| Owner | Filings | Most Recent |
|---|---|---|
| SL GREEN REALTY | 940 | 07/08/2026 |
| PARAMOUNT | 7 | 07/08/2026 |
| SL GREEN | 35 | 07/08/2026 |
| GREEN W 57TH ST | 18 | 03/22/2026 |
| HUNTER ROBERTS, LLC | 1 | 03/22/2026 |
| GREEN WEST 57 ST | 3 | 03/22/2026 |
| KAUFMAN NEWMARK REALTY | 29 | 03/22/2026 |
| 555 W57 ASSOCIATES | 2 | 03/22/2026 |
| 555 W. 57TH ASSOCIATES | 1 | 03/22/2026 |
| ELI ACQUISITION LLC | 1 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| ANDREW FORMICHELLA | 1 | 09/08/2026 |
| CANY ARCHITECTURE & ENGINEERING DPC | 1 | 08/19/2026 |
| ASHRAF CORP | 2 | 01/28/2026 |
| FISKAA ENGINEERING | 5 | 01/12/2026 |
| TPG ARCHITECTURE, LLP | 4 | 01/08/2026 |
| ARMOUR UNSDERFER ENGINEERING INC, P | 2 | 01/07/2026 |
| IMEG | 2 | 10/15/2025 |
| THORNTON TOMASETTI | 1 | 10/15/2025 |
| MERIDIAN DESIGN ASSOCIATES | 1 | 10/14/2025 |
| TOHFAZ UDDIN PE PC | 1 | 06/26/2025 |
| SEVERUD ASSOCIATES | 1 | 05/20/2025 |
| MG ENGINEERING D.P.C. | 17 | 02/18/2025 |
| LOFFREDO BROOKS ARCHITECTS P.C. | 6 | 02/18/2025 |
| BITOPI CONSULTANTS LLC | 1 | 12/30/2024 |
| AMA CONSULTING ENGINEERS, PC | 3 | 11/12/2024 |
| ASDA ARCHITECTURE + DESIGN | 1 | 10/16/2024 |
| JACOB FEINBERG KATZ & MICHAELI CONS | 12 | 08/20/2024 |
| AVCON ENGINEERING PC | 3 | 08/15/2024 |
| NADASKAY KOPELSON ARCHITECTS | 6 | 08/14/2024 |
| KAHN ARCHITECTURE & DESIGN PC | 1 | 05/09/2024 |
| DEMERARA ENGINEERING, PLLC | 1 | 04/26/2024 |
| RANDALL P. COLLINS ARCHITECT, PC | 3 | 03/28/2024 |
| ENV ARCHITECTS, DPC | 1 | 03/14/2024 |
| LILKER ASSOCIATES CONSULTING ENGINE | 10 | 02/27/2024 |
| GOLDMAN COPELAND ASSOCIATES | 2 | 06/20/2023 |
| Representative | Filings | Most Recent |
|---|---|---|
| A1 EXPEDITING SERVICE CORP. | 135 | 03/21/2026 |
| RIZZO GROUP | 9 | 03/21/2026 |
| MUNICIPAL BUILDING CONSULTANTS | 6 | 03/21/2026 |
| OUTSOURCE CONSULTANTS, INC. | 6 | 03/21/2026 |
| KAZAM CONSULTANTS | 10 | 03/21/2026 |
| KD DESIGNS | 2 | 03/21/2026 |
| SPRING SCAFFOLDING LLC | 2 | 03/21/2026 |
| AK CONSULTING SERVICES | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| SIRINA FIRE PROT CORP | Fire Protection | 11 | 07/08/2026 |
| VERSATILE SERVICES LLC | General Contractor | 11 | 07/08/2026 |
| VERUS INC | General Contractor | 10 | 07/08/2026 |
| ZAMAN CONSTRUCTION CORP | General Contractor | 9 | 07/08/2026 |
| SOA SERVICE CORP | General Contractor | 9 | 03/21/2026 |
| STRUCTURE TONE, LLC | General Contractor | 9 | 07/08/2026 |
| EAST COAST OFFICE SOLUT | General Contractor | 8 | 03/21/2026 |
| SHAWMUT WOODWORKING & SUPPLY | General Contractor | 7 | 07/08/2026 |
| GEM-QUALITY CORP | General Contractor | 6 | 07/08/2026 |
| BALATON CONSULTING LLC | Scaffold | 5 | 07/08/2026 |
| CLUNE CONSTRUCTION CO LP | General Contractor | 5 | 04/09/2026 |
| DYCON ENTERPRISES INC | General Contractor | 5 | 07/08/2026 |
| PROJECT EYE CONSULTANTS I | General Contractor | 4 | 07/08/2026 |
| CRESCENT CONTRACTING CORP | Plumbing | 4 | 07/08/2026 |
| CRESCENT CONTRACTING CORP | Fire Protection | 3 | 07/08/2026 |
| ASHLAR MECHANICAL CORP | Fire Protection | 3 | 07/08/2026 |
| ICON INTERIORS INC | General Contractor | 3 | 07/08/2026 |
| TRISTATE PLBG SVCS CORP | Plumbing | 3 | 07/08/2026 |
| STARR INDUSTRIES LLC | General Contractor | 2 | 04/09/2026 |
| FERNANDEZ, WILLIAM | Electrical | 2 | 03/21/2026 |
| MILLAR ELEVATOR IND., INC | Electrical | 2 | 03/21/2026 |
