General warehouse
5361 PRESTON COURT
BROOKLYN · Flatlands · BIN 3350216
💬 Discuss this project
2002Year Built
1Stories
E1Building Class
M1-1Zoning
21,687 sfGross Floor Area
2Units
General warehouse · 25,477 sf lot · 0.85 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentLandscapeCivilGeneralOther
Permit Issued — active, not yet Signed-off
RoofUnder Construction114p · 1 filing · 20 docs
Floor 1Under Construction195p · 1 filing · 20 docs
MezzanineUnder Construction125p · 1 filing · 20 docs
CellarUnder Construction26p · 1 filing · 20 docs
Site & exteriorUnder Construction80p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MET COUNCIL4309/01/2026
PLATINUM SERVICES NY707/08/2026
5433 PRESTON COURT403/21/2026
ARCHSTONE BUILDERS203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/19/2021$6.8M—PRESTON COURT II, LLC → Private party$316/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STUDIO V ARCHITECTURE,PLLC605/18/2026
MG ENGINEERING D.P.C.912/12/2025
ASHRAF CORP210/08/2025
WEXLER ASSOCIATES502/24/2025
HARTLAND ENGINEERING, DPC205/20/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WILLIAM VITACCO ASSOCIATES2003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ARCHSTONE BUILDERS LLCGeneral Contractor1607/08/2026
CARA PLUMBING GROUP INCPlumbing607/08/2026
TITAN INDUSTRIAL SVC CORPGeneral Contractor303/21/2026
PLATINUM SERVICES NY LLCGeneral Contractor207/08/2026
ARCO PLBG AND HTG INCFire Protection207/08/2026
PATRIOT ELECTRIC CORPElectrical203/22/2026
ARCO PLBG HTGPlumbing103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CONCRETE SOLUTIONS LAB CO53442005/18/2026
Building Lifecycle
All (192)Filed (24)Permit Issued (22)Signed Off (15)Inspection (21)Objection (80)Special Inspection (30)
08/24/2026
Signed off — Alteration CO
Phase II General Construction for the Western half of the space.
B00985468-Z2
08/24/2026
Signed off — Alteration CO
Phase II General Construction for the Western half of the space.
B00985468-S3
07/27/2026
Objection resolved — Resolved
06/25/2026
Signed off — Alteration CO
Phase II General Construction for the Western half of the space.
B00985468-S7
06/25/2026
Signed off — Alteration CO
Phase II General Construction for the Western half of the space.
B00985468-S8
05/27/2026
Objection raised — Other
05/18/2026
Filed — Alteration CO
Phase II General Construction for the Western half of the space.
B00985468-P7
05/14/2026
Special inspection requirement — Vestibules
MINA HANNA
05/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MINA HANNA
05/14/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
MINA HANNA
05/14/2026
Special inspection requirement — Air barrier - visual inspection
MINA HANNA
05/14/2026
Special inspection requirement — Fenestration air leakage
MINA HANNA
05/14/2026
Special inspection requirement — Fire-Resistance Rated Construction
MINA HANNA
05/14/2026
Special inspection requirement — Sprayed fire-resistant materials
MINA HANNA
05/14/2026
Special inspection requirement — Insulation placement and R values
MINA HANNA
05/14/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
MINA HANNA
05/14/2026
Special inspection requirement — Energy Code Compliance Inspections
MINA HANNA
05/14/2026
Special inspection requirement — Protection of exposed foundation insulation
MINA HANNA
05/14/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
MINA HANNA
05/14/2026
Special inspection requirement — Fenestration areas
MINA HANNA
05/04/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/29/2026
Signed off — Alteration CO
Phase II General Construction for the Western half of the space.
B00985468-Z4
04/27/2026
Signed off — Alteration
B01299850-I1
04/22/2026
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
03/31/2026
Inspection — Certified StandPipe-Fire Pump (SD)-Fire Pump Test
Certified
View inspection ↗
03/31/2026
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
03/25/2026
Signed off — Alteration CO
Phase II General Construction for the Western half of the space.
B00985468-Z3
03/17/2026
Signed off — Alteration CO
Phase II General Construction for the Western half of the space.
