← Back
Single or multiple dwelling with stores or offices
540 2 AVENUE
MANHATTAN · BIN 1020632
💬 Discuss this project
1910Year Built
3Stories
S9Building Class
C1-8Zoning
4,545 sfGross Floor Area
6Units
Rent Stabilized0 Open Violations
Single or multiple dwelling with stores or offices · Owner of record: SRP MANAGEMENT LLC · 1,515 sf lot · 3 FAR built · Flood zone X
Locations of Work
ArchitectureGeneral
Roof2p · 2 filings · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SRP MANAGEMENT1003/22/2026
B H B CONSTRUCTION503/21/2026
TELEBEAM TELE CORP103/21/2026
NEW CINGULAR WIRELESS PCS, LLC303/21/2026
DFD DEVELOPMENT403/21/2026
RP MANAGEMENT103/21/2026
ALBINO MIZZARO AS OWNER IN PTRSH203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MULLEN PALANDRANI ARCHITECTS401/11/2022
TECTONIC ENGINEERING212/04/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CCM CONSULTING GROUP, INC.103/21/2026
CONSTRUCTION PERMIT SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ODYSSIA GLOBAL COMM. CORPGeneral Contractor507/08/2026
EDGE RENOVATION LLCGeneral Contractor303/21/2026
COONEY, RONANElectrical103/21/2026
HERMAN, LAWRENCEElectrical103/21/2026
IRVING BAPTISTEElectrical103/21/2026
JUNIOR SCOTTElectrical103/21/2026
MAHRAJ, MOHAMMADElectrical103/21/2026
MARTANY TILE CORPElectrical103/21/2026
MARTIN LOETTERLEElectrical103/21/2026
PRAVATO, ANTHONYElectrical103/21/2026
BORRELLI, RAFFAELEElectrical103/21/2026
METROTECH MECHANICAL CORPPlumbing107/08/2026
CLIFTON WALDRONElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MULLEN PALANDRANI ARCHITE4022401/11/2022
TECTONIC ENGINEERING CONS106212/04/2020
Building Lifecycle
All (43)Filed (6)Permit Issued (5)Signed Off (1)Violation (4)Inspection (2)Objection (18)Special Inspection (7)
11/22/2024
Violation issued (HPD, closed)
I
03/15/2023
Violation issued (HPD, closed)
A
03/05/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/21/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/14/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Richard Palandrani
01/13/2022
Permit issued — Plumbing
M00629838-I1-PL
01/12/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Richard Palandrani
01/12/2022
Special inspection requirement — Mechanical Systems
Richard Palandrani
01/12/2022
Special inspection requirement — Final
Richard Palandrani
01/11/2022
Filed — Alteration
Install new accessible toilet room (partitions & finishes) at existing restaurant. Plumbing work filed under a separate application # M00629838 . Minor interior work. No change to use, egress or occupancy.
M00628588-P1
01/11/2022
Filed — Alteration
Install new plumbing fixtures at new toilet room. GC work filed separately under application #M00628588. No change to use, egress, or occupancy.
M00629838-P1
01/11/2022
Special inspection requirement — Mechanical Systems
Richard Palandrani
01/11/2022
Special inspection requirement — Final
Richard Palandrani
01/11/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Richard Palandrani
12/08/2021
Permit issued — General Construction
M00628588-I1-GC-CX
11/17/2021
Filed — Alteration
Install new accessible toilet room (partitions & finishes) at existing restaurant. Plumbing work filed under a separate application # M00629838 . Minor interior work. No change to use, egress or occupancy.
M00628588-I1
11/17/2021
Filed — Alteration
Install new plumbing fixtures at new toilet room. GC work filed separately under application #M00628588. No change to use, egress, or occupancy.
