| Owner | Filings | Most Recent |
|---|---|---|
| CROWN PROPERTIES | 23 | 07/25/2026 |
| 501 ASSOCIATES | 6 | 07/08/2026 |
| SUTTON MANAGEMENT | 22 | 07/08/2026 |
| 55 LIBERTY OWNER'S CORP | 143 | 03/22/2026 |
| COOPER SQUARE REALTY | 4 | 03/22/2026 |
| 55 LIBERTY STREET OWNER'S CORP | 46 | 03/22/2026 |
| WORLD RESTORATION CORP | 2 | 03/22/2026 |
| J.C. KLEIN INC | 3 | 03/22/2026 |
| JOHN ED INC. | 2 | 03/22/2026 |
| FAIRE LIBERTE INC | 1 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| EP ENGINEERING LLC | 2 | 07/28/2026 |
| DHD ARCHITECTURE DESIGN PLLC | 1 | 07/27/2026 |
| AMMR H. VANDAL ARCHITECT | 3 | 05/18/2026 |
| BENDIX ENGINEERING, P.C. | 2 | 08/01/2025 |
| MATTHEW MICHALSKI | 1 | 07/16/2025 |
| UNI-D LLC | 3 | 03/31/2025 |
| JACK GREEN ASSOCIATES | 1 | 10/09/2024 |
| BBSTUDIO ARCHITECTS | 4 | 08/21/2024 |
| LEVEL-UP ENGINEERING, PLLC | 1 | 06/12/2024 |
| IDEAS OF ORDER ARCHITECTURE PLLC | 1 | 05/10/2024 |
| KUSHNER STUDIOS | 4 | 04/17/2024 |
| MICHAEL SUTTON ARCHITECTURE PLLC | 4 | 03/12/2024 |
| KAM CHIU CONSULTING ENGINEER, P.C. | 2 | 03/11/2024 |
| BALA CONSULTING ENGINEERS | 2 | 03/11/2024 |
| KINDO HOLDINGS, LLC | 1 | 03/07/2023 |
| SP WONG ARCHITECT PLLC | 2 | 09/27/2022 |
| AZA ENGINEERING LLC | 4 | 09/07/2022 |
| MISRA & ASSOCIATES, P.C. | 4 | 06/03/2022 |
| HSL ARCHITECT P.C. | 2 | 05/13/2022 |
| TOHFAZ UDDIN PE PC | 5 | 01/21/2022 |
| PAUL PERDEK, PROF. ENG. PLLC | 4 | 11/12/2021 |
| AYUSO ARCHITECTURE PC | 3 | 07/29/2021 |
| BAILEYS ENGINEERING PC | 1 | 03/07/2019 |
| Representative | Filings | Most Recent |
|---|---|---|
| AR KISSIL | 2 | 03/21/2026 |
| BOYD CONSULTING | 6 | 03/21/2026 |
| SKYLINE ACCESS | 1 | 03/21/2026 |
| BOHLER ENGINEERING | 8 | 03/21/2026 |
| LLOYD NOEL BUILDING CONSULTANT | 4 | 03/21/2026 |
| GARDEN STATE OF NJ DATA RECOVERY | 3 | 03/21/2026 |
| MUNICIPAL BUILDING CONSULTANTS | 2 | 03/21/2026 |
| FIVE BOROUGH FILING & EXPEDITING IN | 12 | 03/21/2026 |
| AE DESIGN SOLUTION | 10 | 03/21/2026 |
| I L CONSULTING | 6 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| EMPIRE NY INSTALLATIONS INC | General Contractor | 15 | 07/08/2026 |
| BHD GROUP LLC | General Contractor | 8 | 07/08/2026 |
| J&T REMODELING LLC | General Contractor | 7 | 07/08/2026 |
| H BRONNER & SON PLBG & HTG | Plumbing | 5 | 07/08/2026 |
| GARDEN STATE OF NJ DATA* | General Contractor | 5 | 07/08/2026 |
| SKYLINE RESTORATION INC | General Contractor | 4 | 03/21/2026 |
| SPRING SCAFFOLDING LLC | General Contractor | 4 | 07/08/2026 |
| AQUEDUCT MECHANICAL CORP | Plumbing | 3 | 07/08/2026 |
| FOUR BROTHERS GENERAL CONTRACT | General Contractor | 3 | 07/08/2026 |
| BLACK SQUARE BUILDERS CORP | General Contractor | 3 | 07/08/2026 |
| STONE & OAK INTERIORS INC | General Contractor | 3 | 03/21/2026 |
| BEMUS, JR., J | Electrical | 2 | 03/21/2026 |
| D.B.J. CONTRACTING CORP | General Contractor | 2 | 03/21/2026 |
| DJC CORP | Plumbing | 2 | 07/25/2026 |
| ENTERPRISE CONSTRUCTION I | General Contractor | 2 | 07/08/2026 |
| RICHTER & RATNER CONTRACTING | General Contractor | 2 | 03/21/2026 |
| COW BAY SPRINKLER CORP | General Contractor | 2 | 04/09/2026 |
| HORIZONE REMODELING CORP | General Contractor | 1 | 07/08/2026 |
| UNION BUILDERS SOLUTIONS, | General Contractor | 1 | 07/08/2026 |
| EH PLUMBING & HEATING COR | Plumbing | 1 | 07/08/2026 |
