/18/2025Fenestration areasOtto Ruanoenergy_progress
04/18/2025Fire-Resistant Penetrations and JointsJOHN VALERIOspecial
04/18/2025Energy Code Compliance InspectionsOtto Ruanoprogress
04/18/2025FinalOtto Ruanoprogress
04/18/2025MeteringOtto Ruanoenergy_progress
04/18/2025Fenestration and door U-factor and product ratingsOtto Ruanoenergy_progress
04/18/2025Air barrier - visual inspectionOtto Ruanoenergy_progress
04/18/2025Maintenance informationOtto Ruanoenergy_progress
04/18/2025Fenestration air leakageOtto Ruanoenergy_progress
04/18/2025Permanent certificateOtto Ruanoenergy_progress
04/18/2025Lighting in dwelling unitsOtto Ruanoenergy_progress
12/10/2024Fire-Resistant Penetrations and JointsNICHOLAS AZADIANspecial
12/10/2024HVAC-R and service water heating system controlsNICHOLAS AZADIANenergy_progress
12/10/2024HVAC-R and service water heating equipmentNICHOLAS AZADIANenergy_progress
Latest 25 of 52.
▾Documents — 54 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/24/2026B01042088-P1Request digital key ↗
08/24/2026B01042088-I1Request digital key ↗
08/24/2026B01042091-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits8
▸DOB NOWLPC Approval/Permit8
08/23/2026B01042095-I1Open ↗
08/23/2026B01042095-P1Open ↗
08/13/2026B01042093-P1Open ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications30
▸DOB NOWProgress Inspector Seal & Signature16
09/02/2026B01042095-P2Open ↗
09/02/2026B01042095-P2Open ↗
09/01/2026B01042093-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/24/2026B01042088-P1Open ↗
08/24/2026B01042088-I1Open ↗
08/24/2026B01042091-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/02/2026B01042095-P2Open ↗
09/01/2026B01042093-I1Open ↗
08/28/2026B01042088-I1Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/24/2026B01042088-I1Open ↗
08/24/2026B01042088-P1Open ↗
08/24/2026B01042091-I1Open ↗
Showing 3 of 8 on file for this type