← Back
Health center, child center, clinic
534 WEST 135 STREET
MANHATTAN · Manhattanville-West Harlem · BIN 1059779
💬 Discuss this project
1925Year Built
2Stories
I5Building Class
R8AZoning
18,829 sfGross Floor Area
3Units
13 Open Violations ▸
Health center, child center, clinic · Owner of record: OFECK-NIR LLC · 9,492 sf lot · 1.98 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneralOther
Floor 22p · 1 filing · 14 docs
Floor 113p · 3 filings · 20 docs
Cellar1p · 1 filing · 14 docs
Basement2p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CONSTRUCTION SVS CON NY607/08/2026
NEW YORK PRESBYTERIAN HOSPITAL303/22/2026
HOUSING PRESERVATION103/21/2026
OFECK-NIR REALTY803/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RSC ARCHITECTS311/19/2025
BUILDTECH ENGINEERING DPC109/04/2025
LILKER ASSOCIATES CONSULTING ENGINE304/10/2024
GREEN DESIGN102/16/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL EXPEDITING1203/21/2026
ATLANTIC BUILDING SUPPLY INC.203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EMPIRE GENERAL CONTRACTINGeneral Contractor707/08/2026
CONSTRUCTION SVS CON NYGeneral Contractor607/08/2026
NIKOLL DUSHIElectrical203/21/2026
LAMBERT, LESLIEElectrical103/21/2026
MILLENNIUM ELEVATOR GROUPElectrical103/21/2026
STANLEY MURRAY PLBG & HTGElectrical103/21/2026
AJC SPRINKLER CORPFire Protection107/08/2026
CITY DIMENSIONS CONSTRUCTGeneral Contractor104/09/2026
EREGITANO, JElectrical103/21/2026
A.M.N. CORPORATIONPlumbing107/08/2026
ISAAKIDES, HERCULESElectrical103/21/2026
JAVIER VALERA ACEROElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ALAN MARGOLIN & ASSOC423304/10/2024
Building Lifecycle
All (72)Filed (8)Permit Issued (12)Signed Off (3)Violation (22)Inspection (8)Special Inspection (19)
07/16/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/27/2026
Special inspection requirement — Energy Code Compliance Inspections
Young Suh
11/19/2025
Filed — Alteration CO
Minor alteration to interior finishes at 1st floor and change of use at Cel, 1st & 2nd floor to show tenant space and medical offices as per plans.
M00902593-P1
09/05/2025
Permit issued — General Construction
M01278458-I1-GC
09/04/2025
Filed — Alteration
REMOVAL OF ONE NON-LOAD BEARING PARTITION, INSTALLATION NEW PARTITION AND NEW INTERIOR DOOR, GYPSUM PATCHING REPAIR WORK MINOR TOUCH-UPS, NEW TILE FLOOR AND PAINTING.
M01278458-I1
08/27/2025
Special inspection requirement — Final
Juan Ramos
07/30/2025
Special inspection requirement — Energy Code Compliance Inspections
Young Suh
05/13/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/18/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
01/09/2025
Signed off — Alteration
HVAC MODIFICATIONS TO ACCOMMODATE ALTERATIONS FOR THE RANGEL CENTER EXAM SUITE IN THE EXISTING BUILDING AS PER PLANS FILED HEREWITH.
M00874307-S2
10/22/2024
Signed off — Alteration
HVAC MODIFICATIONS TO ACCOMMODATE ALTERATIONS FOR THE RANGEL CENTER EXAM SUITE IN THE EXISTING BUILDING AS PER PLANS FILED HEREWITH.
M00874307-I1
10/18/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/17/2024
Signed off — Alteration
HVAC MODIFICATIONS TO ACCOMMODATE ALTERATIONS FOR THE RANGEL CENTER EXAM SUITE IN THE EXISTING BUILDING AS PER PLANS FILED HEREWITH.
M00874307-S1
10/07/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/16/2024
Permit issued — General Construction
M00874307-I1-GC
08/13/2024
Permit issued — Mechanical Systems
M00874307-S1-MS
07/23/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/10/2024
Filed — Alteration
HVAC MODIFICATIONS TO ACCOMMODATE ALTERATIONS FOR THE RANGEL CENTER EXAM SUITE IN THE EXISTING BUILDING AS PER PLANS FILED HEREWITH.
