Roof5p · 3 filings · 20 docs
Mechanical
Issued Permit Scope
Mechanical Systems
Installation of Split system AC unit
On file for this project
13 documents · 1 drawing sheet
Apartment renovation to include installation, removal and relocation of plumbing fixtures
On file for this project
33 documents · 1 drawing sheet
Renovation of existing apartment 8A/B in existing mixed use building. Mechanical work type. No change to use, occupancy, or egress.
On file for this project
14 documents · 1 drawing sheet
Floor 12Unit 12A18p · 2 filings · 20 docs
MechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Plumbing
Installation of Split system AC unit
On file for this project
13 documents · 1 drawing sheet
Apartment renovation to include installation, removal and relocation of plumbing fixtures
On file for this project
33 documents · 4 drawing sheets
Floor 11
Floor 10
Floor 9
Floor 8Unit 8A, Unit 8B10p · 3 filings · 20 docs
MechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Structural
renovation of apartment 8 A/B on the 8th floor of existing mixed use building. Plumbing work type. No change to use, occupancy, or egress.
On file for this project
5 documents
Renovation of existing apartment 8A/B in existing mixed use building. Mechanical work type. No change to use, occupancy, or egress.
On file for this project
14 documents
structural work filed in conjunction with renovation of apartment 8 A/B on the 8th floor of an existing mixed use building. Structural work proposed on the roof for mechanical units. structural work type. no change to use, occupancy, or egress.
On file for this project
7 documents
Floor 7Unit 7BUnder Construction41p · 2 filings · 20 docs
ArchitectureDMMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Structural
Work to include infilling of structural slab at abandoned dumbwaiter shaft and creating a new bathroom in that space, removing a partition to create closet in guest bedroom and other misc. renovations.
On file for this project
33 documents · 13 drawing sheets
restore 2 independent apts for 6b & 7b that were comb under job# 110033268. rem of stairs that connected the apts & seal opening. in add, restore kit in 6b(sink & dw existing - adding elec. stove) restoring units is consistent with exist c ofo - 102183227
On file for this project
13 documents · 3 drawing sheets
Floor 6Unit 6B6p · 1 filing · 13 docs
ArchitectureMechanical
Issued Permit Scope
General Construction
restore 2 independent apts for 6b & 7b that were comb under job# 110033268. rem of stairs that connected the apts & seal opening. in add, restore kit in 6b(sink & dw existing - adding elec. stove) restoring units is consistent with exist c ofo - 102183227
On file for this project
13 documents · 2 drawing sheets
Floor 5Replace air conditioning systems10p · 1 filing · 5 docs
ArchitectureDMMechanical
Issued Permit Scope
General Construction · Mechanical Systems
RMVE (2) EXSTNG 5 TON AIR COOLED SPLIT AC SYSTEMS & RPLC W/ (2) NEW 4 TON AIR COOLED SPLIT AC SYSTEMS. PRPSD WORK FOLLOWS SECTION AC 28-104.7. CODES INCLUDE 2022 BLDG & MECH CODES. ASHRAE, AND 2025 NYC ENERGY CODE. NO CHANGE IN USE EGRESS OR OCCUPANCY.
On file for this project
5 documents · 2 drawing sheets
Floor 4Unit 4ABUnder Construction41p · 1 filing · 18 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
RENOVATION OF EXISTING DWELLING UNIT, APARTMENT 4AB AS PER PLANS. NO CHANGE TO USE EGRESS OR OCCUPANCY.
On file for this project
18 documents
Floor 3
Floor 2Unit 2C7p · 2 filings · 6 docs
ArchitectureMechanical
Issued Permit Scope
General Construction · Mechanical Systems
New split system HVAC. Install Four (4) Air Handling Units and related Equipment within Apt 2C, and One (1) Wall Mounted Heat Pump in the Exterior Courtyard. No change in Use, Egress or Occupancy.
On file for this project
3 documents
INTERIOR ALTERATION TO EXISTING APARTMENT TO INCLUDE NEW CEILINGS IN BATHROOM ALONG WITH NEW FLOOR AND WALL FINISHES. NO CHANGE TO USE, EGRESS, AND/OR OCCUPANCY
On file for this project
3 documents
Floor 1Unit 1J
BasementBasement demolition and construction7p · 2 filings · 20 docs
ArchitectureElectricalMechanicalPlumbing
HEREBY FILING THIS APPLICATION TO PROPOSE PLUMBING WORK INCONJUNCTION TO INTERIOR RENOVATION OF APARTMENT # 1J. THIS APP DOES NOT REQUIRE A NEW OR AMENDED CERT. OF OCCUPANCY AS THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
13 documents · 1 drawing sheet
INTERIOR RENOVATIONS FOR DENTAL OFFICE AT BASEMENT & CELLAR; NO CHANGE TO USE, EGRESS OR OCCUPANCY
On file for this project
8 documents · 6 drawing sheets
Sub-BasementBasement demolition and construction18p · 2 filings · 20 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
HEREBY FILING THIS APPLICATION TO PROPOSE PLUMBING WORK INCONJUNCTION TO INTERIOR RENOVATION OF APARTMENT # 1J. THIS APP DOES NOT REQUIRE A NEW OR AMENDED CERT. OF OCCUPANCY AS THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
13 documents
INTERIOR RENOVATIONS FOR DENTAL OFFICE AT BASEMENT & CELLAR; NO CHANGE TO USE, EGRESS OR OCCUPANCY
On file for this project
8 documents
Site & exteriorTemporary heavy duty sidewalk shed installationUnder Construction31p · 5 filings · 20 docs
ArchitectureEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sidewalk Shed · Supported Scaffold
Project M01471803Permit Issued · 10/13/2026
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
On file for this project
1 drawing sheet
RMVE (2) EXSTNG 5 TON AIR COOLED SPLIT AC SYSTEMS & RPLC W/ (2) NEW 4 TON AIR COOLED SPLIT AC SYSTEMS. PRPSD WORK FOLLOWS SECTION AC 28-104.7. CODES INCLUDE 2022 BLDG & MECH CODES. ASHRAE, AND 2025 NYC ENERGY CODE. NO CHANGE IN USE EGRESS OR OCCUPANCY.
On file for this project
5 documents · 12 drawing sheets
New split system HVAC. Install Four (4) Air Handling Units and related Equipment within Apt 2C, and One (1) Wall Mounted Heat Pump in the Exterior Courtyard. No change in Use, Egress or Occupancy.
On file for this project
3 documents · 6 drawing sheets
Latest 3 of 5 filings on this floor.