Miscellaneous store building · Owner of record: MYRTLE AVE DEVELOPMENT PARTNERS 2 LLC · 2,700 sf lot · 2 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Bulkhead6p · 3 filings · 20 docs
Floor 36p · 4 filings · 20 docs
Floor 26p · 4 filings · 20 docs
Floor 18p · 6 filings · 20 docs
Cellar8p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BIG MANAGEMENT3007/08/2026
CAMERACOM CORP103/22/2026
MYRTLE AVENUE DEVELOPMENT PARTNE603/21/2026
MYRTLE AVE DEVELOPMENT LLC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ROBERT PROFFITT1506/26/2025
ASHRAF CORP107/19/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CODE403/21/2026
Rigid Structural Design, LLC103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GOLDEN GATE BAPAZ CONSTRUGeneral Contractor1407/08/2026
ACS ENVIRONMENTAL & CONSTGeneral Contractor303/21/2026
BRUCHE MECHANICAL NY LLCFire Protection207/08/2026
DYNAMIC PLBNG & SPRKR CORFire Protection107/08/2026
J. CAIAZZO PLBG & HTG CORPFire Protection107/08/2026
MANHATTAN D ENTERPRISESGeneral Contractor107/08/2026
BT'S PLUMBING AND HEATINGPlumbing107/08/2026
PLBG P & H INCPlumbing107/08/2026
BDS ELECTRIC CORP.Electrical103/22/2026
PAUL SIGNSScaffold107/08/2026
KWONG MING ELECTRIC INCElectrical103/22/2026
SEGA ELECTRIC LLCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SPECIAL TESTING & CONSULT1688906/26/2025
TROLYDIA TESTING & INSPEC4422105/05/2021
Building Lifecycle
All (113)Filed (16)Permit Issued (15)Signed Off (8)Violation (5)Inspection (10)Objection (29)Special Inspection (30)
04/28/2026
Signed off — Alteration
Installation of lintels in the cellarand first floor. Installation of beams and columns on the first floor to third of the building.
Q00479343-I1
12/16/2025
Signed off — Alteration
ALTERATION OF EXISTING SPRINKLER SYSTEM IN THE CELLAR, 1ST, 2ND, 3RD, FLOORS
Q00679612-I1
11/17/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/12/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/05/2025
Permit issued — Sprinklers
Q55178238-I1-EW-SP
10/16/2025
Signed off — Alteration
INSTALLATION OF NEW PLUMBING FIXTURES IN THE CELLAR,1ST FLOOR, 2ND FLOOR AND 3RD FLOOR.
Q00679606-I1
06/27/2025
Special inspection requirement — Sprinkler Systems
SEBASTIAN SETTEDUCATE JR., P.E
06/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SEBASTIAN SETTEDUCATE JR., P.E
06/26/2025
Filed — Alteration
Installation of lintels in the cellarand first floor. Installation of beams and columns on the first floor to third of the building.
Q00479343-P2
06/23/2025
Filed — Alteration
ALTERATION OF EXISTING SPRINKLER SYSTEM IN THE CELLAR, 1ST, 2ND, 3RD, FLOORS
Q00679612-P2
05/26/2025
Violation issued (HPD, closed)
B
05/16/2025
Signed off — Alteration
INSTALLATION OF HEAT PUMPS ON THE ROOF. INSTALLATION OF MECHANICAL EQUIPMENT IN PART OF THE CELLAR, 1ST, 2ND AND 3RD FLOORS.
Q00479352-I1
02/04/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Robert Proffitt
02/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SEBASTIAN SETTEDUCATE JR., P.E
02/04/2025
Special inspection requirement — Mechanical Systems
SEBASTIAN SETTEDUCATE JR., P.E
02/04/2025
Special inspection requirement — Heating Systems
SEBASTIAN SETTEDUCATE JR., P.E
02/04/2025
Special inspection requirement — Final
Robert Proffitt
02/04/2025
Special inspection requirement — HVAC-R and service water heating equipment
Robert Proffitt
02/04/2025
Special inspection requirement — Maintenance information
Robert Proffitt
02/04/2025
Special inspection requirement — Ventilation and air distribution system
Robert Proffitt
02/04/2025
Special inspection requirement — HVAC-R and service water heating system controls
Robert Proffitt
01/29/2025
Filed — Alteration
INSTALLATION OF HEAT PUMPS ON THE ROOF. INSTALLATION OF MECHANICAL EQUIPMENT IN PART OF THE CELLAR, 1ST, 2ND AND 3RD FLOORS.