B00985468-Z1
03/16/2026
Permit issued — Curb Cut
B00985468-S7-CC
03/11/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/04/2026
Signed off — Alteration CO
Phase II General Construction for the Western half of the space.
B00985468-S9
03/02/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/25/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/25/2026
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
01/15/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/09/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/07/2026
Permit issued — Sprinklers
B00985468-Z4-EW-SP
01/06/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/06/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/02/2026
Special inspection requirement — Final
MINA HANNA
01/02/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
MINA HANNA
01/02/2026
Special inspection requirement — HVAC-R and service water heating system controls
MINA HANNA
01/02/2026
Special inspection requirement — Mechanical Systems
MINA HANNA
01/02/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MINA HANNA
01/02/2026
Special inspection requirement — Energy Code Compliance Inspections
MINA HANNA
01/02/2026
Special inspection requirement — HVAC-R and service water heating equipment
MINA HANNA
12/22/2025
Permit issued — General Construction
B00985468-Z6-GC
12/19/2025
Permit issued — General Construction
B00985468-Z5-GC
12/12/2025
Filed — Alteration CO
Phase II General Construction for the Western half of the space.
B00985468-P6
12/12/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/05/2025
Permit issued — General Construction
B00985468-I1-GC
11/24/2025
Signed off — Alteration CO
Phase II General Construction for the Western half of the space.
B00985468-S4
11/24/2025
Signed off — Alteration CO
Phase II General Construction for the Western half of the space.
B00985468-S5
10/27/2025
Permit issued — Plumbing
B00985468-Z3-PL
10/16/2025
Permit issued — Structural
B00985468-Z1-ST
10/09/2025
Permit issued — Construction Fence
B01299850-I1-FN
10/08/2025
Filed — Alteration
B01299850-I1
10/03/2025
Permit issued — Foundation
B00985468-S9-FO
10/02/2025
Permit issued — Mechanical Systems
B00985468-Z2-MS
09/30/2025
Permit issued — General Construction
B00985468-Z6-GC
Latest 60 of 192 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offARCHSTONE BUILDERS LLC03/16/2026
DOB NOWSprinklersSigned-offARCO PLBG AND HTG INC01/07/2026
DOB NOWGeneral ConstructionPermit IssuedARCHSTONE BUILDERS LLC12/22/2025
DOB NOWGeneral ConstructionPermit IssuedARCHSTONE BUILDERS LLC12/19/2025
DOB NOWGeneral ConstructionPermit IssuedARCHSTONE BUILDERS LLC12/05/2025
DOB NOWPlumbingSigned-offPRIME PLMBG & HTG OF NY10/27/2025
DOB NOWStructuralSigned-offARCHSTONE BUILDERS LLC10/16/2025
DOB NOWConstruction FenceSigned-offPLATINUM SERVICES NY LLC10/09/2025
DOB NOWFoundationSigned-offARCHSTONE BUILDERS LLC10/03/2025
DOB NOWMechanical SystemsSigned-offARCHSTONE BUILDERS LLC10/02/2025
DOB NOWGeneral ConstructionPermit IssuedARCHSTONE BUILDERS LLC09/30/2025
DOB NOWCurb CutSigned-offARCHSTONE BUILDERS LLC04/30/2025
DOB NOWGeneral ConstructionPermit IssuedARCHSTONE BUILDERS LLC01/08/2025
DOB NOWProtection and Mechanical MethodsSigned-offTITAN INDUSTRIAL SVC CORP12/18/2024
DOB NOWGeneral ConstructionPermit IssuedARCHSTONE BUILDERS LLC12/12/2024
DOB NOWGeneral ConstructionPermit IssuedARCHSTONE BUILDERS LLC11/21/2024
DOB NOWSprinklersSigned-offARCO PLBG AND HTG INC11/06/2024
DOB NOWFoundationSigned-offARCHSTONE BUILDERS LLC11/01/2024
DOB NOWStructuralSigned-offARCHSTONE BUILDERS LLC11/01/2024
DOB NOWPlumbingSigned-offPRIME PLMBG & HTG OF NY10/24/2024
