← Back
Predominantly retail with other uses
542 WEST 22 STREET
MANHATTAN · Chelsea-Hudson Yards · BIN 1012317
💬 Discuss this project
2017Year Built
5Stories
K4Building Class
M1-5Zoning
33,007 sfGross Floor Area
8Units
LL97 Covered3 Open Violations ▸
Predominantly retail with other uses · Owner of record: HELZEN ASSOCIATES , · 7,406 sf lot · 4.46 FAR built · Flood zone X500
Locations of Work
ArchitectureMechanicalFire ProtectionGeneral
Bulkhead2p · 1 filing · 11 docs
Floor 51p · 1 filing · 6 docs
Floor 47p · 2 filings · 13 docs
Floor 3
Floor 2
Floor 11p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HAUSER & WIRTH407/08/2026
HELZEN ASSOCIATES2503/22/2026
WESTERMAN CONSTRUCTION CO2303/22/2026
BLUE ROCK CONTRACTING203/22/2026
HELZEN ASS LLP103/22/2026
HELZEN ASS. LLP STEVEN HE103/22/2026
VALENTINE CONSTRUCTION CO103/22/2026
EXPERT ENTERPRISES603/21/2026
HAUSER & WIRTH US PROPERTY LLC4003/21/2026
DURLAS CONSTRUCTION LLC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EUROCELT EXPEDITING, INC803/21/2026
JAM CONSULTANTS, INC.1803/21/2026
PATUXENT ENGINEERING203/21/2026
JP EXPEDITE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
REPUBLIC SCAFFOLD&HOIST CGeneral Contractor2707/08/2026
EUROSTRUCT INCGeneral Contractor907/08/2026
ADVANCED PLBG LLCPlumbing403/22/2026
NATIONWIDE MECHANICAL INCFire Protection107/08/2026
NATIONWIDE MECHANICALPlumbing103/22/2026
SIGNS CADScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BUREAU VERITAS NA6902307/15/2021
Building Lifecycle
All (147)Filed (15)Permit Issued (21)Signed Off (10)Violation (60)Inspection (4)Objection (26)Special Inspection (11)
12/01/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/02/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/02/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/22/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/01/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/02/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/02/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/02/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/09/2022
Signed off — Alteration
M00547272-I1
08/23/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/12/2022
Signed off — Alteration
Remove and install interior partitions per plans filed herewith. No change to occupancy, use or egress.
M00545290-I1
07/27/2022
Signed off — Alteration
Remove and install interior partitions per plans filed herewith. No change to occupancy, use or egress.
M00545290-S1
07/27/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/24/2022
Signed off — Alteration
M00069425-I1
04/27/2022
Signed off — Alteration
INSTALLATION OF A TEMPOARY SCAFFOLD AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD SHALL COMPLY WITH 2014 NYC BUILDING CODE, CHAPTER 33.
M00056154-I1
04/27/2022
Signed off — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED APPROXIMATELY 85' LONG AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
M00050737-I1
04/26/2022
Signed off — Alteration
INSTALLATION OF SUPPORT SCAFFOLD IN ACCORDANCE WITH NYCC 2014 CHAPTER 33. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
M00119941-I1
03/16/2022
Signed off — Alteration
Installation of curb cut A for a driveway to provide loading access at Gallery space.
M00568950-I1
03/16/2022
Signed off — Alteration
M00569330-I1
03/14/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/04/2022
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
01/25/2022
Permit issued — Curb Cut
M00569330-I1-CC
01/25/2022
Permit issued — Curb Cut
M00568950-I1-CC
11/29/2021
Permit issued — Mechanical Systems
M00545290-S1-MS
11/29/2021
Permit issued — General Construction
M00545290-I1-GC
08/25/2021
Permit issued — Sprinklers
M00547272-I1-EW-SP
08/16/2021
Objection raised — Scope
08/16/2021
Objection resolved — Addressed
08/16/2021
Objection raised — Inspections
08/16/2021
Objection resolved — Addressed
08/10/2021
Filed — Alteration
Installation of curb cut A for a driveway to provide loading access at Gallery space.
M00568950-I1
08/10/2021
Filed — Alteration
M00569330-I1
07/20/2021
Permit issued — Mechanical Systems
M00545290-S1-MS
07/20/2021
Permit issued — General Construction
M00545290-I1-GC
07/15/2021
Filed — Alteration
M00547272-I1
07/15/2021
Filed — Alteration
Remove and install interior partitions per plans filed herewith. No change to occupancy, use or egress.
M00545290-S1
06/29/2021
Filed — Alteration
Remove and install interior partitions per plans filed herewith. No change to occupancy, use or egress.
