← Back
BuildNYC
Primarily 2 family with 1 store or office
55 VICTORY BOULEVARD
STATEN ISLAND · BIN 5000217
💬 Discuss this project
1960Year Built
3Stories
S2Building Class
C4-2Zoning
3,026 sfGross Floor Area
3Units
1 Active Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Primarily 2 family with 1 store or office · 2,500 sf lot · 1.21 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 3Interior renovation, gas and plumbing, 2nd and 3rd floors6p · 2 filings · 13 docs
Floor 2Interior renovation, gas and plumbing, 2nd and 3rd floors7p · 2 filings · 13 docs
Floor 1
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Yang Engineering302/14/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JRL Skyline603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Winway DevelopmentGeneral Contractor303/21/2026
Dynamic Plumbing & SprinklerPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Yang Engineering8376302/14/2023
Building Lifecycle
All (18)Filed (3)Permit Issued (2)Violation (2)Inspection (4)Special Inspection (7)
02/14/2023
Filed — Alteration
PROPOSED INTERIOR RENOVATION ON 2ND THRU. 3RD FLOOR. GAS AND PLUMBING WORKS AS PER PLANS. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
S00753222-P1
02/13/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jian Yang
02/08/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/08/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/23/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/23/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/29/2022
Permit issued — Plumbing
S00753222-I1-PL
07/06/2022
Permit issued — General Construction
S00767067-I1-GC
06/30/2022
Filed — Alteration
PROPOSED INTERIOR RENOVATION ON 2ND THRU. 3RD FLOOR. GAS AND PLUMBING WORKS AS PER PLANS. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
S00753222-I1
06/30/2022
Filed — Alteration
PROPOSED INTERIOR RENOVATION ON 2ND THRU. 3RD FLOOR. CEILING, FLOORING, AND PARTITION WORKS AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
S00767067-I1
06/29/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jian Yang
06/29/2022
Special inspection requirement — Energy Code Compliance Inspections
Jian Yang
06/29/2022
Special inspection requirement — Fire-Resistance Rated Construction
Jian Yang
06/29/2022
Special inspection requirement — Lighting controls
Jian Yang
06/29/2022
Special inspection requirement — Interior lighting power
Jian Yang
06/29/2022
Special inspection requirement — Lighting in dwelling units
Jian Yang
02/14/2001
Violation issued (ECB, open)
Construction
02/13/2001
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCitywide Plumbing & Heating & SPKLS08/29/2022
DOB NOWGeneral ConstructionPermit IssuedWinway Development07/06/2022
BISFPISSUEDIdeal Fire Control11/04/1991
1 project · most recent 02/14/2023
Gas Water/Sanitary
FiledStatusContractorScope
02/14/2023Signed-offDynamic Plumbing & SprinklerGas, Water/Sanitary
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
02/08/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/08/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/23/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/23/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
02/13/2023Fire-Resistant Penetrations and JointsJian Yangspecial
06/29/2022Fire-Resistant Penetrations and JointsJian Yangspecial
06/29/2022Energy Code Compliance InspectionsJian Yangprogress
06/29/2022Fire-Resistance Rated ConstructionJian Yangprogress
06/29/2022Lighting controlsJian Yangenergy_progress
06/29/2022Interior lighting powerJian Yangenergy_progress
06/29/2022Lighting in dwelling unitsJian Yangenergy_progress
▾Documents — 13 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/24/2026S00767067-I1Request digital key ↗
08/23/2026S00753222-P1Request digital key ↗
08/23/2026S00753222-I1Request digital key ↗
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/24/2026S00767067-I1Open ↗
08/13/2026S00753222-P1Open ↗
08/13/2026S00753222-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/26/2026S00767067-I1Open ↗
08/26/2026S00767067-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/26/2026S00767067-I1Open ↗
08/23/2026S00753222-P1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/24/2026S00767067-I1Open ↗
08/13/2026S00753222-I1Open ↗
08/13/2026S00753222-P1Open ↗