← Back
One story - permanent living quarter
56-48 EAST HAMPTON BLVD
QUEENS · BIN 4161332
💬 Discuss this project
1950Year Built
1Stories
A2Building Class
R2Zoning
1,444 sfGross Floor Area
1Units
One story - permanent living quarter · 5,000 sf lot · 0.29 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Floor 2Under Construction21p · 1 filing · 20 docs
Floor 1Under Construction20p · 1 filing · 20 docs
CellarUnder Construction23p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/23/2026$1.1M—Private party → C&L BAYSIDE INC.$751/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LAM ENGINEER PC306/05/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
2022 A N J CONSTRUCTION *General Contractor207/14/2026
VILLAGE P & H NY INCPlumbing107/02/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LAM ENGINEER PC1180206/05/2026
Building Lifecycle
All (41)Filed (3)Permit Issued (3)Objection (5)Special Inspection (30)
07/13/2026
Permit issued — General Construction
Q01372655-I1-GC-CX
07/02/2026
Permit issued — Construction Fence
Q01411112-I1-FN
06/30/2026
Permit issued — Plumbing
Q01372655-S1-PL
06/05/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED HORIZONTAL & VERTICAL ENLARGEMENT OF EXIST. 1 STORY BUILDING. PROPOSED 2 STORY AND ATTIC WITH ONE DWELLING UNIT. PARTIAL DEMOLITION AND GUT RENOVATION. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
Q01372655-S1
06/04/2026
Filed — Alteration
PROPOSED TO INSTALL 8' HIGH TEMPORARY PLYWOOD CONSTRUCTION FENCE IN CONJUNCTION WITH JOB# Q01372655. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01411112-I1
06/04/2026
Special inspection requirement — Permanent certificate
YUK LAM
06/04/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
YUK LAM
06/04/2026
Special inspection requirement — HVAC-R and service water heating equipment
YUK LAM
06/04/2026
Special inspection requirement — Maintenance information
YUK LAM
06/04/2026
Special inspection requirement — HVAC-R and service water heating system controls
YUK LAM
06/03/2026
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
YUK LAM
06/03/2026
Special inspection requirement — Energy Code Compliance Inspections
YUK LAM
06/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
YUK LAM
06/03/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
YUK LAM
04/14/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
YUK LAM
04/13/2026
Objection resolved — Resolved
04/13/2026
Objection resolved — Resolved
04/06/2026
Objection raised — Admin
04/06/2026
Objection raised — Energy
04/06/2026
Objection raised — Scope
03/22/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED HORIZONTAL & VERTICAL ENLARGEMENT OF EXIST. 1 STORY BUILDING. PROPOSED 2 STORY AND ATTIC WITH ONE DWELLING UNIT. PARTIAL DEMOLITION AND GUT RENOVATION. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
Q01372655-I1
03/20/2026
Special inspection requirement — Maintenance information
YUK LAM
03/20/2026
Special inspection requirement — Electric vehicle service equipment requirements
YUK LAM
03/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
YUK LAM
03/20/2026
Special inspection requirement — Energy Code Compliance Inspections
YUK LAM
03/20/2026
Special inspection requirement — Interior lighting power
YUK LAM
03/20/2026
Special inspection requirement — Fire-Resistance Rated Construction
YUK LAM
03/20/2026
Special inspection requirement — Structural Wood Frame
YUK LAM
03/20/2026
Special inspection requirement — Masonry
YUK LAM
03/20/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
YUK LAM
03/20/2026
Special inspection requirement — Subgrade Inspections
YUK LAM
03/20/2026
Special inspection requirement — Concrete - Cast-In-Place
YUK LAM
03/20/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
YUK LAM
03/16/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
YUK LAM
03/16/2026
Special inspection requirement — Structural Steel - Details
YUK LAM
03/16/2026
Special inspection requirement — Final
YUK LAM
03/16/2026
Special inspection requirement — Footing and Foundation
YUK LAM
03/16/2026
Special inspection requirement — Insulation placement and R values
YUK LAM
03/16/2026
Special inspection requirement — Fenestration air leakage
