| Date | Filing | items | Scope breakdown | Plans | Address |
|---|---|---|---|---|---|
| 02/17/2026 | X01296331-S2 | 101 | — | — | 1998 BRUCKNER BOULEVARD |
| 10/23/2025 | X01233626-S4 | 31 | — | — | 4225 NAPIER AVENUE |
| 06/10/2025 | M01226230-I1 | 6 | Fixtures 5Gas meters 1 | — | 987 1 AVENUE |
| 03/28/2025 | B01049512-I1 | 102 | Fixtures 100Gas meters 1Risers 1 | — | 523 FULTON STREET |
| 01/13/2025 | M01103484-I1 | 4 | Fixtures 2Gas meters 1Risers 1 | — | 30 ROCKEFELLER PLAZA |
| 12/20/2024 | B07995612-I1 | 49 | Fixtures 47Backflow 1Gas meters 1 | — | 76 ST MARKS AVENUE |
| Name | Jobs together | Most recent |
|---|---|---|
| FISKAA ENGINEERING | 2 | 02/18/2025 |
| AMA CONSULTING ENGINEERS, PC | 1 | 03/27/2026 |
| ANDREW FETHES ARCHITECT | 1 | 09/25/2024 |
| ARCHETYPE ARCHITECTURE | 1 | 04/24/2024 |
| ARMIR TARAJ PE | 1 | 07/19/2026 |
| AUTOMATED DESIGN ENGINEERING, PLLC | 1 | 04/19/2024 |
| COLLADO ENGINEERING | 1 | 12/14/2023 |
| CORE STATES ARCH & ENG PC | 1 | 08/04/2026 |
| CORE STATES GROUP | 1 | 08/04/2026 |
| DAVID JIMENEZ, RA | 1 | 04/16/2024 |
| E4P CONSULTING ENGINEERING PLLC | 1 | 07/18/2025 |
| ETTINGER ENGINEERING ASSOCIATES | 1 | 12/08/2025 |
| EVERJ ENGINEERING INC PC | 1 | 11/06/2024 |
| FRED GEREMIA, ARCHITECTS & PLANNERS | 1 | 07/19/2026 |
| GOLDMAN COPELAND ASSOCIATES | 1 | 04/28/2025 |
| Grid Drafting and Consulting LLC | 1 | 02/16/2026 |
| HNY CONSULTING ENGINEERS LLC | 1 | 10/08/2024 |
| HUAN DESIGN INC. | 1 | 06/10/2026 |
| NODE ENGINEERING & CONSULTING, PC | 1 | 03/10/2026 |
| NY RESTORATION TECHNOLOGY CORP | 1 | 07/16/2024 |
| ROMIT GAJJAR | 1 | 11/08/2023 |
| SATWIN ARCHITECT, PC | 1 | 02/02/2024 |
| STEFANIE WERNER | 1 | 04/19/2024 |
| Name | Jobs together | Most recent |
|---|---|---|
| NEW LINE CONSTRUCTION LLC | 3 | 07/19/2026 |
| EBM PLUMBING CORP | 2 | 03/10/2026 |
| CONTE BUILDERS INC | 1 | 11/08/2023 |
| DGC CAPITAL CONTRACTING C | 1 | 08/04/2026 |
| GRATIA CONTRACTORS LLC | 1 | 04/24/2024 |
| NODE SYSTEMS AND ASSEMBLI | 1 | 04/19/2024 |
| PRACTICAL PLBG & HTG INC | 1 | 12/14/2023 |
| ROBINSON INVESTMENT GROUP | 1 | 09/25/2024 |
| TOKA CONSTRUCTION CORP | 1 | 04/19/2024 |
| Name | Jobs together | Most recent |
|---|---|---|
| 106-24 REALTY CORP | 1 | 02/18/2025 |
| 30 ROCKEFELLER PLAZA | 1 | 04/28/2025 |
| 3030 Bronx Park East LLC | 1 | 02/16/2026 |
| 63 Wall Street Owner, LLC | 1 | 10/11/2024 |
| INSERRA SUPERMARKETS,INC. | 1 | 12/08/2025 |
| MAXWELL-KATES, INC. | 1 | 06/10/2026 |
| NATIONAL PACKING CORP. | 1 | 04/16/2024 |
| NEW LINE BUILDERS | 1 | 07/19/2026 |
| NIOS INC | 1 | 07/16/2024 |
| ONSITE PROPERTY MNGT INC | 1 | 04/19/2024 |
| PIBLY RESIDENTIAL PROGRAMS INC. | 1 | 04/19/2024 |
| SCHOOL IN THE SQUARE | 1 | 12/14/2023 |
| SPEARHEAD CONTRACTING LLC | 1 | 10/08/2024 |
| TISHMAN SPEYER | 1 | 03/27/2026 |
| TUDOR REALTY SERVICES CORP | 1 | 02/02/2024 |
| URBAN EDGE PROPERTIES | 1 | 08/04/2026 |
| Name | Jobs together | Most recent |
|---|---|---|
| BURNHAM NATIONWIDE INC | 3 | 02/18/2025 |