| HP SERVICES INC | Plumbing | 1 | 07/08/2026 |
| KAPNAG HTG & PLBG CORP. | Plumbing | 1 | 07/08/2026 |
| L.L.G. PLBG & HTG INC | Plumbing | 1 | 07/08/2026 |
| M & M PIPING AND HEATING | Plumbing | 1 | 07/08/2026 |
| SIGNORE & SONS PLBG CORP | Plumbing | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| BENDIX ENGINEERING, P.C. | 4293 | 2 | 08/01/2025 |
| HANSEN ENGINEERING PC | 8174 | 1 | 07/16/2025 |
| UNI-D | 7898 | 3 | 03/31/2025 |
| JACK GREEN ASSOCIATES | 422 | 1 | 10/09/2024 |
| MJ ENGINEERING & DESIGN | 5546 | 3 | 08/21/2024 |
| ACE STRUCTURAL ENGINEERIN | 496 | 4 | 08/06/2024 |
| R M & E ENGINEERINC PLLC | 3030 | 2 | 06/12/2024 |
| DNA CONTROLLED INSPECTION | 554 | 2 | 03/11/2024 |
| HRF SERVICES CORP | 5616 | 1 | 03/07/2023 |
| AZA ENGINEERING LLC | 7235 | 4 | 09/27/2022 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Plumbing | Permit Issued | DJC CORP | 07/24/2026 |
| DOB NOW | General Construction | Permit Issued | ESSENTIAL REMODELING INC | 07/06/2026 |
| DOB NOW | Plumbing | Signed-off | WTC PLBG & HEATING CORP | 02/04/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | COW BAY SPRINKLER CORP | 12/24/2025 |
| DOB NOW | General Construction | Permit Issued | COW BAY SPRINKLER CORP | 12/18/2025 |
| DOB NOW | General Construction | Signed-off | GARDEN STATE OF NJ DATA* | 08/18/2025 |
| DOB NOW | General Construction | Signed-off | GARDEN STATE OF NJ DATA* | 05/07/2025 |
| DOB NOW | Plumbing | Signed-off | M & M PIPING AND HEATING | 05/06/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | STONE & OAK INTERIORS INC | 04/04/2025 |
| DOB NOW | General Construction | Signed-off | BLACK SQUARE BUILDERS COR | 03/28/2025 |
| DOB NOW | Mechanical Systems | Signed-off | BLACK SQUARE BUILDERS COR | 03/28/2025 |
| DOB NOW | General Construction | Signed-off | GARDEN STATE OF NJ DATA* | 03/19/2025 |
| DOB NOW | Suspended Scaffold | Permit Issued | SKYLINE RESTORATION INC | 02/21/2025 |
| DOB NOW | Plumbing | Permit Issued | DJC CORP | 02/21/2025 |
| DOB NOW | General Construction | Permit Issued | UNION BUILDERS SOLUTIONS, | 10/08/2024 |
| DOB NOW | Plumbing | Signed-off | URBAN MECHANICAL CORP | 08/21/2024 |
| DOB NOW | General Construction | Permit Issued | HORIZONE REMODELING | 07/30/2024 |
| DOB NOW | Structural | Signed-off | RICHTER & RATNER CONTRACTING | 03/19/2024 |
| DOB NOW | Plumbing | Signed-off | AQUEDUCT MECHANICAL CORP | 02/28/2024 |
| DOB NOW | General Construction | Permit Issued | ENTERPRISE CONSTRUCTION I | 02/20/2024 |
| DOB NOW | Sprinklers | Signed-off | JPI PLUMBING & HEATING IN | 01/19/2024 |
| DOB NOW | General Construction | Signed-off | J&T REMODELING LLC | 12/29/2023 |
| DOB NOW | Plumbing | Signed-off | L.L.G. PLBG & HTG INC | 11/22/2023 |
| DOB NOW | General Construction | Signed-off | BHD GROUP LLC | 10/16/2023 |
| DOB NOW | Plumbing | Signed-off | H BRONNER & SON PLBG & HT | 08/31/2023 |
| DOB NOW | Mechanical Systems | Signed-off | BHD GROUP LLC | 08/17/2023 |
| DOB NOW | General Construction | Signed-off | J&T REMODELING LLC | 05/22/2023 |
| DOB NOW | General Construction | Signed-off | GARY'S CONSTRUCTION INC | 05/19/2023 |
| DOB NOW | Plumbing | Signed-off | H BRONNER & SON PLBG & HT | 04/03/2023 |
| DOB NOW | General Construction | Signed-off | ENTERPRISE CONSTRUCTION I | 03/13/2023 |
| DOB NOW | Plumbing | Signed-off | H BRONNER & SON PLBG & HT | 01/31/2023 |
