Elevator apt, fireproof with stores
The Tate
535 WEST 23RD STREET · BIN 1012347
💬 Discuss this project
2001Year Built
14Stories
D6Building Class
C6-3AZoning
300,000 sfGross Floor Area
325Units
LL97 CoveredRent Stabilized7 Active Violations ▸FISP: SAFE
Elevator apt, fireproof with stores · Owner of record: 23rd Chelsea Associates · 37,031 sf lot · 8.1 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 3Araujo Imperium3p · 1 filing · 4 docs
Floor 2
Floor 1Araujo Imperium, CavalierUnder Construction109p · 9 filings · 20 docs
Site & exteriorRelated Management9p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
23 RD Chelsea Associates6503/22/2026
Twenty Third St Associates3303/21/2026
BTM Development Partners1007/08/2026
23rd Street1003/21/2026
23rd Street Associates503/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Hierarch-E403/21/2026
McAlpine Associates Architects1603/21/2026
Carlos Ramirez703/21/2026
Big Orange Expediting403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Powergen Development GroupGeneral Contractor1107/08/2026
Tribute RestorationScaffold603/21/2026
Annmarie Khan & Andre KhaGeneral Contractor303/21/2026
Ransd DesignGeneral Contractor207/08/2026
Linked Mechanicalspecialty_contractor207/08/2026
Unitech DesignSign hanger108/05/2026
Avon Plumbing & HeatingFire Protection107/08/2026
I Do Plumbing & HeatingPlumbing107/08/2026
L&J PLG & Heating Co of NYPlumbing107/08/2026
Century ElectricElectrical103/21/2026
Paramount Plumbing & HeatingPlumbing107/08/2026
Wise Electrical ServicesElectrical103/21/2026
Wise Electrical ServicesElectrical103/22/2026
Miclaw ContractingGeneral Contractor108/16/2026
Phoenix Sutton STRScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Meszaros Engineering963105/22/2026
Azark8507105/22/2026
McAlpine Architecture56941204/05/2026
HPL Engineering5613303/20/2026
Socotec Engineering4983412/29/2025
Lilker Associates Consulting816402/27/2025
Giovanni Zapata R.A3882701/31/2022
Building Lifecycle
All (200)Filed (36)Permit Issued (27)Signed Off (12)Facade (FISP) (15)Violation (60)Inspection (10)Objection (10)Special Inspection (30)
09/04/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/03/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/02/2026
Violation issued (HPD, open)
B
09/02/2026
Violation issued (HPD, open)
A
09/02/2026
Violation issued (HPD, open)
B
08/31/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/20/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/20/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/14/2026
Permit issued — General Construction
M01380892-I1-GC
08/04/2026
Permit issued — Sign
M01414278-I1-SG
07/30/2026
Filed — Alteration
PROPOSED INSTALLATION OF 1 ILLUMINATED NON-FLASHING ACCESSORY BUSINESS SIGN AND 1 NON-ILLUMINATED DOUBLE FACED ACCESSORY BUSINESS SIGN. FIRST SIGN WORDING "Vets GO" "Veterinary Internal Medicine Diagnostics", SECOND SIGN WORDING "Vets GO".
M01414278-I1
07/23/2026
Objection resolved — Addressed
07/07/2026
Objection resolved — Addressed
07/01/2026
Objection raised — Admin
07/01/2026
Objection raised — Scope
06/15/2026
Signed off — Alteration
MINOR INTERIOR RENOVATIONS INCLUDING NEW PARTITIONS. ALL EXISTING LIGHTING AND SWITCHING TO REMAIN. REPLACE TWO SINKS ON EXISTING ROUGHING UNDER A SEPARATE LAA APPLICATION. MECHANICAL EQUIPMENT REPLACEMENT IN KIND UNDER A SUBSEQUENT APPLICATION.
