Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofEsquire Management CORP.Under Construction57p · 11 filings · 20 docs
ArchitectureElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Domestic plumbing and storm piping and drains for new 13th floor roof and 13th floor roof terrace.
On file for this project
3 documents · 1 drawing sheet
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
On file for this project
2 documents · 1 drawing sheet
SPRINLKER & STANDPIPE WORK FOR 13TH FLOOR AND 13TH FLOOR MEZZANINE.
On file for this project
11 documents · 2 drawing sheets
Latest 3 of 11 filings on this floor.
BulkheadRoof, bulkhead demolition, stair and elevator work1p · 1 filing · 9 docs
DM
Extend existing elevator shaft to the existing roof and relocate existing elevator machine room.
On file for this project
9 documents · 1 drawing sheet
PenthouseMechanical systems for 13th floor, mezzanine, penthouse, and1p · 1 filing · 20 docs
Mechanical
MECHANICAL SYSTEMS FOR OFFICE SPACE
On file for this project
20 documents · 1 drawing sheet
Floor 13Plumbing work, 12th, 13th floors, mezzanine, roofUnder Construction32p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Domestic plumbing and storm piping and drains for new 13th floor roof and 13th floor roof terrace.
On file for this project
3 documents · 1 drawing sheet
SPRINLKER & STANDPIPE WORK FOR 13TH FLOOR AND 13TH FLOOR MEZZANINE.
On file for this project
11 documents · 3 drawing sheets
STRUCTURAL WORK FOR 12TH FLOOR AND ROOF OVER 13TH FLOOR
On file for this project
10 documents
Latest 3 of 4 filings on this floor.
Floor 12Sprinkler and standpipe work, 13th floor9p · 1 filing · 11 docs
Fire ProtectionGeneralStructural
Issued Permit Scope
Sprinklers · Standpipe
SPRINLKER & STANDPIPE WORK FOR 13TH FLOOR AND 13TH FLOOR MEZZANINE.
On file for this project
11 documents · 1 drawing sheet
Floor 11
Floor 10
Floor 9
Floor 8Esquire Management CORP.25p · 1 filing · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers
Plumbing and Sprinkler work in conjunction with interior fit out at 8th floor
On file for this project
28 documents · 5 drawing sheets
Floor 7Bank C15p · 3 filings · 19 docs
ArchitectureFire ProtectionPlumbing
Issued Permit Scope
General Construction · Plumbing · Sprinklers
NEW PLUMBING ON NEW BRANCH PIPING FOR OFFICES ON THE 5TH & 7TH FLOORS.
On file for this project
6 documents · 2 drawing sheets
Office renovations of the 5th and 7th floors. No change of use, occupancy or egress proposed under this application.
On file for this project
6 documents · 1 drawing sheet
Sprinkler work for office space
On file for this project
7 documents · 1 drawing sheet
Floor 6
Floor 5Bank C12p · 3 filings · 19 docs
ArchitectureFire ProtectionPlumbing
Issued Permit Scope
General Construction · Plumbing · Sprinklers
NEW PLUMBING ON NEW BRANCH PIPING FOR OFFICES ON THE 5TH & 7TH FLOORS.
On file for this project
6 documents
Office renovations of the 5th and 7th floors. No change of use, occupancy or egress proposed under this application.
On file for this project
6 documents
Sprinkler work for office space
On file for this project
7 documents · 1 drawing sheet
Floor 4
Floor 3
Floor 2
Floor 1Fabrique Bakery, Bank of America84p · 4 filings · 20 docs
ArchitectureEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Supported Scaffold
Modifications to the existing sprinkler system
On file for this project
17 documents · 5 drawing sheets
Replace and relocate diffuser and register for Bank of America.
On file for this project
18 documents
PROPOSED INSTALLATION OF SYSTEM SCAFFOLD AND NEEDLE BEAM FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents
Latest 3 of 4 filings on this floor.
MezzaninePlumbing work, 12th, 13th floors, mezzanine, roofUnder Construction11p · 3 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
Standpipe
Domestic plumbing and storm piping and drains for new 13th floor roof and 13th floor roof terrace.
On file for this project
3 documents · 1 drawing sheet
SPRINLKER & STANDPIPE WORK FOR 13TH FLOOR AND 13TH FLOOR MEZZANINE.
On file for this project
11 documents · 2 drawing sheets
MECHANICAL SYSTEMS FOR OFFICE SPACE
On file for this project
20 documents · 1 drawing sheet
CellarFabrique Bakery59p · 3 filings · 20 docs
ArchitectureCivilFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Modifications to the existing sprinkler system
On file for this project
17 documents · 8 drawing sheets
Structural work to expose existing connection between the bearing wall and steel beams as indicated on the drawings. Remove existing concrete encasement; Clean steel beams, strengthen the deteriorated areas as per welding and bolting details.
On file for this project
5 documents · 1 drawing sheet
smoke purge system
On file for this project
8 documents · 1 drawing sheet
Site & exteriorPipe scaffolding, roof of protection, and needle beam instal28p · 2 filings · 10 docs
ArchitectureElectricalEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
Sidewalk Shed · Supported Scaffold
INSTALLATION OF PIPE SCAFFOLDING, ROOF OF PROTECTION AND NEEDLE BEAM AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
8 documents · 12 drawing sheets
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AND ROOF PROTECTION FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33
On file for this project
2 documents · 3 drawing sheets