← Back
BuildNYC
Office with commercial, 1-6 stories
541 8TH AVENUE
MANHATTAN · BIN 1013620
💬 Discuss this project
1915Year Built
6Stories
O5Building Class
M1-9A/R12Zoning
19,284 sfGross Floor Area
6Units
3 Active Violations ▸
Office with commercial, 1-6 stories · Owner of record: 541 Construction · 2,800 sf lot · 6.89 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofDAX Real Estate2p · 2 filings · 20 docs
Floor 6Housing Works11p · 2 filings · 20 docs
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1White Castle18p · 3 filings · 20 docs
CellarWhite Castle18p · 4 filings · 20 docs
BasementGlm Property Management1p · 1 filing · 18 docs
Site & exteriorWhite Castle1p · 6 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
541 Construction6403/22/2026
Dax Real Estate2807/08/2026
Gva Williams703/21/2026
Housing Works607/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Moshe Yeganeh201/09/2025
R.A. Stinson & Associates101/09/2025
Kushner Studios311/10/2023
Don Penn Consulting Engineering606/15/2022
Jack Green Associates105/04/2022
Richard Wainer Architect612/10/2021
Chia-Ling Yuan108/24/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Maai Marsh Architects303/21/2026
Kushner Studios303/21/2026
D R Brown1203/21/2026
Socotec203/21/2026
Alba Consultants1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
L.S. Sign CoSign hanger407/08/2026
L.S. Sign Cospecialty_contractor307/08/2026
MCR Construction ManagementGeneral Contractor303/21/2026
Arlington ConstructionScaffold203/21/2026
Village P & H NYPlumbing207/08/2026
Denmar ElectricElectrical203/22/2026
Arlington ConstructionGeneral Contractor203/21/2026
Allstate SprinklerFire Protection207/08/2026
AUR0RA Electrical ContgElectrical203/22/2026
AciscoGeneral Contractor107/08/2026
Arista Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Outsource Special Inspection2827201/09/2025
Crosscheck Inspection Services544211/10/2023
Certified Testing Laborat396606/15/2022
Jack Green Associates422105/04/2022
Building Lifecycle
All (166)Filed (20)Permit Issued (15)Signed Off (10)Violation (60)Inspection (11)Objection (20)Special Inspection (30)
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/18/2025
Permit issued — General Construction
M01155870-I1-GC
03/17/2025
Objection resolved — Addressed
03/14/2025
Objection resolved — Addressed
01/22/2025
Objection resolved — Addressed
01/22/2025
Objection resolved — Addressed
01/22/2025
Objection resolved — Addressed
01/22/2025
Objection resolved — Addressed
01/22/2025
Objection resolved — Addressed
01/22/2025
Objection resolved — Addressed
01/22/2025
Objection resolved — Addressed
01/20/2025
Special inspection requirement — Energy Code Compliance Inspections
JONAR MADRIAGA
01/16/2025
Objection raised — Energy
01/16/2025
Objection raised — Plumbing
01/16/2025
Objection raised — Admin
01/16/2025
Objection raised — Scope
01/16/2025
Objection raised — Admin
01/16/2025
Objection raised — Scope
01/16/2025
Objection raised — Structural
01/16/2025
Objection raised — Plumbing
01/16/2025
Objection raised — Mechanical
01/09/2025
Filed — Alteration
Installation of new non-structural partitions, relocated sprinklers, some mechanical work, new fire alarm devices, new interior doors, pantry cabinetry, repair some flooring, new lighting. No change to use, occupancy and egress of spac
M01155870-S2
01/09/2025
Filed — Alteration
Installation of new non-structural partitions, relocated sprinklers, some mechanical work, new fire alarm devices, new interior doors, pantry cabinetry, repair some flooring, new lighting. No change to use, occupancy and egress of spac
M01155870-S5
01/09/2025
Filed — Alteration
