← Back
BuildNYC
Elevator cooperative
54 WEST 16TH STREET
MANHATTAN · BIN 1015317
💬 Discuss this project
1955Year Built
15Stories
D4Building Class
C6-2MZoning
129,970 sfGross Floor Area
121Units
LL97 CoveredRent Stabilized0 Active ViolationsFISP: SWARMP
Elevator cooperative · Owner of record: 54 W 16 St Apt · 11,875 sf lot · 10.94 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofFacade repairs and brickwork repointing5p · 2 filings · 17 docs
Floor 11Unit 11A, Unit 11C, Unit 11H45p · 4 filings · 20 docs
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6Unit 6H6p · 2 filings · 6 docs
Floor 5
Floor 4
Floor 3Unit 3B1p · 1 filing · 3 docs
Floor 2Unit 2B, Unit 2C, Unit 2D6p · 3 filings · 20 docs
Floor 1
CellarGarage structural repairs2p · 1 filing · 5 docs
Site & exteriorSidewalk shed installation13p · 4 filings · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
54 W 16 Apartment1203/21/2026
54 W 16 St Apt803/22/2026
54 West 16 Street Apt310/04/2026
54 West 16th St Apt Owners203/21/2026
Quantum Design103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PWR Engineering Design309/10/2026
Akt Architects404/29/2026
EC Building Consultants110/17/2025
East Coast110/02/2025
Ashraf305/26/2023
Amr Engineering Consultant102/07/2023
MSM Engineering Services106/28/2022
Morozov212/08/2021
A&A Construction Services110/18/2021
Niza Works of Architecture109/14/2021
Omf Architect109/16/2019
Lighthouse209/24/2018
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Intersystem S&SScaffold707/08/2026
Marek SzmacinskiGeneral Contractor304/09/2026
New Amsterdam Restorationspecialty_contractor303/21/2026
CvancoGeneral Contractor303/21/2026
New Amsterdam RestorationScaffold207/08/2026
Aura PlumbingPlumbing207/08/2026
Freedom GSGeneral Contractor107/08/2026
Stone RemodelingGeneral Contractor107/08/2026
AJC Plumbing & HeatingPlumbing107/08/2026
A.M.NPlumbing107/08/2026
Aqueduct MechanicalPlumbing107/08/2026
Inner City Electrical ContractorsElectrical103/21/2026
Branch PlumbingPlumbing107/08/2026
Salzman Electric CoElectrical103/21/2026
Macintosh ElectricElectrical103/21/2026
Kobryn Electrical ServicesElectrical103/22/2026
Benjamin Fiering ConstructionGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AK Consulting Services, I6198404/29/2026
Urban Integrations7993110/02/2025
IP Concrete Testing and I6252109/25/2023
Building Consulting Engineering1034102/07/2023
Great Wall Consultant P.E5633106/28/2022
Altera Engineering2646112/08/2021
ARCHITECTURE+CONSTRUCTION1326110/18/2021
Niza Works of Architects6101109/14/2021
Building Lifecycle
All (155)Filed (20)Permit Issued (18)Signed Off (8)Facade (FISP) (12)Violation (53)Inspection (3)Objection (17)Special Inspection (24)
09/29/2026
Signed off — Alteration
Installation of Plumbing fixtures for existing Apartment#11C. No change of use, egress or occupancy under this application
M01030978-I1
09/25/2026
Objection raised — Accessibility
09/10/2026
Filed — Alteration
PLUMBING WORK TYPE ONLY IN SUBSEQUENCE FILING OF GC JOB # M00923816-I1 TO RENOVATE EXISTING APT 2B.