M01370298-S1
06/09/2026
Special inspection requirement — Final
JUSTIN KIM
06/03/2026
Permit issued — Plumbing
M01341775-S2-PL
06/03/2026
Permit issued — Plumbing
M01341775-S2-EW-SP
05/28/2026
Permit issued — Mechanical Systems
M01370298-S1-MS
05/26/2026
Signed off — Alteration
MINOR INTERIOR RENOVATIONS INCLUDING NEW PARTITIONS. ALL EXISTING LIGHTING AND SWITCHING TO REMAIN. REPLACE TWO SINKS ON EXISTING ROUGHING UNDER A SEPARATE LAA APPLICATION. MECHANICAL EQUIPMENT REPLACEMENT IN KIND UNDER A SUBSEQUENT APPLICATION.
M01370298-I1
05/22/2026
Filed — Alteration
MINOR INTERIOR RENOVATIONS INCLUDING NEW PARTITIONS. ALL EXISTING LIGHTING AND SWITCHING TO REMAIN. REPLACE TWO SINKS ON EXISTING ROUGHING UNDER A SEPARATE LAA APPLICATION. MECHANICAL EQUIPMENT REPLACEMENT IN KIND UNDER A SUBSEQUENT APPLICATION.
M01370298-S1
05/22/2026
Filed — Alteration
Interior renovation of existing 1st floor art gallery tenant space. Work includes non-structural demo, new partitions/doors, lighting and finishes. No exterior work proposed under this application. No Change to use, egress, or occupancy.
M01380892-I1
05/15/2026
Permit issued — General Construction
M01341775-I1-GC
05/15/2026
Permit issued — Mechanical Systems
M01341775-S1-MS
04/16/2026
Permit issued — General Construction
M01370298-I1-GC
04/07/2026
Objection resolved — Addressed
04/05/2026
Filed — Alteration
MINOR INTERIOR RENOVATIONS INCLUDING NEW PARTITIONS. ALL EXISTING LIGHTING AND SWITCHING TO REMAIN. REPLACE TWO SINKS ON EXISTING ROUGHING UNDER A SEPARATE LAA APPLICATION. MECHANICAL EQUIPMENT REPLACEMENT IN KIND UNDER A SUBSEQUENT APPLICATION.
M01370298-I1
04/03/2026
Special inspection requirement — Fire-Resistance Rated Construction
David McAlpine
04/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
David McAlpine
04/01/2026
Objection raised — Scope
03/31/2026
Objection raised — Scope
03/31/2026
Objection resolved — Addressed
03/30/2026
Special inspection requirement — Tenant Protection Plan Compliance
David McAlpine
03/20/2026
Filed — Alteration
ren. of existing retail space - install nonbearing partitions, ceilings, doors, furnishings, equipment for new veterinary clinic & lighting. no change in use egress or occupancy. subsequent applications to be filed for plumbing, mechanical, sprinkler etc
M01341775-S2
03/20/2026
Filed — Alteration
ren. of existing retail space - install nonbearing partitions, ceilings, doors, furnishings, equipment for new veterinary clinic & lighting. no change in use egress or occupancy. subsequent applications to be filed for plumbing, mechanical, sprinkler etc
M01341775-S1
03/18/2026
Filed — Alteration
ren. of existing retail space - install nonbearing partitions, ceilings, doors, furnishings, equipment for new veterinary clinic & lighting. no change in use egress or occupancy. subsequent applications to be filed for plumbing, mechanical, sprinkler etc
M01341775-I1
03/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
03/12/2026
Special inspection requirement — Post-installed Anchors
Fran Huang
03/11/2026
Special inspection requirement — Final
David McAlpine
03/09/2026
Special inspection requirement — Maintenance information
Fran Huang
03/09/2026
Special inspection requirement — Final
Fran Huang
03/09/2026
Special inspection requirement — Lighting controls
Fran Huang
03/09/2026
Special inspection requirement — Interior lighting power
Fran Huang
02/20/2026
Special inspection requirement — Heating Systems
Fran Huang
02/20/2026
Special inspection requirement — Maintenance information
Fran Huang
02/20/2026
Special inspection requirement — HVAC-R and service water heating equipment
Fran Huang
