Condo, commercial tower (mixed-use) [derived]
Myrtle Hall
536 MYRTLE AVENUE · BIN 3259561
💬 Discuss this project
2009Year Built
6Stories
RCBuilding Class
R7-1Zoning
117,754 sfGross Floor Area
2Units
LL97 Covered4 Open Violations ▸FISP: SWARMPFDNY Report ↗
Condo, commercial tower (mixed-use) [derived] · Owner of record: 526 MYRTLE AVENUE CONDOMINIMUM · 22,500 sf lot · 5.23 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionCivilGeneralOther
Permit Issued — active, not yet Signed-off
Floor 614p · 1 filing · 20 docs
Floor 5
Floor 4
Floor 313p · 5 filings · 20 docs
Floor 2
Floor 1Under Construction44p · 2 filings · 20 docs
CellarUnder Construction1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OF 526 LC103/22/2026
OF 5261403/22/2026
MJ ORBACH ASSOCIATES2603/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.1203/21/2026
D R BROWN203/21/2026
EPAC BUILDING CONSULTING INC1003/21/2026
MODERN BUILDING CONSULTANT403/21/2026
LOUIS STRIAR203/21/2026
JAM CONSULTANTS, INC.603/21/2026
BMB BUILDING CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TALISEN CONSTRUCTION CORPGeneral Contractor1907/08/2026
CURAM CONSTRUCTION CONCEPGeneral Contractor507/08/2026
HAWKINS WEBB, LLCGeneral Contractor404/09/2026
UNIVERSAL CONSTRUCTIONGeneral Contractor203/21/2026
PRECISION SPKLR SVCS LLCFire Protection207/02/2026
ALL AMERICAN CONSTRUCTIONGeneral Contractor203/21/2026
SAFEPIPE PLUMBING INCFire Protection107/08/2026
STANDARD FIRE PROTECT LLCFire Protection107/08/2026
ACCURATE MECH INDSTRS INCPlumbing107/08/2026
AMC PLBG, HTG & CLNG, INCPlumbing107/08/2026
BEDROCK PLBG. & HTG., INCPlumbing107/08/2026
SAFEPIPE PLUMBING INCPlumbing107/08/2026
WILLIAM C. GERAKARIS P&HPlumbing107/08/2026
TEE BEE SIGN INSTScaffold107/08/2026
UNITECH DESIGNScaffold106/27/2026
ALEXANDER MERZLYAKElectrical103/21/2026
Z-CAR-DScaffold107/08/2026
BARRY SAXEElectrical103/21/2026
EXECUTIVE ELECTL SER INCElectrical103/22/2026
AMERICAN STANDARD PLUMBING &Fire Protection107/08/2026
BEDROCK MECHANICAL INCFire Protection107/08/2026
GO PRO FIRE PROTECTION CFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GREAT WALL CONSULTANT P.E5633306/11/2026
NIC DESIGN INC9758302/23/2026
SGM ENGINEERING23661712/22/2025
HALO ARCHITECTURE PLLC8021212/19/2025
ZELTA INSPECT LLC7764212/10/2025
CROSSCHECK INSPECTION SER544308/11/2025
Building Lifecycle
All (202)Filed (41)Permit Issued (33)Signed Off (18)Facade (FISP) (9)Violation (26)Inspection (33)Objection (12)Special Inspection (30)
08/31/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/26/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/24/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/24/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/21/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/10/2026
Signed off — Alteration
PROPOSED INSTALLATION OF 2 ILLUMINATED, NON FLASHING, ACCESSORY BUSINESS SIGNS, FIRST SIGN WORDING "TOUS les JOURS" "BAKERY CAFE". SECOND SIGN WORDING "TLJ" "BAKERY CAFE".
B01343323-I1
06/30/2026
Special inspection requirement — Post-installed Anchors
Xiong Wei Wu
06/30/2026
Special inspection requirement — Sprinkler Systems
Xiong Wei Wu
06/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Xiong Wei Wu
06/11/2026
Filed — Alteration
Proposed new mechanical system for commercial space on 1st floor. Install exhaust hood work for commercial kitchen of eating and drinking establishment. FIRE SUPPRESSION is filed under 2026-TMGHD-002822-PLAN. No change in use, egress, or occupancy.
