← Back
Elevator apt, fireproof with stores
538 THIRD AVENUE
MANHATTAN · BIN 1091704
💬 Discuss this project
2024Year Built
22Stories
D6Building Class
C1-9Zoning
142,927 sfGross Floor Area
132Units
Rent Stabilized0 Open Violations
Elevator apt, fireproof with stores · Owner of record: THIRD AVENUE PAVILION RESIDENCES, LLC · 8,887 sf lot · 16.08 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneralOther
Permit Issued — active, not yet Signed-off
RoofUnder Construction19p · 6 filings · 20 docs
Bulkhead9p · 3 filings · 20 docs
Floor 22Under Construction6p · 5 filings · 20 docs
Floor 21Under Construction6p · 5 filings · 20 docs
Floor 20Under Construction8p · 6 filings · 20 docs
Floor 19Under Construction9p · 6 filings · 20 docs
Floor 18Under Construction9p · 6 filings · 20 docs
Floor 17Under Construction13p · 6 filings · 20 docs
Floor 16Under Construction8p · 6 filings · 20 docs
Floor 15Under Construction9p · 5 filings · 20 docs
Floor 14Under Construction11p · 7 filings · 20 docs
Floor 13Under Construction11p · 6 filings · 20 docs
Floor 12Under Construction10p · 6 filings · 20 docs
Floor 11Under Construction10p · 6 filings · 20 docs
Floor 10Under Construction10p · 6 filings · 20 docs
Floor 9Under Construction10p · 6 filings · 20 docs
Floor 8Under Construction10p · 6 filings · 20 docs
Floor 7Under Construction13p · 7 filings · 20 docs
Floor 6Under Construction12p · 7 filings · 20 docs
Floor 5Under Construction11p · 6 filings · 20 docs
Floor 4Under Construction11p · 6 filings · 20 docs
Floor 3Under Construction7p · 6 filings · 20 docs
Floor 2Under Construction10p · 6 filings · 20 docs
Floor 1Under Construction4p · 5 filings · 20 docs
Cellar10p · 6 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNERS REP2808/26/2026
CITY BUILDERS NYC1003/22/2026
536 THIRD AVENUE LLC1103/22/2026
536 3RD AVE LLC703/22/2026
536 3 AVENUE LLC203/22/2026
BUILDERS NYC LLC CITY103/22/2026
GILAR REALTY303/21/2026
BHAGHIANA GENERAL CONSTRUCTION103/21/2026
RAILSPLITTER203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/12/2015$8.0M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
METROPOLIS GROUP INC403/21/2026
AE DESIGN SOLUTION2603/21/2026
JM ZONING, LLC.2003/21/2026
DOMANI CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CORE SCAFFOLD SYSTEMS INC.General Contractor1808/26/2026
CITY BUILDERS NYC LLCGeneral Contractor1207/08/2026
METFLOW FIRE CONTROL LLCFire Protection607/08/2026
CREATIVE PLUMBING INPlumbing207/08/2026
SAFETY FIRE SPRINKLER CORPFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BIG APPLE GROUP NY A RMA91681101/05/2026
HRF SERVICES CORP5616110/01/2024
Building Lifecycle
All (188)Filed (32)Permit Issued (31)Signed Off (7)Violation (58)Inspection (11)Objection (16)Special Inspection (30)Tax Incentive (3)
01/01/2027
421-a(16) construction completed
08/17/2026
Permit issued — Sidewalk Shed
M01097616-I1-SH
08/06/2026
Permit issued — Supported Scaffold
M01101550-I1-SF
07/02/2026
Permit issued — Construction Fence
M00706312-I1-FN
06/05/2026
Signed off — Alteration
HEREWITH FILING FOR THE INSTALLATION OF A SPRINKLER/STANDPIPE SYSTEM IN CONJUNCTION WITH NB# 121207942.
M00602365-I1
06/05/2026
Signed off — Alteration
HEREWITH FILING TEMPORARY STANDPIPE FILING IN CONJUNCTION WITH NB# 121207942.