YUK LAM
03/16/2026
Special inspection requirement — Permanent certificate
YUK LAM
03/16/2026
Special inspection requirement — HVAC-R and service water heating equipment
YUK LAM
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit Issued2022 A N J CONSTRUCTION *07/13/2026
DOB NOWConstruction FencePermit Issued2022 A N J CONSTRUCTION *07/02/2026
DOB NOWPlumbingPermit IssuedVILLAGE P & H NY INC06/30/2026
1 project · most recent 06/05/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/05/2026Permit Issued2022 A N J CONSTRUCTIONHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZ-3C30NA3 171,000 BTU · Heat Pump Outdoor ×6
1 project · most recent 06/05/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
06/05/2026Permit IssuedPARAMOUNT SERVICES, LLCGas, Storm, Water/Sanitary
1 project · most recent 07/14/2026
General Wiring
FiledStatusContractorScope
07/14/2026Permit IssuedKJK ELECTRIC INCGeneral Wiring
1 project · most recent 06/05/2026
Steel Wood
FiledStatusContractorScope
06/05/2026Permit Issued2022 A N J CONSTRUCTIONSteel, Wood
1 project · most recent 06/04/2026
Fence
FiledStatusContractorScope
06/04/2026Permit Issued2022 A N J CONSTRUCTIONFence
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
06/04/2026Permanent certificateYUK LAMenergy_progress
06/04/2026HVAC-R and service water piping design and insulationYUK LAMenergy_progress
06/04/2026HVAC-R and service water heating equipmentYUK LAMenergy_progress
06/04/2026Maintenance informationYUK LAMenergy_progress
06/04/2026HVAC-R and service water heating system controlsYUK LAMenergy_progress
06/03/2026Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesYUK LAMspecial
06/03/2026Energy Code Compliance InspectionsYUK LAMprogress
06/03/2026Fire-Resistant Penetrations and JointsYUK LAMspecial
06/03/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationYUK LAMspecial
04/14/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationYUK LAMspecial
03/20/2026Maintenance informationYUK LAMenergy_progress
03/20/2026Electric vehicle service equipment requirementsYUK LAMenergy_progress
03/20/2026Fire-Resistant Penetrations and JointsYUK LAMspecial
03/20/2026Energy Code Compliance InspectionsYUK LAMprogress
03/20/2026Interior lighting powerYUK LAMenergy_progress
03/20/2026Fire-Resistance Rated ConstructionYUK LAMprogress
03/20/2026Structural Wood FrameYUK LAMprogress
03/20/2026MasonryYUK LAMspecial
03/20/2026Structural Stability – Alterations of existing buildingsYUK LAMspecial
03/20/2026Subgrade InspectionsYUK LAMspecial
03/20/2026Concrete - Cast-In-PlaceYUK LAMspecial
03/20/2026Excavations - Sheeting, Shoring, and BracingYUK LAMspecial
03/16/2026Fenestration and door U-factor and product ratingsYUK LAMenergy_progress
03/16/2026Structural Steel - DetailsYUK LAMspecial
03/16/2026FinalYUK LAMprogress
Latest 25 of 37.
▾Documents — 23 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/16/2026Q01411112-I1Request digital key ↗
08/16/2026Q01372655-S1Request digital key ↗
08/16/2026Q01372655-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/16/2026Q01372655-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/16/2026Q01372655-I1Open ↗
▸Seals & Professional Certifications9
▸DOB NOWProgress Inspector Seal & Signature4
08/29/2026Q01372655-S1Open ↗
08/29/2026Q01372655-S1Open ↗
08/24/2026Q01372655-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/16/2026Q01411112-I1Open ↗
08/16/2026Q01372655-S1Open ↗
08/16/2026Q01372655-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/29/2026Q01372655-S1Open ↗
08/24/2026Q01372655-I1Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/16/2026Q01372655-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/16/2026Q01372655-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/16/2026Q01372655-I1Open ↗
08/16/2026Q01372655-S1Open ↗
▸Inspections & Test Reports1
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/16/2026Q01372655-I1Open ↗
▸Other Documents4
▸DOB NOWProperty Ownership Certification1
08/16/2026Q01372655-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/16/2026Q01372655-I1Open ↗
▸DOB NOWFinal Survey1
08/16/2026Q01372655-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/16/2026Q01372655-I1Open ↗