BuildNYC
Elevator cooperative
5410 NETHERLAND AVENUE
BRONX · BIN 2086306
💬 Discuss this project
1939Year Built
6Stories
D4Building Class
R4Zoning
189,592 sfGross Floor Area
144Units
LL97 CoveredRent Stabilized12 Active Violations 9 unresolved · 3 paperwork only 5 old, status unconfirmed ▸FISP: SWARMPFDNY Report ↗
Elevator cooperative · 98,900 sf lot · 1.92 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofPride Property Management CORP.1p · 1 filing · 5 docs
Floor 1Pipe scaffold installation1p · 1 filing · 2 docs
CellarPride Property Management5p · 3 filings · 13 docs
Site & exteriorPride Property Management16p · 4 filings · 20 docs
Filed — no permit issuedPride Property Management CORP.6p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Riverdale Park1003/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADG303/21/2026
Xinos Construction203/21/2026
Merritt Engineering Consultant403/21/2026
J A Expediting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Bhaghiana General ConstructionGeneral Contractor303/21/2026
Misa PlumbingPlumbing307/08/2026
S. Tieger Plumbing CoPlumbing203/22/2026
RPJ ElectricElectrical103/21/2026
DGM IndustriesFire Protection107/08/2026
Xinos ConstructionScaffold104/09/2026
Bhaghiana General ConstructionScaffold107/08/2026
Reliable EnterprisesScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RI Consulting Services8904103/31/2026
Merritt Engineering Consulting460204/29/2024
Moore Engineering of NY9134212/22/2023
AA Building & Inspection1519111/03/2023
Metrospec Sia6420110/24/2023
Blanco Design9212310/24/2023
Group-S5216108/01/2023
Building Lifecycle
02/20/2028
Facade inspection report due (FISP Cycle 9, sub-cycle B)
The filing window opened 02/21/2026. No Cycle 9 filing on record yet
10/23/2026
Permit expired, never signed off — Suspended Scaffold
The city's record still shows this permit as issued, with no sign-off on its filing
X01380500-I1-SC
09/16/2026
Elevator Category 1 inspection report filed
09/15/2026
Elevator Category 1 inspection report filed
09/14/2026
Co-op apartment A24 sold for $365,000
300 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedAveva Construction07/14/2026
DOB NOWBoiler EquipmentSigned-offNew York Heating01/28/2025
DOB NOWPlumbingPermit IssuedMisa Plumbing01/23/2025
DOB NOWSprinklersSigned-offDGM Industries01/23/2025
DOB NOWGeneral ConstructionSigned-offBhaghiana General Construction05/02/2024
DOB NOWSupported ScaffoldSigned-offBhaghiana General Construction04/18/2024
DOB NOWSidewalk ShedSigned-offXinos Construction02/23/2024
DOB NOWSupported ScaffoldPermit IssuedReliable Enterprises09/05/2023
BISOTISSUEDUrban Energy04/01/2024
BISOTISSUEDUrban Energy02/08/2024
BISOTISSUEDUrban Energy09/30/2022
BISBLISSUEDEfficient Comb & Cooling Co02/27/2019
BISOTISSUEDVertigo02/26/2019
BISPLISSUEDG.bassolino Plumbing02/26/2019
BISPLISSUEDHudson River Mechanical Group I09/14/2016
BISOTISSUEDHigh End Construction08/24/2016
BISOTISSUEDReal Dependabl Contracting05/25/2012
BISEQISSUEDB H & B Construction05/17/2012
BISOTISSUEDAllstate Restoration04/22/2004
BISPLISSUEDClean Tech Mechanical08/27/1998
BISOTISSUEDCanzone Plaster & Tile07/28/1998
BISPLISSUEDAffordable Heating & Repair Service04/11/1996
BISOTISSUEDTectonix11/17/1995
1 project · most recent 10/24/2023
Associated Ducts and Piping Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScope
10/24/2023——Associated Ducts and Piping, Heating and Air Conditioning Systems, Ventilation Systems
1 project · most recent 10/24/2023
Gas Water/Sanitary
FiledStatusContractorScope
10/24/2023Permit IssuedMisa PlumbingGas, Water/Sanitary
1 project · most recent 10/19/2022
FiledStatusContractorScope
10/19/2022Permit IssuedTower Electric—
1 project · most recent 03/31/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
03/31/2026Permit IssuedAveva ConstructionSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
06/16/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/12/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/17/2025Pass-Final Boiler Equipment InspectionPassView ↗
03/13/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/07/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/07/2025Certified Sprinkler - SP - RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
03/31/2026Post-installed AnchorsMd Istiaque Hasanspecial
03/31/2026Alternative Materials - OTCR Buildings Bulletin NumberMd Istiaque Hasanspecial
04/29/2024Air barrier - visual inspectionChristopher Krepcioenergy_progress
04/29/2024MasonryChristopher Krepciospecial
04/29/2024Tenant Protection Plan ComplianceYounes Abouyaalaspecial
04/29/2024Structural Stability – Alterations of existing buildingsChristopher Krepciospecial
04/29/2024FinalChristopher Krepcioprogress
04/29/2024Air barrier - visual inspectionChristopher Krepcioenergy_progress
04/29/2024MasonryChristopher Krepciospecial
04/29/2024Structural Stability – Alterations of existing buildingsChristopher Krepciospecial
04/29/2024Tenant Protection Plan Compliance—special
04/29/2024FinalChristopher Krepcioprogress
04/05/2024Lighting controls—energy_progress
04/05/2024Maintenance information—energy_progress
04/05/2024Interior lighting power—energy_progress
10/23/2023Tenant Protection Plan ComplianceVERONICA BLANCOspecial
10/17/2023Tenant Protection Plan ComplianceChristine Hobsonspecial
10/13/2023Tenant Protection Plan ComplianceChristine Hobsonspecial
08/22/2023Fire-Resistant Penetrations and JointsVERONICA BLANCOspecial
08/22/2023Fire-Resistant Penetrations and Joints—special
06/22/2023Fire-Resistant Penetrations and JointsMICHAEL SCORRANOspecial
06/22/2023Tenant Protection Plan ComplianceMICHAEL SCORRANOspecial
06/22/2023Fuel-Oil Storage and Fuel-Oil Piping SystemsMICHAEL SCORRANOspecial
10/04/2022Final—progress
10/04/2022Mechanical Systems—special
132 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account