Vital Bk Utica Crescent
548 UTICA AVENUE · BIN 3429452
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
0 Active ViolationsFDNY Report ↗
Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsBrookdale University Hospital Medical Center3 filings
RoofMonadnock Development4p · 4 filings
Floor 1Brookdale University Hospital Medical Center5 filings · 6 docs
CellarUtica Crescent temporary construction office1 filing
Site & exteriorBrookdale University Hospital Medical Center9 filings
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Brookdale Hospital Medical Center5407/08/2026
Monadnock Development3907/08/2026
VB Ccpopd Housing Development Fund Corp Ration103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM Zoning4003/21/2026
KD Designs1503/21/2026
Eurocelt Expediting1003/21/2026
S R Solar Design203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Monadnock General ContGeneral Contractor3307/08/2026
Arsenal ScaffoldScaffold2304/09/2026
Metro Fire ProtectionFire Protection807/08/2026
Cosan ConstructionScaffold504/09/2026
Monadnock General ContScaffold504/09/2026
D.D.S. Mechanical PBG & HeatingPlumbing307/08/2026
Voltair SolarGeneral Contractor303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Vibranalysis Inc., Dba VT68641208/19/2025
NKM Engineering6244111/15/2024
Amm Engineering725105/22/2024
Building Lifecycle
All (250)Filed (42)Permit Issued (58)Signed Off (22)Violation (10)Inspection (16)Objection (72)Special Inspection (30)
08/06/2026
Signed off — New Building
Plumbing work per plans filed herewith
B00648034-S4
07/29/2026
Signed off — Alteration
B00669833-I1
07/29/2026
Signed off — Alteration
B00669909-I1
07/29/2026
Signed off — Alteration
B00669844-I1
07/24/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
06/25/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY SCAFFOLD AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
B01046768-I1
06/16/2026
Signed off — Alteration
B01093275-I1
06/12/2026
Signed off — New Building
Plumbing work per plans filed herewith
B00648034-S1
06/12/2026
Signed off — Alteration
Install temporary standpipe system as per plans filed. No change to use, egress or occupancy. Filed in conjunction with NB# B00648034-I1.
B00669820-I1
06/12/2026
Signed off — New Building
Plumbing work per plans filed herewith
B00648034-S2
06/12/2026
Signed off — New Building
Plumbing work per plans filed herewith
B00648034-S3
06/12/2026
Signed off — New Building
Plumbing work per plans filed herewith
B00648034-S5
06/12/2026
Permit issued — Curb Cut
B00669909-I1-CC
06/12/2026
Permit issued — Curb Cut
B00669844-I1-CC
06/12/2026
Permit issued — Curb Cut
B00669833-I1-CC
05/21/2026
Signed off — Alteration
TEMPORARY CONSTRUCTION FENCE FILED IN CONJUNCTION WITH NB# B00648034-I1
B00945125-I1
03/04/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/23/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/04/2025
Permit issued — Plumbing
B00648034-S4-PL
12/03/2025
Special inspection requirement — Air barrier — testing
JUAN GOMEZ
12/03/2025
Special inspection requirement — Protection of exposed foundation insulation
JUAN GOMEZ
12/03/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
JUAN GOMEZ
12/03/2025
Special inspection requirement — Energy Code Compliance Inspections
JUAN GOMEZ
12/03/2025
Special inspection requirement — Vestibules
JUAN GOMEZ
12/03/2025
Special inspection requirement — Air barrier continuity plan testing
JUAN GOMEZ
12/03/2025
Special inspection requirement — Fenestration areas
JUAN GOMEZ
12/03/2025
Special inspection requirement — Fenestration air leakage
JUAN GOMEZ
12/03/2025
Special inspection requirement — Fire-Resistance Rated Construction
JUAN GOMEZ
12/03/2025
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
JUAN GOMEZ
12/03/2025
Special inspection requirement — Insulation placement and R values
JUAN GOMEZ
12/03/2025
Special inspection requirement — Air barrier - visual inspection
JUAN GOMEZ
12/03/2025
Special inspection requirement — Sprayed fire-resistant materials
JUAN GOMEZ
12/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JUAN GOMEZ
11/21/2025
Permit issued — General Construction
B00648034-I1-GC
11/20/2025
Permit issued — Mechanical Systems
B00648034-S3-MS
11/20/2025
Permit issued — Support of Excavation
B00648034-S5-SE
11/20/2025
Objection resolved — Addressed
11/18/2025
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
11/18/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/13/2025