02/20/2026
Special inspection requirement — HVAC-R and service water heating system controls
Fran Huang
02/20/2026
Special inspection requirement — Post-installed Anchors
Fran Huang
01/19/2026
Signed off — Alteration
MATERIAL HOIST
M01311554-I1
01/16/2026
Permit issued — Suspended Scaffold
M01311554-I1-SC
01/12/2026
Permit issued — Mechanical Systems
M01263640-S2-MS
01/02/2026
Special inspection requirement — Final
Fran Huang
01/02/2026
Special inspection requirement — Mechanical Systems
Fran Huang
01/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
01/02/2026
Special inspection requirement — Tenant Protection Plan Compliance
Fran Huang
01/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
01/02/2026
Special inspection requirement — Tenant Protection Plan Compliance
Fran Huang
01/02/2026
Special inspection requirement — Sprinkler Systems
Fran Huang
01/02/2026
Special inspection requirement — Fire-Resistance Rated Construction
Fran Huang
Latest 60 of 200 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedMiclaw Contracting08/14/2026
DOB NOWSignPermit IssuedUnitech Design08/04/2026
DOB NOWPlumbingPermit IssuedI Do Plumbing & Heating06/03/2026
DOB NOWSprinklersPermit IssuedAvon Plumbing & Heating06/03/2026
DOB NOWMechanical SystemsSigned-offLinked Mechanical05/28/2026
DOB NOWGeneral ConstructionPermit IssuedRansd Design05/15/2026
DOB NOWMechanical SystemsPermit IssuedRansd Design05/15/2026
DOB NOWGeneral ConstructionSigned-offPowergen Development Group04/16/2026
DOB NOWSuspended ScaffoldSigned-offRosenwach Tank Co01/16/2026
DOB NOWMechanical SystemsPermit IssuedLinked Mechanical01/12/2026
DOB NOWSuspended ScaffoldSigned-offRosenwach Tank Co11/03/2025
DOB NOWPlumbingPermit IssuedParamount Plumbing & Heating10/21/2025
DOB NOWSuspended ScaffoldPermit IssuedJC Santana Contracting Co09/19/2025
DOB NOWMechanical SystemsPermit IssuedPowergen Development Group09/12/2025
DOB NOWGeneral ConstructionPermit IssuedPowergen Development Group09/11/2025
DOB NOWGeneral ConstructionSigned-offPowergen Development Group02/19/2025
DOB NOWMechanical SystemsSigned-offPowergen Development Group01/06/2025
DOB NOWMechanical SystemsSigned-offPowergen Development Group12/24/2024
DOB NOWGeneral ConstructionSigned-offPowergen Development Group12/19/2024
DOB NOWGeneral ConstructionSigned-offPowergen Development Group12/19/2024
DOB NOWSuspended ScaffoldPermit IssuedJepol Construction07/18/2024
DOB NOWGeneral ConstructionSigned-offAnnmarie Khan & Andre Kha09/09/2021
DOB NOWPlumbingSigned-offL&J PLG & Heating Co of NY09/08/2021
DOB NOWSupported ScaffoldPermit IssuedTribute Restoration10/01/2019
DOB NOWSupported ScaffoldPermit IssuedTribute Restoration08/06/2019
DOB NOWSupported ScaffoldPermit IssuedTribute Restoration03/27/2019
DOB NOWSidewalk ShedSigned-offPhoenix Sutton STR03/13/2019
BISOTISSUEDTribute Restoration10/01/2019
BISOTISSUEDToji Develop NY06/14/2019
BISOTISSUEDTribute Restoration05/17/2019
BISPLISSUEDArista Plumbing & Heating08/04/2017
BISMHISSUEDLinked Mechanical07/10/2017
BISMHISSUEDLinked Mechanical02/08/2017
BISMHISSUEDLinked Mechanical06/05/2015
BISPLISSUEDJag Plumbing & Mechanical06/30/2014
BISPLISSUEDJag Plumbing & Mechanical03/17/2014
BISEQISSUEDEverest Scaffolding11/04/2011
BISOTISSUEDMDB Development10/05/2011
BISEQISSUEDEverest Scaffolding08/25/2011
BISPLISSUEDSean Coakley P & H09/29/2009
+ 37 more permits on file
2 projects · most recent 03/20/2026
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
03/20/2026Permit IssuedRansd DesignAir Conditioning Systems
Cooling
Skypeak SKY-SESH036 1,200 CFM · Split System ×1
12/29/2025Permit IssuedLinked MechanicalAir Conditioning Systems, Heating Systems