M00691353-I1
06/05/2026
Signed off — Alteration
HEREWITH FILING MECHANICAL WORK IN CONJUNCTION WITH NEW BUILDING# 121207942
M00347595-I1
05/06/2026
Special inspection requirement — HVAC and service water heating system controls
SOORJBALLY HARILALL
05/06/2026
Special inspection requirement — HVAC and service water heating equipment
SOORJBALLY HARILALL
05/06/2026
Special inspection requirement — Maintenance information
SOORJBALLY HARILALL
05/06/2026
Special inspection requirement — Heating Systems
SOORJBALLY HARILALL
05/06/2026
Special inspection requirement — Mechanical Systems
SOORJBALLY HARILALL
05/06/2026
Special inspection requirement — Chimneys and vents
SOORJBALLY HARILALL
05/06/2026
Special inspection requirement — Shutoff dampers
SOORJBALLY HARILALL
05/06/2026
Special inspection requirement — HVAC insulation and sealing
SOORJBALLY HARILALL
05/06/2026
Special inspection requirement — Final
SOORJBALLY HARILALL
05/06/2026
Special inspection requirement — Energy Code Compliance Inspections
SOORJBALLY HARILALL
04/23/2026
Objection resolved — Addressed
02/16/2026
Filed — Alteration
M01097616-P3
02/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
02/03/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
SOORJBALLY HARILALL
01/26/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01149958-I1
01/26/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01097636-I1
01/23/2026
Objection resolved — Addressed
01/21/2026
Signed off — Alteration
INSTALLATION OF TEMP CONSTRUCTION OFFICE AS PER PLAN. IN CONJUNCTION WITH NEW BUILDING JOB # 121207942. NO CHANGE OF USE, OCCUPANCY OR EGRESS. THIS TEMP OFFICE WILL BE USED ONLY BYCONSTRUCTION PERSONNEL WITH OSHA CERTIFICATE.
M01170285-I1
01/21/2026
Objection raised — Scope
01/20/2026
Signed off — Alteration
M01141024-I1
01/05/2026
Filed — Alteration
HEREWITH FILING PLUMBING IN CONJUNCTION WITH NB 121207942
M00347619-P6
01/03/2026
Violation issued (ECB, closed)
Unknown
01/03/2026
Violation issued (ECB, closed)
Construction
01/03/2026
Violation issued (ECB, closed)
Unknown
01/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
01/02/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
SOORJBALLY HARILALL
12/23/2025
Objection raised — Other
11/26/2025
Permit issued — Protection and Mechanical Methods
M01149958-I1-PMM
11/25/2025
Objection resolved — Addressed
11/19/2025
Permit issued — Protection and Mechanical Methods
M01141024-I1-PMM
11/13/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/13/2025
Inspection — Certified StandPipe-Fire Pump (SD)-Fire Pump Test
Certified
View inspection ↗
11/13/2025
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
11/09/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/09/2025
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
10/16/2025
Filed — Alteration
HEREWITH FILING FOR THE INSTALLATION OF A SPRINKLER/STANDPIPE SYSTEM IN CONJUNCTION WITH NB# 121207942.
M00602365-P5
09/08/2025
Permit issued — Standpipe
M00691353-I1-EW-SD
09/04/2025
Permit issued — Standpipe
M00602365-I1-EW-SD
09/04/2025
Permit issued — Sprinklers
M00602365-I1-EW-SP
09/03/2025
Permit issued — Structural
M00347581-I1-ST
09/02/2025
Permit issued — Plumbing
M00347619-I1-PL
09/02/2025
Violation issued (ECB, closed)
Unknown
08/28/2025
Permit issued — Mechanical Systems
M00347595-I1-MS
08/19/2025
Permit issued — Sidewalk Shed
M01097616-I1-SH
08/19/2025
Permit issued — Supported Scaffold
M01101550-I1-SF
08/19/2025
Permit issued — Protection and Mechanical Methods
M01100457-I1-PMM
08/12/2025
Permit issued — Protection and Mechanical Methods
M01097636-I1-PMM
07/15/2025
Permit issued — Construction Fence
M00706312-I1-FN
06/25/2025
Filed — Alteration
HEREWITH FILING PLUMBING IN CONJUNCTION WITH NB 121207942