Signed off — Alteration
B01054269-I1
11/13/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/06/2025
Permit issued — Construction Fence
B00945125-I1-FN
10/09/2025
Inspection — Certified StandPipe-Fire Pump (SD)-Fire Pump Test
Certified
View inspection ↗
10/09/2025
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
09/19/2025
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
09/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JUAN GOMEZ
09/05/2025
Special inspection requirement — Sprinkler Systems
JUAN GOMEZ
09/05/2025
Special inspection requirement — Standpipe Systems
JUAN GOMEZ
09/02/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLANS DURING CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. FENCE SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
B01037239-I1
09/02/2025
Signed off — Alteration
INSTALLATION OF PLYWOOD FENCE AND HEAVY DUTY SIDEWALK SHED AS PER PLANS. EQUIPMENT WILL BE INSTALLED ON ROADWAY AND SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01216677-I1
09/02/2025
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01037221-I1
09/02/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY ROOF PROTECTION OVER ADJACENT PROPERTIES AS PER PLANS. ROOF PROTECTION SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01037197-I1
08/28/2025
Objection raised — Other
08/19/2025
Filed — New Building
Plumbing work per plans filed herewith
B00648034-P8
08/18/2025
Filed — Alteration
B00669636-P1
08/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JUAN GOMEZ
08/15/2025
Special inspection requirement — Sprinkler Systems
JUAN GOMEZ
08/15/2025
Special inspection requirement — Standpipe Systems
JUAN GOMEZ
08/07/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
JUAN GOMEZ
08/01/2025
Signed off — Alteration
INSTALLATION OF 7,100 LB SINGLE PERSONNEL/MATERIAL HOIST CAR #3 @ EAST TOWER AS PER PLANS DURING CONSTRUCTION. HOIST SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01076899-I1
Latest 60 of 250 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offMonadnock General Cont06/12/2026
DOB NOWCurb CutSigned-offMonadnock General Cont06/12/2026
DOB NOWCurb CutSigned-offMonadnock General Cont06/12/2026
DOB NOWPlumbingSigned-offD.D.S. Mechanical PBG & Heating12/04/2025
DOB NOWGeneral ConstructionPermit IssuedMonadnock General Cont11/21/2025
DOB NOWMechanical SystemsSigned-offMonadnock General Cont11/20/2025
DOB NOWSupport of ExcavationSigned-offMonadnock General Cont11/20/2025
DOB NOWConstruction FenceSigned-offMonadnock General Cont11/06/2025
DOB NOWStandpipePermit IssuedMetro Fire Protection07/29/2025
DOB NOWGeneral ConstructionSigned-offMonadnock General Cont07/29/2025
DOB NOWStandpipeSigned-offMetro Fire Protection07/29/2025
DOB NOWProtection and Mechanical MethodsSigned-offArsenal Scaffold06/30/2025
DOB NOWProtection and Mechanical MethodsSigned-offArsenal Scaffold06/27/2025
DOB NOWProtection and Mechanical MethodsSigned-offArsenal Scaffold06/27/2025
DOB NOWProtection and Mechanical MethodsSigned-offArsenal Scaffold06/27/2025
DOB NOWConstruction FenceSigned-offArsenal Scaffold05/28/2025
DOB NOWConstruction FenceSigned-offArsenal Scaffold05/28/2025
DOB NOWConstruction FenceSigned-offArsenal Scaffold04/30/2025
DOB NOWProtection and Mechanical MethodsSigned-offArsenal Scaffold04/15/2025
DOB NOWSidewalk ShedSigned-offArsenal Scaffold04/15/2025
DOB NOWGeneral ConstructionPermit IssuedMonadnock General Cont02/28/2025
DOB NOWStandpipeSigned-offMetro Fire Protection02/25/2025
DOB NOWSprinklersSigned-offMetro Fire Protection02/24/2025
DOB NOWStandpipeSigned-offMetro Fire Protection01/06/2025
DOB NOWPlumbingSigned-offD.D.S. Mechanical PBG & Heating12/26/2024
DOB NOWSupported ScaffoldSigned-offCosan Construction11/20/2024
DOB NOWMechanical SystemsSigned-offMonadnock General Cont11/20/2024
DOB NOWSupport of ExcavationSigned-offMonadnock General Cont11/20/2024
DOB NOWSuspended ScaffoldSigned-offCosan Construction11/20/2024
DOB NOWConstruction FenceSigned-offMonadnock General Cont11/19/2024
DOB NOWSolarPermit IssuedVoltair Solar11/19/2024
DOB NOWGeneral ConstructionSigned-offMonadnock General Cont08/30/2024
DOB NOWProtection and Mechanical MethodsSigned-offArsenal Scaffold07/24/2024
DOB NOWEarth WorkSigned-offMonadnock General Cont07/18/2024
DOB NOWStructuralSigned-offMonadnock General Cont07/17/2024
DOB NOWProtection and Mechanical MethodsSigned-offArsenal Scaffold07/16/2024
