← Back
BuildNYC
Elevator cooperative
55 EAST 72ND STREET
MANHATTAN · BIN 1041461
💬 Discuss this project
1924Year Built
15Stories
D4Building Class
R10Zoning
69,227 sfGross Floor Area
31Units
LL97 CoveredRent Stabilized0 Active Violations 1 likely answered 2 old, status unconfirmed ▸FISP: SWARMP
Elevator cooperative · Owner of record: 72nd and Park · 6,325 sf lot · 10.94 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 12Unit 12N9p · 1 filing · 12 docs
Floor 11
Floor 10
Floor 9
Floor 8Unit 8S2p · 1 filing · 5 docs
Floor 7Unit 7SUnder Construction16p · 3 filings · 20 docs
Floor 6
Floor 5
Floor 4Unit 4N1 filing · 14 docs
Floor 3
Floor 2
Floor 1Sidewalk shed installationUnder Construction45p · 1 filing · 20 docs
Site & exteriorBrown Harris Stevens LLCUnder Construction3p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
72nd St & Park4303/22/2026
Women & Construction203/22/2026
Brown, Harris, Stevens103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Sol Building Consulting Services203/21/2026
Hierarch-E603/21/2026
Kit Middleton Architect P403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Star-Cel WaterproofingScaffold408/14/2026
Star-Cel Waterproofingspecialty_contractor204/09/2026
Darby Construction ServiceGeneral Contractor207/17/2026
Mega Electrical ContractingElectrical103/21/2026
Nash Electric ServicesElectrical103/21/2026
Power Surge ElectricalElectrical103/22/2026
Super Charged ElectricElectrical103/21/2026
Andaloro ConstructionGeneral Contractor104/09/2026
Panorama Windowsspecialty_contractor104/09/2026
The Avaris GroupGeneral Contractor107/08/2026
Delta-Sigma MechanicalPlumbing107/08/2026
Hudson Plumbing & MCHPlumbing107/08/2026
Almasi ElectricElectrical103/21/2026
Metrotech MechanicalPlumbing107/16/2026
Apn ElectricalElectrical103/22/2026
Lobello Electric InstallationElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Ace Structural Engineering496306/26/2026
Portell Architecture5332206/08/2026
Turino Kalberer Architect1831206/03/2026
Ryan Special Engineering2018112/24/2024
Sag Engineering & Consulting608112/02/2024
Seth P Roye Architect8554112/02/2024
Building Lifecycle
All (144)Filed (17)Permit Issued (16)Signed Off (4)Facade (FISP) (12)Violation (30)Inspection (9)Objection (26)Special Inspection (30)
09/14/2026
Filed — Alteration
Suspended Scaffold installation as per plans filed herewith.
M01128795-P4
08/31/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/31/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/13/2026
Permit issued — Sidewalk Shed
M01128795-I1-SH
07/16/2026
Permit issued — Mechanical Systems
M01409234-S2-MS
07/15/2026
Permit issued — Plumbing
M01409234-S1-PL
07/09/2026
Permit issued — General Construction
M01409234-I1-GC
07/01/2026
Objection raised — Scope
07/01/2026
Objection raised — Other
06/26/2026
Filed — Alteration
Mechanical modifications within existing Apartment 7S as indicated on the plans. No change to use, occupancy or egress.
M01409234-S2
06/26/2026
Objection resolved — Addressed
06/26/2026
Objection resolved — Addressed
06/26/2026
Objection resolved — Addressed
06/26/2026
Objection resolved — Addressed
06/26/2026
Objection resolved — Addressed
06/26/2026
Objection resolved — Addressed
06/23/2026
Objection raised — Scope
06/23/2026
Objection resolved — Resolved
06/23/2026
Objection raised — Scope
06/23/2026
Objection resolved — Resolved
06/18/2026
Objection raised — Scope
06/18/2026
Objection raised — Inspections
06/18/2026
Objection raised — Other
06/18/2026
Objection raised — Inspections
06/18/2026
Objection raised — Other
06/18/2026
Objection raised — Fire_Protection
06/17/2026
Filed — Alteration
Mechanical modifications within existing Apartment 7S as indicated on the plans. No change to use, occupancy or egress.