M00347619-P5
06/17/2025
Special inspection requirement — High-Pressure Fuel-Gas Piping (Welding)
06/17/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
06/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/20/2025
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE & SYSTEM SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01101550-P2
Latest 60 of 188 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedCORE SCAFFOLD SYSTEMS INC.08/17/2026
DOB NOWSupported ScaffoldPermit IssuedCORE SCAFFOLD SYSTEMS INC.08/06/2026
DOB NOWConstruction FencePermit IssuedCITY BUILDERS NYC LLC07/02/2026
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC11/26/2025
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC11/19/2025
DOB NOWStandpipeSigned-offMETFLOW FIRE CONTROL LLC09/08/2025
DOB NOWStandpipeSigned-offMETFLOW FIRE CONTROL LLC09/04/2025
DOB NOWSprinklersSigned-offMETFLOW FIRE CONTROL LLC09/04/2025
DOB NOWStructuralSigned-offCITY BUILDERS NYC09/03/2025
DOB NOWPlumbingSigned-offAB PLUMBING INC09/02/2025
DOB NOWMechanical SystemsSigned-offCITY BUILDERS NYC08/28/2025
DOB NOWSidewalk ShedPermit IssuedCORE SCAFFOLD SYSTEMS INC08/19/2025
DOB NOWSupported ScaffoldPermit IssuedCORE SCAFFOLD SYSTEMS INC08/19/2025
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC08/19/2025
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC08/12/2025
DOB NOWConstruction FencePermit IssuedCITY BUILDERS NYC07/15/2025
DOB NOWGeneral ConstructionSigned-offCITY BUILDERS NYC03/06/2025
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC12/05/2024
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC11/27/2024
DOB NOWStandpipeSigned-offMETFLOW FIRE CONTROL LLC09/11/2024
DOB NOWStructuralSigned-offCITY BUILDERS NYC09/10/2024
DOB NOWStandpipeSigned-offMETFLOW FIRE CONTROL LLC09/09/2024
DOB NOWStandpipeSigned-offMETFLOW FIRE CONTROL LLC09/09/2024
DOB NOWPlumbingSigned-offAB PLUMBING INC09/03/2024
DOB NOWSupported ScaffoldPermit IssuedCORE SCAFFOLD SYSTEMS INC08/27/2024
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC08/26/2024
DOB NOWMechanical SystemsSigned-offCITY BUILDERS NYC08/22/2024
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC08/20/2024
DOB NOWSidewalk ShedPermit IssuedCORE SCAFFOLD SYSTEMS INC08/20/2024
DOB NOWConstruction FencePermit IssuedCITY BUILDERS NYC04/17/2024
DOB NOWStandpipeSigned-offSAFETY FIRE SPRINKLER CORP03/26/2024
BIS—ISSUEDCITY BUILDERS NYC LLC11/07/2025
BIS—ISSUEDCITY BUILDERS NYC LLC11/07/2024
BIS—ISSUEDCITY BUILDERS NYC LLC09/05/2024
BIS—ISSUEDCITY BUILDERS NYC LLC05/06/2024
BIS—ISSUEDCITY BUILDERS NYC LLC05/03/2024
BISOTISSUEDBHAGHIANA GENERAL CONSTRU08/10/2016
BISEQISSUEDB & S RESTORATION INC07/15/2016
BISEQISSUEDB & S RESTORATION INC07/21/2015
BISFPISSUEDNEW YORK BUSINESS FIRE SYS12/13/2001
+ 13 more permits on file
1 project · most recent 01/15/2025
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
01/15/2025Signed-offCITY BUILDERS NYC LLCAir Conditioning Systems, Heating Systems
Cooling
Mitsubishi Electric PURY-EP120NYU-A1 119,700 BTU · Vrf Outdoor ×21
PUHY-EP96YNU-A1 96,000 BTU · Vrf Outdoor ×7
PURY-EP72NYU-A1 72,000 BTU · Vrf Outdoor ×7
PURY-P168NYU-A 168,000 BTU · Vrf Outdoor ×7
PURY-P144YNU-A 144,000 BTU · Vrf Outdoor ×1
PURY-P192YNU-A 192,000 BTU · Vrf Outdoor ×1
Aaon RN-008-3-0-GABY-V0-21-000-A 88,900 BTU · Rooftop Unit ×1
RN-020-3-0GABY-V0-21-000-A 229,500 BTU · Rooftop Unit ×1
RN-008-8-0-EB09 93,980 BTU · Rooftop Unit ×1
RN-018-8-0-EB09 210,000 BTU · Rooftop Unit ×1
Lg ARUN048GSS4 48,100 BTU · Vrf Outdoor ×1
Climatemaster TSM-24 23,600 BTU · Wshp ×92
TSM-12 10,600 BTU · Wshp ×40
TSM-18 14,000 BTU · Wshp ×26
TCH-024 22,400 BTU · Wshp ×17
TCH-018 16,500 BTU · Wshp ×16
TCH-036 31,700 BTU · Wshp ×16
