| Owner | Filings | Most Recent |
|---|---|---|
| HINES | 6 | 09/13/2026 |
| TRINITY | 73 | 07/08/2026 |
| TRINITY CHURCH WALL STREET | 36 | 07/08/2026 |
| TRINITY HUDSON HOLDING | 60 | 07/08/2026 |
| ELM SUSPENSION SYSTEMS | 3 | 07/08/2026 |
| TRINITY REAL ESTATE | 14 | 07/08/2026 |
| VIK XS SERVICES INC | 5 | 03/22/2026 |
| REMAINDERMAN 561 GREENWICH LLC | 1 | 03/22/2026 |
| TISHMAN CONSTRUCTION | 8 | 03/22/2026 |
| 561 HH | 20 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| JAROS BAUM & BOLLES | 32 | 07/20/2026 |
| THORNTON TOMASETTI | 6 | 05/05/2026 |
| ROBERT DERECTOR ASSOCIATES | 6 | 04/13/2026 |
| VOCON | 8 | 04/02/2026 |
| ADVANCED PROFESSIONAL ENGINEERING | 2 | 03/26/2026 |
| MOTIF ARCHITECTURE + DESIGN, LLC | 1 | 03/25/2026 |
| LEHMAN SMITH MCLEISH | 2 | 11/19/2025 |
| UNIVERSAL BUILDERS SUPPLY, LLC | 5 | 10/24/2024 |
| JONATHAN VAN OSTENBRIDGE | 1 | 09/09/2024 |
| COOKFOX ARCHITECTS | 1 | 09/03/2024 |
| LEON SKVIRSKY PE | 1 | 12/07/2023 |
| LOMBARDO PROFESSIONAL ENGINEERING | 4 | 05/08/2023 |
| HOWARD I SHAPIRO & ASSOCIATES | 2 | 01/04/2023 |
| AMM ENGINEERING PC | 5 | 12/06/2022 |
| NCE CONSULTING ENGINEERS | 1 | 11/23/2022 |
| LEVIN ENGINEERING PLLC | 1 | 11/07/2022 |
| PLAN B ENGINEERING | 1 | 09/06/2022 |
| PAUL PERDEK, PROF. ENG. PLLC | 4 | 08/05/2022 |
| VILLA PEX CONSULTING ENGINEERING | 1 | 08/06/2021 |
| LANGAN ENGINEERING | 1 | 07/22/2021 |
| DOKA USA | 1 | 06/24/2021 |
| URBAN FOUNDATION/ENGINEERING | 1 | 06/19/2020 |
| Representative | Filings | Most Recent |
|---|---|---|
| A1 EXPEDITING SERVICE CORP. | 73 | 03/21/2026 |
| EUROCELT EXPEDITING, INC | 12 | 03/21/2026 |
| CORNERSTONE CONSULTING | 10 | 03/21/2026 |
| ARCHETYPE CONSULTANTS | 4 | 03/21/2026 |
| LOMBARDO PROFESSIONAL ENGINEERING | 4 | 03/21/2026 |
| RPO | 2 | 03/21/2026 |
| HOWARD I SHAPIRO ASSOCIATES | 4 | 03/21/2026 |
| A1 EXPEDITING SERVICE | 8 | 03/21/2026 |
| GRS CONSULTING SERVICES | 2 | 03/21/2026 |
| LEVIN ENGINEERING PLLC | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| CONSIGLI CONSTRUCTION CO | General Contractor | 13 | 07/08/2026 |
| LONG ISLAND CONCRETE INC | General Contractor | 12 | 07/08/2026 |
| CLUNE CONSTRUCTION CO LP | General Contractor | 12 | 07/08/2026 |
| KG SPRINKLER CORP | Fire Protection | 12 | 07/08/2026 |
| UNIVERSAL BUILD SUPP LLC | General Contractor | 9 | 07/08/2026 |
| TISHMAN INTERIORS CORP | General Contractor | 7 | 07/25/2026 |
| COMMODORE CONSTRUCT CORP | General Contractor | 4 | 07/08/2026 |
| R & R SCAFFOLDING LTD | General Contractor | 4 | 03/21/2026 |
| DONATO PLUMBING GROUP INC | Plumbing | 3 | 07/08/2026 |
| MASS CONTRACTING CORP | General Contractor | 3 | 07/08/2026 |
| HARMON, INC | General Contractor | 3 | 03/21/2026 |
| ATLAS-ACON ELEC. SERVICE | Electrical | 2 | 03/22/2026 |
| D&D ELECTL CONST CO INC | Electrical | 2 | 03/22/2026 |
| PSI PARTNERS, LLC | Fire Protection | 2 | 07/08/2026 |
| REIDY CONTRACTING GROUP | General Contractor | 2 | 04/09/2026 |
| VIK XS SERVICES INC | General Contractor | 2 | 03/21/2026 |
| ARCON PLBG SOLUTIONS | Plumbing | 2 | 07/08/2026 |
| BLUEWATER PLBG& HTG INC | Plumbing | 2 | 07/08/2026 |
| PLUMBING NYC, INC | Fire Protection | 1 | 07/08/2026 |
| FULL CAPACITY FIRE CORP | Fire Protection | 1 | 07/08/2026 |