M01409234-S1
06/12/2026
Objection raised — Scope
06/12/2026
Objection resolved — Addressed
06/08/2026
Filed — Alteration
Mechanical modifications within existing Apartment 7S as indicated on the plans. No change to use, occupancy or egress.
M01409234-I1
06/03/2026
Filed — Alteration
APARTMENT 4N KITCHEN, REPLACE EXISTING PLUMBING FIXTURES WITH NEW. NO CHANGE IN EGRESS, OCCUPANCY OR USE.
M01408893-S1
06/03/2026
Filed — Alteration
APARTMENT 4N KITCHEN, REPLACE EXISTING PLUMBING FIXTURES WITH NEW. NO CHANGE IN EGRESS, OCCUPANCY OR USE.
M01408893-I1
06/03/2026
Special inspection requirement — Fire-Resistance Rated Construction
JULIE KALBERER
06/03/2026
Special inspection requirement — HVAC-R and service water heating system controls
Alan Schwartz
06/03/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Alan Schwartz
06/03/2026
Special inspection requirement — HVAC-R and service water heating equipment
Alan Schwartz
06/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Portell
06/02/2026
Special inspection requirement — Lighting in dwelling units
Paul Portell
06/02/2026
Special inspection requirement — Energy Code Compliance Inspections
Paul Portell
06/02/2026
Special inspection requirement — Post-installed Anchors
ANTHONY UGBEBOR
05/29/2026
Special inspection requirement — Mechanical Systems
ANTHONY UGBEBOR
05/29/2026
Special inspection requirement — Final
Alan Schwartz
05/29/2026
Special inspection requirement — Final
Paul Portell
05/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JULIE KALBERER
05/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JULIE KALBERER
05/28/2026
Special inspection requirement — Final
JULIE KALBERER
05/28/2026
Special inspection requirement — Energy Code Compliance Inspections
JULIE KALBERER
05/28/2026
Special inspection requirement — Lighting in dwelling units
JULIE KALBERER
05/20/2026
Permit issued — Sidewalk Shed
M01128795-I1-SH
04/27/2026
Filed — Alteration
Suspended Scaffold installation as per plans filed herewith.
M01128795-P3
04/07/2026
Filed — Alteration
Suspended Scaffold installation as per plans filed herewith.
M01128795-P2
03/13/2026
Signed off — Alteration
It is filed for demolition and construction of interior partitions, new woodwork, new flooring, new bathroom finishes, ceiling work in apartment 12N. Plumbing work to be filed as a subsequent application. No change in use, occupancy or egress.
M01157841-S1
03/13/2026
Signed off — Alteration
It is filed for demolition and construction of interior partitions, new woodwork, new flooring, new bathroom finishes, ceiling work in apartment 12N. Plumbing work to be filed as a subsequent application. No change in use, occupancy or egress.
M01157841-I1
02/20/2026
Permit issued — Sidewalk Shed
M01128795-I1-SH
02/19/2026
Filed — Alteration
Suspended Scaffold installation as per plans filed herewith.