Cooling
Sigma SIG-SDSG096D.1 8 tons ×5
Heating
Nortek 5SS-2-18x38x1-7AL 150,000 BTU · Condensing Unit ×5
2 projects · most recent 03/20/2026
Sprinkler System
FiledStatusContractorScope
03/20/2026Permit IssuedAvon Plumbing & HeatingSprinkler System
12/29/2025——2 heads
2 projects · most recent 03/20/2026
Water/Sanitary
FiledStatusContractorScope
03/20/2026Permit IssuedI Do Plumbing & HeatingWater/Sanitary
12/29/2025Permit IssuedParamount Plumbing & HeatingWater/Sanitary
13 projects · most recent 10/15/2026
General Wiring
FiledStatusContractorScope
10/15/2026Permit IssuedAtmos Electric Svce—
06/16/2026Permit IssuedAsko Electric Construction & MaintenanceGeneral Wiring
05/08/2026Permit IssuedWise Electrical ServicesGeneral Wiring
03/13/2026Permit IssuedWise Electrical ServicesGeneral Wiring
08/06/2025Permit IssuedCentury ElectricGeneral Wiring
01/09/2025Permit IssuedWise Electrical ServicesGeneral Wiring
12/23/2024Permit IssuedWise Electrical ServicesGeneral Wiring
08/14/2023CompleteRobert Chimenti156 meters, 1 new_meters
07/26/2022Permit IssuedInterstate ElectricGeneral Wiring
11/08/2021CompleteRegional Electrical VoiceGeneral Wiring
06/23/2019CompleteDelta Power ElectricalGeneral Wiring
03/13/2019CompleteElpo Electrical Contg—
10/14/2018CompleteAtmos Electric SvceGeneral Wiring
1 project · most recent 05/22/2026
FiledStatusContractorScope
05/22/2026Signed-offLinked Mechanical1 scope_items
1 project · most recent 04/15/2019
Scaffold
FiledStatusContractorScope
04/15/2019Permit IssuedTribute RestorationScaffold
1 project · most recent 09/25/2025
FiledStatusContractorScope
09/25/2025Permit IssuedJC Santana Contracting Co—
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
09/04/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/03/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/31/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/20/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/20/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/10/2022Pass-Final General Construction Non-Directive 14PassView ↗
01/13/2022Fail-Final General Construction Non-Directive 14FailView ↗
10/29/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/14/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/12/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 88
DateRequirementInspectorRole
06/09/2026FinalJUSTIN KIMprogress
04/03/2026Fire-Resistance Rated ConstructionDavid McAlpineprogress
04/03/2026Fire-Resistant Penetrations and JointsDavid McAlpinespecial
03/30/2026Tenant Protection Plan ComplianceDavid McAlpinespecial
03/12/2026Fire-Resistant Penetrations and JointsFran Huangspecial
03/12/2026Post-installed AnchorsFran Huangspecial
03/11/2026FinalDavid McAlpineprogress
03/09/2026Interior lighting powerFran Huangenergy_progress
03/09/2026Lighting controlsFran Huangenergy_progress
03/09/2026Maintenance informationFran Huangenergy_progress
03/09/2026FinalFran Huangprogress
02/20/2026Maintenance informationFran Huangenergy_progress
02/20/2026HVAC-R and service water heating system controlsFran Huangenergy_progress
02/20/2026Heating SystemsFran Huangspecial
02/20/2026Post-installed AnchorsFran Huangspecial
02/20/2026HVAC-R and service water heating equipmentFran Huangenergy_progress
01/02/2026Fire-Resistant Penetrations and JointsFran Huangspecial
01/02/2026Tenant Protection Plan ComplianceFran Huangspecial
01/02/2026Fire-Resistance Rated ConstructionFran Huangprogress
01/02/2026Tenant Protection Plan ComplianceFran Huangspecial
01/02/2026Fire-Resistant Penetrations and JointsFran Huangspecial
01/02/2026Sprinkler SystemsFran Huangspecial
