← Back
Factory, light manufacturing
538 CRAVEN STREET
BRONX · BIN 2006774
💬 Discuss this project
1933Year Built
1Stories
F5Building Class
M1-2Zoning
4,500 sfGross Floor Area
1Units
6 Open Violations 2 unresolved · 4 paperwork only ▸
Factory, light manufacturing · Owner of record: 538 CAVEN REALTY CORP · 5,000 sf lot · 0.9 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Roof3p · 2 filings · 20 docs
Floor 22p · 1 filing · 11 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
538 CRAVEN REALTY CORP.403/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DAVID JIMENEZ, RA607/22/2024
PIRO STUDIO LLC105/13/2024
THEODORE G. RIEPER ARCHITECTS PC303/02/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEO CONSULTANTS1203/21/2026
DI DIO ARCHITECTURE, PC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
IGNITE PLUMBING & HEATINGPlumbing507/08/2026
ACROPOLIS RENOVATIONS LLCGeneral Contractor204/08/2026
ALEXANDER CLIMATE CONTROLGeneral Contractor203/21/2026
L.L.G. PLBG & HTG INCPlumbing207/08/2026
ALLIANCE CONTRACTING GROUP NYGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PIRO STUDIO LLC7503105/13/2024
THEODORE G RIEPER ARCHITE4447404/16/2024
RYAN SPECIAL ENGINEERING2018203/02/2023
Building Lifecycle
All (81)Filed (10)Permit Issued (7)Signed Off (4)Violation (29)Inspection (4)Objection (10)Special Inspection (17)
10/03/2025
Signed off — Alteration
PAA filed herewith for minor layout revisions as per plans filed herewith.
X00760850-I1
10/03/2025
Signed off — Alteration
Installation of Plumbing fixtures including an ADA bathroom, & interior renovation of existing bathroom as per plans shown. Resolve ECB Violation #35459675P. In conj with GC#X00760850-I1. No change to use occupancy or egress under this application
X00666605-I1
02/18/2025
Signed off — Alteration
Minor plumbing work related to installation of backflow device and minor boiler maintenance repairs for annual inspection as per plans filed herewith. In conjunction to PL #X00666605 & GC#X00760850.
X01035478-I1
02/05/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/15/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
10/15/2024
Special inspection requirement — Lighting in dwelling units
THEODORE RIEPER
10/15/2024
Special inspection requirement — Final
THEODORE RIEPER
10/15/2024
Special inspection requirement — Energy Code Compliance Inspections
THEODORE RIEPER
09/26/2024
Permit issued — Plumbing
X01035478-I1-PL
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/22/2024
Filed — Alteration
Minor plumbing work related to installation of backflow device and minor boiler maintenance repairs for annual inspection as per plans filed herewith. In conjunction to PL #X00666605 & GC#X00760850.
X01035478-P1
07/15/2024
Signed off — Alteration
Installation of (1) 3 ton air cooled split system for Office spaces., which will include (1) 8 ton air - cooled RTU.
X01048574-I1
06/24/2024
Permit issued — Mechanical Systems
X01048574-I1-MS
05/13/2024
Filed — Alteration
Installation of (1) 3 ton air cooled split system for Office spaces., which will include (1) 8 ton air - cooled RTU.
X01048574-I1
05/13/2024
Special inspection requirement — HVAC-R and service water heating system controls
PIETRO ROSATO
05/13/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIETRO ROSATO
05/13/2024
Special inspection requirement — Energy Code Compliance Inspections
PIETRO ROSATO
05/13/2024
Special inspection requirement — HVAC-R and service water heating equipment
PIETRO ROSATO
05/13/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
PIETRO ROSATO
05/09/2024
Special inspection requirement — Mechanical Systems
PIETRO ROSATO
05/09/2024
Special inspection requirement — Final
PIETRO ROSATO
04/29/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/19/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
THEODORE RIEPER
04/16/2024
Filed — Alteration
Minor plumbing work related to installation of backflow device and minor boiler maintenance repairs for annual inspection as per plans filed herewith. In conjunction to PL #X00666605 & GC#X00760850.
X01035478-I1
04/16/2024
Filed — Alteration
Installation of Plumbing fixtures including an ADA bathroom, & interior renovation of existing bathroom as per plans shown. Resolve ECB Violation #35459675P. In conj with GC#X00760850-I1. No change to use occupancy or egress under this application
X00666605-P3
02/01/2024
Objection resolved — Addressed
01/31/2024
Objection raised — Other
01/29/2024
Filed — Alteration
Installation of Plumbing fixtures including an ADA bathroom, & interior renovation of existing bathroom as per plans shown. Resolve ECB Violation #35459675P. In conj with GC#X00760850-I1. No change to use occupancy or egress under this application
X00666605-P2
01/24/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
THEODORE RIEPER
12/27/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/25/2023
Permit issued — General Construction
X00760850-I1-GC
09/21/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/11/2023
Permit issued — Plumbing
X00666605-I1-PL
07/12/2023
Permit issued — Plumbing
X00666605-I1-PL
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/10/2023
Objection resolved — Addressed
04/10/2023
Objection resolved — Addressed
04/10/2023
Objection resolved — Addressed
04/10/2023
Objection resolved — Addressed
03/02/2023
Filed — Alteration
PAA filed herewith for minor layout revisions as per plans filed herewith.