B01304585-P3
06/03/2026
Special inspection requirement — Post-installed Anchors
Xiong Wei Wu
06/03/2026
Special inspection requirement — Sprinkler Systems
Xiong Wei Wu
06/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Xiong Wei Wu
05/19/2026
Signed off — Alteration
Erect illuminated non advertising sign on wall-TACO BELL- No change of use, egress or occupancy
B01342400-I1
05/04/2026
Permit issued — Sprinklers
B01304585-S2-EW-SP
04/28/2026
Objection resolved — Addressed
04/28/2026
Objection resolved — Addressed
04/23/2026
Objection resolved — Addressed
04/22/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/22/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/22/2026
Objection resolved — Addressed
04/17/2026
Objection raised — Cost
04/17/2026
Objection raised — Structural
04/16/2026
Permit issued — Sprinklers
B01304585-S2-EW-SP
04/14/2026
Filed — Alteration
Proposed new mechanical system for commercial space on 1st floor. Install exhaust hood work for commercial kitchen of eating and drinking establishment. FIRE SUPPRESSION is filed under 2026-TMGHD-002822-PLAN. No change in use, egress, or occupancy.
B01304585-P2
04/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Xiong Wei Wu
04/07/2026
Special inspection requirement — Post-installed Anchors
Xiong Wei Wu
04/07/2026
Special inspection requirement — Sprinkler Systems
Xiong Wei Wu
03/20/2026
Cycle 9 facade report signed — SWARMP
03/12/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/11/2026
Cycle 9 facade inspection completed
02/23/2026
Filed — Alteration
PROPOSED RENOVATION AT EXISTING COMMERCIAL SPACE FOR AN EATING & DRINKING ESTABLISHMENT AT THE FIRST FLOOR WITH COMMERCIAL COOKING EXHAUST SYSTEM. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B01299483-P3
02/23/2026
Special inspection requirement — Sprinkler Systems
Eric Sun
02/04/2026
Objection raised — Fire_Protection
02/04/2026
Objection raised — Cost
02/03/2026
Filed — Alteration
PROPOSED INSTALLATION OF 2 ILLUMINATED, NON FLASHING, ACCESSORY BUSINESS SIGNS, FIRST SIGN WORDING "TOUS les JOURS" "BAKERY CAFE". SECOND SIGN WORDING "TLJ" "BAKERY CAFE".
B01343323-I1
02/03/2026
Permit issued — Sign
B01343323-I1-SG
02/02/2026
Signed off — Alteration
B00662118-I1
01/30/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/28/2026
Objection resolved — Addressed
01/28/2026
Special inspection requirement — Post-installed Anchors
steven Giammona
01/28/2026
Special inspection requirement — Preliminary
steven Giammona
01/28/2026
Special inspection requirement — Fire-Resistance Rated Construction
steven Giammona
01/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
steven Giammona
01/26/2026
Permit issued — Sign
B01342400-I1-SG
01/26/2026
Permit issued — Plumbing
B01304585-S1-PL
01/22/2026
Filed — Alteration
Proposed new mechanical system for commercial space on 1st floor. Install exhaust hood work for commercial kitchen of eating and drinking establishment. FIRE SUPPRESSION is filed under 2026-TMGHD-002822-PLAN. No change in use, egress, or occupancy.