DOB NOWMechanical SystemsSigned-offARCHSTONE BUILDERS LLC10/23/2024
DOB NOWConstruction FenceSigned-offPLATINUM SERVICES NY LLC10/09/2024
BIS—ISSUEDPHILIP TOSCANO ARCHITECTS08/11/2004
BIS—ISSUEDLAQUILA CONST09/03/2002
BISEQISSUEDLAQUILA CONST09/03/2002
1 project · most recent 05/18/2026
Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
05/18/2026Signed-offARCHSTONE BUILDERS LLCHeating Systems
Heating
Modine UXDC-400 400,000 BTU · Unit Heater ×10
Daikin FXDQ07MVJU 8,500 BTU · Vrf Indoor ×4
FXTQ30TAVJU 34,000 BTU · Vrf Indoor ×4
FBQ18PVJU 20,000 BTU · Vrf Indoor ×2
FBQ24PVJU 27,000 BTU · Fan Coil Indoor ×2
FXTQ24TAVJU 27,000 BTU · Vrf Indoor ×2
Reznor UDXC-400 400,000 BTU · Unit Heater ×10
Greenheck IDHES-12H/14W 34,130 BTU · Electric Heater ×2
Qmark ARRWH4808 5,120 BTU · Electric Heater ×2
Cooling
Daikin FXDQ07MVJU 7,500 BTU · Vrf Indoor ×4
FXTQ30TAVJU 30,000 BTU · Vrf Indoor ×4
FBQ18PVJU 18,000 BTU · Vrf Indoor ×2
FBQ24PVJU 24,000 BTU · Fan Coil Indoor ×2
FXTQ24TAVJU 24,000 BTU · Vrf Indoor ×2
RXLQ120-TATJA 120,000 BTU · Vrf Outdoor ×2
Greenheck SQ-97-VG-X 380 CFM · Exhaust Fan ×4
Renewaire HE-10RT 1,000 CFM · Erv ×2
1 project · most recent 05/18/2026
Sprinkler System
FiledStatusContractorScope
05/18/2026Signed-offARCO PLBG AND HTG INCSprinkler System
1 project · most recent 05/18/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
05/18/2026Signed-offCARA PLUMBING GROUP INCGas, Storm, Water/Sanitary
6 projects · most recent 08/28/2026
General Wiring
FiledStatusContractorScope
08/28/2026Permit IssuedM.C. ELECTRICAL NY INCGeneral Wiring
08/27/2026Permit IssuedPATRIOT ELECTRIC CORP—
04/25/2025CompletePATRIOT ELECTRIC CORP3 meters, 1 new_meters
01/23/2025Permit IssuedPATRIOT ELECTRIC CORPGeneral Wiring
11/04/2024Permit IssuedPATRIOT ELECTRIC CORP1 meters, 1 new_meters
10/30/2024Permit IssuedPATRIOT ELECTRIC CORP—
1 project · most recent 05/18/2026
Steel Concrete
FiledStatusContractorScope
05/18/2026Signed-offARCHSTONE BUILDERS LLCSteel, Concrete
▾Field Inspections (DOB CAP) — 21
DateTypeResultReport
05/04/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/22/2026Fail-Final Curb Cut Non-Directive 14FailView ↗
03/31/2026Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
03/31/2026Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
03/11/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/02/2026Pass-Final CND-Occupancy InspectionPassView ↗
02/25/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/25/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
01/15/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/09/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/06/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/06/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/12/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/19/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/18/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/29/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/19/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/14/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/04/2025Pass-Final PL - UndergroundPassView ↗
01/31/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/27/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 112
DateRequirementInspectorRole
05/14/2026Fenestration and door U-factor and product ratingsMINA HANNAenergy_progress
05/14/2026Fire-Resistant Penetrations and JointsMINA HANNAspecial
05/14/2026Fenestration areasMINA HANNAenergy_progress
05/14/2026Air barrier - visual inspectionMINA HANNAenergy_progress
05/14/2026Insulation placement and R valuesMINA HANNAenergy_progress
05/14/2026Fenestration air leakageMINA HANNAenergy_progress