| ZEREGA CONTRACTING CORP | Plumbing | 1 | 07/08/2026 |
| BEDROCK PLBG. & HTG., INC | Plumbing | 1 | 07/08/2026 |
| PLATFORM SOLUTIONS, INC | General Contractor | 1 | 07/08/2026 |
| ACTIVE SIGNS | Scaffold | 1 | 07/08/2026 |
| ELM SUSPENSION SYSTEMS* | General Contractor | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| ATLAS ATC ENGINEERING INC | 8011 | 14 | 07/20/2026 |
| ALAN MARGOLIN & ASSOC | 423 | 11 | 05/05/2026 |
| SAG ENGINEERING & CONSULT | 608 | 2 | 08/21/2025 |
| ATLANTIC ENGINEERINGLABOR | 1381 | 23 | 04/22/2024 |
| HIGHRISE GROUP NYC, INC | 6753 | 5 | 12/06/2022 |
| CLARKE ENGINEERING SERVIC | 3795 | 2 | 08/05/2022 |
| THORNTON TOMASETTI, INC. | 1740 | 3 | 04/27/2022 |
| KENDALL ENGINEERING PC | 4154 | 1 | 08/06/2021 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Mechanical Systems | Signed-off | TISHMAN INTERIORS CORP | 07/24/2026 |
| DOB NOW | Plumbing | Permit Issued | PSI PARTNERS, LLC | 06/01/2026 |
| DOB NOW | Plumbing | Permit Issued | BEDROCK PLBG. & HTG., INC | 05/28/2026 |
| DOB NOW | Structural | Permit Issued | MASS CONTRACTING CORP | 05/18/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | MASS CONTRACTING CORP | 04/09/2026 |
| DOB NOW | General Construction | Permit Issued | MASS CONTRACTING CORP | 04/01/2026 |
| DOB NOW | General Construction | Signed-off | CONSIGLI CONSTRUCTION CO | 12/19/2025 |
| DOB NOW | Structural | Signed-off | CONSIGLI CONSTRUCTION CO | 12/19/2025 |
| DOB NOW | Mechanical Systems | Signed-off | CONSIGLI CONSTRUCTION CO | 11/12/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | UNIVERSAL BUILD SUPP LLC | 10/21/2025 |
| DOB NOW | Sprinklers | Signed-off | ZEREGA CONTRACTING CORP | 09/04/2025 |
| DOB NOW | Sprinklers | Permit Issued | FULL CAPACITY FIRE CORP | 09/02/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | REIDY CONTRACTING GROUP | 07/31/2025 |
| DOB NOW | General Construction | Signed-off | REIDY CONTRACTING GROUP | 07/14/2025 |
| DOB NOW | General Construction | Permit Issued | CLEAR CONCEPT GROUP LLC | 03/12/2025 |
| DOB NOW | Sprinklers | Signed-off | PLUMBING NYC, INC | 03/04/2025 |
| DOB NOW | Structural | Signed-off | CONSIGLI CONSTRUCTION CO | 12/26/2024 |
| DOB NOW | General Construction | Signed-off | CONSIGLI CONSTRUCTION CO | 12/26/2024 |
| DOB NOW | Structural | Signed-off | CONSIGLI CONSTRUCTION CO | 12/26/2024 |
| DOB NOW | Structural | Signed-off | CONSIGLI CONSTRUCTION CO | 11/19/2024 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | UNIVERSAL BUILD SUPP LLC | 10/28/2024 |
| DOB NOW | Mechanical Systems | Signed-off | CONSIGLI CONSTRUCTION CO | 10/17/2024 |
| DOB NOW | General Construction | Signed-off | CONSIGLI CONSTRUCTION CO | 09/26/2024 |
| DOB NOW | Plumbing | Signed-off | BLUEWATER PLBG& HTG INC | 02/12/2024 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | R & R SCAFFOLDING LTD | 02/01/2024 |
| DOB NOW | Sign | Signed-off | ACTIVE SIGNS INC | 01/10/2024 |
| DOB NOW | Plumbing | Signed-off | BLUEWATER PLBG& HTG INC | 10/31/2023 |
| DOB NOW | Plumbing | Signed-off | MORA FIRE PROTECTION LLC | 10/31/2023 |
| DOB NOW | General Construction | Signed-off | CLUNE CONSTRUCTION CO LP | 10/23/2023 |
| DOB NOW | Mechanical Systems | Signed-off | CLUNE CONSTRUCTION CO LP | 10/23/2023 |