B01304585-S3
01/15/2026
Filed — Alteration
Erect illuminated non advertising sign on wall-TACO BELL- No change of use, egress or occupancy
B01342400-I1
01/09/2026
Special inspection requirement — Maintenance information
01/09/2026
Special inspection requirement — Shutoff dampers
01/09/2026
Special inspection requirement — HVAC-R and service water heating system controls
01/09/2026
Special inspection requirement — Energy Code Compliance Inspections
01/09/2026
Special inspection requirement — Duct leakage testing, insulation and design
01/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
01/09/2026
Special inspection requirement — Final
01/09/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
01/09/2026
Special inspection requirement — Post-installed Anchors
01/09/2026
Special inspection requirement — Mechanical Systems
01/09/2026
Special inspection requirement — HVAC-R and service water heating equipment
01/07/2026
Special inspection requirement — Final
JUSTIN KIM
Latest 60 of 202 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offPRECISION SPKLR SVCS LLC05/04/2026
DOB NOWSprinklersSigned-offPRECISION SPKLR SVCS LLC04/16/2026
DOB NOWSignSigned-offUNITECH DESIGN INC02/03/2026
DOB NOWSignSigned-offWEINFELD, ELLIOT01/26/2026
DOB NOWPlumbingPermit IssuedAMC PLBG, HTG & CLNG, INC01/26/2026
DOB NOWGeneral ConstructionPermit IssuedCURAM CONSTRUCTION CONCEP11/05/2025
DOB NOWSprinklersSigned-offBELLEROSE PLBG & HEATING10/22/2025
DOB NOWPlumbingSigned-offBELLEROSE PLBG & HTG10/22/2025
DOB NOWMechanical SystemsPermit IssuedALL AMERICAN CONSTRUCTION10/22/2025
DOB NOWGeneral ConstructionPermit IssuedUNIVERSAL CONSTRUCTION10/22/2025
DOB NOWGeneral ConstructionSigned-offHAWKINS WEBB, LLC08/14/2025
DOB NOWMechanical SystemsSigned-offHAWKINS WEBB, LLC08/14/2025
DOB NOWPlumbingSigned-offACCURATE MECH INDSTRS INC08/12/2025
DOB NOWSignSigned-offZ-CAR-D CORP08/06/2025
DOB NOWGeneral ConstructionPermit IssuedTALISEN CONSTRUCTION CORP07/15/2025
DOB NOWSprinklersSigned-offGO PRO FIRE PROTECTION C05/19/2025
DOB NOWStructuralSigned-offTALISEN CONSTRUCTION CORP05/05/2025
DOB NOWGeneral ConstructionSigned-offTALISEN CONSTRUCTION CORP05/05/2025
DOB NOWMechanical SystemsSigned-offTALISEN CONSTRUCTION CORP05/05/2025
DOB NOWConstruction FencePermit IssuedCURAM CONSTRUCTION CONCEP04/08/2025
DOB NOWMechanical SystemsSigned-offTALISEN CONSTRUCTION CORP03/17/2025
DOB NOWStructuralSigned-offTALISEN CONSTRUCTION CORP03/17/2025
DOB NOWSprinklersSigned-offBEDROCK MECHANICAL INC03/04/2025
DOB NOWPlumbingSigned-offBEDROCK PLBG. & HTG., INC02/28/2025
DOB NOWGeneral ConstructionSigned-offTALISEN CONSTRUCTION CORP02/19/2025
DOB NOWSprinklersSigned-offAMERICAN STANDARD PLUMBIN01/30/2025
DOB NOWMechanical SystemsSigned-offTALISEN CONSTRUCTION CORP01/21/2025
DOB NOWGeneral ConstructionSigned-offTALISEN CONSTRUCTION CORP12/20/2024
DOB NOWGeneral ConstructionPermit IssuedCURAM CONSTRUCTION CONCEP09/10/2024
DOB NOWPlumbingSigned-offWILLIAM C. GERAKARIS P&H04/11/2022
DOB NOWMechanical SystemsSigned-offTALISEN CONSTRUCTION CORP03/17/2022
DOB NOWSprinklersSigned-offSTANDARD FIRE SUPP CORP02/22/2022
DOB NOWGeneral ConstructionSigned-offTALISEN CONSTRUCTION CORP02/17/2022
BISPLISSUEDP.S.I. MECHANICAL10/14/2016
BISOTISSUEDA.W. & S. CONSTRUCTION CO08/02/2016
BISSPISSUEDVIP FIRE SPRINKLER INC05/25/2016
BISOTISSUEDBAYSIDE CONTRACTING INC05/20/2016
BISMHISSUEDBAYSIDE CONTRACTING INC05/20/2016
BISOTISSUEDBAYSIDE CONTRACTING INC05/20/2016
BISOTISSUEDBAYSIDE CONTRACTING INC05/06/2016