Installation of new non-structural partitions, relocated sprinklers, some mechanical work, new fire alarm devices, new interior doors, pantry cabinetry, repair some flooring, new lighting. No change to use, occupancy and egress of spac
M01155870-I1
12/20/2024
Special inspection requirement — Post-installed Anchors
JONAR MADRIAGA
12/20/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JONAR MADRIAGA
12/20/2024
Special inspection requirement — Electrical motors and elevators
JONAR MADRIAGA
12/20/2024
Special inspection requirement — Maintenance information
JONAR MADRIAGA
12/18/2024
Special inspection requirement — Mechanical Systems
JONAR MADRIAGA
12/18/2024
Special inspection requirement — Final
JONAR MADRIAGA
12/17/2024
Special inspection requirement — Sprinkler Systems
JONAR MADRIAGA
12/13/2024
Special inspection requirement — Lighting controls
JONAR MADRIAGA
12/13/2024
Special inspection requirement — Final
Robert Stinson
12/13/2024
Special inspection requirement — Energy Code Compliance Inspections
JONAR MADRIAGA
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/15/2024
Signed off — Alteration
INSTALLATION OF NEW SPLIT HEAT PUMP HVAC SYSTEMS AS PER THE DRAWINGS FILED HEREIN. FILED IN CONJUNCTION WITH GC APPLICATION #M00896733-I1
M00896733-S2
05/15/2024
Signed off — Alteration
INSTALLATION OF NEW SPLIT HEAT PUMP HVAC SYSTEMS AS PER THE DRAWINGS FILED HEREIN. FILED IN CONJUNCTION WITH GC APPLICATION #M00896733-I1
M00896733-I1
05/15/2024
Signed off — Alteration
INSTALLATION OF NEW SPLIT HEAT PUMP HVAC SYSTEMS AS PER THE DRAWINGS FILED HEREIN. FILED IN CONJUNCTION WITH GC APPLICATION #M00896733-I1
M00896733-S1
04/09/2024
Permit issued — Mechanical Systems
M00896733-S2-MS
11/13/2023
Objection raised — Other
11/13/2023
Objection resolved — Addressed
11/10/2023
Filed — Alteration
INSTALLATION OF NEW SPLIT HEAT PUMP HVAC SYSTEMS AS PER THE DRAWINGS FILED HEREIN. FILED IN CONJUNCTION WITH GC APPLICATION #M00896733-I1
M00896733-S2
11/10/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/10/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/16/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/05/2023
Permit issued — Plumbing
M00896733-S1-PL
07/13/2023
Filed — Alteration
INSTALLATION OF NEW SPLIT HEAT PUMP HVAC SYSTEMS AS PER THE DRAWINGS FILED HEREIN. FILED IN CONJUNCTION WITH GC APPLICATION #M00896733-I1
M00896733-S1
07/12/2023
Filed — Alteration
INSTALLATION OF NEW SPLIT HEAT PUMP HVAC SYSTEMS AS PER THE DRAWINGS FILED HEREIN. FILED IN CONJUNCTION WITH GC APPLICATION #M00896733-I1
M00896733-I1
07/07/2023
Special inspection requirement — Mechanical Systems
EUGENE BIFULCO
07/07/2023
Special inspection requirement — Final
EUGENE BIFULCO
07/07/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
07/07/2023
Special inspection requirement — Final
EUGENE BIFULCO
07/07/2023
Special inspection requirement — Energy Code Compliance Inspections
EUGENE BIFULCO
07/07/2023
Special inspection requirement — HVAC-R and service water heating system controls
EUGENE BIFULCO
07/07/2023
Special inspection requirement — HVAC-R and service water heating equipment
EUGENE BIFULCO
Latest 60 of 166 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedAcisco06/18/2025
DOB NOWMechanical SystemsSigned-offMCR Construction Management04/09/2024
DOB NOWPlumbingSigned-offArista Plumbing & Heating10/05/2023
DOB NOWStandpipePermit IssuedAllstate Sprinkler07/12/2022
DOB NOWBoiler EquipmentSigned-offVillage P & H NY05/26/2022
DOB NOWMechanical SystemsSigned-offArlington Construction04/22/2022
DOB NOWGeneral ConstructionSigned-offL.S. Sign Co01/08/2022
DOB NOWSignSigned-offWeinfeld, Elliot01/08/2022
DOB NOWSignSigned-offWeinfeld, Elliot01/08/2022