TRC-09 8,100 BTU · Heat Pump Outdoor ×13
TCH-009 7,900 BTU · Wshp ×12
TSV-042 38,400 BTU · Wshp ×4
TCH-048 44,900 BTU · Wshp ×3
TSV-048 48,100 BTU · Wshp ×2
TCH-012 11,000 BTU · Wshp ×1
Stulz OHS-048-AHU 53,700 BTU · Condensing Unit ×1
OHS-048-RCU-0 53,700 BTU · Split System ×1
Heating
Mitsubishi Electric PURY-EP120NYU-A1 135,000 BTU · Vrf Outdoor ×21
PUHY-EP96YNU-A1 108,000 BTU · Vrf Outdoor ×7
PURY-EP72NYU-A1 81,000 BTU · Vrf Outdoor ×7
PURY-P168YNU-A 189,000 BTU · Vrf Outdoor ×2
PURY-P144YNU-A 162,000 BTU · Vrf Outdoor ×1
PURY-P192YNU-A 215,000 BTU · Vrf Outdoor ×1
Lg ARUN048GSS4 51,200 BTU · Vrf Outdoor ×1
Climatemaster TSM-24 32,500 BTU · Wshp ×92
TSM-12 14,700 BTU · Wshp ×40
TSM-18 20,200 BTU · Wshp ×26
TCH-024 30,600 BTU · Wshp ×17
TCH-018 22,100 BTU · Wshp ×16
TCH-036 46,700 BTU · Wshp ×16
TRC-09 11,400 BTU · Heat Pump Outdoor ×13
TCH-009 11,600 BTU · Wshp ×12
TSV-042 49,500 BTU · Wshp ×4
TCH-048 58,100 BTU · Wshp ×3
TSV-048 61,100 BTU · Wshp ×2
TCH-012 15,800 BTU · Wshp ×1
Aaon RN-008-8-0-EB09 120,000 BTU · Rooftop Unit ×1
RN-018-8-0-EB09 432,000 BTU · Rooftop Unit ×1
Cooling Tower
Evapco UT-215-4J9 400 tons · Cooling Tower ×1
1 project · most recent 10/16/2025
FiledStatusContractorScope
10/16/2025Signed-offMETFLOW FIRE CONTROL LLC1,984 heads, 2 outlets
2 projects · most recent 01/05/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
01/05/2026Signed-offMETFLOW MECHANICAL LLCGas, Storm, Water/Sanitary
10/16/2025———
5 projects · most recent 09/14/2026
General Wiring
FiledStatusContractorScope
09/14/2026CompleteS&F ELECTRICAL SERVICE INGeneral Wiring
03/06/2025CompleteDENALI ELECTRIC CORP—
12/03/2024CompleteS&F ELECTRICAL SERVICE IN1 meters, 1 new_meters
09/18/2024CompleteSOLAS ELECTRICAL CORP—
09/09/2024Permit IssuedSOLAS ELECTRICAL CORP—
1 project · most recent 09/30/2024
Steel Concrete
FiledStatusContractorScope
09/30/2024Signed-offCITY BUILDERS NYC LLCSteel, Concrete
1 project · most recent 05/20/2025
Scaffold
FiledStatusContractorScope
05/20/2025Permit IssuedCORE SCAFFOLD SYSTEMS INCScaffold
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
11/13/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/13/2025Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
11/13/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
11/09/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/09/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
03/28/2025Pass-Final PL - More than 10 Requested FloorsPassView ↗
02/19/2025Pass-Final PL - More than 10 Requested FloorsPassView ↗
02/03/2025Pass-Final PL - More than 10 Requested FloorsPassView ↗
12/02/2024Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)CertifiedView ↗
12/02/2024Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
08/30/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 63
DateRequirementInspectorRole
05/06/2026Energy Code Compliance InspectionsSOORJBALLY HARILALLprogress
05/06/2026Chimneys and ventsSOORJBALLY HARILALLspecial
05/06/2026Heating SystemsSOORJBALLY HARILALLspecial
05/06/2026Mechanical SystemsSOORJBALLY HARILALLspecial
05/06/2026FinalSOORJBALLY HARILALLprogress
05/06/2026HVAC and service water heating system controls SOORJBALLY HARILALLenergy_progress
05/06/2026HVAC and service water heating equipment SOORJBALLY HARILALLenergy_progress
05/06/2026Maintenance informationSOORJBALLY HARILALLenergy_progress
05/06/2026HVAC insulation and sealing SOORJBALLY HARILALLenergy_progress
05/06/2026Shutoff dampersSOORJBALLY HARILALLenergy_progress
02/03/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationSOORJBALLY HARILALLspecial
02/03/2026Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
01/02/2026Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