| FERRAN CONTRACTING CORP | General Contractor | 2 | 04/09/2026 |
| A.W. & S. CONSTRUCTION CO | General Contractor | 2 | 07/08/2026 |
| BIGMAN BROS., INC. | Electrical | 2 | 03/22/2026 |
| ABCO-PEERLESS SPRKLR CORP | Fire Protection | 2 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| ALAN MARGOLIN & ASSOC | 423 | 11 | 08/19/2026 |
| MILROSE CONSULTANTS LLC | 2003 | 21 | 01/12/2026 |
| RICHMOND TESTING LAB | 263 | 1 | 05/20/2025 |
| WB ENGINEERING | 533 | 6 | 02/18/2025 |
| AK ENGINEERING PC | 678 | 3 | 11/12/2024 |
| FUTURE TECH CONSULTANTS O | 589 | 4 | 08/20/2024 |
| AVCON ENGINEERING PC | 548 | 4 | 08/15/2024 |
| CODEGREEN | 510 | 6 | 06/10/2024 |
| QUALITY CONTROL LABORATOR | 406 | 9 | 06/03/2024 |
| DEMERARA ENGINEERING, PLL | 4248 | 1 | 04/26/2024 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Structural | Permit Issued | FERRAN CONTRACTING CORP | 01/22/2026 |
| DOB NOW | Plumbing | Permit Issued | APEX MECHANICAL CORP | 01/15/2026 |
| DOB NOW | Plumbing | Permit Issued | CRESCENT CONTRACTING CORP | 01/14/2026 |
| DOB NOW | Sprinklers | Permit Issued | SIRINA FIRE PROT CORP | 12/08/2025 |
| DOB NOW | Structural | Permit Issued | FERRAN CONTRACTING CORP | 10/28/2025 |
| DOB NOW | Sprinklers | Signed-off | SIRINA FIRE PROT CORP | 10/22/2025 |
| DOB NOW | General Construction | Signed-off | VERUS INC | 10/21/2025 |
| DOB NOW | Mechanical Systems | Signed-off | VERUS INC | 10/21/2025 |
| DOB NOW | Sidewalk Shed | Signed-off | STARR INDUSTRIES LLC | 10/15/2025 |
| DOB NOW | Construction Fence | Signed-off | STARR INDUSTRIES LLC | 10/15/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | AKS INTERNATIONAL INC | 09/29/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | SPRING SCAFFOLDING LLC | 06/26/2025 |
| DOB NOW | Structural | Signed-off | CLUNE CONSTRUCTION CO LP | 06/10/2025 |
| DOB NOW | Plumbing | Permit Issued | CRESCENT CONTRACTING CORP | 06/02/2025 |
| DOB NOW | Structural | Signed-off | VERSATILE SERVICES LLC | 05/27/2025 |
| DOB NOW | Sprinklers | Signed-off | NY PLUMBING & HEATING COR | 05/07/2025 |
| DOB NOW | Plumbing | Signed-off | ASHLAR MECHANICAL CORP | 05/07/2025 |
| DOB NOW | General Construction | Signed-off | VERSATILE SERVICES LLC | 05/01/2025 |
| DOB NOW | Mechanical Systems | Signed-off | VERSATILE SERVICES LLC | 05/01/2025 |
| DOB NOW | General Construction | Permit Issued | ZAMAN CONSTRUCTION CORP | 03/11/2025 |
| DOB NOW | General Construction | Permit Issued | ZAMAN CONSTRUCTION CORP | 03/11/2025 |
| DOB NOW | Sprinklers | Signed-off | AGGRESSIVE FIRE PROT LLC | 03/05/2025 |
| DOB NOW | General Construction | Signed-off | CLUNE CONSTRUCTION CO LP | 03/04/2025 |
| DOB NOW | Mechanical Systems | Signed-off | CLUNE CONSTRUCTION CO LP | 02/27/2025 |
| DOB NOW | Sprinklers | Permit Issued | SIRINA FIRE PROT CORP | 02/26/2025 |
| DOB NOW | Sprinklers | Permit Issued | APEX MECHANICAL CORP | 02/24/2025 |
| DOB NOW | Sprinklers | Permit Issued | CRESCENT CONTRACTING CORP | 02/24/2025 |
| DOB NOW | Sidewalk Shed | Permit Issued | GEM-QUALITY CORPORATION | 02/21/2025 |
| DOB NOW | General Construction | Permit Issued | GEM-QUALITY CORPORATION | 02/19/2025 |
| DOB NOW | Sidewalk Shed | Permit Issued | GEM-QUALITY CORPORATION | 12/31/2024 |
| DOB NOW | Plumbing | Permit Issued | SIRINA FIRE PROT CORP | 12/09/2024 |
| DOB NOW | Sign | Permit Issued | SERVICE SIGN ERECTORS CO | 10/18/2024 |