Q00479352-P1
01/04/2025
Special inspection requirement — Heating Systems
SEBASTIAN SETTEDUCATE JR., P.E
01/04/2025
Special inspection requirement — HVAC-R and service water heating system controls
Robert Proffitt
01/04/2025
Special inspection requirement — Maintenance information
Robert Proffitt
01/04/2025
Special inspection requirement — Ventilation and air distribution system
Robert Proffitt
01/04/2025
Special inspection requirement — HVAC-R and service water heating equipment
Robert Proffitt
01/04/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Robert Proffitt
01/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SEBASTIAN SETTEDUCATE JR., P.E
01/04/2025
Special inspection requirement — Final
Robert Proffitt
01/04/2025
Special inspection requirement — Mechanical Systems
SEBASTIAN SETTEDUCATE JR., P.E
12/19/2024
Special inspection requirement — Sprinkler Systems
SEBASTIAN SETTEDUCATE JR., P.E
12/19/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SEBASTIAN SETTEDUCATE JR., P.E
11/15/2024
Permit issued — Sprinklers
Q55178238-I1-EW-SP
11/13/2024
Permit issued — Mechanical Systems
Q00479352-I1-MS
07/23/2024
Signed off — Alteration
REMOVE INTERIOR PATRONS AS INDICATED ON DRAWINGS.. REMOVE FINISHES.
Q00455782-I1
11/29/2023
Violation issued (HPD, closed)
I
06/20/2023
Signed off — Alteration
INSTALLATION OF NEW SIGN FACE ON EXISTING PROJECTION SIGN.
Q00322130-I1
06/20/2023
Filed — Alteration
ALTERATION OF EXISTING SPRINKLER SYSTEM IN THE CELLAR, 1ST, 2ND, 3RD, FLOORS
Q00679612-P1
05/30/2023
Signed off — Alteration
CONSTRUCTION OF CONSTRUCTION FENCE AS INDICATED ON DRAWINGS AND IN ACCORDANCE WITH THE BUILDING CODE.
Q00447742-I1
05/10/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SEBASTIAN SETTEDUCATE JR., P.E
05/10/2023
Special inspection requirement — Sprinkler Systems
SEBASTIAN SETTEDUCATE JR., P.E
12/30/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/28/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/22/2022
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
12/22/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/12/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
SEBASTIAN SETTEDUCATE JR., P.E
12/11/2022
Filed — Alteration
INSTALLATION OF NEW PLUMBING FIXTURES IN THE CELLAR,1ST FLOOR, 2ND FLOOR AND 3RD FLOOR.
Q00679606-P1
12/07/2022
Signed off — Alteration
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q00558905-I1
11/29/2022
Permit issued — Sign
Q00322130-I1-SG
11/18/2022
Violation issued (HPD, closed)
I
07/05/2022
Permit issued — Plumbing
Q43178304-I1-PL
07/05/2022
Permit issued — Sprinklers
Q98553215-I1-EW-SP
04/14/2022
Permit issued — Sprinklers
Q00679612-I1-EW-SP
04/06/2022
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
04/06/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
04/06/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/06/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/11/2022
Permit issued — Plumbing
Q00679606-I1-PL
02/28/2022
Filed — Alteration
INSTALLATION OF NEW PLUMBING FIXTURES IN THE CELLAR,1ST FLOOR, 2ND FLOOR AND 3RD FLOOR.