DOB NOWSignSigned-offWeinfeld, Elliot01/08/2022
DOB NOWGeneral ConstructionSigned-offL.S. Sign Co01/07/2022
DOB NOWSignSigned-offWeinfeld, Elliot01/07/2022
DOB NOWPlumbingSigned-offVillage P & H NY09/08/2021
DOB NOWSprinklersPermit IssuedAllstate Sprinkler09/02/2021
DOB NOWConstruction FenceSigned-offArlington Construction08/31/2021
BISOTISSUEDArlington Construction08/31/2021
BISOTISSUEDJ Hoyler Construction01/10/2020
BISSPISSUEDC. James Plumbing & Heating11/13/2018
BISMHISSUEDC.james Plumbing & Heating03/12/2018
BISPLISSUEDC James Plumbing & Heating03/09/2018
BISOTISSUEDSquan Construction Services12/07/2015
BISOTISSUEDCel Tech Electric09/21/2015
BISOTISSUEDSquan Construction Services08/05/2015
BISPLISSUEDBedrock Plumbing & Heating05/22/2014
BISMHISSUEDRC3 Electric02/28/2014
BISOTISSUEDRC3 Electric02/25/2014
BISEQISSUEDRockledge Scaffold02/05/2013
BISEQISSUEDRockledge Scaffold02/27/2012
BIS—ISSUEDBerger Signs12/20/2011
BIS—ISSUEDBerger Signs12/19/2011
BISSPISSUEDVip Fire Sprinkler11/29/2011
BISPLISSUEDPro Star Plumbing, Heating & Mechanical09/29/2011
BISEQISSUEDLegacy Builders/Developers08/23/2011
BISOTISSUEDLegacy Builders/Developers08/23/2011
BISOTISSUEDLegacy Builders/Developers08/22/2011
BISEQISSUEDLegacy Builders/Developers08/22/2011
BISOTISSUEDAlcatel-Lucent USA06/07/2010
BISPLISSUEDDewater Plumbing & Heating03/10/2010
BISOTISSUEDTelcom Engineering GP05/05/2009
BISSPISSUEDSchumacher & Farley P&H02/19/2009
+ 25 more permits on file
2 projects · most recent 01/09/2025
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
01/09/2025Permit IssuedAciscoAir Conditioning Systems
Cooling
Gree GMV-ND07G/B4B-T(U) 7,500 BTU · Vrf Indoor ×5
GMV-V36WL/C-T(U) 36,000 BTU · Vrf Outdoor ×1
10/13/2020Signed-offArlington ConstructionHeating Systems
Cooling
Coolaire C5G43AHAX 75,300 BTU ×2
Heating
Coolaire C5G43AHAX 75,300 BTU ×2
1 project · most recent 04/20/2022
FiledStatusContractorScope
04/20/2022Permit IssuedAllstate Sprinkler—
1 project · most recent 04/20/2022
Gas Water/Sanitary
FiledStatusContractorScope
04/20/2022Signed-offVillage P & H NYGas, Water/Sanitary
9 projects · most recent 05/23/2022
General Wiring HVAC Wiring
FiledStatusContractorScope
05/23/2022CompleteL&B Electrical InternationalGeneral Wiring
04/18/2022CompleteAUR0RA Electrical Contg—
04/18/2022CompleteAUR0RA Electrical Contg—
04/18/2022CompleteAUR0RA Electrical Contg—
04/18/2022CompleteAUR0RA Electrical Contg—
11/18/2021Permit IssuedAxon Electrical Contracting6 meters
06/16/2021CompleteE-J Electric Installation CoGeneral Wiring
04/10/2021CompleteDenmar Electric1 meters, 1 new_meters
03/14/2018CompleteDenmar ElectricGeneral Wiring, HVAC Wiring
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
11/10/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/10/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/16/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/30/2023Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
08/26/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/21/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/13/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/08/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/16/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/11/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/14/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 45
DateRequirementInspectorRole
01/20/2025Energy Code Compliance InspectionsJONAR MADRIAGAprogress
12/20/2024Post-installed AnchorsJONAR MADRIAGAspecial
12/20/2024Fire-Resistant Penetrations and JointsJONAR MADRIAGAspecial
12/20/2024Electrical motors and elevatorsJONAR MADRIAGAenergy_progress
