← Back
Primarily 4 family with 1 store or office
57 DRIGGS AVENUE
BROOKLYN · BIN 3067775
💬 Discuss this project
1928Year Built
3Stories
S4Building Class
R6BZoning
4,874 sfGross Floor Area
5Units
Rent Stabilized3 Open Violations ▸FDNY Report ↗
Primarily 4 family with 1 store or office · Owner of record: 57 DRIGGS AVENUE, LLC · 2,500 sf lot · 1.95 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof1p · 1 filing · 10 docs
Floor 13p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
57 DRIGGS AVENUE, LLC103/22/2026
57 GREENPOINT PROPERTY IN103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/29/2022$3.2M—— → —$657/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARQUITECTURA VARELA712/26/2024
ADAL ENGINEERING PLLC107/21/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
L & J DESIGN GROUP1403/21/2026
BIG ORANGE EXPEDITING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
INNOVATIVE VENTURES TEAMGeneral Contractor407/08/2026
ANVA LLCGeneral Contractor203/21/2026
APOLLO ELECTRIC USA, INCElectrical103/22/2026
ARANDA PLBG & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FRANCISCO D. PEREZ PE3306112/26/2024
SANARK CONSULTING ENGINEE6824104/03/2023
ADAL ENGINEERING PLLC4205207/21/2022
Building Lifecycle
All (84)Filed (8)Permit Issued (4)Signed Off (3)Violation (42)Inspection (6)Special Inspection (21)
11/20/2025
Violation issued (HPD, closed)
I
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/13/2025
Violation issued (FDNY_NOV, closed)
01/02/2025
Signed off — Alteration
INSTALL NEW MECHANICAL EQUIPMENT IN PROPOSED EATING AND DRINKING ESTABLISHMENT TO INCLUDE BATHROOM EXHAUST FAN, KITCHEN HOOD, AND SPLIT SYSTEM AIR CONDITIONING UNITS. ALL GENERAL CONSTRUCTION WORK FILED UNDER APPLICATION B00815129-I1.
B00815129-S2
12/27/2024
Special inspection requirement — Ventilation and air distribution system
Vicente Varela
12/27/2024
Special inspection requirement — Mechanical Systems
REJEP KOLAR
12/27/2024
Special inspection requirement — Energy Code Compliance Inspections
Vicente Varela
12/27/2024
Special inspection requirement — Final
Vicente Varela
12/27/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Vicente Varela
12/26/2024
Filed — Alteration
INSTALL NEW MECHANICAL EQUIPMENT IN PROPOSED EATING AND DRINKING ESTABLISHMENT TO INCLUDE BATHROOM EXHAUST FAN, KITCHEN HOOD, AND SPLIT SYSTEM AIR CONDITIONING UNITS. ALL GENERAL CONSTRUCTION WORK FILED UNDER APPLICATION B00815129-I1.
B00815129-P4
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/09/2024
Violation issued (HPD, closed)
A
03/26/2024
Permit issued — Mechanical Systems
B00815129-S2-MS
01/11/2024
Signed off — Alteration
INSTALL NEW MECHANICAL EQUIPMENT IN PROPOSED EATING AND DRINKING ESTABLISHMENT TO INCLUDE BATHROOM EXHAUST FAN, KITCHEN HOOD, AND SPLIT SYSTEM AIR CONDITIONING UNITS. ALL GENERAL CONSTRUCTION WORK FILED UNDER APPLICATION B00815129-I1.
B00815129-I1
01/11/2024
Signed off — Alteration
INSTALL NEW MECHANICAL EQUIPMENT IN PROPOSED EATING AND DRINKING ESTABLISHMENT TO INCLUDE BATHROOM EXHAUST FAN, KITCHEN HOOD, AND SPLIT SYSTEM AIR CONDITIONING UNITS. ALL GENERAL CONSTRUCTION WORK FILED UNDER APPLICATION B00815129-I1.
