RoofUnder Construction6p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola
On file for this project
2 documents · 1 drawing sheet
EMR AC REPLACEMENT- REMOVE AC AND INSTALL REPLACEMENT AC EQUIPMENT WITH RELATED MECHANICAL MODIFICATIONS AS PER PLANS FILED. No change to use, egress or occupancy.
On file for this project
3 documents · 3 drawing sheets
TEMPORARY INSTALLATION OF ADJUSTABLE SUSPENDED SCAFFOLD. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. Designated Primary Site Supervisor: Dariusz Janczak
On file for this project
11 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Floor 251p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
APFM-- General construction inclusive of interior partitions modifications as per plans filed. No change to use, egress, or occupancy,
On file for this project
3 documents
APFM-- MECHANICAL MODIFICATIONS RELATED TO OFFICE RENOVATIONS AS PER PLANS FILED.
On file for this project
3 documents
APFM-- MODIFICATIONS TO EXISTING SPRINKLER SYSTEM IN CONJUNCTION WITH OFFICE RENOVATIONS AS PER PLANS.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Floor 241 filing · 4 docs
Architecture
Issued Permit Scope
General Construction
NYCPF-- General construction inclusive of interior partitions work. No change to use egress or occupancy.
On file for this project
4 documents
Floor 23
Floor 22
Floor 216p · 7 filings · 20 docs
ArchitectureFire ProtectionGeneralPlumbing
Issued Permit Scope
General Construction · Plumbing · Sprinklers
PLUMBING MODIFICATIONS TO THE 21ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
12 documents · 2 drawing sheets
SPRINKLER MODIFICATIONS TO THE 21ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
8 documents · 2 drawing sheets
General construction on the 21st floor as per plans. No change use, egress or occupancy
On file for this project
4 documents · 2 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 20
Floor 19
Floor 181p · 2 filings · 11 docs
ArchitectureFire Protection
Issued Permit Scope
General Construction · Sprinklers
18th floor demo--Interior pre-tenant demolition inclusive of non-load bearing partitions as per plans filed. No change to use, egress, or occupancy.
On file for this project
5 documents
18th floor demo-- Modification to existing sprinkler system inclusive of demolition and installation of TCSP as per plans filed.
On file for this project
6 documents · 1 drawing sheet
Floor 17Under Construction9p · 5 filings · 8 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
17TH FLOOR MECH TI--Relocation of ductwork and grilles for new office layout. No change to use, egress or occupancy.
On file for this project
5 documents · 2 drawing sheets
17TH FLOOR--MECHANICAL MODIFICATIONS INCLUSIVE OF AHU REPLACEMENT, DUCT/EQUIPMENT DEMO, AND INSTALLATION OF NEW DISTRIBUTION FOR TENANT OFFICES PRE-BUILD.
On file for this project
3 documents · 2 drawing sheets
17TH FLOOR--GENERAL CONSTRUCTION INCLUSIVE OF INTERIOR DEMO AND PARTITIONS INSTALLATION FOR PRE-TENANT OFFICES BUILD-OUT.
On file for this project
9 documents · 2 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 16
Floor 151p · 2 filings · 8 docs
ArchitectureFire ProtectionMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
15th floor demo-- Modification to existing sprinkler system inclusive of demolition and installation of TCSP as per plans filed.
On file for this project
6 documents · 1 drawing sheet
15TH FLOOR-- INTERIOR PRE-TENANT DEMOLITION AND CONSTRUCTION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents
Floor 149p · 13 filings · 8 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
14TH FLOOR TI WORK-- PLUMBING MODIFICATIONS IN CONJUCTION WITH RENOVATION.
On file for this project
23 documents · 4 drawing sheets
14TH FLOOR TI WORK-- MODIFICATIONS TO EXISTING SPRINKLER SYSTEM IN CONJUCTION WITH RENOVATIONS.
On file for this project
6 documents · 3 drawing sheets
PEI MEDIA-- MODIFICATIONS TO PLUMBING FIXTURES IN CONJUNCTION WITH OFFICE RENOVATIONS AS PER PLANS FILED.
On file for this project
3 documents
Latest 3 of 13 filings on this floor.
Floor 13
Floor 129p · 15 filings · 8 docs
ArchitectureElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
GENERAL CONSTRUCTION ON THE 12TH FLOOR ROOF TERRACE IN CONJUNCTION WITH RAILINGS MODIFICATIONS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
On file for this project
7 documents · 1 drawing sheet
STRUCTURAL ALTERATIONS REQUIRED FOR RAILINGS MODIFICATIONS AT 12TH FLOOR TERRACE. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this project
8 documents
MECHANICAL MODIFICATIONS INCLUSIVE OF EQUIPMENT REPLACEMENTS IN CONJUNCTION WITH OFFICE BUILD-OUT.
On file for this project
19 documents · 4 drawing sheets
Latest 3 of 15 filings on this floor.
Floor 114p · 7 filings · 8 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Modifications to existing sprinkler system on part of 11th floor. Demolish TCSP and install new distribution for public corridor and tenant build-out as per plans.
On file for this project
3 documents · 1 drawing sheet
General construction inclusive of partitions installations to demise floor, create public corridor, and build-out new tenant office space as per plans filed herewith. No change to use, egress, or occupancy.
On file for this project
6 documents · 2 drawing sheets
Mechanical modifications inclusive of installation of new distribution for public corridor, lobby, and tenant office space as per plans filed.
On file for this project
14 documents
Latest 3 of 7 filings on this floor.