M01128795-P1
02/19/2026
Permit issued — General Construction
M01127915-I1-GC
02/18/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/18/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/17/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/05/2026
Permit issued — General Construction
M01127915-I1-GC
Latest 60 of 144 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedStar-Cel Waterproofing08/13/2026
DOB NOWMechanical SystemsPermit IssuedDarby Construction Service07/16/2026
DOB NOWPlumbingPermit IssuedMetrotech Mechanical07/15/2026
DOB NOWGeneral ConstructionPermit IssuedDarby Construction Service07/09/2026
DOB NOWSidewalk ShedPermit IssuedLiberty Construction & Restoration05/20/2026
DOB NOWSidewalk ShedPermit IssuedStar-Cel Waterproofing02/20/2026
DOB NOWGeneral ConstructionPermit IssuedStar-Cel Waterproofing02/19/2026
DOB NOWGeneral ConstructionPermit IssuedStar-Cel Waterproofing02/05/2026
DOB NOWSuspended ScaffoldPermit IssuedStar-Cel Waterpr & Restr Co02/04/2026
DOB NOWPlumbingSigned-offDelta-Sigma Mechanical04/14/2025
DOB NOWGeneral ConstructionSigned-offThe Avaris Group03/31/2025
DOB NOWGeneral ConstructionPermit IssuedPanorama Windows03/18/2025
DOB NOWPlumbingSigned-offHudson Plumbing & MCH03/05/2025
DOB NOWGeneral ConstructionSigned-offAndaloro Construction01/22/2025
DOB NOWSidewalk ShedPermit IssuedStar-Cel Waterproofing10/30/2024
DOB NOWSuspended ScaffoldPermit IssuedStar-Cel Waterpr & Restr Co10/30/2024
BISPLISSUEDJulian Plumbing & Heating01/07/2019
BISOTISSUEDNY Fine Interiors & Woodw01/04/2019
BISBLISSUEDAbilene08/16/2018
BISOTISSUEDRiconda Maintenance09/15/2017
BISEQISSUEDEverest Scaffolding08/08/2017
BISEQISSUEDNew Force Construction05/19/2017
BISPLISSUEDAccurate Mechanical09/02/2015
BISOTISSUEDGraphic Builders08/12/2015
BISOTISSUEDV. Disalvo Contracting Co04/17/2014
BISPLISSUEDWalter J.grande P & H03/06/2014
BISOTISSUEDUpgrade Contracting Co02/03/2014
BISMHISSUEDV. Disalvo Contracting Co12/18/2013
BISMHISSUEDThe Renovated Home 110/01/2013
BISEQISSUEDEverest Scaffolding06/07/2013
BISPLISSUEDSuperb Plumbing & Heating03/22/2013
BISOTISSUEDUpgrade Contracting Co02/27/2013
BISOTISSUEDShaira Construction02/06/2013
BISOTISSUEDReidman Associates02/05/2013
BISOTISSUEDUpgrade Contracting Co12/21/2012
BISPLISSUEDCochrane Plumbing & Heating10/23/2012
BISOTISSUEDUpgrade Contracting Co10/03/2012
BISMHISSUEDShaira Construction09/24/2012
BISOTISSUEDShaira Construction09/21/2012
BISOTISSUEDUpgrade Contracting Co07/13/2012
+ 26 more permits on file
1 project · most recent 06/26/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/26/2026Permit IssuedDarby Construction ServiceAir Conditioning Systems
Cooling
National Comfort NATIONAL COMFORT NCP3244000A 24,000 BTU · Condensing Unit ×1
2 projects · most recent 06/26/2026
Water/Sanitary Gas
FiledStatusContractorScope
06/26/2026Permit IssuedMetrotech MechanicalGas, Water/Sanitary
06/03/2026——Water/Sanitary
8 projects · most recent 07/16/2026
General Wiring Boiler Controls
FiledStatusContractorScope
07/16/2026Permit IssuedNash Electric ServicesGeneral Wiring
02/19/2026Permit IssuedNash Electric Services—
11/02/2025Permit IssuedApn ElectricalGeneral Wiring
09/29/2025CompletePower Surge ElectricalGeneral Wiring
07/30/2025CompleteMega Electrical ContractingGeneral Wiring
01/07/2019CompleteGlendale Electl ContngGeneral Wiring
10/26/2018CompleteAbilene ElectricBoiler Controls
08/20/2018CompleteAbilene Electric—
1 project · most recent 09/14/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
09/14/2026Permit IssuedStar-Cel WaterproofingSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
08/31/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/31/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/18/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/18/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/17/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/22/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/10/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/30/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