M00629838-I1
12/04/2020
Filed — Alteration
M00410229-I1
09/30/2020
Signed off — Alteration
AT&T / Replacement of existing telecommunication antennas with installation/ replacement of RRH units on roof. Removal and installation of cabinets with installation of RRH units on existing equipment platform on roof. Relocation of existing antenna mounts as per FDNY Rooftop Variance Approval. All work in compliance with TPPN 5/98. No change to occupancy, use or egress.
M00007355-I1
03/24/2020
Permit issued — Antenna
M00007355-I1-AN
11/08/2019
Permit issued — Antenna
M00007355-I1-AN
02/26/2019
Permit issued — Antenna
M00007355-I1-AN
01/29/2019
Objection raised — 2014-AN AC 28-104.7.1-Administ
01/29/2019
Objection resolved — Addressed
05/14/2018
Objection raised — AN -Other
05/14/2018
Objection resolved — Addressed
05/14/2018
Objection raised — AN -Other
05/14/2018
Objection resolved — Addressed
05/14/2018
Objection raised — AN -Other
05/14/2018
Objection resolved — Addressed
05/14/2018
Objection raised — AN -Other
05/14/2018
Objection resolved — Addressed
05/14/2018
Objection raised — AN -Other
05/14/2018
Objection resolved — Addressed
05/14/2018
Objection raised — AN -Other
05/14/2018
Objection resolved — Addressed
05/14/2018
Objection raised — AN -Other
05/14/2018
Objection resolved — Addressed
05/14/2018
Objection raised — AN -Other
05/14/2018
Objection resolved — Addressed
05/10/2018
Filed — Alteration
AT&T / Replacement of existing telecommunication antennas with installation/ replacement of RRH units on roof. Removal and installation of cabinets with installation of RRH units on existing equipment platform on roof. Relocation of existing antenna mounts as per FDNY Rooftop Variance Approval. All work in compliance with TPPN 5/98. No change to occupancy, use or egress.
M00007355-I1
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/01/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offMETROTECH MECHANICAL CORP01/13/2022
DOB NOWGeneral ConstructionPermit IssuedEDGE RENOVATION LLC12/08/2021
DOB NOWAntennaSigned-offODYSSIA GLOBAL COMM. CORP03/24/2020
DOB NOWAntennaSigned-offODYSSIA GLOBAL COMM. CORP11/08/2019
DOB NOWAntennaSigned-offODYSSIA GLOBAL COMM. CORP02/26/2019
BISOTISSUEDODYSSIA GLOBAL COMM. CORP07/23/2020
BISOTISSUEDODYSSIA GLOBAL COMM. CORP04/19/2019
BISOTISSUEDBECHTEL INFRASTRUCTURE AN05/10/2016
BISOTISSUEDBECHTEL INFRASTRUCTURE AN12/07/2015
BISOTISSUEDBECHTEL INFRASTRUCTURE AN05/08/2013
BISPLISSUEDTRISTATE PLBG SVCS CORP01/24/2013
BISOTISSUEDCONSTRUCTION MAINTENANCE01/07/2013
BISEQISSUEDB H & B CONSTRUCTION INC11/01/2012
BISEQISSUEDB H & B CONSTRUCTION INC11/01/2012
BISOTISSUEDODYSSIA GLOBAL COMM. CORP06/21/2010
BISFPISSUEDLUND FIRE PRD. CO07/14/2005
BISOTISSUEDCELLULAR01/26/2001
BISMHISSUEDLOMANOX CONSTR CO08/21/1997
1 project · most recent 01/11/2022
Water/Sanitary
FiledStatusContractorScope
01/11/2022Signed-offMETROTECH MECHANICAL CORPWater/Sanitary
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
03/05/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/21/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
01/14/2022Fire-Resistant Penetrations and JointsRichard Palandranispecial
01/12/2022Fire-Resistant Penetrations and JointsRichard Palandranispecial
01/12/2022Mechanical SystemsRichard Palandranispecial
01/12/2022FinalRichard Palandraniprogress
01/11/2022Mechanical SystemsRichard Palandranispecial
01/11/2022FinalRichard Palandraniprogress
01/11/2022Fire-Resistant Penetrations and JointsRichard Palandranispecial
▾Documents — 131 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch5