01/02/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationSOORJBALLY HARILALLspecial
06/17/2025High-Pressure Fuel-Gas Piping (Welding)—special
06/17/2025Fire-Resistant Penetrations and Joints—special
06/17/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
01/15/2025Structural Steel - High Strength BoltingSOORJBALLY HARILALLspecial
01/15/2025Structural Steel - DetailsSOORJBALLY HARILALLspecial
01/15/2025FinalSOORJBALLY HARILALLprogress
01/15/2025Concrete - Cast-In-PlaceSOORJBALLY HARILALLspecial
01/15/2025Structural Steel - WeldingSOORJBALLY HARILALLspecial
01/14/2025Final—progress
12/05/2024Maintenance informationSOORJBALLY HARILALLenergy_progress
12/05/2024Shutoff dampersSOORJBALLY HARILALLenergy_progress
Latest 25 of 63.
▾Documents — 274 on file (BIS + DOB NOW)
▸Plans & Drawings34
▸DOB NOWPlans/Sketch22
09/03/2026M00602365-P2Request digital key ↗
09/03/2026M00602365-P3Request digital key ↗
09/03/2026M00602365-I1Request digital key ↗
Showing 3 of 22 on file for this type
▸DOB NOWPlans/Sketch - Plumbing5
09/05/2026M00347619-I1Request digital key ↗
09/05/2026M00347619-P6Request digital key ↗
09/05/2026M00347619-P5Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems4
09/03/2026M00347595-P2Request digital key ↗
09/03/2026M00347595-I1Request digital key ↗
08/15/2026M00347595-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Structural3
08/26/2026M00347581-I1Request digital key ↗
08/15/2026M00347581-P2Request digital key ↗
08/15/2026M00347581-P3Request digital key ↗
▸Applications & Permits43
▸BISPLAN / WORK APPROVAL APPLICATION23
03/02/2026121207942Open ↗
12/01/2025121207942Open ↗
11/19/2025120330542Open ↗
Showing 3 of 23 on file for this type
▸BISWORK PERMIT APPLICATION19
11/07/2024121207942Open ↗
09/06/2024121207942Open ↗
09/06/2024121207942Open ↗
Showing 3 of 19 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
11/05/2025121207942Open ↗
▸Zoning, Tax Lot & Property Records5
▸BISZONING DIAGRAM2
02/14/2025121207942Open ↗
03/29/2022121207942Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
06/11/2020121207942Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
03/30/2022121207942Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
03/30/2022121207942Open ↗
▸Seals & Professional Certifications63
▸DOB NOWDPL-1: Design Professional Seal & Signature33
09/03/2026M00602365-P5Open ↗
09/03/2026M00602365-I1Open ↗
09/03/2026M00602365-P2Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/01/2026M00347595-I1Open ↗
09/01/2026M00347581-P3Open ↗
09/01/2026M00347581-P3Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/01/2026M00347595-I1Open ↗
09/01/2026M00347595-I1Open ↗
09/01/2026M00347595-I1Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
07/31/2015122446941Open ↗
07/31/2015122446941Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
01/04/2022141006587Open ↗
08/03/2016140530290Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
08/03/2016140530290Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
01/03/2022141006587Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
07/31/2015122446941Open ↗
▸Trade Schedules & Equipment3
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SCP)2
01/04/2026121207942Open ↗
12/15/2021121207942Open ↗
▸BISDEP STORMWATER SEWER CERTIFICATION (HCP/SCP)1
12/15/2021121207942Open ↗
▸Safety & Tenant Protection21
▸DOB NOWHPD-3: Single Room Occupancy Multiple Dwelling (SRO MD) Anti-Harassment Checklist15
09/03/2026M00602365-P2Open ↗
09/03/2026M00602365-I1Open ↗
09/03/2026M00602365-P3Open ↗
Showing 3 of 15 on file for this type
▸BISSTREET TREE CHECKLIST2
11/15/2024121207942Open ↗
07/13/2020121207942Open ↗
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING1
01/05/2026121207942Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