DOB NOWProtection and Mechanical MethodsSigned-offArsenal Scaffold07/16/2024
DOB NOWProtection and Mechanical MethodsSigned-offArsenal Scaffold07/15/2024
DOB NOWSupported ScaffoldSigned-offCosan Construction06/03/2024
DOB NOWSuspended ScaffoldSigned-offCosan Construction05/22/2024
+ 10 more permits on file
1 project · most recent 08/19/2025
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/19/2025Permit IssuedMonadnock General ContAir Conditioning Systems
Cooling
Mitsubishi Electric PUY-A24NHA7 9,200 CFM · Condensing Unit ×4
NTXMSH36A142BA 7,750 CFM · Condensing Unit ×2
Trane 10 - TON PUHY-P120TNU-A 7,750 CFM · Vrf Outdoor ×2
1 project · most recent 08/19/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/19/2025Signed-offD.D.S. Mechanical PBG & HeatingGas, Storm, Water/Sanitary
11 projects · most recent 08/26/2026
General Wiring Lighting HVAC Wiring Boiler Controls
FiledStatusContractorScope
08/26/2026CompleteB.P. Electric—
05/04/2026CompleteTF ElectricalGeneral Wiring
05/02/2026CompleteTF ElectricalGeneral Wiring
05/02/2026CompleteTF ElectricalGeneral Wiring
07/18/2024CompleteGlo ElectricGeneral Wiring, Lighting, HVAC Wiring, Boiler Controls
07/17/2024CompleteNash Electric Services—
07/17/2024CompleteNash Electric Services—
07/01/2024CancelledNash Electric Services—
07/01/2024CompleteNash Electric Services—
05/02/2024CompleteNash Electric Services—
04/11/2024CompleteAmber Lite Electric1 meters, 1 new_meters
1 project · most recent 08/19/2025
Steel Concrete Masonry
FiledStatusContractorScope
08/19/2025Signed-offD.D.S. Mechanical PBG & HeatingSteel, Concrete, Masonry
1 project · most recent 10/10/2023
Fence
FiledStatusContractorScope
10/10/2023Signed-offMonadnock General ContFence
▾Field Inspections (DOB CAP) — 17
DateTypeResultReport
07/24/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
07/24/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
03/04/2026Pass-Final CND-Occupancy InspectionPassView ↗
12/23/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/18/2025Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
11/18/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/13/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/09/2025Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
10/09/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
09/19/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
10/16/2024Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
10/16/2024Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
05/29/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/25/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/25/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/19/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/19/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 77
DateRequirementInspectorRole
12/03/2025VestibulesJUAN GOMEZenergy_progress
12/03/2025Fire-Resistance Rated ConstructionJUAN GOMEZprogress
12/03/2025Air barrier — testing JUAN GOMEZenergy_progress
12/03/2025Fenestration and door U-factor and product ratingsJUAN GOMEZenergy_progress
12/03/2025Fenestration air leakageJUAN GOMEZenergy_progress
12/03/2025Protection of exposed foundation insulationJUAN GOMEZenergy_progress
12/03/2025Air barrier continuity plan testingJUAN GOMEZenergy_progress
12/03/2025Fenestration areasJUAN GOMEZenergy_progress
12/03/2025Insulation placement and R valuesJUAN GOMEZenergy_progress
12/03/2025Air barrier - visual inspectionJUAN GOMEZenergy_progress
12/03/2025Wall Panels, Curtain Walls, and VeneersJUAN GOMEZspecial
12/03/2025Fire-Resistant Penetrations and JointsJUAN GOMEZspecial
12/03/2025Sprayed fire-resistant materialsJUAN GOMEZspecial
12/03/2025Energy Code Compliance InspectionsJUAN GOMEZprogress
09/05/2025Fire-Resistant Penetrations and JointsJUAN GOMEZspecial
09/05/2025Standpipe SystemsJUAN GOMEZspecial
09/05/2025Sprinkler SystemsJUAN GOMEZspecial
08/15/2025Fire-Resistant Penetrations and JointsJUAN GOMEZspecial
08/15/2025Sprinkler SystemsJUAN GOMEZspecial
08/15/2025Standpipe SystemsJUAN GOMEZspecial
08/07/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationJUAN GOMEZspecial
06/20/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationJUAN GOMEZspecial
08/13/2024Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
08/13/2024Air barrier - visual inspectionNARESH MAHANGUenergy_progress
08/13/2024Structural Stability – Alterations of existing buildingsNARESH MAHANGUspecial