+ 43 more permits on file
2 projects · most recent 06/11/2026
Ventilation Systems Heating Systems Heating and Air Conditioning Systems Others
FiledStatusContractorScopeMake / Model / Capacity
06/11/2026Permit IssuedUNIVERSAL CONSTRUCTIONHeating Systems, Ventilation Systems
Heating
Berner AE08-E-2084E 10 kW · Air Curtain ×4
Ventilation
Greenheck QEI-12 2,200 CFM · Kitchen Exhaust ×8
02/23/2026Permit IssuedALL AMERICAN CONSTRUCTIONHeating and Air Conditioning Systems, Others, Ventilation Systems
Heat / Cool
Lg ZRUM241BTE6 20 tons · Vrf Outdoor ×2
Ventilation
Greenheck AX-80-190-0424 14,000 CFM · Exhaust Fan ×2
SQ-15-M2-VG 2,400 CFM · Exhaust Fan ×2
Loren Cook 120 QMX 1,680 CFM · Exhaust Fan ×2
Stratovent SV-SIF11DD 470 CFM · Exhaust Fan ×2
2 projects · most recent 06/11/2026
Sprinkler System
FiledStatusContractorScope
06/11/2026Signed-offPRECISION SPKLR SVCS LLC134 heads
02/23/2026Signed-offSAFEPIPE PLUMBING INCSprinkler System
1 project · most recent 02/23/2026
Water/Sanitary
FiledStatusContractorScope
02/23/2026Signed-offSAFEPIPE PLUMBING INCWater/Sanitary
13 projects · most recent 04/28/2026
General Wiring
FiledStatusContractorScope
04/28/2026Permit IssuedAURORA ELECL CONTG INC—
02/02/2026CompleteATMOS ELECTRIC SVCE CORP—
02/02/2026CompleteATMOS ELECTRIC SVCE CORP—
02/02/2026Permit IssuedCEDAR ELEC'L CONT'RS INC.General Wiring
12/17/2025Permit IssuedP.L. ELEC'L CONTR'G CORPGeneral Wiring
11/24/2025Permit IssuedISLAND ELECTRIC CORP—
11/19/2025Permit IssuedR & T ELECTRICAL CORPGeneral Wiring
10/15/2025Permit IssuedCEDAR ELEC'L CONT'RS INC.General Wiring
09/15/2025Permit IssuedCEDAR ELEC'L CONT'RS INC.4 meters, 1 new_meters
08/18/2025CompleteNYCO ELECTRIC CORPGeneral Wiring
03/05/2025CompleteEXECUTIVE ELECTL SER INCGeneral Wiring
01/06/2025CompleteEXECUTIVE ELECTL SER INCGeneral Wiring
10/17/2022CompleteAMERGY ELECTRIC OF NY INCGeneral Wiring
1 project · most recent 04/06/2025
Fence
FiledStatusContractorScope
04/06/2025Permit IssuedCURAM CONSTRUCTION CONCEPFence
▾Field Inspections (DOB CAP) — 33
DateTypeResultReport
08/31/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/26/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/24/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/24/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/21/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/22/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/22/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/12/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/30/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/31/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/27/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/19/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/29/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/18/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/26/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/30/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/29/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/24/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/24/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/23/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/11/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/06/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/03/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/19/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/06/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
Latest 25 of 33.