| DOB NOW | General Construction | Signed-off | BHD GROUP LLC | 11/03/2022 |
| DOB NOW | Plumbing | Signed-off | HP SERVICES INC | 07/16/2022 |
| DOB NOW | Supported Scaffold | Permit Issued | SKYLINE RESTORATION INC | 07/12/2022 |
| DOB NOW | Plumbing | Signed-off | AQUEDUCT MECHANICAL CORP | 06/09/2022 |
| DOB NOW | General Construction | Signed-off | J&T REMODELING LLC | 06/01/2022 |
| DOB NOW | Supported Scaffold | Signed-off | SPRING SCAFFOLDING LLC | 03/24/2022 |
| DOB NOW | Sidewalk Shed | Signed-off | EMPIRE NY INSTALLATIONS I | 02/02/2022 |
| DOB NOW | Supported Scaffold | Signed-off | EMPIRE NY INSTALLATIONS I | 01/26/2022 |
| DOB NOW | Plumbing | Signed-off | KAPNAG HTG & PLBG CORP. | 12/30/2021 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 07/28/2026 | — | — | Heating Systems | Heating Ephoca AVP20R3H2 700 CFM · Heat Pump Outdoor ×1 |
| 08/01/2025 | Permit Issued | COW BAY SPRINKLER CORP | Air Conditioning Systems | Cooling Johnson Controls DSH060C2M6SAA3A0D 61,600 BTU · Rooftop Unit ×2 |
| 10/09/2024 | Permit Issued | STONE & OAK INTERIORS INC | Air Conditioning Systems | Cooling Skilaire Model #PAA 060-H3 1,950 CFM · Crac Unit ×1 |
| 08/06/2024 | Permit Issued | ESSENTIAL REMODELING INC | Air Conditioning Systems, Ventilation Systems | |
| 03/07/2023 | Signed-off | GARY'S CONSTRUCTION INC | Associated Ducts and Piping | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/11/2024 | Signed-off | JPI PLUMBING & HEATING IN | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/28/2026 | — | — | Gas, Water/Sanitary |
| 07/16/2025 | Signed-off | WTC PLBG & HEATING CORP | Water/Sanitary |
| 08/21/2024 | Signed-off | URBAN MECHANICAL CORP | Gas, Water/Sanitary |
| 08/06/2024 | Permit Issued | DJC CORP | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/30/2026 | Complete | ASSET ELECTRIC CORP | General Wiring |
| 03/04/2026 | Complete | EMPIRE LIC ELECL CONTRS | General Wiring |
| 02/02/2026 | Complete | SMART ELECTRIC SERVICES | General Wiring |
| 07/30/2025 | Complete | JOE ELECTRICAL INC | General Wiring |
| 10/30/2024 | Permit Issued | SMART ELECTRIC SERVICES | General Wiring |
| 09/13/2024 | Complete | SMART ELECTRIC SERVICES | General Wiring |
| 09/03/2024 | Complete | BLU ELECTRICAL SVS INC | General Wiring |
| 07/08/2024 | Complete | STEEL CITY ELECTRICAL CON | General Wiring |
| 12/06/2023 | Complete | TESTA ELECTRIC CO., INC | General Wiring |
| 06/13/2023 | Complete | STEEL CITY ELECTRICAL CON | — |
| 04/17/2023 | Complete | FALCO ELEC'L SERVICES INC | General Wiring |
| 09/21/2022 | Permit Issued | SAFETECH ELECL CONTNG COR | General Wiring |
| 01/20/2022 | Permit Issued | EASTERN ELEC'L TECHNOLOGI | General Wiring |
| 08/09/2021 | Permit Issued | JTE ELECTRICAL SERVICES | — |
| 05/21/2021 | Permit Issued | ALL WAYS ELECTRIC CORP.W | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/18/2026 | — | — | 1 scope_items |
| 08/21/2024 | Signed-off | URBAN MECHANICAL CORP | Steel, Concrete |
| 03/12/2024 | Permit Issued | ENTERPRISE CONSTRUCTION I | 1 scope_items |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/01/2025 | Permit Issued | COW BAY SPRINKLER CORP | Tenant Protection Plan 72 Hour |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 02/18/2025 | Permit Issued | SKYLINE ACCESS LLC | — |