12/20/2024Maintenance informationJONAR MADRIAGAenergy_progress
12/18/2024Mechanical SystemsJONAR MADRIAGAspecial
12/18/2024FinalJONAR MADRIAGAprogress
12/17/2024Sprinkler SystemsJONAR MADRIAGAspecial
12/13/2024Lighting controlsJONAR MADRIAGAenergy_progress
12/13/2024FinalRobert Stinsonprogress
12/13/2024Energy Code Compliance InspectionsJONAR MADRIAGAprogress
07/07/2023Mechanical SystemsEUGENE BIFULCOspecial
07/07/2023FinalEUGENE BIFULCOprogress
07/07/2023Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
07/07/2023FinalEUGENE BIFULCOprogress
07/07/2023Energy Code Compliance InspectionsEUGENE BIFULCOprogress
07/07/2023HVAC-R and service water heating system controlsEUGENE BIFULCOenergy_progress
07/07/2023HVAC-R and service water heating equipmentEUGENE BIFULCOenergy_progress
07/07/2023Maintenance informationEUGENE BIFULCOenergy_progress
07/07/2023HVAC-R and service water piping design and insulationEUGENE BIFULCOenergy_progress
06/15/2022Heating SystemsKIRT DOBBINSspecial
06/07/2022Heating SystemsKIRT DOBBINSspecial
04/20/2022Sprinkler SystemsKIRT DOBBINSspecial
04/20/2022Maintenance informationKIRT DOBBINSenergy_progress
04/14/2022Standpipe SystemsJACK GREENspecial
Latest 25 of 45.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Housing WorksOfficeFloor 6
Project M01155870 Alteration · Permit Entire · 01/09/2025
White CastleRestaurant / Food ServiceCellar
Project M00717977 Alteration · Permit Entire · 05/04/2022
Project M00719184 Alteration · Permit Entire · 05/04/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 416 on file (BIS + DOB NOW)
▸Plans & Drawings22
▸DOB NOWPlans/Sketch17
09/03/2026M00582253-I1Request digital key ↗
09/03/2026M00629146-I1Request digital key ↗
09/03/2026M00629138-I1Request digital key ↗
Showing 3 of 17 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler2
09/02/2026M00353672-I1Request digital key ↗
08/15/2026M00353672-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/02/2026M00353672-I1Request digital key ↗
08/15/2026M00353672-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/04/2026M00353428-I1Request digital key ↗
▸Applications & Permits67
▸BISPLAN / WORK APPROVAL APPLICATION37
08/19/2025120220448Open ↗
04/01/2025120220448Open ↗
06/29/2021123569682Open ↗
Showing 3 of 37 on file for this type
▸BISWORK PERMIT APPLICATION30
09/02/2021123569682Open ↗
01/13/2020123794876Open ↗
11/13/2018123132840Open ↗
Showing 3 of 30 on file for this type
▸Seals & Professional Certifications126
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION39
03/02/2020123794876Open ↗
03/02/2020123794876Open ↗
03/02/2020123794876Open ↗
Showing 3 of 39 on file for this type
▸DOB NOWProgress Inspector Seal & Signature28
09/01/2026M00353428-I1Open ↗
09/01/2026M00353428-I1Open ↗
09/01/2026M00353428-I1Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature20
09/03/2026M00582253-I1Open ↗
09/03/2026M00629146-I1Open ↗
09/03/2026M00629138-I1Open ↗
Showing 3 of 20 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST14
02/26/2020123569682Open ↗
01/08/2020123794876Open ↗
06/12/2019123720241Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
09/25/2026M00719184-I1Open ↗
09/01/2026M00353428-I1Open ↗
09/01/2026M00353428-I1Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM6
02/29/2012120976596Open ↗
12/12/2011120916456Open ↗
12/12/2011120916330Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
02/26/2020123569682Open ↗
01/08/2020123794876Open ↗
06/12/2019123720250Open ↗
Showing 3 of 4 on file for this type
▸BISProfessional and Owner Certification (POC3)1
06/15/2018123045515Open ↗
▸Trade Schedules & Equipment21
▸BISSELF-CERT PLUMBING NOTICE10
06/30/2014121785880Open ↗