| DOB NOW | Construction Fence | Signed-off | UNIVERSAL BUILD SUPP LLC | 09/29/2023 |
| DOB NOW | Mechanical Systems | Signed-off | TISHMAN INTERIORS CORP | 09/01/2023 |
| DOB NOW | Sprinklers | Signed-off | H M SPRINKLER INC | 08/14/2023 |
| DOB NOW | Construction Fence | Signed-off | UNIVERSAL BUILD SUPP LLC | 08/04/2023 |
| DOB NOW | Sprinklers | Signed-off | H M SPRINKLER INC | 06/14/2023 |
| DOB NOW | Sidewalk Shed | Signed-off | UNIVERSAL BUILD SUPP LLC | 06/14/2023 |
| DOB NOW | Sprinklers | Signed-off | H M SPRINKLER INC | 06/05/2023 |
| DOB NOW | Sprinklers | Signed-off | H M SPRINKLER INC | 06/05/2023 |
| DOB NOW | Standpipe | Signed-off | H M SPRINKLER INC | 06/05/2023 |
| DOB NOW | General Construction | Signed-off | CLUNE CONSTRUCTION CO LP | 06/01/2023 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 07/20/2026 | Signed-off | TISHMAN INTERIORS CORP | Heating and Air Conditioning Systems | Heat / Cool Multistack ARA030L 30 tons · Heat Pump Outdoor ×5 ARA060X 60 tons · Heat Pump Outdoor ×5 ARA020X 20 tons · Heat Pump Outdoor ×2 ARA030X 30 tons · Heat Pump Outdoor ×2 HSS168ANHCRAAA-B-AAJ-AA-H 18 tons · Wshp ×1 HSS332ANHCRAAA-B-AAJ-AA-H 36 tons · Wshp ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/13/2026 | Permit Issued | PSI PARTNERS, LLC | 16 heads |
| 04/02/2026 | Permit Issued | FULL CAPACITY FIRE CORP | 208 heads |
| 03/26/2026 | — | — | Sprinkler System |
| 07/13/2022 | Signed-off | KG SPRINKLER CORP | 3,048 heads, 21 outlets |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/13/2026 | Permit Issued | BEDROCK PLUMBING & HEATING INC | Water/Sanitary |
| 04/02/2026 | Signed-off | ZEREGA CONTRACTING CORP | Water/Sanitary |
| 03/26/2026 | — | — | Gas, Water/Sanitary |
| 07/13/2022 | Permit Issued | DONATO, INC | Gas, Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 11/04/2025 | Permit Issued | TITAN ELEC'L & ELEV CONTR | General Wiring |
| 06/06/2025 | Permit Issued | ATLAS-ACON ELEC. SERVICE | — |
| 05/21/2025 | Permit Issued | ATLAS-ACON ELEC. SERVICE | 1 meters, 1 new_meters |
| 09/11/2024 | Complete | BIG CITY ELECL SOLUTIONS | General Wiring |
| 06/18/2024 | Complete | ATLAS-ACON ELEC. SERVICE | General Wiring |
| 06/07/2024 | Complete | ATLAS-ACON ELEC. SERVICE | General Wiring |
| 01/25/2023 | Complete | LIVE WIRE ELECTRIC 1 LLC | General Wiring |
| 11/05/2021 | Permit Issued | TRANSEL ELEV. & ELEC. INC | General Wiring |
| 09/29/2021 | Complete | D&D ELECTL CONST CO INC | General Wiring |
| 10/09/2020 | Complete | WELSBACH ELECTRIC CORP. | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/05/2026 | Permit Issued | MASS CONTRACTING CORP | Steel, Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 12/06/2022 | Permit Issued | COMMODORE CONSTRUCT CORP | Scaffold |
| Date | Type | Result | Report |
|---|---|---|---|
| 06/30/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 06/25/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 06/25/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 04/29/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 01/16/2026 | Fail-Final Curb Cut Non-Directive 14 | Fail | View ↗ |