B00815129-S1
12/06/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/21/2023
Violation issued (HPD, closed)
I
11/18/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/26/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
08/22/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/08/2023
Filed — Alteration
INSTALL NEW MECHANICAL EQUIPMENT IN PROPOSED EATING AND DRINKING ESTABLISHMENT TO INCLUDE BATHROOM EXHAUST FAN, KITCHEN HOOD, AND SPLIT SYSTEM AIR CONDITIONING UNITS. ALL GENERAL CONSTRUCTION WORK FILED UNDER APPLICATION B00815129-I1.
B00815129-P1
06/08/2023
Filed — Alteration
INSTALL NEW MECHANICAL EQUIPMENT IN PROPOSED EATING AND DRINKING ESTABLISHMENT TO INCLUDE BATHROOM EXHAUST FAN, KITCHEN HOOD, AND SPLIT SYSTEM AIR CONDITIONING UNITS. ALL GENERAL CONSTRUCTION WORK FILED UNDER APPLICATION B00815129-I1.
B00815129-P2
06/08/2023
Filed — Alteration
INSTALL NEW MECHANICAL EQUIPMENT IN PROPOSED EATING AND DRINKING ESTABLISHMENT TO INCLUDE BATHROOM EXHAUST FAN, KITCHEN HOOD, AND SPLIT SYSTEM AIR CONDITIONING UNITS. ALL GENERAL CONSTRUCTION WORK FILED UNDER APPLICATION B00815129-I1.
B00815129-P3
06/06/2023
Special inspection requirement — Final
Vicente Varela
06/06/2023
Special inspection requirement — Energy Code Compliance Inspections
Vicente Varela
06/06/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Vicente Varela
06/06/2023
Special inspection requirement — Mechanical Systems
06/06/2023
Special inspection requirement — Energy Code Compliance Inspections
Vicente Varela
06/06/2023
Special inspection requirement — Final
Vicente Varela
06/06/2023
Special inspection requirement — Ventilation and air distribution system
Vicente Varela
06/06/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Vicente Varela
04/28/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/05/2023
Permit issued — Plumbing
B00815129-S1-PL
04/03/2023
Filed — Alteration
INSTALL NEW MECHANICAL EQUIPMENT IN PROPOSED EATING AND DRINKING ESTABLISHMENT TO INCLUDE BATHROOM EXHAUST FAN, KITCHEN HOOD, AND SPLIT SYSTEM AIR CONDITIONING UNITS. ALL GENERAL CONSTRUCTION WORK FILED UNDER APPLICATION B00815129-I1.
B00815129-S2
03/29/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
03/22/2023
Violation issued (HPD, closed)
A
02/27/2023
Filed — Alteration
INSTALL NEW MECHANICAL EQUIPMENT IN PROPOSED EATING AND DRINKING ESTABLISHMENT TO INCLUDE BATHROOM EXHAUST FAN, KITCHEN HOOD, AND SPLIT SYSTEM AIR CONDITIONING UNITS. ALL GENERAL CONSTRUCTION WORK FILED UNDER APPLICATION B00815129-I1.
B00815129-S1
02/14/2023
Permit issued — General Construction
B00815129-I1-GC
02/01/2023
Filed — Alteration
INSTALL NEW MECHANICAL EQUIPMENT IN PROPOSED EATING AND DRINKING ESTABLISHMENT TO INCLUDE BATHROOM EXHAUST FAN, KITCHEN HOOD, AND SPLIT SYSTEM AIR CONDITIONING UNITS. ALL GENERAL CONSTRUCTION WORK FILED UNDER APPLICATION B00815129-I1.
B00815129-I1
08/01/2022
Permit issued — Mechanical Systems
B00763262-I1-MS
07/21/2022
Filed — Alteration
Installation of new 4 ton heat pump system on 1st floor and associated condenser on the roof as per plans attached herewith. No change to use, egress and occupancy.