Q00679606-I1
Latest 60 of 113 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offANTHONY CAIAZZO11/05/2025
DOB NOWSprinklersSigned-offBRUCHE MECHANICAL NY LLC11/15/2024
DOB NOWMechanical SystemsSigned-offACS ENVIRONMENTAL & CONST11/13/2024
DOB NOWSignSigned-offPAUL SIGNS, INC11/29/2022
DOB NOWPlumbingSigned-offPLBG P & H INC07/05/2022
DOB NOWSprinklersSigned-offBRUCHE MECHANICAL NY LLC07/05/2022
DOB NOWSprinklersSigned-offCITYWIDE PLBG, HTG &SPRKL04/14/2022
DOB NOWPlumbingSigned-offBT'S PLUMBING AND HEATING03/11/2022
DOB NOWGeneral ConstructionSigned-offGOLDEN GATE BAPAZ CONSTRU01/20/2022
DOB NOWGeneral ConstructionSigned-offGOLDEN GATE BAPAZ CONSTRU09/24/2021
DOB NOWConstruction FenceSigned-offGOLDEN GATE BAPAZ CONSTRU09/24/2021
DOB NOWSidewalk ShedSigned-offMANHATTAN D ENTERPRISES07/21/2021
DOB NOWStructuralSigned-offGOLDEN GATE BAPAZ CONSTRU04/21/2021
DOB NOWGeneral ConstructionSigned-offGOLDEN GATE BAPAZ CONSTRU03/17/2021
DOB NOWConstruction FenceSigned-offGOLDEN GATE BAPAZ CONSTRU02/22/2021
BISSPISSUEDBRUCHE MECHANICAL NY LLC07/03/2024
BIS—ISSUEDMORELL BUILDERS INC12/08/2022
BISSPISSUEDBRUCHE MECHANICAL NY LLC10/29/2020
BISMHISSUEDGOLDEN GATE BAPAZ CONSTRU09/24/2019
BISPLISSUEDPLBG P & H INC09/23/2019
BIS—ISSUEDKEJDI CORP09/05/2019
BISSPISSUEDBRUCHE MECHANICAL NY LLC12/20/2018
BIS—ISSUEDKEJDI CORP10/22/2018
BISPLISSUEDPLBG P & H INC09/21/2018
BIS—ISSUEDKEJDI CORP07/24/2018
BISOTISSUEDRICHTER AND RATNER CONTRACTING06/07/1995
BISMHISSUEDRICHTER AND RATNER CONTRACTING06/07/1995
BISOTISSUEDROSS 7 BERT. ARCH.05/25/1995
BISMHISSUEDJ.Z. ASSOCIATES05/18/1990
BIS—ISSUEDAMBROSINO CONSTRUCTION11/13/1989
BISOTISSUEDAMBROSINIO CONSTRUCTION CORP.06/27/1989
BISEQISSUEDAMBROSINIO CONSTRUCTION CORP.06/27/1989
1 project · most recent 03/02/2021
Water/Sanitary
FiledStatusContractorScope
03/02/2021——Water/Sanitary
9 projects · most recent 02/26/2024
General Wiring Lighting
FiledStatusContractorScope
02/26/2024CompleteLTC ELECTRIC INC.General Wiring
01/25/2024CompleteLTC ELECTRIC INC.General Wiring
07/20/2023CompleteLTC ELECTRIC INC.General Wiring
01/20/2023CompleteLTC ELEC'L CONTR'G LLCGeneral Wiring
07/01/2021CompleteV. VASS ELECTRIC CORP—
06/05/2020CompleteSEGA ELECTRIC LLCGeneral Wiring
03/16/2020CompleteBDS ELECTRIC CORP.General Wiring, Lighting
10/24/2019CompleteSEGA ELECTRIC LLCGeneral Wiring
10/05/2018CompleteKWONG MING ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
11/17/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/12/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/30/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/28/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/22/2022Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
12/22/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/06/2022Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
04/06/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/06/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/06/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
06/27/2025Sprinkler SystemsSEBASTIAN SETTEDUCATE JR., P.Especial
06/27/2025Fire-Resistant Penetrations and JointsSEBASTIAN SETTEDUCATE JR., P.Especial
02/04/2025HVAC-R and service water piping design and insulationRobert Proffittenergy_progress
02/04/2025Fire-Resistant Penetrations and JointsSEBASTIAN SETTEDUCATE JR., P.Especial
02/04/2025Mechanical SystemsSEBASTIAN SETTEDUCATE JR., P.Especial
02/04/2025Heating SystemsSEBASTIAN SETTEDUCATE JR., P.Especial
02/04/2025FinalRobert Proffittprogress
02/04/2025HVAC-R and service water heating equipmentRobert Proffittenergy_progress