09/03/2026M00629838-I1Request digital key ↗
09/03/2026M00629838-P1Request digital key ↗
09/03/2026M00628588-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Antenna1
09/04/2026M00410229-I1Request digital key ↗
▸Applications & Permits24
▸BISPLAN / WORK APPROVAL APPLICATION14
02/22/2024123869518Open ↗
06/08/2020123869518Open ↗
04/08/2019123869518Open ↗
Showing 3 of 14 on file for this type
▸BISWORK PERMIT APPLICATION10
04/22/2019123869518Open ↗
05/23/2016122732383Open ↗
01/08/2016122467473Open ↗
Showing 3 of 10 on file for this type
▸Seals & Professional Certifications31
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION12
04/08/2019123869518Open ↗
12/14/2016122732383Open ↗
07/07/2016122467473Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/06/2026M00007355-I1Open ↗
09/04/2026M00410229-I1Open ↗
09/03/2026M00629838-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/29/2026M00628588-I1Open ↗
08/29/2026M00628588-I1Open ↗
08/29/2026M00628588-P1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
01/08/2013121476018Open ↗
11/08/2012121423940Open ↗
11/08/2012121419009Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
01/08/2013121476018Open ↗
11/08/2012121423940Open ↗
11/08/2012121419009Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/29/2026M00628588-I1Open ↗
08/29/2026M00628588-P1Open ↗
▸Trade Schedules & Equipment3
▸BISFA - FDNY APPROVAL : FD-FAA2
04/20/2016122732383Open ↗
12/29/2015122467473Open ↗
▸BISSCHEDULE B - PLUMBING1
01/08/2013121476018Open ↗
▸Safety & Tenant Protection3
▸BISTenant Protection Plan and Notes2
04/08/2019123869518Open ↗
04/28/2016122732383Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026M00410229-I1Open ↗
▸Environmental & Asbestos14
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
09/04/2026M00410229-I1Open ↗
09/03/2026M00629838-P1Open ↗
09/03/2026M00629838-I1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
04/08/2019123869518Open ↗
04/06/2016122732383Open ↗
09/15/2015122467473Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
05/27/2010120365032Open ↗
05/27/2010120365032Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
01/08/2013121476018Open ↗
▸BISASBESTOS-EXEMPTION (ASB4)1
11/08/2012121423940Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
04/08/2019123869518Open ↗
12/14/2016122732383Open ↗
07/07/2016122467473Open ↗
Showing 3 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
02/22/2024123869518Open ↗
12/14/2016122732383Open ↗
07/07/2016122467473Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
02/22/2024123869518Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
02/22/2024123869518Open ↗
▸Approvals, Objections & Sign-offs12
▸BISADMINISTRATIVE OBJECTIONS5
01/15/2013121476018Open ↗
11/08/2012121423940Open ↗
11/08/2012121419009Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
02/22/2024123869518Open ↗
12/14/2016122732383Open ↗
07/07/2016122467473Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
07/07/2016122467473Open ↗
01/07/2016122467473Open ↗
▸Cost, Insurance & Ownership11
▸BISCOST AFFIDAVIT11
02/22/2024123869518Open ↗
04/08/2019123869518Open ↗
12/14/2016122732383Open ↗
Showing 3 of 11 on file for this type
▸Filing & Intake Forms13
▸BISADDITIONAL INFORMATION7
06/08/2020123869518Open ↗
05/24/2016122467473Open ↗
05/23/2016122732383Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING COVER SHEET6
04/08/2019123869518Open ↗
04/06/2016122732383Open ↗
09/15/2015122467473Open ↗
Showing 3 of 6 on file for this type
▸Other Documents1
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
02/01/2011120365032Open ↗