| DOB NOW | Plumbing | Permit Issued | APEX MECHANICAL CORP | 09/30/2024 |
| DOB NOW | Mechanical Systems | Permit Issued | AKS INTERNATIONAL INC | 09/05/2024 |
| DOB NOW | Plumbing | Permit Issued | CRESCENT CONTRACTING CORP | 09/04/2024 |
| DOB NOW | General Construction | Permit Issued | GEM-QUALITY CORPORATION | 08/30/2024 |
| DOB NOW | Sprinklers | Signed-off | A + SPRINKLER CORP | 05/29/2024 |
| DOB NOW | Sprinklers | Signed-off | ABCO-PEERLESS SPRKLR CORP | 05/28/2024 |
| DOB NOW | Mechanical Systems | Signed-off | VERUS INC | 05/20/2024 |
| DOB NOW | General Construction | Signed-off | VERUS INC | 05/15/2024 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 08/20/2024 | Permit Issued | AKS INTERNATIONAL INC | Air Conditioning Systems | |
| 09/06/2023 | Permit Issued | ZOI CONTRACTING INC | Others | Other Qmark MUH0581-PRO-SSP 350 CFM · Unit Heater ×5 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/12/2026 | Signed-off | AGGRESSIVE FIRE PROT LLC | 154 heads |
| 08/20/2024 | Permit Issued | CRESCENT CONTRACTING CORP | — |
| 05/22/2024 | Permit Issued | SIRINA FIRE PROT CORP | 80 heads |
| 09/06/2023 | Permit Issued | SIRINA FIRE PROT CORP | 61 heads |
| 05/08/2023 | — | — | 147 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/12/2026 | — | — | — |
| 08/20/2024 | Permit Issued | CRESCENT CONTRACTING CORP | Water/Sanitary |
| 05/22/2024 | Signed-off | LIQUID PLBG & HTNG SCS IN | Water/Sanitary |
| 05/08/2023 | — | — | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/03/2025 | Complete | J.A. LEE ELEC SVCS LLC | General Wiring |
| 08/05/2025 | Permit Issued | ATLAS-ACON ELEC. SERVICE | General Wiring |
| 04/07/2025 | Complete | BIGMAN BROS., INC. | — |
| 02/26/2025 | Permit Issued | POWER-TECH INSTALL. ELEC' | General Wiring |
| 10/28/2024 | Complete | CITY GRID ELECTRIC CORP | General Wiring |
| 07/31/2024 | Permit Issued | ARK SYSTEMS ELEC. CORP | General Wiring, Lighting |
| 07/17/2024 | Complete | CITY GRID ELECTRIC CORP | General Wiring |
| 05/23/2024 | Complete | BIGMAN BROS., INC. | General Wiring |
| 04/15/2024 | Complete | TIKVAH ELECTRIC CO, INC. | General Wiring |
| 04/01/2024 | Complete | BIGMAN BROS., INC. | General Wiring |
| 03/07/2024 | Complete | CITY GRID ELECTRIC CORP | General Wiring |
| 02/22/2024 | Permit Issued | GOTHAM TECHNICAL SERVICES | General Wiring |
| 07/26/2023 | Complete | P.E. STONE INC | General Wiring |
| 05/11/2023 | Complete | P.E. STONE INC | General Wiring |
| 04/14/2023 | Complete | BIGMAN BROS., INC. | General Wiring, Lighting |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/19/2026 | — | — | Concrete |
| 10/15/2025 | Permit Issued | FERRAN CONTRACTING CORP | Steel, Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 12/30/2024 | Permit Issued | GEM-QUALITY CORP | Sidewalk Shed |
| Date | Type | Result | Report |
|---|---|---|---|
| 04/17/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 04/03/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/30/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 03/30/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 03/25/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 03/18/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 03/12/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 03/12/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 03/10/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 02/18/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 02/02/2026 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 02/02/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/22/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 01/05/2026 | Fail-Final Curb Cut Non-Directive 14 | Fail | View ↗ |