▾Special Inspection Requirements (DOB NOW) — 148
DateRequirementInspectorRole
06/30/2026Fire-Resistant Penetrations and JointsXiong Wei Wuspecial
06/30/2026Sprinkler SystemsXiong Wei Wuspecial
06/30/2026Post-installed AnchorsXiong Wei Wuspecial
06/03/2026Fire-Resistant Penetrations and JointsXiong Wei Wuspecial
06/03/2026Sprinkler SystemsXiong Wei Wuspecial
06/03/2026Post-installed AnchorsXiong Wei Wuspecial
04/07/2026Post-installed AnchorsXiong Wei Wuspecial
04/07/2026Sprinkler SystemsXiong Wei Wuspecial
04/07/2026Fire-Resistant Penetrations and JointsXiong Wei Wuspecial
02/23/2026Sprinkler SystemsEric Sunspecial
01/28/2026Preliminarysteven Giammonaprogress
01/28/2026Fire-Resistance Rated Constructionsteven Giammonaprogress
01/28/2026Fire-Resistant Penetrations and Jointssteven Giammonaspecial
01/28/2026Post-installed Anchorssteven Giammonaspecial
01/09/2026Energy Code Compliance Inspections—progress
01/09/2026Maintenance information—energy_progress
01/09/2026Shutoff dampers—energy_progress
01/09/2026HVAC-R and service water heating equipment—energy_progress
01/09/2026Duct leakage testing, insulation and design—energy_progress
01/09/2026HVAC-R and service water heating system controls—energy_progress
01/09/2026HVAC-R and service water piping design and insulation—energy_progress
01/09/2026Final—progress
01/09/2026Mechanical Systems—special
01/09/2026Post-installed Anchors—special
01/09/2026Fire-Resistant Penetrations and Joints—special
Latest 25 of 148.
▾Documents — 1,036 on file (BIS + DOB NOW)
▸Plans & Drawings41
▸DOB NOWPlans/Sketch41
08/31/2026B00662118-I1Request digital key ↗
08/31/2026B00662593-I1Request digital key ↗
08/31/2026B00662555-I1Request digital key ↗
Showing 3 of 41 on file for this type
▸Applications & Permits181
▸BISPLAN / WORK APPROVAL APPLICATION108
07/29/2016321354075Open ↗
04/12/2016321363939Open ↗
04/12/2016321363939Open ↗
Showing 3 of 108 on file for this type
▸BISWORK PERMIT APPLICATION72
10/26/2016321363939Open ↗
08/02/2016321354075Open ↗
05/27/2016321363920Open ↗
Showing 3 of 72 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records6
▸DOB NOWHouse Number Verification: TOPO Stamp3
08/13/2026B01086483-I1Open ↗
08/13/2026B01086483-P4Open ↗
08/13/2026B01086483-P3Open ↗
▸BISEASEMENT AND RESTRICTIVE DECLARATIONS - SUPPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISZONING EXHIBIT II: CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISZONING EXHIBIT IV: CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications281
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION112
09/29/2016321354075Open ↗
09/29/2016321354075Open ↗
07/29/2016321354075Open ↗
Showing 3 of 112 on file for this type
▸DOB NOWProgress Inspector Seal & Signature46
09/26/2026B01158620-S1Open ↗
09/25/2026B01158620-P1Open ↗
09/25/2026B01158620-P1Open ↗
Showing 3 of 46 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature41
08/31/2026B00662118-I1Open ↗
08/31/2026B00662593-I1Open ↗
08/22/2026B01146454-S1Open ↗
Showing 3 of 41 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature36
09/26/2026B01158620-S1Open ↗
09/26/2026B01158620-S1Open ↗
09/26/2026B01158620-S1Open ↗
Showing 3 of 36 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST23
07/29/2016321354075Open ↗
04/12/2016321363939Open ↗
04/11/2016321363920Open ↗
Showing 3 of 23 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM18
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 18 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
07/29/2016321354075Open ↗
04/12/2016321363939Open ↗
04/11/2016321363920Open ↗
Showing 3 of 5 on file for this type
▸Trade Schedules & Equipment119
▸BISSELF-CERT PLUMBING NOTICE45
05/22/2015321054210Open ↗
05/11/2015321054210Open ↗
05/08/2015321054210Open ↗
Showing 3 of 45 on file for this type
▸BISSCHEDULE B - PLUMBING23
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 23 on file for this type
▸BISRPZ/DDCV TEST REPORT : GEN215B10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA7
07/18/2013320354335Open ↗
07/18/2013320411363Open ↗
07/18/2013320219385Open ↗
Showing 3 of 7 on file for this type
▸BISSPRINKLER INSP REPORT : FP-856
05/22/2015321054210Open ↗
05/08/2015321054210Open ↗