| NEXUS CONSULTING NYC, INC | 2 | 04/24/2024 |
| WALTER T. GORMAN, PE, PC | 2 | 03/27/2026 |
| BRP CONSTRUCTION GROUP, LLC | 1 | 04/19/2024 |
| CANAS SOLUTIONS INC | 1 | 12/08/2025 |
| CLARKE CONSTRUCTION CONSULTANTS | 1 | 09/25/2024 |
| DAO STUDIOS LLC | 1 | 07/18/2025 |
| GERALD J. CALIENDO R.A., P.C. | 1 | 08/04/2026 |
| GRID DRAFTING AND CONSULTING LLC | 1 | 02/16/2026 |
| NEW LINE CONSTRUCTION | 1 | 07/19/2026 |
| NODE ARCHITECTURE,ENGINEERING,CON | 1 | 03/10/2026 |
| PEROTTO CONSULTING MGT | 1 | 10/11/2024 |
| SATWIN ARCHITECT, PC | 1 | 02/02/2024 |
| TERESA N TEJEDA-MELO | 1 | 04/16/2024 |
| Job | Address | Type | Status | Filed | Latest permit | On the job | Description |
|---|---|---|---|---|---|---|---|
| X01065781 ↗ | 308 EAST 162 STREET BRONX | New Building | Permit Issued | 07/05/2024 | 09/25/2026 | Owner NEW LINE BUILDERS Filer NEW LINE CONSTRUCTION | Support of Excavation work associated with NB application under job# X01065781-i1 |
| M01396688 ↗ | 125 EAST 12 STREET MANHATTAN | Alteration | Permit Issued | 06/09/2026 | 07/14/2026 | Design HUAN DESIGN INC. Owner MAXWELL-KATES | APPLICATION FILED FOR INTERIOR RENOVATION &RELATED PLUMBING WORK OF APT 2H ON 2NDFLOOR. NO CHANGE IN USE, EGRESS OROCCUPANCY UNDER THIS APPL… |
| X01214816 ↗ | 3030 BRONX PARK EAST BRONX | New Building | Permit Issued | 07/03/2025 | 06/29/2026 | Owner 3030 Bronx Park East LLC | Structural work in conjunction with NB application #X01214816-I1 |
| M01368008 ↗ | 1230 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 03/27/2026 | 04/14/2026 | Design AMA CONSULTING ENGINEERS, PC Owner Tishman Speyer Filer WALTER T. GORMAN, PE, PC | Alterations to plumbing system on 1st and 2nd floor as plans. No change to use, egress or occupancy. |
| X01296331 ↗ | 1998 BRUCKNER BOULEVARD BRONX | Alteration | Permit Issued | 11/18/2025 | 02/17/2026 | Design CORE STATES ARCH & ENG PC Owner URBAN EDGE PROPERTIES | The plumbing scope of work for this interior fit-out project include the installation, modification, and connection of the domestic water, g… |
| X01233626 ↗ | 4225 NAPIER AVENUE BRONX | New Building | Permit Issued | 05/30/2025 | 02/12/2026 | STRUCTURAL APPLICATION BEING FILED FOR NEW BUILDING. | |
| M01226230 ↗ | 985 1 AVENUE MANHATTAN | Alteration | Permit Issued | 06/02/2025 | 06/10/2025 | Filer DAO STUDIOS LLC | MINOR PLUMBING WORK IN CONJUNCTION WITH COMMERCIAL SPACE ON THE FIRST FLOOR. NO CHANE TO USE, OCCUPANCY, OR EGRESS. |
| B01049512 ↗ | 523 FULTON STREET BROOKLYN | Alteration | Signed-off | 07/03/2024 | 03/28/2025 | Filer CANAS SOLUTIONS INC | Installation of plumbing fixtures and associated piping. |
| M01103484 ↗ | 1250 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 11/25/2024 | 01/13/2025 | Design GOLDMAN COPELAND ASSOCIATES Owner 30 ROCKEFELLER PLAZA Filer WALTER T. GORMAN, PE, PC | Plumbing work on cellar as per plans. No change to use, egress or occupancy. |