M00874307-P1
04/10/2024
Special inspection requirement — Sprinkler Systems
Young Suh
04/10/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
04/10/2024
Special inspection requirement — Post-installed Anchors
Young Suh
03/29/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/16/2024
Permit issued — General Construction
M00902593-I1-GC
10/12/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/30/2023
Filed — Alteration CO
Minor alteration to interior finishes at 1st floor and change of use at Cel, 1st & 2nd floor to show tenant space and medical offices as per plans.
M00902593-I1
08/03/2023
Permit issued — Plumbing
M00874307-S2-EW-SP
08/01/2023
Permit issued — Plumbing
M00874307-S2-PL
07/16/2023
Permit issued — Mechanical Systems
M00874307-S1-MS
06/21/2023
Permit issued — General Construction
M00874307-I1-GC
06/09/2023
Filed — Alteration
HVAC MODIFICATIONS TO ACCOMMODATE ALTERATIONS FOR THE RANGEL CENTER EXAM SUITE IN THE EXISTING BUILDING AS PER PLANS FILED HEREWITH.
M00874307-S2
06/09/2023
Filed — Alteration
HVAC MODIFICATIONS TO ACCOMMODATE ALTERATIONS FOR THE RANGEL CENTER EXAM SUITE IN THE EXISTING BUILDING AS PER PLANS FILED HEREWITH.
M00874307-I1
06/09/2023
Filed — Alteration
HVAC MODIFICATIONS TO ACCOMMODATE ALTERATIONS FOR THE RANGEL CENTER EXAM SUITE IN THE EXISTING BUILDING AS PER PLANS FILED HEREWITH.
M00874307-S1
05/24/2023
Special inspection requirement — Post-installed Anchors
Young Suh
05/24/2023
Special inspection requirement — Energy Code Compliance Inspections
Young Suh
05/24/2023
Special inspection requirement — HVAC-R and service water heating system controls
Young Suh
05/24/2023
Special inspection requirement — Shutoff dampers
Young Suh
05/24/2023
Special inspection requirement — Maintenance information
Young Suh
05/24/2023
Special inspection requirement — HVAC-R and service water heating equipment
Young Suh
05/24/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Young Suh
05/16/2023
Special inspection requirement — Interior lighting power
Young Suh
05/16/2023
Special inspection requirement — Lighting controls
Young Suh
05/16/2023
Special inspection requirement — Final
Young Suh
05/16/2023
Special inspection requirement — Energy Code Compliance Inspections
Young Suh
05/12/2023
Special inspection requirement — Mechanical Systems
Young Suh
05/12/2023
Special inspection requirement — Final
Young Suh
11/13/2020
Violation issued (ECB, closed)
Construction
11/13/2020
Violation issued (ECB, closed)
Construction
04/16/2020
Permit issued — Sidewalk Shed
M00130422-I1-SH
04/15/2019
Permit issued — Sidewalk Shed
M00130422-I1-SH
03/25/2019
Permit issued — Sidewalk Shed
M00130422-I1-SH
03/22/2019
Violation issued (ECB, closed)
Unknown
02/19/2019
Permit issued — Sidewalk Shed
M00130422-I1-SH
02/16/2019
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE.