Floor 10Under Construction11p · 5 filings · 8 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
HEREWITH FILING FOR PLUMBING MODIFICATION ON 10TH FLOOR FOR OFFICE RENOVATIONS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
23 documents · 5 drawing sheets
Sprinkler modifications taking place on the 10th floor as per drawings filed herewith. No change in use, egress or occupancy.
On file for this project
3 documents
Plumbing modifications taking place on the 10th floor as per drawings filed herewith. No change in use, egress or occupancy.
On file for this project
4 documents
Latest 3 of 5 filings on this floor.
Floor 91p · 1 filing · 2 docs
GeneralMechanical
Issued Permit Scope
Mechanical Systems
No filed description on record for this project.
On file for this project
2 documents · 1 drawing sheet
Floor 8
Floor 7
Floor 6Under Construction24p · 10 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
MJFF -- STRUCTURAL WORK FOR NEW SLAB OPENING, NEW ACCESS STAIR, AND OPERABLE PARTITION SUPPORT AS PER PLANS FILED. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this project
41 documents · 2 drawing sheets
6th FLOOR MER-- Modifications to existing sprinkler system, add sprinkler piping and new heads as per plans filed.
On file for this project
6 documents · 3 drawing sheets
6th floor MER--Removal and Installation of mechanical unit air handler unit with related ductwork and piping. No change to use, egress or occupancy.
On file for this project
3 documents · 3 drawing sheets
Latest 3 of 10 filings on this floor.
Floor 5Under Construction3p · 3 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
MJFF -- STRUCTURAL WORK FOR NEW SLAB OPENING, NEW ACCESS STAIR, AND OPERABLE PARTITION SUPPORT AS PER PLANS FILED. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this project
41 documents · 3 drawing sheets
5TH FLOOR DEMO-- PRE-TENANT INTERIOR NON-STRUCTURAL DEMOLITION INCLUSIVE OF PARTITIONS REMOVALS AS PER PLANS FILED. No change to use, egress, or occupancy.
On file for this project
5 documents
Project M01361045Permit Issued · 03/31/2026
5TH FLOOR- MODIFICATION TO EXISTING SPRINKLER SYSTEM, DEMOLITION OF BRANCH PIPIING AND SPRINKLER HEADS. INSTALLATION OF TCSP AS PER PLANS FILED.
On file for this project
3 documents
Floor 412p · 3 filings · 8 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers
PLUMBING MODIFICATIONS TO THE 3D AND 4TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents · 4 drawing sheets
SPRINKLER MODIFICATIONS TO THE 3RD AND 4TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
10 documents · 3 drawing sheets
MECHANICAL MODIFICATIONS TO THE 3RD AND 4TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents · 5 drawing sheets
Floor 316p · 7 filings · 8 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe
PLUMBING MODIFICATIONS TO THE 3D AND 4TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents · 4 drawing sheets
SPRINKLER MODIFICATIONS TO THE 3RD FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
5 documents · 1 drawing sheet
filing for the installation of an additional Fire Hose Rack and related piping, all as per plans filed herewith. No change to use, egress or occupancy.
On file for this project
6 documents · 1 drawing sheet
Latest 3 of 7 filings on this floor.
Floor 2Under Construction10p · 4 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Sprinkler modification taking place on the 2nd floor as indicated on the drawings.
On file for this project
8 documents · 6 drawing sheets
MECHANICAL MODIFICATIONS TO THE 11TH, 12TH AND 14TH FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
17 documents · 2 drawing sheets
Mechanical work for existing commercial space on the first and second floors and cellar. No change in use, occupancy, or egress.
On file for this project
21 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 1Under Construction13p · 7 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sign · Sprinklers · Structural
LOBBY REMODEL INCLUSIVE OF TEMPORARY PROTECTIONS AND ADA DOOR OPENER INSTALLATION AS PER PLANS FILED. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this project
7 documents
Sprinkler modification taking place on the 2nd floor as indicated on the drawings.
On file for this project
8 documents · 6 drawing sheets
Minor structural work on facade for signage support. Structural work only, signage application filed separately. There is to be no change in use, occupancy, or egress.
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 7 filings on this floor.
Cellar2p · 1 filing · 20 docs
Mechanical
Issued Permit Scope
Mechanical Systems
Mechanical work for existing commercial space on the first and second floors and cellar. No change in use, occupancy, or egress.
On file for this project
21 documents · 2 drawing sheets
Site & exterior9 filings · 20 docs
ArchitectureElectricalEquipmentGeneralMechanicalStructural
Issued Permit Scope
Construction Fence · General Construction · Sidewalk Shed · Sign
REPAIR OF EXTERIOR WALLS AND APPURTENANCES INCLUDING: LIMESTONE CRACK AND SPALL REPAIR, LIMESTONE JOINT RESEALING, CONCRETE SPALL AND CRACK REPAIR OF ROOF LEVEL SPANDREL BEAMS, AND WINDOW RESEALING. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this project
4 documents · 11 drawing sheets
INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK SHALL COMPLY WITH CHAPTER 33 OF NYCC
On file for this project
2 documents · 4 drawing sheets
INSTALLATION OF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED LIVE LOAD WILL BE 300 PSF SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents · 7 drawing sheets
Latest 3 of 9 filings on this floor.
Filed — no permit issued3 filings · 6 docs
DMFire ProtectionGeneral
ARCHITECTURAL MODIFICATIONS TO THE 21ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents · 5 drawing sheets
No filed description on record for this project.
On file for this project
2 documents · 1 drawing sheet
Project M01190620Filing Withdrawn
Construction modifications taking place on the 1st and 2nd floors as indicated on the drawings.