| B07995612 ↗ | 76 ST MARKS AVENUE BROOKLYN | Alteration | Permit Issued | 03/21/2023 | 12/20/2024 | Design EVERJ ENGINEERING INC PC Filer BURNHAM NATIONWIDE INC | Filing herewith application for plumbing modifications as per drawings submitted. |
| M01119305 ↗ | 67 WALL STREET MANHATTAN | Alteration | Signed-off | 10/11/2024 | 10/25/2024 | Design FISKAA ENGINEERING Filer PEROTTO CONSULTING MGT | 8903 - PLUMBING MODIFICATIONS FOR SWEETGREEN SPACE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY |
| Q01077559 ↗ | 31-76 STEINWAY STREET QUEENS | Alteration | Signed-off | 07/16/2024 | 09/18/2024 | Owner NIOS INC | INSTALL NEW VENTS TO CONNECT TO ORIGINAL RISER, INSTALL NEW SINKS, LAVATORIES, TOILET, AND NEW ELECTRIC TANKLESS WATER HEATER, AND NEW MOP S… |
| Q01063113 ↗ | 106-24 71 AVENUE QUEENS | Alteration | Permit Issued | 07/02/2024 | 09/13/2024 | Design FISKAA ENGINEERING Owner 106-24 REALTY CORP Filer BURNHAM NATIONWIDE INC | Minor Plumbing work as per plans filed herewith. No change in use, egress or occupancy. |
| B01033510 ↗ | 992 MANHATTAN AVENUE BROOKLYN | Alteration | Signed-off | 05/03/2024 | 05/24/2024 | Design HNY CONSULTING ENGINEERS LLC Filer BURNHAM NATIONWIDE INC | Plumbing work as per plans filed herewith. No change in use, egress or occupancy under our application |
| X00973978 ↗ | 1373 HERSCHELL STREET BRONX | Alteration | Signed-off | 12/14/2023 | 02/26/2024 | Design STEFANIE WERNER | Interior renovation of existing vacant space. Providing new partitions and flooring. No change in Use, Egress, or occupancy. |
| M00889145 ↗ | 165 WEST END AVENUE MANHATTAN | Alteration | Signed-off | 07/14/2023 | 01/29/2024 | Design ROMIT GAJJAR | Plumbing work for unit renovations. No change in use, egress, or occupancy. |
| M00956403 ↗ | 49 WARREN STREET MANHATTAN | Alteration | Signed-off | 11/15/2023 | 01/08/2024 | Design ANDREW FETHES ARCHITECT | PL FIXTURES FILED IN CONJUNCTION WITH DOB NOW GC. NO CHANGE TO USE, OCCUPANCY OR EGRESS |
| M00341628 ↗ | 620 ISHAM STREET MANHATTAN | Alteration | Signed-off | 04/23/2020 | 01/04/2024 | Design COLLADO ENGINEERING Owner SCHOOL IN THE SQUARE | PLUMBING WORK ASSOCIATED WITH SCHOOL RENOVATION AS PER PLANS FILED HEREWITH. |
| M00695622 ↗ | 845 WEST END AVENUE MANHATTAN | Alteration | Signed-off | 01/11/2023 | 12/29/2023 | Design SATWIN ARCHITECT, PC Filer SATWIN ARCHITECT, PC | PLUMBING WORK IN APARTMENT 14F ON FLOOR 013, IN CONJUNCTION WITH APPLICATION M00695576. |
| M00839206 ↗ | 17 WEST 71 STREET MANHATTAN | Alteration | Signed-off | 09/07/2023 | 11/22/2023 | Design ARCHETYPE ARCHITECTURE | New alt 2 application for plumbing work to be performed in existing unit #1A on the 1st floor. Initial general construction application to b… |
| X00666605 ↗ | 538 CRAVEN STREET BRONX | Alteration | Signed-off | 08/03/2022 | 09/11/2023 | Design DAVID JIMENEZ, RA Owner NATIONAL PACKING CORP. Filer TERESA N TEJEDA-MELO | Installation of Plumbing fixtures including an ADA bathroom, & interior renovation of existing bathroom as per plans shown. Resolve ECB Vio… |