M00545290-I1
06/25/2021
Special inspection requirement — Lighting controls
PHILIP RESCINITI
06/25/2021
Special inspection requirement — Interior lighting power
PHILIP RESCINITI
06/24/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
PHILIP RESCINITI
06/23/2021
Special inspection requirement — Final
PHILIP RESCINITI
06/08/2021
Special inspection requirement — Public Assembly Emergency Lighting
Annabelle Selldorf
06/01/2021
Objection resolved — Addressed
04/30/2021
Special inspection requirement — Public Assembly Emergency Lighting
Annabelle Selldorf
04/21/2021
Objection resolved — Addressed
04/20/2021
Objection raised — Structural
04/12/2021
Filed — No Work
M00280222-P1
04/09/2021
Special inspection requirement — Public Assembly Emergency Lighting
Annabelle Selldorf
01/14/2021
Objection raised — Inspections
01/08/2021
Filed — No Work
M00280264-P2
01/08/2021
Special inspection requirement — Public Assembly Emergency Lighting
Annabelle Selldorf
10/09/2020
Violation issued (ECB, closed)
Unknown
09/09/2020
Signed off — Alteration
ERECT NON-ILLUMINATED ACCESSORY BUSINESS WALL SIGN, NON-FLASHING, NON-ADVERTISING SIGN, NO CHANGE IN USE, EGRESS, OR OCCUPANCY
M00378466-I1
08/13/2020
Permit issued — Sign
M00378466-I1-SG
08/12/2020
Filed — Alteration
ERECT NON-ILLUMINATED ACCESSORY BUSINESS WALL SIGN, NON-FLASHING, NON-ADVERTISING SIGN, NO CHANGE IN USE, EGRESS, OR OCCUPANCY
M00378466-I1
07/30/2020
Violation issued (ECB, closed)
Construction
07/30/2020
Violation issued (ECB, closed)
Unknown
07/30/2020
Violation issued (ECB, closed)
Unknown
07/30/2020
Violation issued (ECB, closed)
Construction
Latest 60 of 147 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offEUROSTRUCT INC01/25/2022
DOB NOWCurb CutSigned-offEUROSTRUCT INC01/25/2022
DOB NOWMechanical SystemsSigned-offEUROSTRUCT INC11/29/2021
DOB NOWGeneral ConstructionSigned-offEUROSTRUCT INC11/29/2021
DOB NOWSprinklersSigned-offNATIONWIDE MECHANICAL INC08/25/2021
DOB NOWMechanical SystemsSigned-offEUROSTRUCT INC07/20/2021
DOB NOWGeneral ConstructionSigned-offEUROSTRUCT INC07/20/2021
DOB NOWSignSigned-offSIGNS CAD CORP08/13/2020
DOB NOWSidewalk ShedSigned-offREPUBLIC SCAFFOLD&HOIST C04/07/2020
DOB NOWSupported ScaffoldSigned-offREPUBLIC SCAFFOLD&HOIST C04/07/2020
DOB NOWSupported ScaffoldSigned-offREPUBLIC SCAFFOLD&HOIST C04/07/2020
DOB NOWSidewalk ShedSigned-offREPUBLIC SCAFFOLD&HOIST C04/02/2019
DOB NOWSupported ScaffoldSigned-offREPUBLIC SCAFFOLD&HOIST C04/01/2019
DOB NOWSupported ScaffoldSigned-offREPUBLIC SCAFFOLD&HOIST C04/01/2019
DOB NOWSupported ScaffoldSigned-offREPUBLIC SCAFFOLD&HOIST C04/01/2019
DOB NOWSupported ScaffoldSigned-offREPUBLIC SCAFFOLD&HOIST C01/17/2019
DOB NOWSupported ScaffoldSigned-offREPUBLIC SCAFFOLD&HOIST C08/13/2018
DOB NOWSidewalk ShedSigned-offREPUBLIC SCAFFOLD&HOIST C08/13/2018
DOB NOWSupported ScaffoldSigned-offREPUBLIC SCAFFOLD&HOIST C08/13/2018
DOB NOWSupported ScaffoldSigned-offREPUBLIC SCAFFOLD&HOIST C06/25/2018
DOB NOWSidewalk ShedSigned-offREPUBLIC SCAFFOLD&HOIST C06/07/2018
BISPLISSUEDADVANCED PLBG LLC07/21/2022
BIS—ISSUEDEUROSTRUCT INC02/08/2022
BIS—ISSUEDWESTERMAN CONSTRUCTION CO09/08/2020
BISSDISSUEDADVANCED PLUMBING LLC07/07/2020
BIS—ISSUEDWESTERMAN CONSTRUCTION CO06/24/2020
BISSPISSUEDADVANCED PLUMBING LLC06/15/2020
BIS—ISSUEDWESTERMAN CONSTRUCTION CO04/29/2020
BIS—ISSUEDWESTERMAN CONSTRUCTION CO04/23/2020
BISEQISSUEDWESTERMAN CONSTRUCTION CO02/24/2020
BIS—ISSUEDWESTERMAN CONSTRUCTION CO11/20/2019
BISEQISSUEDREPUBLIC SCAFFOLD&HOIST C10/21/2019
BIS—ISSUEDWESTERMAN CONSTRUCTION CO08/29/2019
BISEQISSUEDREPUBLIC SCAFFOLD&HOIST C06/12/2019
BISSDISSUEDADVANCED PLUMBING LLC05/01/2019
BISSDISSUEDADVANCED PLUMBING LLC05/01/2019
BISPLISSUEDADVANCED PLBG LLC04/30/2019
BISPLISSUEDADVANCED PLBG LLC04/30/2019
BISEQISSUEDREPUBLIC SCAFFOLD&HOIST C03/11/2019
BIS—ISSUEDWESTERMAN CONSTRUCTION CO02/26/2019
+ 31 more permits on file
5 projects · most recent 03/17/2022
General Wiring
FiledStatusContractorScope