| 12/18/2025 | Fail-Final Boiler Equipment Inspection | Fail | View ↗ |
| 09/17/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 08/21/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 08/20/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 08/18/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 08/18/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/18/2025 | Certified Sprinkler - SP - Roughing | Certified | View ↗ |
| 07/02/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 06/30/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 06/30/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 06/30/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 07/14/2026 | Concrete - Cast-In-Place | Young Suh | special |
| 07/14/2026 | Post-installed Anchors | Young Suh | special |
| 07/09/2026 | Final | Yifeng Zhang | progress |
| 01/27/2026 | Fire-Resistant Penetrations and Joints | Christopher Drutjons | special |
| 01/27/2026 | Post-installed Anchors | Christopher Drutjons | special |
| 01/27/2026 | Sprinkler Systems | Christopher Drutjons | special |
| 01/20/2026 | Final | Christopher Drutjons | progress |
| 01/09/2026 | Fire-Resistant Penetrations and Joints | Christopher Drutjons | special |
| 01/09/2026 | Final | Thomas Hughes | progress |
| 01/09/2026 | Post-installed Anchors | Christopher Drutjons | special |
| 01/06/2026 | Sprinkler Systems | Christopher Drutjons | special |
| 01/06/2026 | Fire-Resistant Penetrations and Joints | Christopher Drutjons | special |
| 01/06/2026 | Post-installed Anchors | Christopher Drutjons | special |
| 01/02/2026 | Post-installed Anchors | Christopher Drutjons | special |
| 01/02/2026 | Final | Thomas Hughes | progress |
| 01/02/2026 | Final | Christopher Drutjons | progress |
| 01/02/2026 | Fire-Resistant Penetrations and Joints | Christopher Drutjons | special |
| 10/01/2025 | Post-installed Anchors | Christopher Drutjons | special |
| 10/01/2025 | Final | Antonio Argibay | progress |
| 10/01/2025 | Fire-Resistant Penetrations and Joints | Christopher Drutjons | special |
| 08/11/2025 | Structural Stability – Alterations of existing buildings | Young Suh | special |
| 07/29/2025 | Structural Steel - Details | Young Suh | special |
| 07/29/2025 | Concrete - Cast-In-Place | Young Suh | special |
| 07/29/2025 | Structural Steel - Welding | Young Suh | special |
| 07/29/2025 | Final | Michael Gerasopoulos | progress |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| CBS Sports / IE Collocation | Office | Floor 17 | Project M01296019 |
| CBS 60 Minutes - CBS Sports | Office | Floors 14, 17, 18 | Project M00906594 |
| CBS Sports | Office | Floors 7, 14, 17, 18 | Project M00861514 |
| BMW Mini of Manhattan | Retail | — | Project M00706555 Project M00706561 Project M00706568 Project M00706576 Project M00706581 |
| BMW of Manhattan | Office | Cellar, Floors 1, 2 | Project M00646516 Project M00646568 |
| Last Week Tonight | Office | Floor 8 | Project M00513742 Project M00513710 Project M00513684 |
| CBS Tech | Office | Floors 17, 18 | Project M00212636 |