04/09/2024121207942Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
03/31/2022121207942Open ↗
▸BISBPP: STREET TREES SITE PLAN1
01/04/2022141006587Open ↗
▸Energy Compliance10
▸BISAIR SEALING AND INSULATION - VISUAL1
01/05/2026121207942Open ↗
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
02/16/2022121207942Open ↗
▸BISINTERIOR LIGHTING POWER1
01/05/2026121207942Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
01/05/2026121207942Open ↗
▸BISFENESTRATION AREAS1
01/05/2026121207942Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
01/05/2026121207942Open ↗
▸BISLIGHTING IN DWELLING UNITS1
01/05/2026121207942Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
01/05/2026121207942Open ↗
▸BISELECTRIC MOTORS1
01/05/2026121207942Open ↗
▸BISLIGHTING CONTROLS1
01/05/2026121207942Open ↗
▸Inspections & Test Reports19
▸BISTECHNICAL REPORT: RESPONSIBILITY7
03/31/2022121207942Open ↗
03/31/2022121207942Open ↗
03/30/2022121207942Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
05/06/2024121207942Open ↗
05/06/2024121207942Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
01/05/2026121207942Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
05/06/2024121207942Open ↗
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
03/31/2022121207942Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
04/19/2024121207942Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
01/05/2026121207942Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
01/05/2026121207942Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
01/05/2026121207942Open ↗
▸BISSOIL REPORT1
12/15/2021121207942Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
01/05/2026121207942Open ↗
▸DOB NOWConcrete Testing Exception Report1
08/13/2026M00347581-I1Open ↗
▸Approvals, Objections & Sign-offs15
▸BISSCHEDULE A - OCCUPANCY / USE7
03/02/2026121207942Open ↗
12/01/2025121207942Open ↗
01/21/2025121207942Open ↗
Showing 3 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
05/06/2024121207942Open ↗
04/19/2024121207942Open ↗
03/31/2022121207942Open ↗
Showing 3 of 5 on file for this type
▸BISSUPERSEDING LETTER2
09/06/2024121207942Open ↗
09/06/2024121207942Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
05/10/2010120330542Open ↗
▸Cost, Insurance & Ownership7
▸BISPROJECT-SPECIFIC GL INSURANCE5
05/06/2024121207942Open ↗
04/24/2024121207942Open ↗
04/19/2024121207942Open ↗
Showing 3 of 5 on file for this type
▸BISCOST AFFIDAVIT2
08/03/2016140530290Open ↗
05/10/2010120330542Open ↗
▸Filing & Intake Forms15
▸BISADDITIONAL INFORMATION7
12/31/2025121207942Open ↗
02/06/2025121207942Open ↗
10/04/2024121207942Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING COVER SHEET5
05/17/2020121207942Open ↗
05/08/2020121207942Open ↗
05/08/2020121207942Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
01/03/2022141006587Open ↗
08/03/2016140530290Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
08/12/2022141006587Open ↗
▸Other Documents22
▸DOB NOWDHCR Document11
08/13/2026M00706312-I1Open ↗
08/13/2026M00347595-P1Open ↗
08/13/2026M00347619-P1Open ↗
Showing 3 of 11 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION2
10/05/2022141006587Open ↗
10/05/2022141006587Open ↗
▸BISDHCR DOCUMENT1
01/04/2022141006587Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
12/08/2021121207942Open ↗
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS) (2014)1
01/05/2026121207942Open ↗
▸BISHPD: INCLUSIONARY HOUSING ELIG. CERT1
03/30/2022121207942Open ↗
▸BISVESTIBULES1
01/05/2026121207942Open ↗
▸BISMAINTENANCE INFORMATION1
01/05/2026121207942Open ↗
▸BISFIREPLACES1
01/05/2026121207942Open ↗
▸BISBPP: FILING REQUIRED1
03/30/2022121207942Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
01/05/2026121207942Open ↗