06/03/2026Fire-Resistance Rated ConstructionJULIE KALBERERprogress
06/03/2026HVAC-R and service water heating system controlsAlan Schwartzenergy_progress
06/03/2026HVAC-R and service water piping design and insulationAlan Schwartzenergy_progress
06/03/2026HVAC-R and service water heating equipmentAlan Schwartzenergy_progress
06/02/2026Fire-Resistant Penetrations and JointsPaul Portellspecial
06/02/2026Lighting in dwelling unitsPaul Portellenergy_progress
06/02/2026Energy Code Compliance InspectionsPaul Portellprogress
06/02/2026Post-installed AnchorsANTHONY UGBEBORspecial
05/29/2026Mechanical SystemsANTHONY UGBEBORspecial
05/29/2026FinalAlan Schwartzprogress
05/29/2026FinalPaul Portellprogress
05/28/2026Fire-Resistant Penetrations and JointsJULIE KALBERERspecial
05/28/2026Fire-Resistant Penetrations and JointsJULIE KALBERERspecial
05/28/2026FinalJULIE KALBERERprogress
05/28/2026Energy Code Compliance InspectionsJULIE KALBERERprogress
05/28/2026Lighting in dwelling unitsJULIE KALBERERenergy_progress
03/14/2025Fire-Resistant Penetrations and JointsPaul Portellspecial
03/14/2025FinalPaul Portellprogress
03/14/2025Energy Code Compliance InspectionsPaul Portellprogress
03/14/2025Lighting in dwelling unitsPaul Portellenergy_progress
03/14/2025Post-installed AnchorsANTHONY UGBEBORspecial
12/23/2024Lighting in dwelling unitsWilliam Ryanenergy_progress
12/18/2024Fire-Resistant Penetrations and JointsWilliam Ryanspecial
12/18/2024FinalWilliam Ryanprogress
12/18/2024Post-installed AnchorsWilliam Ryanspecial
Latest 25 of 30.
▾Documents — 428 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch15
08/25/2026M01127915-I1Request digital key ↗
08/25/2026M01157841-I1Request digital key ↗
08/25/2026M01157841-S1Request digital key ↗
Showing 3 of 15 on file for this type
▸Applications & Permits80
▸BISPLAN / WORK APPROVAL APPLICATION36
01/07/2026100429760Open ↗
05/03/2024121032569Open ↗
01/07/2020123791511Open ↗
Showing 3 of 36 on file for this type
▸BISWORK PERMIT APPLICATION34
01/07/2019123507847Open ↗
01/04/2019123507847Open ↗
08/15/2018140794193Open ↗
Showing 3 of 34 on file for this type
▸DOB NOWLPC Approval/Permit10
08/15/2026M01408893-S1Open ↗
08/15/2026M01409234-S2Open ↗
08/15/2026M01409234-I1Open ↗
Showing 3 of 10 on file for this type
▸Seals & Professional Certifications113
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION40
01/07/2020123791511Open ↗
01/07/2020123791511Open ↗
01/07/2020123791511Open ↗
Showing 3 of 40 on file for this type
▸DOB NOWProgress Inspector Seal & Signature18
09/26/2026M01409234-S2Open ↗
09/26/2026M01409234-S2Open ↗
09/26/2026M01409234-S2Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature17
10/14/2026M01128795-P4Open ↗
08/25/2026M01127915-I1Open ↗
08/25/2026M01157841-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
10/07/2026M01408893-S1Open ↗
09/26/2026M01409234-S2Open ↗
09/01/2026M01127915-I1Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST8
07/31/2017123306323Open ↗
07/26/2017123327890Open ↗
05/30/2017121238491Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
08/15/2018140794193Open ↗
08/07/2017140678826Open ↗
07/31/2017123306323Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
08/15/2018140794193Open ↗
08/07/2017140678826Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
08/15/2018140794193Open ↗
08/07/2017140678826Open ↗
▸Trade Schedules & Equipment31
▸BISSELF-CERT PLUMBING NOTICE13
09/09/2014121766874Open ↗
05/08/2014121766874Open ↗
05/09/2013121128378Open ↗
Showing 3 of 13 on file for this type
▸BISSCHEDULE B - PLUMBING10
09/10/2013121766874Open ↗
08/14/2013121465903Open ↗
08/08/2013121465903Open ↗
Showing 3 of 10 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE6
10/26/2018123507847Open ↗
02/17/2016122415109Open ↗