03/17/2022CompleteNIDETCH ELECTRIC CO INCGeneral Wiring
08/26/2021CompleteALBA ELECTRIC CORPGeneral Wiring
07/12/2018CompleteNASH ELECTRIC SERVICES IN—
06/07/2018CompleteNASH ELECTRIC SERVICES IN—
05/24/2018Complete247 ELECTRICAL CORP—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
08/23/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/27/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/14/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/04/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
06/25/2021Lighting controlsPHILIP RESCINITIenergy_progress
06/25/2021Interior lighting powerPHILIP RESCINITIenergy_progress
06/24/2021Fire-Resistant Penetrations and JointsPHILIP RESCINITIspecial
06/23/2021FinalPHILIP RESCINITIprogress
06/08/2021Public Assembly Emergency LightingAnnabelle Selldorfprogress
04/30/2021Public Assembly Emergency LightingAnnabelle Selldorfprogress
04/09/2021Public Assembly Emergency LightingAnnabelle Selldorfprogress
01/08/2021Public Assembly Emergency LightingAnnabelle Selldorfprogress
08/13/2019FinalHumayun Ahmedprogress
01/16/2019FinalJOHN O'CONNOR, P.E.progress
06/25/2018FinalBrian Clarkeprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Hauser & WirthOfficeFloor 4
Project M00547272 Alteration · LOC Issued · 07/15/2021
Project M00545290 Alteration · LOC Issued · 06/29/2021
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 344 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch8
09/06/2026M00056154-I1Request digital key ↗
09/06/2026M00069425-I1Request digital key ↗
09/05/2026M00050737-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly4
08/15/2026M00280222-P1Request digital key ↗
08/15/2026M00280264-P2Request digital key ↗
08/15/2026M00280222-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/05/2026M00050737-I1Request digital key ↗
09/05/2026M00050737-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sign1
09/04/2026M00378466-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00119941-I1Request digital key ↗
▸Applications & Permits65
▸BISPLAN / WORK APPROVAL APPLICATION40
06/13/2022140491910Open ↗
06/13/2022140491830Open ↗
05/13/2022123033804Open ↗
Showing 3 of 40 on file for this type
▸BISWORK PERMIT APPLICATION23
10/21/2019140813546Open ↗
10/17/2019122724221Open ↗
06/13/2019123458463Open ↗
Showing 3 of 23 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
10/04/2021122692050Open ↗
Showing 1 of 2 on file for this type
▸Zoning, Tax Lot & Property Records3
▸BISFLOOD ZONE COMPLIANCE2
07/14/2022122712172Open ↗
07/14/2022122712172Open ↗
▸BISFLOOD ZONE DESIGN CERTIFICATION1
08/16/2018140794326Open ↗
▸Seals & Professional Certifications79
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION26
11/26/2019122954428Open ↗
11/26/2019122954428Open ↗
09/30/2019122724221Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
09/05/2026M00050737-I1Open ↗
09/05/2026M00050737-P1Open ↗
09/05/2026M00280264-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/02/2026M00280264-P2Open ↗
09/01/2026M00280222-P1Open ↗
08/31/2026M00050737-I1Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT9
10/23/2018140813546Open ↗
08/16/2018140794326Open ↗
07/02/2018123458463Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
07/02/2018123458463Open ↗
03/08/2017123033804Open ↗
11/30/2016122954428Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
10/23/2018140813546Open ↗
08/16/2018140794326Open ↗
05/05/2016140491910Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
10/23/2018140813546Open ↗
08/16/2018140794326Open ↗
05/05/2016140491910Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026M00545290-I1Open ↗
▸Trade Schedules & Equipment12
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
01/06/2020122724212Open ↗
12/30/2019122724212Open ↗
12/20/2017122724212Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING2
09/14/2020122724212Open ↗
Showing 1 of 2 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