M00923816-S2
06/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAHFUZAR RAHMAN
06/03/2026
Special inspection requirement — Final
ANNA THORSDOTTIR
06/03/2026
Special inspection requirement — Fire-Resistance Rated Construction
ANNA THORSDOTTIR
06/03/2026
Special inspection requirement — Energy Code Compliance Inspections
ANNA THORSDOTTIR
06/03/2026
Special inspection requirement — Lighting in dwelling units
ANNA THORSDOTTIR
06/01/2026
Signed off — Alteration
GARAGE REPAIRS AS INDICATED ON THE PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
M01277352-I1
05/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAHFUZAR RAHMAN
05/20/2026
Special inspection requirement — Energy Code Compliance Inspections
ANNA THORSDOTTIR
04/29/2026
Filed — Alteration
M01030966-P1
04/29/2026
Filed — Alteration
Installation of Plumbing fixtures for existing Apartment#11C. No change of use, egress or occupancy under this application
M01030978-P1
03/17/2026
Signed off — Alteration
MINOR INTERIOR RENOVATION OF EXISTINGONE-BEDROOM APARTMENT. BATHROOM AND KITCHEN RENOVATIONS. CONSTRUCTION FILED WITH DOB - JOB NUMBER 123840754. No change to egress, occupancy or use.
M00332239-I1
01/28/2026
Signed off — Alteration
M01293521-I1
12/03/2025
Permit issued — General Construction
M01293521-I1-GC
10/17/2025
Filed — Alteration
M01293521-I1
10/15/2025
Permit issued — Structural
M01277352-I1-ST
10/02/2025
Filed — Alteration
GARAGE REPAIRS AS INDICATED ON THE PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
M01277352-I1
09/26/2025
Special inspection requirement — Final
MINKUK KIM
09/16/2025
Special inspection requirement — Tenant Protection Plan Compliance
DANNY TRUJILLO
08/25/2025
Special inspection requirement — Final
JAMES NAPOLI
09/23/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/14/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAHFUZAR RAHMAN
08/14/2024
Special inspection requirement — Lighting in dwelling units
ANNA THORSDOTTIR
08/14/2024
Special inspection requirement — Fire-Resistance Rated Construction
ANNA THORSDOTTIR
08/14/2024
Special inspection requirement — Final
ANNA THORSDOTTIR
08/14/2024
Special inspection requirement — Energy Code Compliance Inspections
ANNA THORSDOTTIR
08/02/2024
Permit issued — General Construction
M01030966-I1-GC
06/28/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/20/2024
Permit issued — General Construction
M01030966-I1-GC
06/20/2024
Permit issued — Plumbing
M01030978-I1-PL
05/22/2024
Permit issued — General Construction
M00923816-I1-GC
05/16/2024
Objection resolved — Addressed
05/08/2024
Objection raised — Scope
04/29/2024
Filed — Alteration
Installation of Plumbing fixtures for existing Apartment#11C. No change of use, egress or occupancy under this application
M01030978-I1
04/29/2024
Filed — Alteration
M01030966-I1
03/19/2024
Signed off — Alteration
M08025542-I1
03/19/2024
Signed off — Alteration
M08025517-I1
12/07/2023
Objection resolved — Addressed
12/07/2023
Objection resolved — Addressed
12/07/2023
Objection resolved — Addressed
11/27/2023
Objection resolved — Addressed
11/13/2023
Signed off — Alteration
FACADE REPAIRS AS INDICATED ON THE PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M08017487-I1
10/03/2023
Objection raised — Accessibility
10/03/2023
Objection raised — Accessibility
10/03/2023
Objection raised — Accessibility
10/03/2023
Objection raised — Accessibility
09/25/2023
Filed — Alteration
PLUMBING WORK TYPE ONLY IN SUBSEQUENCE FILING OF GC JOB # M00923816-I1 TO RENOVATE EXISTING APT 2B.