01/27/2016122415109Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
01/16/2019140794193Open ↗
08/15/2018140794193Open ↗
▸Safety & Tenant Protection10
▸BISTenant Protection Plan and Notes7
01/28/2020123791511Open ↗
10/26/2018123507847Open ↗
07/31/2017123306323Open ↗
Showing 3 of 7 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE2
12/26/2014121465903Open ↗
12/26/2014121465903Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos27
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/25/2026M01127915-I1Open ↗
08/25/2026M01157841-S1Open ↗
08/25/2026M01157841-I1Open ↗
Showing 3 of 11 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)8
01/07/2020123791511Open ↗
08/15/2018140794193Open ↗
07/26/2017123327890Open ↗
Showing 3 of 8 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
10/26/2018123507847Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
09/10/2013121766874Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance29
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS14
04/17/2019140794193Open ↗
06/06/2018121056524Open ↗
06/06/2018123327890Open ↗
Showing 3 of 14 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS8
05/23/2024121032569Open ↗
05/16/2024121032569Open ↗
04/17/2019140794193Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISENERGY CODE 1ST REVIEW COMPLETE1
10/26/2018123507847Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
08/07/2017140678826Open ↗
▸BISPRELIMINARY COMMISSIONING REPORT CERTIFICATION1
04/12/2019140794193Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
08/15/2018140794193Open ↗
▸BISTR8 INSPECTOR TO CONFIRM AS-BUILT VALUES1
05/23/2024121032569Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY5
05/22/2020123507847Open ↗
05/22/2020123507847Open ↗
05/22/2020123507847Open ↗
Showing 3 of 5 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)2
05/23/2024121032569Open ↗
05/22/2024121032569Open ↗
▸Approvals, Objections & Sign-offs48
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST16
05/28/2024121032569Open ↗
05/24/2024121032569Open ↗
05/22/2020123507847Open ↗
Showing 3 of 16 on file for this type
▸BISLANDMARKS APPROVAL12
05/20/2024121032569Open ↗
12/18/2018123507847Open ↗
08/15/2018140794193Open ↗
Showing 3 of 12 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
04/17/2019140794193Open ↗
05/20/2016122415109Open ↗
12/26/2014121465903Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISFINAL4
05/22/2024121032569Open ↗
05/22/2024121032569Open ↗
05/22/2024121032569Open ↗
Showing 3 of 4 on file for this type
▸BISLANDMARKS SIGNOFF2
05/24/2024121032569Open ↗
05/22/2020123507847Open ↗
▸BISCCD1-Construction Code Determination1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWLandmark Approval1
08/13/2026M01199622-I1Open ↗
▸Cost, Insurance & Ownership24
▸BISCOST AFFIDAVIT21
05/22/2020123507847Open ↗
01/07/2020123791511Open ↗
04/17/2019140794193Open ↗
Showing 3 of 21 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
05/23/2024121032569Open ↗
▸Filing & Intake Forms32
▸BISEFILING COVER SHEET17
01/07/2020123791511Open ↗
10/26/2018123507847Open ↗
07/31/2017123306323Open ↗
Showing 3 of 17 on file for this type
▸BISADDITIONAL INFORMATION8
01/16/2019140794193Open ↗
11/02/2015122415109Open ↗
08/31/2015122415109Open ↗
Showing 3 of 8 on file for this type
▸BISBOROUGH INTAKE FORM5
04/17/2019140794193Open ↗
08/01/2018121238491Open ↗
07/10/2018140678826Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
08/15/2018140794193Open ↗
08/07/2017140678826Open ↗
▸Other Documents12
▸DOB NOWCalculations5
10/14/2026M01128795-P4Open ↗
08/17/2026M01128795-P3Open ↗
08/17/2026M01128795-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWManufacturer's Specifications3
10/14/2026M01128795-P4Open ↗
08/13/2026M01128795-P3Open ↗
08/13/2026M01128795-S1Open ↗
▸BISPLOT DIAGRAM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSupporting Document: Fee Exempt1
12/26/2014121465903Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type