| Date | Type | Result | Report |
|---|---|---|---|
| 07/07/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/14/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 04/07/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/19/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 02/13/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 09/04/2025 | Fail-Final General Construction Non-Directive 14 | Fail | View ↗ |
| 07/15/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 05/16/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/14/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 05/13/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/13/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 11/26/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 11/08/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 11/06/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 10/28/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 10/18/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 06/04/2024 | Fail-Final CND-Occupancy Inspection | Fail | View ↗ |
| 04/23/2024 | Fail-Final CND-Occupancy Inspection | Fail | View ↗ |
| 04/17/2024 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 04/09/2024 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 04/04/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 04/04/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 09/27/2023 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 09/22/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 05/15/2023 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/04/2026 | Post-installed Anchors | — | special |
| 07/27/2026 | Exhaust and Vent Systems in Plenums and Ducts | — | special |
| 07/27/2026 | Post-installed Anchors | — | special |
| 07/27/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 07/21/2026 | Fire-Resistance Rated Construction | — | progress |
| 07/21/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 07/21/2026 | Post-installed Anchors | — | special |
| 07/14/2026 | Final | — | progress |
| 07/14/2026 | Final | David Howell | progress |
| 07/14/2026 | Mechanical Systems | — | special |
| 01/15/2026 | Final | — | progress |
| 07/16/2025 | Fire-Resistant Penetrations and Joints | Matthew Bendix | special |
| 07/16/2025 | Ventilation and air distribution system | Matthew Bendix | energy_progress |
| 07/16/2025 | Energy Code Compliance Inspections | Matthew Bendix | progress |
| 07/16/2025 | HVAC-R and service water heating system controls | Matthew Bendix | energy_progress |
| 07/16/2025 | Duct leakage testing, insulation and design | Matthew Bendix | energy_progress |
| 07/16/2025 | Maintenance information | Matthew Bendix | energy_progress |
| 07/16/2025 | HVAC-R and service water piping design and insulation | Matthew Bendix | energy_progress |
| 07/16/2025 | HVAC-R and service water heating equipment | Matthew Bendix | energy_progress |
| 07/07/2025 | Fire-Resistant Penetrations and Joints | Ryan Hansen | special |
| 05/09/2025 | Fire-Resistant Penetrations and Joints | Matthew Bendix | special |
| 05/09/2025 | Final | Matthew Bendix | progress |
| 05/09/2025 | Mechanical Systems | Matthew Bendix | special |
| 05/07/2025 | Final | Ryan Hansen | progress |
| 01/13/2025 | Lighting in dwelling units | Jackie Bolalin | energy_progress |