M00923816-I1
08/25/2023
Special inspection requirement — Fire-Resistance Rated Construction
INDARDEO PARBHUNATH
08/25/2023
Special inspection requirement — Tenant Protection Plan Compliance
INDARDEO PARBHUNATH
08/25/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
08/23/2023
Special inspection requirement — Final
NAVEEN KUMAR
06/05/2023
Cycle 9 facade report signed — SWARMP
05/26/2023
Filed — Alteration
M08025517-P1
05/23/2023
Permit issued — Plumbing
M00227466-I1-PL
05/17/2023
Cycle 9 facade inspection completed
02/17/2023
Cycle 9 facade report submitted
02/07/2023
Filed — Alteration
FACADE REPAIRS AS INDICATED ON THE PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M08017487-I1
02/02/2023
Special inspection requirement — Tenant Protection Plan Compliance
TONY ONYEAGORO
Latest 60 of 155 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offFreedom GS12/03/2025
DOB NOWStructuralSigned-offNew Amsterdam Restoration10/15/2025
DOB NOWGeneral ConstructionPermit IssuedMarek Szmacinski08/02/2024
DOB NOWGeneral ConstructionPermit IssuedMarek Szmacinski06/20/2024
DOB NOWPlumbingSigned-offA.M.N06/20/2024
DOB NOWGeneral ConstructionPermit IssuedBenjamin Fiering Construction05/22/2024
DOB NOWPlumbingPermit IssuedAura Plumbing05/23/2023
DOB NOWSidewalk ShedSigned-offNew Amsterdam Restoration12/21/2022
DOB NOWSupported ScaffoldSigned-offNew Amsterdam Restoration10/26/2022
DOB NOWGeneral ConstructionPermit IssuedStone Remodeling08/09/2022
DOB NOWPlumbingPermit IssuedAura Plumbing06/22/2022
DOB NOWGeneral ConstructionSigned-offCvanco12/22/2021
DOB NOWPlumbingPermit IssuedAqueduct Mechanical12/14/2021
DOB NOWPlumbingSigned-offAJC Plumbing & Heating12/13/2021
DOB NOWPlumbingPermit IssuedBranch Plumbing10/24/2019
DOB NOWSidewalk ShedPermit IssuedIntersystem S&S07/31/2018
DOB NOWSidewalk ShedPermit IssuedIntersystem S&S07/02/2018
DOB NOWSidewalk ShedPermit IssuedIntersystem S&S01/19/2018
BISOTISSUEDL&H Woodwork & Renovation08/27/2020
BISOTISSUEDJBKS Construction03/16/2020
BISOTISSUEDL&H Woodwork & Renovation09/27/2019
BISPLISSUEDPinnacle Plumbing & Heating10/05/2018
BISOTISSUEDAbilene08/13/2018
BISPLISSUEDBell Fuel Oil08/13/2018
BISOTISSUEDPratt Construction & Restoration05/25/2018
BISFPISSUEDPinnacle Plumbing & Heating11/09/2017
BISEQISSUEDEmg Industrial Chimney10/17/2017
BISOTISSUEDAbilene08/18/2017
BISPLISSUEDBell Fuel Oil08/18/2017
BISPLISSUEDArk-Pol Plumbing07/20/2017
BISOTISSUEDJBKS Construction07/10/2017
BISPLISSUEDTristar Plumbing & Heating09/23/2016
BISOTISSUEDRedline Construction & Ma08/17/2016
BISPLISSUEDFlytiger P & H07/07/2015
BISOTISSUEDAmerican C Construction07/01/2015
BISOTISSUEDColumbia East Construction06/18/2015
BISEQISSUEDIntersystem S&S11/18/2014
BIS—ISSUEDR.G.M. Signs06/09/2014
BISEQISSUEDThe Palombo Group03/31/2014
BISPLISSUEDBest Plumbing & HVAC02/26/2014
+ 28 more permits on file
3 projects · most recent 09/10/2026
Water/Sanitary Gas
FiledStatusContractorScope
09/10/2026——Water/Sanitary
04/29/2026Signed-offA.M.NGas, Water/Sanitary
09/16/2019Permit IssuedAura PlumbingGas, Water/Sanitary
17 projects · most recent 05/28/2026
General Wiring
FiledStatusContractorScope
05/28/2026CompleteNead ElectricGeneral Wiring
04/22/2026CompleteMacintosh ElectricGeneral Wiring
03/25/2026CompleteCentury ElectricGeneral Wiring
02/24/2025CompleteEmpire Lic Electrical Contractors—
09/25/2024CompleteIndy ElectricGeneral Wiring
06/21/2024CompleteVertex Electric—
05/24/2024CompleteImr Electrical ContractingGeneral Wiring
08/14/2023CompleteInfiniti ElectricGeneral Wiring
02/16/2023Permit IssuedInterstate ElectricGeneral Wiring
01/10/2023CompleteGlendale Electl Contng—
01/09/2023CancelledGlendale Electl Contng—
09/06/2022Permit IssuedWise Electric SolutionsGeneral Wiring