10/26/2020122724221Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISGAS CUT-OFF1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
07/14/2021122712172Open ↗
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
03/13/2020122724212Open ↗
▸Safety & Tenant Protection27
▸DOB NOWHPD-1: Anti-Harassment Area Checklist10
09/05/2026M00050737-I1Open ↗
09/05/2026M00050737-P1Open ↗
08/13/2026M00119941-I1Open ↗
Showing 3 of 10 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTenant Protection Plan and Notes4
07/02/2018123458463Open ↗
03/08/2017123033804Open ↗
11/30/2016122954428Open ↗
Showing 3 of 4 on file for this type
▸BISANTI-HARASSMENT CHECKLIST3
10/18/2016122904599Open ↗
Showing 1 of 3 on file for this type
▸BISSTREET TREE CHECKLIST2
05/25/2016122692050Open ↗
Showing 1 of 2 on file for this type
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
10/04/2021122692050Open ↗
▸Environmental & Asbestos5
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
05/05/2016140491910Open ↗
Showing 1 of 4 on file for this type
▸BISRODENT CONTROL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
10/12/2016122904599Open ↗
09/29/2016122904599Open ↗
Showing 2 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00545290-I1Open ↗
▸Inspections & Test Reports19
▸BISTECHNICAL REPORT: RESPONSIBILITY16
06/08/2022140491910Open ↗
06/08/2022140491830Open ↗
05/03/2022122877725Open ↗
Showing 3 of 16 on file for this type
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS2
06/08/2022140491910Open ↗
06/08/2022140491910Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
05/09/2022140794326Open ↗
▸Approvals, Objections & Sign-offs28
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST13
07/14/2022122712172Open ↗
06/10/2022140491830Open ↗
06/10/2022140491910Open ↗
Showing 3 of 13 on file for this type
▸BISFINAL7
06/08/2022140491910Open ↗
06/08/2022140491830Open ↗
05/05/2022140794326Open ↗
Showing 3 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
09/13/2017122877725Open ↗
12/28/2016122954428Open ↗
Showing 2 of 3 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION1
08/24/2016122523509Open ↗
▸BISACPE Objection Review Request1
03/13/2020122724212Open ↗
▸BISLANDMARKS APPROVAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership12
▸BISCOST AFFIDAVIT7
10/16/2020122954428Open ↗
08/16/2018140794326Open ↗
11/30/2016122954428Open ↗
Showing 3 of 7 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE2
07/07/2016122523509Open ↗
Showing 1 of 2 on file for this type
▸BISAcord 25 (Acord Certificate of Liability Insurance)2
07/07/2016122523509Open ↗
07/07/2016122523509Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
05/05/2022140794326Open ↗
▸Filing & Intake Forms50
▸BISADDITIONAL INFORMATION20
10/04/2021122692050Open ↗
11/09/2020122724212Open ↗
11/09/2020122724212Open ↗
Showing 3 of 20 on file for this type
▸BISEFILING COVER SHEET14
07/02/2018123458463Open ↗
03/08/2017123033804Open ↗
11/30/2016122954428Open ↗
Showing 3 of 14 on file for this type
▸BISBOROUGH INTAKE FORM10
01/06/2020122724212Open ↗
12/30/2019122724212Open ↗
08/16/2019103863650Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
10/23/2018140813546Open ↗
08/16/2018140794326Open ↗
05/05/2016140491910Open ↗
Showing 3 of 5 on file for this type
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents20
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION8
10/04/2021122692050Open ↗
04/15/2016122523509Open ↗
04/15/2016122523509Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWMultiple Dwelling Special District Feasibility of Government Funded Rehabilitation5
09/05/2026M00050737-P1Open ↗
09/05/2026M00050737-I1Open ↗
08/13/2026M00119941-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWMultiple Dwelling Special District Notice to Community Board5
09/05/2026M00050737-P1Open ↗
09/05/2026M00050737-I1Open ↗
08/13/2026M00119941-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWAlternate Plan 12
08/15/2026M00280264-P2Open ↗
08/15/2026M00280264-I1Open ↗