| M55250776 | 234 EAST 61 STREET MANHATTAN | — | Signed-off | — | 03/13/2023 | — | REPLACE EXISTING BOILER AND ACCESSORIES. NO CHANGE TO USE, EGRESS OR OCCUPANCY |
| Permit history | Filing | items | Scope breakdown | Plans | Address | Building |
|---|---|---|---|---|---|---|
Feb '26 single permit | X01296331-S2 | 101 | — | — | 1998 BRUCKNER BOULEVARD | Mercantile · 2 fl |
Oct '25 ↻ 2 permits · latest Feb '26 · active | X01233626-S4 | 31 | — | — | 4225 NAPIER AVENUE | Unknown |
Jun '25 single permit | M01226230-I1 | 6 | Fixtures 5Gas meters 1 | — | 987 1 AVENUE | Residential · 4 fl |
Mar '25 single permit | B01049512-I1 | 102 | Fixtures 100Gas meters 1Risers 1 | — | 523 FULTON STREET | Mercantile · 3 fl |
Jan '25 single permit | M01103484-I1 | 4 | Fixtures 2Gas meters 1Risers 1 | — | 30 ROCKEFELLER PLAZA | Commercial · 70 fl |
Dec '24 single permit | B07995612-I1 | 49 | Fixtures 47Backflow 1Gas meters 1 | — | 76 ST MARKS AVENUE | Residential · 5 fl |
Oct '24 single permit | M01119305-I1 | 2 | Fixtures 1Water heaters 1 | — | 67 WALL STREET | Residential · 25 fl |
Sep '24 single permit | Q01063113-I1 | 30 | Fixtures 26Water heaters 1Risers 3 | — | 106-24 71 AVENUE | Mercantile · 1 fl |
May '24 single permit | B01033510-I1 | 32 | Fixtures 26Backflow 4Gas meters 1Risers 1 | — | 723 MANHATTAN AVENUE | Unknown |
Jan '24 single permit | M00889145-S1 | 2 | Fixtures 2 | — | 165 WEST END AVENUE | Residential · 28 fl |
Jan '24 single permit | M00956403-S1 | 12 | Fixtures 10Gas meters 1Risers 1 | — | 51 WARREN STREET | Residential · 6 fl |
Jun '20 ↻ 5 permits · latest Jan '24 | M00341628-I1 | 44 | Fixtures 42Water heaters 2 | — | 620 ISHAM STREET | Educational · 3 fl |
May '23 ↻ 2 permits · latest Dec '23 | M00695622-I1 | 7 | Fixtures 4Gas meters 1Risers 2 | — | 845 WEST END AVENUE | Residential · 15 fl |
Jul '23 ↻ 2 permits · latest Sep '23 | X00666605-I1 | 10 | Fixtures 10 | — | 538 CRAVEN STREET | Factory and Industrial · 1 fl |
| Building | Filings | Most Recent |
|---|---|---|
| 308 EAST 162 STREET ↗ | 1 | 08/18/2026 |
| 125 EAST 12 STREET ↗ | 1 | 07/15/2026 |
| 1230 AVENUE OF THE AMER ↗ | 1 | 07/08/2026 |
| 3030 BRONX PARK EAST ↗ | 1 | 07/08/2026 |
| 234 EAST 61 STREET ↗ | 1 | 07/08/2026 |
| 845 WEST END AVENUE ↗ | 2 | 07/08/2026 |
| 67 WALL STREET ↗ | 1 | 07/08/2026 |
| 31-76 STEINWAY STREET ↗ | 1 | 07/08/2026 |
| 538 CRAVEN STREET ↗ | 5 | 07/08/2026 |
| 17 WEST 71 STREET ↗ | 1 | 07/08/2026 |
| 1373 HERSCHELL STREET ↗ | 2 | 07/08/2026 |
| 1998 BRUCKNER BOULEVARD ↗ | 1 | 07/08/2026 |
| 4225 NAPIER AVENUE ↗ | 2 | 07/08/2026 |
| 523 FULTON STREET ↗ | 2 | 07/08/2026 |
| 106-24 71 AVENUE ↗ | 1 | 07/08/2026 |
| 992 MANHATTAN AVENUE ↗ | 1 | 07/08/2026 |
| 620 ISHAM STREET ↗ | 1 | 07/08/2026 |
| 49 WARREN STREET ↗ | 1 | 07/08/2026 |
| 165 WEST END AVENUE ↗ | 1 | 07/08/2026 |
| 1250 AVENUE OF THE AMER ↗ | 1 | 07/08/2026 |
| 76 ST MARKS AVENUE ↗ | 1 | 07/08/2026 |
| 985 1 AVENUE ↗ | 1 | 06/28/2026 |
| 2001 BROADWAY ↗ | 2 | 03/22/2026 |