03/30/2022CompleteTop Tier ElectricGeneral Wiring
03/23/2022CompleteKobryn Electrical ServicesGeneral Wiring
04/29/2021Permit IssuedRobert Chimenti124 meters, 1 new_meters
1 project · most recent 10/02/2025
Concrete
FiledStatusContractorScope
10/02/2025Signed-offNew Amsterdam RestorationConcrete
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
09/23/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/28/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/07/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
06/03/2026Fire-Resistant Penetrations and JointsMAHFUZAR RAHMANspecial
06/03/2026FinalANNA THORSDOTTIRprogress
06/03/2026Fire-Resistance Rated ConstructionANNA THORSDOTTIRprogress
06/03/2026Energy Code Compliance InspectionsANNA THORSDOTTIRprogress
06/03/2026Lighting in dwelling unitsANNA THORSDOTTIRenergy_progress
05/20/2026Fire-Resistant Penetrations and JointsMAHFUZAR RAHMANspecial
05/20/2026Energy Code Compliance InspectionsANNA THORSDOTTIRprogress
09/26/2025FinalMINKUK KIMprogress
09/16/2025Tenant Protection Plan ComplianceDANNY TRUJILLOspecial
08/25/2025FinalJAMES NAPOLIprogress
08/14/2024Fire-Resistant Penetrations and JointsMAHFUZAR RAHMANspecial
08/14/2024Lighting in dwelling unitsANNA THORSDOTTIRenergy_progress
08/14/2024Fire-Resistance Rated ConstructionANNA THORSDOTTIRprogress
08/14/2024FinalANNA THORSDOTTIRprogress
08/14/2024Energy Code Compliance InspectionsANNA THORSDOTTIRprogress
08/25/2023Fire-Resistance Rated ConstructionINDARDEO PARBHUNATHprogress
08/25/2023Tenant Protection Plan ComplianceINDARDEO PARBHUNATHspecial
08/25/2023Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
08/23/2023FinalNAVEEN KUMARprogress
02/02/2023Tenant Protection Plan ComplianceTONY ONYEAGOROspecial
10/07/2022FinalAMR HAFEZprogress
03/13/2020Energy Code Compliance InspectionsJoshua Pulverprogress
03/13/2020Fire-Resistant Penetrations and JointsJoshua Pulverspecial
03/13/2020HVAC insulation and sealing Joshua Pulverenergy_progress
▾Documents — 394 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch17
09/06/2026M00012503-P1Request digital key ↗
09/06/2026M00012503-I1Request digital key ↗
09/03/2026M00593042-I1Request digital key ↗
Showing 3 of 17 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/05/2026M00227466-I1Request digital key ↗
09/03/2026M00332239-I1Request digital key ↗
▸Applications & Permits77
▸BISPLAN / WORK APPROVAL APPLICATION47
05/06/2021122846117Open ↗
05/04/2021122846117Open ↗
05/03/2021122846117Open ↗
Showing 3 of 47 on file for this type
▸BISWORK PERMIT APPLICATION30
03/18/2020123840754Open ↗
09/30/2019123770945Open ↗
10/09/2018123145202Open ↗
Showing 3 of 30 on file for this type
▸Seals & Professional Certifications102
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION38
03/11/2020123840754Open ↗
09/12/2019123770945Open ↗
02/15/2019123436790Open ↗
Showing 3 of 38 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature19
09/06/2026M00012503-P1Open ↗
09/06/2026M00012503-I1Open ↗
09/03/2026M00593042-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
08/31/2026M01030966-P1Open ↗
08/31/2026M01030966-P1Open ↗
08/29/2026M01293521-I1Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT10
05/04/2018123602066Open ↗
04/03/2018123436790Open ↗
11/03/2017123145202Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST9
05/04/2018123602066Open ↗
04/03/2018123436790Open ↗
08/11/2017121766419Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
08/31/2026M01030966-P1Open ↗
08/28/2026M01277352-I1Open ↗
08/27/2026M00923816-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
10/13/2017140706733Open ↗
11/14/2014140281004Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