05/14/2026Protection of exposed foundation insulationMINA HANNAenergy_progress
05/14/2026VestibulesMINA HANNAenergy_progress
05/14/2026Fire-Resistance Rated ConstructionMINA HANNAprogress
05/14/2026Energy Code Compliance InspectionsMINA HANNAprogress
05/14/2026Wall Panels, Curtain Walls, and VeneersMINA HANNAspecial
05/14/2026Structural Stability – Alterations of existing buildingsMINA HANNAspecial
05/14/2026Sprayed fire-resistant materialsMINA HANNAspecial
01/02/2026HVAC-R and service water heating equipmentMINA HANNAenergy_progress
01/02/2026HVAC-R and service water piping design and insulationMINA HANNAenergy_progress
01/02/2026Energy Code Compliance InspectionsMINA HANNAprogress
01/02/2026FinalMINA HANNAprogress
01/02/2026Mechanical SystemsMINA HANNAspecial
01/02/2026Structural Stability – Alterations of existing buildingsMINA HANNAspecial
01/02/2026HVAC-R and service water heating system controlsMINA HANNAenergy_progress
09/04/2025Sprayed fire-resistant materialsMINA HANNAspecial
09/04/2025Fenestration and door U-factor and product ratingsMINA HANNAenergy_progress
09/04/2025Protection of exposed foundation insulationMINA HANNAenergy_progress
09/04/2025Fenestration areasMINA HANNAenergy_progress
09/04/2025Insulation placement and R valuesMINA HANNAenergy_progress
Latest 25 of 112.
▾Documents — 221 on file (BIS + DOB NOW)
▸Plans & Drawings24
▸DOB NOWPlans/Sketch24
08/23/2026B01122505-I1Request digital key ↗
08/20/2026B01299850-I1Request digital key ↗
08/17/2026B00985468-Z1Request digital key ↗
Showing 3 of 24 on file for this type
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram3
08/15/2026B00985468-P7Open ↗
08/13/2026B00985468-I1Open ↗
08/13/2026B00985468-P4Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/15/2026B00985468-P7Open ↗
08/13/2026B00985468-P4Open ↗
08/13/2026B00985468-I1Open ↗
▸Seals & Professional Certifications136
▸DOB NOWSpecial Inspector Seal & Signature60
08/31/2026B00985468-P7Open ↗
08/31/2026B00985468-P7Open ↗
08/31/2026B00985468-P7Open ↗
Showing 3 of 60 on file for this type
▸DOB NOWProgress Inspector Seal & Signature52
08/31/2026B00985468-P7Open ↗
08/31/2026B00985468-P7Open ↗
08/31/2026B00985468-P7Open ↗
Showing 3 of 52 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature24
08/20/2026B01299850-I1Open ↗
08/17/2026B00985468-P7Open ↗
08/13/2026B00985468-Z3Open ↗
Showing 3 of 24 on file for this type
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist5
08/15/2026B00985468-P7Open ↗
08/13/2026B00985468-P4Open ↗
08/13/2026B00985468-Z6Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance2
▸DOB NOWPreliminary Commissioning Report Certification2
08/25/2026B00985468-S3Open ↗
08/25/2026B00985468-Z2Open ↗
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026B00985468-S9Open ↗
08/13/2026B00985468-S1Open ↗
▸DOB NOWTR5 Test Report1
08/13/2026B00985468-S1Open ↗
▸Approvals, Objections & Sign-offs23
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter23
08/15/2026B00985468-P7Open ↗
08/13/2026B01299850-I1Open ↗
08/13/2026B00985468-Z3Open ↗
Showing 3 of 23 on file for this type
▸Other Documents20
▸DOB NOWPlot Diagram7
08/15/2026B00985468-P7Open ↗
08/13/2026B00985468-P4Open ↗
08/13/2026B00985468-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSite Survey: Initial5
08/15/2026B00985468-P7Open ↗
08/13/2026B00985468-P4Open ↗
08/13/2026B00985468-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/15/2026B00985468-P7Open ↗
08/13/2026B00985468-I1Open ↗
08/13/2026B00985468-Z6Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProperty Ownership Certification3
08/15/2026B00985468-P7Open ↗
08/13/2026B00985468-P4Open ↗
Showing 2 of 3 on file for this type