← Back
BuildNYC
General warehouse
JFK8 - Amazon Fulfillment Center
546 GULF AVENUE · BIN 5169720
💬 Discuss this project
2018Year Built
1Stories
E1Building Class
M3-1Zoning
904,400 sfGross Floor Area
2Units
0 Active ViolationsFDNY Report ↗
General warehouse · Owner of record: Staten Island Global Logistic Park Lot 3 · 2,122,958 sf lot · 0.43 FAR built · Flood zone AE
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof3 filings
Floor 42 filings
Floor 32 filings
Floor 22 filings
Floor 117 filings
Mezzanine5 filings
Site & exterior9 filings
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Matrix Develpment Group6407/08/2026
Simd503/21/2026
Staten Island Global Logistic Park Lot 3103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Socotec2203/21/2026
Just Architecture203/21/2026
Municipal Building Consultants103/21/2026
Vincent J. Liotta P.E.103/21/2026
Gig Expediting203/21/2026
Rigid Structural Design203/21/2026
Walter T Gorman PE203/21/2026
Rybak Development203/21/2026
Milrose Consultants203/21/2026
Vincent J. Liotta P. E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Sunpower Corporation, SystemsScaffold1607/08/2026
PAR Plumbingspecialty_contractor507/08/2026
A1 SpecializedSign hanger407/08/2026
D.R. ContractingScaffold303/21/2026
D.R. ContractingGeneral Contractor303/21/2026
Skyline Scaffolding GroupScaffold307/08/2026
Cre TurnkeyGeneral Contractor207/08/2026
DematicGeneral Contractor203/21/2026
Capezzano ConstructionGeneral Contractor203/21/2026
Meadowlands Fire ProtectionFire Protection207/08/2026
F&G MechanicalPlumbing207/08/2026
Cre Turnkeyspecialty_contractor107/08/2026
GrinnellFire Protection106/28/2026
V. C. Vitanza SonsPlumbing107/08/2026
Adco ElectricalElectrical103/22/2026
West Shore ConsultingPlumbing107/08/2026
Hylan Datacom & ElectricalElectrical103/22/2026
Mangi ElectricalElectrical103/21/2026
Mac Elect'l ContractingElectrical103/22/2026
Nova ElectricElectrical203/22/2026
Bottoni ConstructionGeneral Contractor103/21/2026
KB Environmental ConstructionGeneral Contractor103/21/2026
MVN AssociatesGeneral Contractor107/08/2026
Nicolosi BrothersGeneral Contractor107/08/2026
Blue Rock ConstructionGeneral Contractor310/25/2019
Fisher InstallationsGeneral Contractor107/17/2017
Freedom Home ImprovementGeneral Contractor107/18/2018
Matrix Construction ServicesGeneral Contractor306/07/2018
Sunpower Corporation, SystemsGeneral Contractor111/05/2020
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Milrose Consultants2003210/07/2026
Crosscheck Inspection Services544208/25/2026
Sparc Fire Protection Engineering6362101/08/2026
Vincent J. Liotta P. E1974204/01/2025
Atlantic Engineeringlabor1381312/23/2020
Richmond Testing Lab263202/19/2020
Becker Engineering633111/13/2019
Building Lifecycle
11/16/2026
Elevator Category 1 inspection report filed
10/07/2026
Filed — Alteration
Remove 350 SF of existing deck and add steel support frames for new rooftop HVAC units, 2700 ft proposed new steel channel framing.
S01460424-I1
10/06/2026
Signed off — Alteration
FILING GC FOR INSTALLATION OF SUSPENDED ISOLATION CURTAINS AROUND THE PERIMETER OF EQUIPMENT PLATFORMS AS INDICATED ON DRAWINGS. NO CHANGES OCCUPANCY OR EGRESS.
S01363845-I1
10/06/2026
Filed — Alteration
MECHANICAL MODIFICATION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
S01451446-I1
10/06/2026
Signed off — Alteration
FILING ST FOR INSTALLATION OF SUSPENDED ISOLATION CURTAINS AROUND THE PERIMETER OF EQUIPMENT PLATFORMS AS INDICATED ON DRAWINGS. NO CHANGES OCCUPANCY OR EGRESS.
S01363850-I1
169 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOW—Cre Turnkey—
DOB NOW—Cre Turnkey—
DOB NOW—Cre Turnkey—
DOB NOW—Grinnell—
DOB NOW—PAR Plumbing—
DOB NOW—PAR Plumbing—
DOB NOW—PAR Plumbing—
DOB NOW—Skyline Scaffolding Group—
DOB NOW—Nicolosi Brothers—
DOB NOW—Skyline Scaffolding Group—
DOB NOW—David L Flum—
DOB NOW—Skyline Scaffolding Group—
DOB NOW—D.R. Contracting—
DOB NOW—D.R. Contracting—
DOB NOW—David L Flum—
DOB NOW—David L Flum—
DOB NOW—David L Flum—
DOB NOW—F&G Mechanical—
DOB NOW—MVN Associates—
DOB NOW—Meadowlands Fire Protection—
DOB NOW—Sunpower Corporation, Systems—
DOB NOW—Sunpower Corporation, Systems—
DOB NOW—Sunpower Corporation, Systems—
DOB NOW—Sunpower Corporation, Systems—
DOB NOW—Sunpower Corporation, Systems—
DOB NOW—Sunpower Corporation, Systems—
DOB NOW—Capezzano Construction—
DOB NOW—Mad Signs—
DOB NOW—Meadowlands Fire Protection—
DOB NOW—V. C. Vitanza Sons—
DOB NOW—Demerac Plumbing & Heating—
DOB NOW—Mad Signs—
DOB NOW—Mad Signs—
DOB NOW—Mad Signs—
BIS—Sunpower Corporation, Systems—
BIS—Jensen Hughtes—
BIS—Blue Rock Construction—
BIS—Bottoni Construction—
BIS—Matrix Construction Service—
BIS—Scaran Oil Service—
+ 19 more permits on file
Nothing on file for this building.
Nothing on file for this building.
577 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account