10/13/2017140706733Open ↗
11/14/2014140281004Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment33
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE11
12/19/2018123145202Open ↗
12/10/2018123145202Open ↗
11/20/2018123145202Open ↗
Showing 3 of 11 on file for this type
▸BISSCHEDULE B - PLUMBING11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISSELF-CERT PLUMBING NOTICE8
09/09/2015122449314Open ↗
Showing 1 of 8 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
08/11/2017121766419Open ↗
Showing 1 of 2 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
11/03/2017123145202Open ↗
▸Safety & Tenant Protection9
▸BISTenant Protection Plan and Notes7
03/12/2020123840754Open ↗
09/12/2019123770945Open ↗
12/28/2018123145202Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWTenant Protection Plan2
09/03/2026M00332239-I1Open ↗
08/13/2026M00227466-I1Open ↗
▸Environmental & Asbestos28
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
09/03/2026M00593042-I1Open ↗
09/03/2026M00332239-I1Open ↗
09/03/2026M00644190-I1Open ↗
Showing 3 of 13 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)9
03/11/2020123840754Open ↗
09/12/2019123770945Open ↗
08/11/2017121766419Open ↗
Showing 3 of 9 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM3
05/29/2018123436790Open ↗
Showing 1 of 3 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance33
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS15
03/11/2020123840754Open ↗
09/12/2019123770945Open ↗
12/19/2018121766419Open ↗
Showing 3 of 15 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS6
05/10/2021122846117Open ↗
12/19/2018121766419Open ↗
11/22/2017121276449Open ↗
Showing 3 of 6 on file for this type
▸BISTR8: Energy Code Progress Inspections3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
07/07/2021123770945Open ↗
07/07/2021123770945Open ↗
05/10/2021122846117Open ↗
▸BISTECHNICAL REPORT: ENERGY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
07/07/2021123770945Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
11/14/2014140281004Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
09/03/2026M00332239-I1Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY4
07/07/2021123770945Open ↗
05/10/2021122846117Open ↗
10/13/2017140706733Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs20
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST14
07/14/2021123770945Open ↗
05/10/2021122846117Open ↗
10/14/2020140706733Open ↗
Showing 3 of 14 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
12/19/2018121766419Open ↗
01/25/2018123145202Open ↗
Showing 2 of 3 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Cost, Insurance & Ownership30
▸BISCOST AFFIDAVIT29
05/10/2021122846117Open ↗
03/11/2020123840754Open ↗
09/12/2019123770945Open ↗
Showing 3 of 29 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
07/14/2021123770945Open ↗
▸Filing & Intake Forms34
▸BISEFILING COVER SHEET16
03/11/2020123840754Open ↗
09/12/2019123770945Open ↗
05/04/2018123602066Open ↗
Showing 3 of 16 on file for this type
▸BISBOROUGH INTAKE FORM11
02/15/2019123436790Open ↗
02/13/2019123436790Open ↗
12/28/2018140706733Open ↗
Showing 3 of 11 on file for this type
▸BISADDITIONAL INFORMATION4
12/28/2018123145202Open ↗
05/04/2018123602066Open ↗
09/19/2017121276449Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
10/13/2017140706733Open ↗
11/14/2014140281004Open ↗
Showing 2 of 3 on file for this type
▸Other Documents5
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
01/25/2018123145202Open ↗
07/17/2017121276449Open ↗
▸DOB NOWDHCR Document2
09/03/2026M00332239-I1Open ↗
08/13/2026M00227466-I1Open ↗
▸BISDepartment of Consumer Affairs (DCA) Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type