01/02/2026FinalFran Huangprogress
01/02/2026HVAC-R and service water piping design and insulationFran Huangenergy_progress
01/02/2026Tenant Protection Plan ComplianceFran Huangspecial
Latest 25 of 88.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Araujo ImperiumRetailFloors 1, 3
Project M01370298 Alteration · LOC Issued · 04/05/2026
CavalierRetailFloor 1
Project M01143003 Alteration · LOC Issued · 12/10/2024
Project M01143072 Alteration · LOC Issued · 12/10/2024
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 390 on file (BIS + DOB NOW)
▸Plans & Drawings33
▸DOB NOWPlans/Sketch30
09/03/2026M00557511-P2Request digital key ↗
09/03/2026M00557511-P1Request digital key ↗
09/03/2026M00557566-P2Request digital key ↗
Showing 3 of 30 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold2
09/05/2026M00146151-P1Request digital key ↗
09/05/2026M00146151-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00141332-I1Request digital key ↗
▸Applications & Permits35
▸BISPLAN / WORK APPROVAL APPLICATION20
12/05/2019122935164Open ↗
12/03/2019122935164Open ↗
11/29/2019122935164Open ↗
Showing 3 of 20 on file for this type
▸BISWORK PERMIT APPLICATION15
10/02/2019140839369Open ↗
08/02/2019140839369Open ↗
07/03/2019123737395Open ↗
Showing 3 of 15 on file for this type
▸Seals & Professional Certifications140
▸DOB NOWProgress Inspector Seal & Signature36
09/01/2026M01263640-P1Open ↗
08/31/2026M01143003-P1Open ↗
08/31/2026M01143003-S1Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature35
09/01/2026M01341775-S2Open ↗
09/01/2026M01341775-S2Open ↗
09/01/2026M01341775-S2Open ↗
Showing 3 of 35 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature32
09/05/2026M00141332-I1Open ↗
09/05/2026M00146151-I1Open ↗
09/05/2026M00146151-P1Open ↗
Showing 3 of 32 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION17
05/04/2020140839369Open ↗
12/09/2019122935164Open ↗
04/18/2019123737395Open ↗
Showing 3 of 17 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
04/18/2019123737395Open ↗
04/12/2019140839369Open ↗
11/04/2011120884347Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
04/18/2019123737395Open ↗
03/28/2019140839369Open ↗
07/05/2017140650695Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
03/28/2019140839369Open ↗
07/05/2017140650695Open ↗
06/04/2015140348559Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
11/04/2011120884347Open ↗
10/03/2011120835169Open ↗
09/07/2011120800972Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
03/28/2019140839369Open ↗
07/05/2017140650695Open ↗
06/04/2015140348559Open ↗
▸BISProfessional and Owner Certification (POC3)1
11/23/2016122935164Open ↗
▸Trade Schedules & Equipment14
▸BISSELF-CERT PLUMBING NOTICE4
01/05/2015121904957Open ↗
12/11/2014121904957Open ↗
08/13/2014121904957Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE PERMITS3
12/09/2019122935164Open ↗
02/14/2018140650695Open ↗
07/15/2015140348559Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT3
12/09/2019122935164Open ↗
02/14/2018140650695Open ↗
07/15/2015140348559Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
04/18/2019123737395Open ↗
01/28/2014121904957Open ↗
▸BISSCHEDULE B - PLUMBING2
07/05/2017140650695Open ↗
02/24/2009110467557Open ↗
▸Safety & Tenant Protection36
▸DOB NOWHPD-1: Anti-Harassment Area Checklist27
09/05/2026M00146151-I1Open ↗
09/05/2026M00146151-P1Open ↗
09/03/2026M00557511-P2Open ↗
Showing 3 of 27 on file for this type
▸BISANTI-HARASSMENT CHECKLIST3
04/18/2019123737395Open ↗
01/28/2014121904957Open ↗
10/03/2011120835169Open ↗
▸DOB NOWCertificate of No Harassment3
09/03/2026M00557511-P2Open ↗
09/03/2026M00557511-P1Open ↗
08/15/2026M00557511-I1Open ↗