02/04/2025Maintenance informationRobert Proffittenergy_progress
02/04/2025Ventilation and air distribution systemRobert Proffittenergy_progress
02/04/2025HVAC-R and service water heating system controlsRobert Proffittenergy_progress
01/04/2025Heating SystemsSEBASTIAN SETTEDUCATE JR., P.Especial
01/04/2025HVAC-R and service water heating system controlsRobert Proffittenergy_progress
01/04/2025Maintenance informationRobert Proffittenergy_progress
01/04/2025Ventilation and air distribution systemRobert Proffittenergy_progress
01/04/2025HVAC-R and service water heating equipmentRobert Proffittenergy_progress
01/04/2025HVAC-R and service water piping design and insulationRobert Proffittenergy_progress
01/04/2025Fire-Resistant Penetrations and JointsSEBASTIAN SETTEDUCATE JR., P.Especial
01/04/2025FinalRobert Proffittprogress
01/04/2025Mechanical SystemsSEBASTIAN SETTEDUCATE JR., P.Especial
12/19/2024Sprinkler SystemsSEBASTIAN SETTEDUCATE JR., P.Especial
12/19/2024Fire-Resistant Penetrations and JointsSEBASTIAN SETTEDUCATE JR., P.Especial
05/10/2023Fire-Resistant Penetrations and JointsSEBASTIAN SETTEDUCATE JR., P.Especial
05/10/2023Sprinkler SystemsSEBASTIAN SETTEDUCATE JR., P.Especial
12/12/2022Fire-Resistant Penetrations and JointsSEBASTIAN SETTEDUCATE JR., P.Especial
Latest 25 of 34.
▾Documents — 239 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch12
08/27/2026Q00479343-I1Request digital key ↗
08/27/2026Q00479343-P2Request digital key ↗
08/27/2026Q00479343-P1Request digital key ↗
Showing 3 of 12 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence2
08/15/2026Q00447742-I1Request digital key ↗
08/14/2026Q00447742-P1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
08/15/2026Q00455782-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
08/15/2026Q00473903-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sign1
08/15/2026Q00322130-I1Request digital key ↗
▸Applications & Permits51
▸BISPLAN / WORK APPROVAL APPLICATION39
02/24/2026421551467Open ↗
01/29/2026421551467Open ↗
01/22/2026440735554Open ↗
Showing 3 of 39 on file for this type
▸BISWORK PERMIT APPLICATION11
06/10/2025421612295Open ↗
02/07/2023421551467Open ↗
07/29/2021421551467Open ↗
Showing 3 of 11 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
08/20/2019421551467Open ↗
▸Zoning, Tax Lot & Property Records5
▸BISEASEMENT AND RESTRICTIVE DECLARATIONS - SUPPPORTING DOCUMENTATION2
07/26/2018421551467Open ↗
07/26/2018421551467Open ↗
▸BISZONING DIAGRAM2
04/06/2023421551467Open ↗
07/26/2018421551467Open ↗
▸BISVERIFY TAX LOT1
11/24/2024421551467Open ↗
▸Seals & Professional Certifications53
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/28/2026Q00322130-I1Open ↗
08/27/2026Q00447742-P1Open ↗
08/27/2026Q00447742-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
09/01/2026Q00479352-I1Open ↗
09/01/2026Q00479352-I1Open ↗
09/01/2026Q00479352-I1Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION11
08/12/2019421922664Open ↗
08/12/2019421922664Open ↗
07/26/2019421922664Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/02/2026Q00679612-I1Open ↗
09/01/2026Q00479352-I1Open ↗
08/29/2026Q00679612-P1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
03/29/2018421612295Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
07/19/2022440735554Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
03/29/2018421612295Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/19/2022440735554Open ↗
▸Trade Schedules & Equipment15
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE6
12/27/2019421551467Open ↗
12/06/2019421551467Open ↗