| 11/18/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 09/26/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 09/22/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 08/28/2024 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 08/23/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 04/25/2024 | Pass-Final SD - Fire Pump | Pass | View ↗ |
| 04/19/2024 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 03/20/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 12/28/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 11/30/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 09/01/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 08/18/2023 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 08/16/2023 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 07/21/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 06/30/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 06/29/2023 | Pass-Final SP - Up to 3 Requested Floors | Pass | View ↗ |
| 06/15/2023 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 03/24/2023 | Pass-Final SD - Fire Pump | Pass | View ↗ |
| 03/20/2023 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 03/17/2023 | Certified StandPipe-SD-Fixtures-Finish-SD | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 05/22/2026 | Mechanical Systems | Jorge Santos | special |
| 05/22/2026 | Final | Jorge Santos | progress |
| 05/07/2026 | Post-installed Anchors | Young Suh | special |
| 05/07/2026 | Structural Stability – Alterations of existing buildings | Young Suh | special |
| 05/07/2026 | Final | Young Suh | progress |
| 05/07/2026 | Structural Steel - Details | Young Suh | special |
| 05/07/2026 | Concrete - Cast-In-Place | Young Suh | special |
| 05/07/2026 | Structural Steel - Welding | Young Suh | special |
| 05/07/2026 | Structural Steel - High Strength Bolting | Young Suh | special |
| 04/29/2026 | Structural Stability – Alterations of existing buildings | Young Suh | special |
| 04/29/2026 | Structural Steel - High Strength Bolting | Young Suh | special |
| 04/29/2026 | Post-installed Anchors | Young Suh | special |
| 04/29/2026 | Concrete - Cast-In-Place | Young Suh | special |
| 04/29/2026 | Final | Young Suh | progress |
| 04/29/2026 | Structural Steel - Welding | Young Suh | special |
| 04/29/2026 | Structural Steel - Details | Young Suh | special |
| 04/13/2026 | HVAC-R and service water heating equipment | Young Suh | energy_progress |
| 04/13/2026 | Mechanical Systems | Young Suh | special |
| 04/13/2026 | Energy Code Compliance Inspections | Young Suh | progress |
| 04/13/2026 | Fire-Resistant Penetrations and Joints | Young Suh | special |
| 04/13/2026 | Sprinkler Systems | Young Suh | special |
| 04/13/2026 | Final | Young Suh | progress |
| 04/13/2026 | Duct leakage testing, insulation and design | Young Suh | energy_progress |
| 04/13/2026 | HVAC-R and service water heating system controls | Young Suh | energy_progress |
| 04/08/2026 | Duct leakage testing, insulation and design | Young Suh | energy_progress |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Nadia's | Restaurant / Food Service | Cellar, Floor 1 | Project M01376310 |
| 11 MKTG | Office | Floor 10 | Project M00889535 Project M00889530 |
| Lerer Hippeau | Office | Floor 10 | Project M00852987 |
| Trinity Church Wall Street | Office | — | Project M00853070 |