▸BISTENANT PROTECTION PLAN AND NOTES2
03/28/2019140839369Open ↗
11/23/2016122935164Open ↗
▸BISANTI-HARASSMENT AREA CHECKLIST1
07/05/2017140650695Open ↗
▸Environmental & Asbestos48
▸DOB NOWOER: Notice to Proceed25
09/05/2026M00146151-P1Open ↗
09/05/2026M00146151-I1Open ↗
09/03/2026M00557511-P2Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWOER: Notice of Satisfaction12
08/13/2026M01143003-S2Open ↗
08/13/2026M01143003-S1Open ↗
08/13/2026M01143072-I1Open ↗
Showing 3 of 12 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED6
12/09/2019122935164Open ↗
06/13/2019123737395Open ↗
03/28/2019140839369Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
10/03/2011120835169Open ↗
02/24/2009110467557Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
07/05/2017140650695Open ↗
01/28/2014121904957Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
04/08/2020140839369Open ↗
▸Energy Compliance14
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
12/09/2019122935164Open ↗
04/18/2019123737395Open ↗
02/14/2018140650695Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
12/09/2019122935164Open ↗
02/14/2018140650695Open ↗
08/05/2015140348559Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
07/05/2017140650695Open ↗
06/04/2015140348559Open ↗
▸BISTR8: Energy Code Progress Inspections2
03/19/2014121904957Open ↗
03/19/2014121904957Open ↗
▸BISTECHNICAL REPORT: ENERGY1
10/04/2011120835169Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
06/04/2015140348559Open ↗
▸Approvals, Objections & Sign-offs15
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST9
05/04/2020140839369Open ↗
12/09/2019122935164Open ↗
02/28/2018103799579Open ↗
Showing 3 of 9 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
11/04/2011120884347Open ↗
10/03/2011120835169Open ↗
09/07/2011120800972Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
02/13/2017122935164Open ↗
01/06/2010110467557Open ↗
▸BISLANDMARKS APPROVAL1
10/04/2011120835169Open ↗
▸Cost, Insurance & Ownership13
▸BISCOST AFFIDAVIT13
12/09/2019122935164Open ↗
04/18/2019123737395Open ↗
03/28/2019140839369Open ↗
Showing 3 of 13 on file for this type
▸Filing & Intake Forms19
▸BISBOROUGH INTAKE FORM9
12/09/2019122935164Open ↗
12/03/2019122935164Open ↗
11/04/2019122935164Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING COVER SHEET6
04/18/2019123737395Open ↗
11/23/2016122935164Open ↗
01/28/2014121904957Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
03/28/2019140839369Open ↗
07/05/2017140650695Open ↗
06/04/2015140348559Open ↗
▸BISADDITIONAL INFORMATION1
11/22/2011120800972Open ↗
▸Other Documents22
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
12/09/2019122935164Open ↗
11/04/2019122935164Open ↗
10/10/2019122935164Open ↗
Showing 3 of 4 on file for this type
▸BISUnknown3
05/04/2020140839369Open ↗
05/04/2020140839369Open ↗
05/04/2020140839369Open ↗
▸DOB NOWDHCR Document3
09/03/2026M00557511-P2Open ↗
09/03/2026M00557511-P1Open ↗
08/15/2026M00557511-I1Open ↗
▸DOB NOWMultiple Dwelling Special District Feasibility of Government Funded Rehabilitation3
09/05/2026M00146151-P1Open ↗
09/05/2026M00146151-I1Open ↗
08/13/2026M00141332-I1Open ↗
▸DOB NOWMultiple Dwelling Special District Notice to Community Board3
09/05/2026M00146151-P1Open ↗
09/05/2026M00146151-I1Open ↗
08/13/2026M00141332-I1Open ↗
▸DOB NOWIRA Certification3
08/13/2026M01227002-P1Open ↗
08/13/2026M01227002-I1Open ↗
Showing 2 of 3 on file for this type
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
08/13/2026M00141332-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M01311554-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01311554-I1Open ↗