07/26/2019421922664Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING5
06/18/2024421612295Open ↗
06/03/2024421612295Open ↗
12/02/2020421612295Open ↗
Showing 3 of 5 on file for this type
▸BISFINAL PLUMBING SIGNOFF1
02/02/2024421551467Open ↗
▸BISSPRINKLER SYSTEMS1
12/13/2022421612295Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
10/08/2025421551467Open ↗
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
03/29/2018421612295Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST1
09/27/2017421551467Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026Q00322130-I1Open ↗
▸Environmental & Asbestos15
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
08/27/2026Q00479343-P2Open ↗
08/27/2026Q00479343-P1Open ↗
08/27/2026Q00479343-I1Open ↗
Showing 3 of 12 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
07/26/2019421922664Open ↗
06/26/2019421922664Open ↗
09/27/2017421551467Open ↗
▸Energy Compliance19
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS10
03/26/2020421551467Open ↗
03/26/2020421551467Open ↗
08/12/2019421922664Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026Q00473903-I1Open ↗
08/13/2026Q00455782-I1Open ↗
08/13/2026Q00479352-I1Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
03/26/2020421551467Open ↗
03/26/2020421551467Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
09/15/2023421551467Open ↗
09/03/2020421922664Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
11/05/2025421551467Open ↗
08/28/2020421922664Open ↗
▸Inspections & Test Reports10
▸BISTECHNICAL REPORT: RESPONSIBILITY4
11/05/2025421551467Open ↗
11/05/2025421551467Open ↗
11/05/2025421551467Open ↗
Showing 3 of 4 on file for this type
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
08/28/2020421922664Open ↗
▸BISMECHANICAL SYSTEMS1
11/05/2025421551467Open ↗
▸BISHYDRO FLOW TEST LETTER1
03/29/2018421612295Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
11/05/2025421551467Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
11/05/2025421551467Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
11/05/2025421551467Open ↗
▸Approvals, Objections & Sign-offs16
▸BISSCHEDULE A - OCCUPANCY / USE9
10/16/2025421551467Open ↗
07/18/2024421551467Open ↗
11/21/2022421551467Open ↗
Showing 3 of 9 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
02/07/2023421551467Open ↗
07/29/2021421551467Open ↗
07/29/2021421551467Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
01/30/2025421612295Open ↗
09/08/2020421922664Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
09/21/2017421551467Open ↗
▸BISFINAL1
06/05/2025440735554Open ↗
▸Cost, Insurance & Ownership14
▸BISCOST AFFIDAVIT11
02/04/2026421551467Open ↗
02/03/2026421551467Open ↗
01/03/2023421612295Open ↗
Showing 3 of 11 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
11/28/2022421612295Open ↗
09/08/2020421922664Open ↗
▸BISCIVIL PENALTY AFFIDAVIT/REQUEST1
07/29/2021421551467Open ↗
▸Filing & Intake Forms18
▸BISADDITIONAL INFORMATION8
02/23/2026421551467Open ↗
10/29/2025421551467Open ↗
10/29/2025421551467Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING COVER SHEET5
07/26/2019421922664Open ↗
06/26/2019421922664Open ↗
01/19/2019421673834Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM4
02/07/2023421551467Open ↗
07/29/2021421551467Open ↗
07/29/2021421551467Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
07/19/2022440735554Open ↗
▸Other Documents4
▸BISPLOT DIAGRAM2
06/26/2022421551467Open ↗
07/26/2018421551467Open ↗
▸BISCHIMNEYS AND VENTS1
11/05/2025421551467Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
09/08/2020421922664Open ↗