03/22/2012120791759Open ↗
02/10/2012120791759Open ↗
Showing 3 of 10 on file for this type
▸BISSCHEDULE B - PLUMBING5
10/04/2013121785880Open ↗
Showing 1 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
06/12/2019123720250Open ↗
06/10/2019123132840Open ↗
03/21/2019123132840Open ↗
Showing 3 of 4 on file for this type
▸BISSPRINKLER INSP REPORT : FP-851
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
03/04/2014121785880Open ↗
▸Safety & Tenant Protection16
▸DOB NOWHPD-1: Anti-Harassment Area Checklist14
09/03/2026M00582253-I1Open ↗
09/03/2026M00629146-I1Open ↗
09/03/2026M00629138-I1Open ↗
Showing 3 of 14 on file for this type
▸BISTenant Protection Plan and Notes2
01/08/2020123794876Open ↗
06/15/2018123045515Open ↗
▸Environmental & Asbestos38
▸DOB NOWDEP ACP-5: Asbestos Assessment Report17
09/03/2026M00629146-I1Open ↗
09/03/2026M00629138-I1Open ↗
09/03/2026M00629131-I1Open ↗
Showing 3 of 17 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)11
02/26/2020123569682Open ↗
01/08/2020123794876Open ↗
06/12/2019123720241Open ↗
Showing 3 of 11 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
02/29/2012120976596Open ↗
Showing 1 of 3 on file for this type
▸Energy Compliance29
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS12
02/26/2020123569682Open ↗
01/08/2020123794876Open ↗
06/12/2019123720241Open ↗
Showing 3 of 12 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
03/02/2020123794876Open ↗
06/04/2018122283126Open ↗
03/15/2016122366171Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
08/16/2021123569682Open ↗
06/29/2021123569682Open ↗
06/02/2021123569682Open ↗
▸BISTR8: Energy Code Progress Inspections2
06/27/2014121785899Open ↗
11/01/2013121785899Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
04/20/2022123569682Open ↗
04/20/2022123569682Open ↗
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFENESTRATION AIR LEAKAGE1
04/20/2022123569682Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
04/20/2022123569682Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
04/20/2022123569682Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY3
08/16/2021123569682Open ↗
06/29/2021123569682Open ↗
06/02/2021123569682Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
04/20/2022123569682Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
04/20/2022123569682Open ↗
▸BISTECHNICAL REPORT: PILE DRIVING1
06/15/2018123045515Open ↗
▸Approvals, Objections & Sign-offs27
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST14
04/21/2022123569682Open ↗
03/02/2020123794876Open ↗
06/04/2018122283126Open ↗
Showing 3 of 14 on file for this type
▸BISADMINISTRATIVE OBJECTIONS9
02/29/2012120976596Open ↗
12/12/2011120916456Open ↗
12/09/2011120916330Open ↗
Showing 3 of 9 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFINAL1
04/20/2022123569682Open ↗
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
04/16/2013120976596Open ↗
▸Cost, Insurance & Ownership34
▸BISCOST AFFIDAVIT33
06/29/2021123569682Open ↗
06/17/2021123569682Open ↗
03/02/2020123794876Open ↗
Showing 3 of 33 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
04/20/2022123569682Open ↗
▸Filing & Intake Forms30
▸BISEFILING COVER SHEET16
02/26/2020123569682Open ↗
01/08/2020123794876Open ↗
06/12/2019123720241Open ↗
Showing 3 of 16 on file for this type
▸BISADDITIONAL INFORMATION9
06/29/2021123569682Open ↗
06/10/2019123132840Open ↗
06/10/2019123132840Open ↗
Showing 3 of 9 on file for this type
▸BISBOROUGH INTAKE FORM4
03/02/2020123794876Open ↗
03/21/2019123132840Open ↗
06/04/2018122283126Open ↗
Showing 3 of 4 on file for this type
▸BISeFiling Job Application Cover Sheet1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type