Showing 2 of 6 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISWATER METER PERMIT : DEP-METER6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISEQUIPMENT USE PERMITS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
04/12/2016321363939Open ↗
04/11/2016321363920Open ↗
09/02/2014321054210Open ↗
▸BISSTANDPIPE INSP REPORT : FP-842
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSEWER/HOUSE CON SIGNOFF: DEP HC 0212
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSEWER CONNECTION: DEP SD1 & SD22
08/23/2012320503923Open ↗
Showing 1 of 2 on file for this type
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISBOILERS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection8
▸BISSTREET TREE CHECKLIST3
07/29/2016321354075Open ↗
09/02/2014321054210Open ↗
Showing 2 of 3 on file for this type
▸DOB NOWStreet Tree Checklist3
08/13/2026B01086483-P4Open ↗
08/13/2026B01086483-I1Open ↗
08/13/2026B01086483-P3Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISST-1 Street Tree Checklist1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos40
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER29
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 29 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
04/12/2016321363939Open ↗
04/11/2016321363920Open ↗
03/25/2016321327186Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/19/2026B01086483-P4Open ↗
08/19/2026B01086483-I1Open ↗
08/19/2026B01086483-P3Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION2
05/11/2016321363939Open ↗
07/08/2015321017733Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
07/29/2014321017733Open ↗
▸BISRODENT CONTROL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance29
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS11
09/29/2016321354075Open ↗
09/29/2016321354075Open ↗
07/29/2016321354075Open ↗
Showing 3 of 11 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS8
09/29/2016321354075Open ↗
12/11/2012320454076Open ↗
11/14/2012320503923Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISENERGY CODE 2ND REVIEW2
06/09/2015321054210Open ↗
06/09/2015321054210Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00662118-I1Open ↗
▸Inspections & Test Reports3
▸BISNOTIF.-PROPOSED STEAM/HOT WATER INSPECTION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISHYDRO FLOW TEST LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs162
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST61
09/29/2016321354075Open ↗
07/08/2015321017733Open ↗
06/09/2015321054210Open ↗
Showing 3 of 61 on file for this type
▸BISADMINISTRATIVE OBJECTIONS40
07/29/2016321354075Open ↗
03/25/2016321327186Open ↗
09/02/2014321054210Open ↗
Showing 3 of 40 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION29
07/10/2014320819520Open ↗
06/18/2013320354335Open ↗
06/18/2013320219385Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter21
08/31/2026B00662118-I1Open ↗
08/31/2026B00662593-I1Open ↗
08/22/2026B01146454-P1Open ↗
Showing 3 of 21 on file for this type
▸BISTAP LETTER - FIRE SVC : DEP-FIRE5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISLANDMARKS APPROVAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership34
▸BISCOST AFFIDAVIT34
09/29/2016321354075Open ↗
07/29/2016321354075Open ↗
04/12/2016321363939Open ↗
Showing 3 of 34 on file for this type
▸Filing & Intake Forms70
▸BISEFILING COVER SHEET37
07/29/2016321354075Open ↗
04/11/2016321363920Open ↗
04/11/2016321363939Open ↗
Showing 3 of 37 on file for this type
▸BISADDITIONAL INFORMATION30
08/02/2016321354075Open ↗
06/18/2015321054210Open ↗
06/18/2015321054210Open ↗
Showing 3 of 30 on file for this type
▸BISeFiling Job Application Cover Sheet3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Other Documents50
▸BISENVIRONMENTAL(E) DEP NOTICE TO PROCEED22
09/18/2012320354326Open ↗
Showing 1 of 22 on file for this type
▸BISENVIRONMENTAL -E- DEP NOTICE OF SATIS13
06/21/2013320354335Open ↗
06/21/2013320219385Open ↗
06/21/2013320404442Open ↗
Showing 3 of 13 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸DOB NOWProperty Ownership Certification3
08/19/2026B01086483-I1Open ↗
08/19/2026B01086483-P3Open ↗
08/19/2026B01086483-P4Open ↗
▸BISPlot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFIRE SUPP ANSUL APPROVL- FD-FSS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWLuminous Egress Path Markings Report1
08/13/2026B00662118-I1Open ↗