X00760850-P1
02/03/2023
Objection raised — Admin
02/03/2023
Objection raised — Admin
02/03/2023
Objection raised — Other
02/03/2023
Objection raised — Inspections
01/31/2023
Filed — Alteration
Installation of Plumbing fixtures including an ADA bathroom, & interior renovation of existing bathroom as per plans shown. Resolve ECB Violation #35459675P. In conj with GC#X00760850-I1. No change to use occupancy or egress under this application
X00666605-P1
12/09/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
THEODORE RIEPER
10/05/2022
Permit issued — General Construction
X00760850-I1-GC
08/31/2022
Permit issued — General Construction
X00760850-I1-GC
08/03/2022
Filed — Alteration
PAA filed herewith for minor layout revisions as per plans filed herewith.
X00760850-I1
08/03/2022
Filed — Alteration
Installation of Plumbing fixtures including an ADA bathroom, & interior renovation of existing bathroom as per plans shown. Resolve ECB Violation #35459675P. In conj with GC#X00760850-I1. No change to use occupancy or egress under this application
X00666605-I1
Latest 60 of 81 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offL.L.G. PLBG & HTG INC09/26/2024
DOB NOWMechanical SystemsSigned-offEAGLE CONSTRUCTION06/24/2024
DOB NOWGeneral ConstructionSigned-offACROPOLIS RENOVATIONS LLC09/25/2023
DOB NOWPlumbingSigned-offIGNITE PLUMBING & HEATING09/11/2023
DOB NOWPlumbingSigned-offIGNITE PLUMBING & HEATING07/12/2023
DOB NOWGeneral ConstructionSigned-offACROPOLIS RENOVATIONS LLC10/05/2022
DOB NOWGeneral ConstructionSigned-offALLIANCE CONTRACTING GROU08/31/2022
BISPLISSUEDWASOFF PLBG & UTILITY CO02/26/2014
BISPLISSUEDWASOFF PLBG & UTILITY CO08/17/2012
BISBLISSUEDWASOFF PLBG & UTILITY CO08/17/2012
BISBLISSUEDMANHATTAN BOILER & EQUIPMENT02/27/1992
3 projects · most recent 12/18/2023
General Wiring
FiledStatusContractorScope
12/18/2023CompleteIZZO ELECTRIC INC.General Wiring
08/24/2023CompleteDELTA PHASE ELEC'L CORP.General Wiring
12/27/2017CompleteASCUATECH ELECTRICAL CORP1 meters, 1 new_meters
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
02/05/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/29/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/27/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/21/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
10/15/2024Fire-Resistant Penetrations and JointsWilliam Ryanspecial
10/15/2024Lighting in dwelling unitsTHEODORE RIEPERenergy_progress
10/15/2024FinalTHEODORE RIEPERprogress
10/15/2024Energy Code Compliance InspectionsTHEODORE RIEPERprogress
05/13/2024HVAC-R and service water heating system controlsPIETRO ROSATOenergy_progress
05/13/2024Fire-Resistant Penetrations and JointsPIETRO ROSATOspecial
05/13/2024Energy Code Compliance InspectionsPIETRO ROSATOprogress
05/13/2024HVAC-R and service water heating equipmentPIETRO ROSATOenergy_progress
05/13/2024HVAC-R and service water piping design and insulationPIETRO ROSATOenergy_progress
05/09/2024Mechanical SystemsPIETRO ROSATOspecial
05/09/2024FinalPIETRO ROSATOprogress
04/19/2024Fire-Resistant Penetrations and JointsTHEODORE RIEPERspecial
01/24/2024Fire-Resistant Penetrations and JointsTHEODORE RIEPERspecial
12/09/2022Fire-Resistant Penetrations and JointsTHEODORE RIEPERspecial
01/24/2022Fire-Resistant Penetrations and JointsTHEODORE RIEPERspecial
01/24/2022Lighting in dwelling unitsTHEODORE RIEPERenergy_progress
11/05/2021Final—progress
▾Documents — 59 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/24/2026X00625791-I1Request digital key ↗
08/23/2026X00760850-P1Request digital key ↗
08/23/2026X00760850-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits5
▸BISWORK PERMIT APPLICATION3
03/05/2014220220151Open ↗
08/20/2012220220151Open ↗
08/20/2012220220151Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
10/04/2013220220151Open ↗
08/20/2012220220151Open ↗
▸Seals & Professional Certifications26
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/24/2026X00625791-I1Open ↗
08/21/2026X00666605-I1Open ↗
08/21/2026X00666605-P3Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
08/31/2026X00760850-I1Open ↗
08/31/2026X00760850-I1Open ↗
08/31/2026X00760850-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/31/2026X00760850-I1Open ↗
08/27/2026X00666605-P2Open ↗
08/26/2026X01048574-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
08/20/2012220220151Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
08/20/2012220220151Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
08/20/2012220220151Open ↗
▸Trade Schedules & Equipment5
▸BISSCHEDULE B - PLUMBING2
10/04/2013220220151Open ↗
08/20/2012220220151Open ↗
▸BISBOILERS - SUPPORTING DOCUMENTATION1
05/06/2014220220151Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
05/06/2014220220151Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
08/20/2012220220151Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/24/2026X00625791-I1Open ↗
08/21/2026X00666605-P3Open ↗
08/21/2026X00666605-I1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
08/20/2012220220151Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
08/20/2012220220151Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026X00760850-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
08/20/2012220220151Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
08/20/2012220220151Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
08/20/2012220220151Open ↗