M00130422-I1
12/12/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2018
Violation issued (ECB, closed)
Construction
09/20/2018
Violation issued (ECB, closed)
Construction
09/05/2018
Violation issued (HPD, open)
B
09/05/2018
Violation issued (HPD, open)
A
09/05/2018
Violation issued (HPD, open)
A
09/05/2018
Violation issued (HPD, open)
C
Latest 60 of 72 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedCITY DIMENSIONS CONSTRUCT09/05/2025
DOB NOWGeneral ConstructionSigned-offEMPIRE GENERAL CONTRACTIN08/16/2024
DOB NOWMechanical SystemsSigned-offEMPIRE GENERAL CONTRACTIN08/13/2024
DOB NOWGeneral ConstructionPermit IssuedEMPIRE GENERAL CONTRACTIN02/16/2024
DOB NOWPlumbingSigned-offAJC SPRINKLER CORP08/03/2023
DOB NOWPlumbingSigned-offA.M.N. CORPORATION08/01/2023
DOB NOWMechanical SystemsSigned-offEMPIRE GENERAL CONTRACTIN07/16/2023
DOB NOWGeneral ConstructionSigned-offEMPIRE GENERAL CONTRACTIN06/21/2023
DOB NOWSidewalk ShedPermit IssuedCONSTRUCTION SVS CON NY04/16/2020
DOB NOWSidewalk ShedPermit IssuedCONSTRUCTION SVS CON NY04/15/2019
DOB NOWSidewalk ShedPermit IssuedCONSTRUCTION SVS CON NY03/25/2019
DOB NOWSidewalk ShedPermit IssuedCONSTRUCTION SVS CON NY02/19/2019
BISMHISSUEDHELLMAN CONSTRUCTION CO01/25/2019
BISOTISSUEDHELLMAN CONSTRUCTION CO01/25/2019
BISSPISSUEDFULL CAPACITY FIRE CORP01/08/2019
BISPLISSUEDWILLIAM C. GERAKARIS P&H01/03/2019
BISMHISSUEDADELHARDT CONSTRUCTION11/03/2017
BISEQISSUEDEVEREST SCAFFOLDING INC05/10/2010
BISEQISSUEDEVEREST SCAFFOLDING INC05/07/2010
BISEQISSUEDEMPIRE HEYDT SCAFFOLD03/06/1998
BISOTISSUEDJT MAGEN & COMPANY INC02/24/1998
4 projects · most recent 11/17/2025
General Wiring
FiledStatusContractorScope
11/17/2025Permit IssuedTRIPLE H ELECTRICAL CORPGeneral Wiring
08/06/2024CompleteM.C. ELECTRICAL NY INCGeneral Wiring
09/21/2021CompleteNEW AGE ELEC'L CONTRG INCGeneral Wiring
02/15/2019Permit IssuedBOROWIDE ELECT'L CONTR'S—
1 project · most recent 02/16/2019
Sidewalk Shed
FiledStatusContractorScope
02/16/2019Permit IssuedCONSTRUCTION SVS CON NYSidewalk Shed
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
07/16/2026Pass-Final CND-Occupancy InspectionPassView ↗
05/13/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/18/2025Fail-Final CND-Occupancy InspectionFailView ↗
10/18/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/07/2024Pass-Final CND-Occupancy InspectionPassView ↗
07/23/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/29/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/12/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
01/27/2026Energy Code Compliance InspectionsYoung Suhprogress
08/27/2025FinalJuan Ramosprogress
07/30/2025Energy Code Compliance InspectionsYoung Suhprogress
04/10/2024Sprinkler SystemsYoung Suhspecial
04/10/2024Fire-Resistant Penetrations and JointsYoung Suhspecial
04/10/2024Post-installed AnchorsYoung Suhspecial
05/24/2023Post-installed AnchorsYoung Suhspecial
05/24/2023Energy Code Compliance InspectionsYoung Suhprogress
05/24/2023HVAC-R and service water heating system controlsYoung Suhenergy_progress
05/24/2023Shutoff dampersYoung Suhenergy_progress
05/24/2023Maintenance informationYoung Suhenergy_progress
05/24/2023HVAC-R and service water heating equipmentYoung Suhenergy_progress
05/24/2023HVAC-R and service water piping design and insulationYoung Suhenergy_progress
05/16/2023Interior lighting powerYoung Suhenergy_progress
05/16/2023Lighting controlsYoung Suhenergy_progress
05/16/2023FinalYoung Suhprogress
05/16/2023Energy Code Compliance InspectionsYoung Suhprogress
05/12/2023Mechanical SystemsYoung Suhspecial
05/12/2023FinalYoung Suhprogress
▾Documents — 155 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch7
08/31/2026M00874307-P1Request digital key ↗
08/31/2026M00874307-S1Request digital key ↗
08/31/2026M00874307-S2Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00130422-I1Request digital key ↗
▸Applications & Permits21
▸BISPLAN / WORK APPROVAL APPLICATION14
08/07/2025122049201Open ↗
02/27/2020123482463Open ↗