B00763262-I1
07/21/2022
Special inspection requirement — Energy Code Compliance Inspections
Dariusz Makara
07/21/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Dariusz Makara
07/21/2022
Special inspection requirement — Permanent certificate
Dariusz Makara
07/14/2022
Special inspection requirement — HVAC-R and service water heating system controls
Dariusz Makara
07/14/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Dariusz Makara
07/14/2022
Special inspection requirement — HVAC-R and service water heating equipment
Dariusz Makara
06/23/2022
Special inspection requirement — Final
Dariusz Makara
06/23/2022
Special inspection requirement — Mechanical Systems
Dariusz Makara
02/24/2022
Violation issued (HPD, closed)
A
02/24/2022
Violation issued (HPD, closed)
I
04/08/2021
Violation issued (HPD, closed)
I
04/08/2021
Violation issued (HPD, closed)
A
11/08/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/29/2019
Violation issued (HPD, closed)
I
Latest 60 of 84 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offINNOVATIVE VENTURES TEAM03/26/2024
DOB NOWPlumbingSigned-offARANDA PLBG & HTG CORP04/05/2023
DOB NOWGeneral ConstructionSigned-offINNOVATIVE VENTURES TEAM02/14/2023
DOB NOWMechanical SystemsPermit IssuedANVA08/01/2022
BISPLISSUEDAMOK INC01/20/2000
BISEQISSUEDG E M AMERICAN CONST CORP01/13/2000
BISOTISSUEDG E M AMERICAN CONST CORP01/13/2000
1 project · most recent 07/21/2022
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/21/2022Permit IssuedANVA LLCHeating and Air Conditioning Systems
Heat / Cool
Daikin RXTQQ48TAVJU 45,500 BTU · Vrf Outdoor ×1
2 projects · most recent 09/10/2025
General Wiring
FiledStatusContractorScope
09/10/2025CompleteAPOLLO ELECTRIC USA, INCGeneral Wiring
01/30/2023CompleteN.Z. PILGRIM ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
12/06/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/18/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/26/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/22/2023Fail-Final General Construction Non-Directive 14FailView ↗
04/28/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/29/2023Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
12/27/2024Ventilation and air distribution systemVicente Varelaenergy_progress
12/27/2024Mechanical SystemsREJEP KOLARspecial
12/27/2024Energy Code Compliance InspectionsVicente Varelaprogress
12/27/2024FinalVicente Varelaprogress
12/27/2024HVAC-R and service water piping design and insulationVicente Varelaenergy_progress
06/06/2023FinalVicente Varelaprogress
06/06/2023Energy Code Compliance InspectionsVicente Varelaprogress
06/06/2023HVAC-R and service water piping design and insulationVicente Varelaenergy_progress
06/06/2023Mechanical Systems—special
06/06/2023Energy Code Compliance InspectionsVicente Varelaprogress
06/06/2023FinalVicente Varelaprogress
06/06/2023Ventilation and air distribution systemVicente Varelaenergy_progress
06/06/2023HVAC-R and service water piping design and insulationVicente Varelaenergy_progress
07/21/2022Energy Code Compliance InspectionsDariusz Makaraprogress
07/21/2022Fire-Resistant Penetrations and JointsDariusz Makaraspecial
07/21/2022Permanent certificateDariusz Makaraenergy_progress
07/14/2022HVAC-R and service water heating system controlsDariusz Makaraenergy_progress
07/14/2022HVAC-R and service water piping design and insulationDariusz Makaraenergy_progress
07/14/2022HVAC-R and service water heating equipmentDariusz Makaraenergy_progress
06/23/2022FinalDariusz Makaraprogress
06/23/2022Mechanical SystemsDariusz Makaraspecial
▾Documents — 37 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/29/2026B00763262-I1Request digital key ↗
08/27/2026B00815129-S2Request digital key ↗
08/27/2026B00815129-S1Request digital key ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications21
▸DOB NOWProgress Inspector Seal & Signature10
08/28/2026B00763262-I1Open ↗
08/28/2026B00763262-I1Open ↗
08/28/2026B00763262-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/29/2026B00763262-I1Open ↗
08/27/2026B00815129-P1Open ↗
08/27/2026B00815129-S2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/28/2026B00763262-I1Open ↗
08/28/2026B00763262-I1Open ↗
08/25/2026B00815129-S2Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/29/2026B00763262-I1Open ↗
08/27/2026B00815129-S2Open ↗
08/27/2026B00815129-S1Open ↗
Showing 3 of 8 on file for this type