Latest 25 of 77.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Brookdale University Hospital Medical CenterMedical / HealthcareSub-cellar, Cellar, Floors 1–12, Roof
Project B00945125 Alteration · LOC Issued · 10/10/2023
Project B00669820 Alteration · LOC Issued · 09/06/2022
Project B00669844 Alteration · LOC Issued · 02/25/2022
Project B00669909 Alteration · LOC Issued · 02/23/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 167 on file (BIS + DOB NOW)
▸Plans & Drawings40
▸DOB NOWPlans/Sketch40
08/31/2026B00669909-I1Request digital key ↗
08/31/2026B00669844-I1Request digital key ↗
08/31/2026B00669833-I1Request digital key ↗
Showing 3 of 40 on file for this type
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION4
02/07/2025321602119Open ↗
09/24/2024340834510Open ↗
07/12/2024340834510Open ↗
Showing 3 of 4 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
03/24/2022340834510Open ↗
▸Zoning, Tax Lot & Property Records16
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED3
02/05/2025321602119Open ↗
05/17/2024321601888Open ↗
08/03/2023321601628Open ↗
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026B00648034-I1Open ↗
08/13/2026B00648034-P8Open ↗
08/13/2026B00648034-P4Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026B00648034-P8Open ↗
08/13/2026B00648034-P4Open ↗
08/13/2026B00648034-I1Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT2
02/13/2025321602119Open ↗
05/17/2024321601888Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED2
02/05/2025321602119Open ↗
05/17/2024321601888Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION2
02/13/2025321602119Open ↗
05/17/2024321601888Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00648034-I1Open ↗
▸Seals & Professional Certifications64
▸DOB NOWDPL-1: Design Professional Seal & Signature40
08/31/2026B00669909-I1Open ↗
08/31/2026B00669844-I1Open ↗
08/31/2026B00669833-I1Open ↗
Showing 3 of 40 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/27/2026B00648034-S1Open ↗
09/27/2026B00648034-S1Open ↗
09/01/2026B00648034-S3Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/27/2026B00648034-S1Open ↗
09/01/2026B00648034-S3Open ↗
09/01/2026B00648034-S3Open ↗
Showing 3 of 9 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
03/24/2022340834510Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/24/2022340834510Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026B00648034-P8Open ↗
08/13/2026B00648034-P4Open ↗
08/13/2026B00648034-I1Open ↗
▸DOB NOWStandpipe Alarms Drawings1
08/20/2026B00648034-I1—
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist3
08/20/2026B00648034-I1Open ↗
08/15/2026B00648034-P4Open ↗
08/15/2026B00648034-P8Open ↗
▸BISSTREET TREE CHECKLIST1
03/24/2022340834510Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00648034-I1Open ↗
▸Energy Compliance4
▸DOB NOWPreliminary Commissioning Report Certification3
08/20/2026B00648034-S4Open ↗
08/13/2026B00648034-S3Open ↗
08/13/2026B00648034-I1Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00648034-I1Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY1
03/24/2022340834510Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00648034-S1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026B00648034-S1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026B00648034-S1Open ↗
▸Approvals, Objections & Sign-offs7
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter6
08/24/2026B01046768-P4Open ↗
08/24/2026B01046768-P1Open ↗
08/24/2026B01046768-P2Open ↗
Showing 3 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
02/05/2025321602119Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
03/24/2022340834510Open ↗
▸Other Documents17
▸DOB NOWSite Survey: Initial3
08/13/2026B00648034-P4Open ↗
08/13/2026B00648034-P8Open ↗
08/13/2026B00648034-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026B00648034-P8Open ↗
08/13/2026B00648034-P4Open ↗
08/13/2026B00648034-I1Open ↗
▸DOB NOWProperty Ownership Certification3
08/20/2026B00648034-I1Open ↗
08/15/2026B00648034-P4Open ↗
08/15/2026B00648034-P8Open ↗
▸BISPLOT DIAGRAM2
02/05/2025321602119Open ↗
05/17/2024321601888Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026B00648034-S5Open ↗
08/13/2026B00648034-S1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026B01054269-I1Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026B00648034-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00648034-I1Open ↗
▸DOB NOWCalculations1
08/13/2026B01054269-I1Open ↗