02/14/2020123482463Open ↗
Showing 3 of 14 on file for this type
▸BISWORK PERMIT APPLICATION7
01/25/2019123482463Open ↗
01/25/2019123482463Open ↗
01/08/2019123482463Open ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications42
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION16
11/30/2020123482463Open ↗
03/04/2020123482463Open ↗
03/04/2020123482463Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/31/2026M00874307-S1Open ↗
08/31/2026M00874307-S2Open ↗
08/31/2026M00874307-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/01/2026M00874307-S1Open ↗
09/01/2026M00874307-S1Open ↗
08/30/2026M00874307-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
02/27/2020123482463Open ↗
02/14/2020123482463Open ↗
12/06/2018123482463Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
12/06/2018123482463Open ↗
12/06/2018123482463Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
05/11/2010120350431Open ↗
05/10/2010120341601Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026M00874307-S1Open ↗
08/28/2026M00874307-S2Open ↗
▸Trade Schedules & Equipment7
▸BISEQUIPMENT USE PERMITS2
10/02/2020123021283Open ↗
08/12/2020123021283Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
12/06/2018123482463Open ↗
07/08/2014122049201Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT2
10/02/2020123021283Open ↗
08/12/2020123021283Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
10/09/2025123408197Open ↗
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist2
08/13/2026M00902593-I1Open ↗
08/13/2026M00902593-P1Open ↗
▸BISSTREET TREE CHECKLIST1
07/08/2014122049201Open ↗
▸Environmental & Asbestos27
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/31/2026M00874307-P1Open ↗
08/31/2026M00874307-S2Open ↗
08/31/2026M00874307-S1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWOER: Notice to Proceed6
08/13/2026M00130422-I1Open ↗
08/13/2026M01278458-I1Open ↗
08/13/2026M00874307-I1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
12/06/2018123408197Open ↗
12/06/2018123482463Open ↗
09/22/2017123021283Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWOER: Notice of Satisfaction5
08/13/2026M00130422-I1Open ↗
08/13/2026M00874307-I1Open ↗
08/13/2026M00874307-S1Open ↗
Showing 3 of 5 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
05/11/2010120350431Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
10/09/2025123408197Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
05/10/2010120341601Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
07/08/2014122049201Open ↗
▸Energy Compliance14
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS12
03/04/2020123482463Open ↗
03/04/2020123482463Open ↗
09/04/2019123021283Open ↗
Showing 3 of 12 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
08/12/2020123021283Open ↗
03/04/2020123482463Open ↗
▸Approvals, Objections & Sign-offs9
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
10/10/2025123408197Open ↗
08/12/2020123021283Open ↗
03/04/2020123482463Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
03/04/2020123482463Open ↗
11/13/2018123021283Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
05/11/2010120350431Open ↗
05/10/2010120341601Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT6
08/12/2020123021283Open ↗
03/04/2020123482463Open ↗
12/06/2018123408197Open ↗
Showing 3 of 6 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
10/09/2025123408197Open ↗
▸Filing & Intake Forms11
▸BISEFILING COVER SHEET7
12/06/2018123408197Open ↗
12/06/2018123482463Open ↗
12/06/2018123482463Open ↗
Showing 3 of 7 on file for this type
▸BISBOROUGH INTAKE FORM3
03/04/2020123482463Open ↗
02/14/2020123482463Open ↗
09/22/2017123021283Open ↗
▸BISADDITIONAL INFORMATION1
09/04/2019123021283Open ↗
▸Other Documents6
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
01/10/2011120350431Open ↗
01/10/2011120341601Open ↗
01/10/2011120341601Open ↗
▸DOB NOWProperty Ownership Certification2
08/20/2026M00902593-I1Open ↗
08/20/2026M00902593-P1Open ↗
▸BISPLOT DIAGRAM1
09/22/2017123021283Open ↗