Roof13p · 5 filings · 20 docs
ArchitectureElectricalFire ProtectionMechanicalPlumbingStructural
Installation of a new domestic water, gas system, sewer, and storm water, sanitary water system as indicated on plans.
On file for this project
16 documents · 4 drawing sheets
Mechanical Scope to be filed as per plans filed herewith.
On file for this project
19 documents · 5 drawing sheets
Structural application filed in conjunction to NB B00564411
On file for this project
11 documents · 2 drawing sheets
Latest 3 of 5 filings on this floor.
Bulkhead6p · 3 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Installation of a new domestic water, gas system, sewer, and storm water, sanitary water system as indicated on plans.
On file for this project
16 documents · 3 drawing sheets
Mechanical Scope to be filed as per plans filed herewith.
On file for this project
19 documents · 2 drawing sheets
Structural application filed in conjunction to NB B00564411
On file for this project
11 documents · 2 drawing sheets
Floor 441p · 1 filing · 19 docs
Mechanical
Mechanical Scope to be filed as per plans filed herewith.
On file for this project
19 documents · 1 drawing sheet
Floor 431p · 1 filing · 19 docs
Mechanical
Mechanical Scope to be filed as per plans filed herewith.
On file for this project
19 documents · 1 drawing sheet
Floor 421p · 1 filing · 19 docs
Mechanical
Mechanical Scope to be filed as per plans filed herewith.
On file for this project
19 documents · 1 drawing sheet
Floor 411p · 1 filing · 19 docs
Mechanical
Mechanical Scope to be filed as per plans filed herewith.
On file for this project
19 documents · 1 drawing sheet
Floor 401p · 1 filing · 19 docs
Mechanical
Mechanical Scope to be filed as per plans filed herewith.
On file for this project
19 documents · 1 drawing sheet
Floor 391p · 1 filing · 19 docs
Mechanical
Mechanical Scope to be filed as per plans filed herewith.
On file for this project
19 documents · 1 drawing sheet
Floor 381p · 1 filing · 19 docs
Mechanical
Mechanical Scope to be filed as per plans filed herewith.
On file for this project
19 documents · 1 drawing sheet
Floor 371p · 1 filing · 19 docs
Mechanical
Mechanical Scope to be filed as per plans filed herewith.
On file for this project
19 documents · 1 drawing sheet
Floor 361p · 1 filing · 19 docs
Mechanical
Mechanical Scope to be filed as per plans filed herewith.
On file for this project
19 documents · 1 drawing sheet
Floor 351p · 1 filing · 19 docs
Mechanical
Mechanical Scope to be filed as per plans filed herewith.
On file for this project
19 documents · 1 drawing sheet
Floor 341p · 1 filing · 19 docs
Mechanical
Mechanical Scope to be filed as per plans filed herewith.
On file for this project
19 documents · 1 drawing sheet
Floor 331p · 1 filing · 19 docs
Mechanical
Mechanical Scope to be filed as per plans filed herewith.
On file for this project
19 documents · 1 drawing sheet
Floor 321p · 1 filing · 19 docs
Mechanical
Mechanical Scope to be filed as per plans filed herewith.
On file for this project
19 documents · 1 drawing sheet
Floor 311p · 1 filing · 19 docs
Mechanical
Mechanical Scope to be filed as per plans filed herewith.
On file for this project
19 documents · 1 drawing sheet
Floor 301p · 1 filing · 19 docs
Mechanical
Mechanical Scope to be filed as per plans filed herewith.
On file for this project
19 documents · 1 drawing sheet
Floor 291p · 1 filing · 19 docs
Mechanical
Mechanical Scope to be filed as per plans filed herewith.
On file for this project
19 documents · 1 drawing sheet
Floor 281p · 1 filing · 19 docs
Mechanical
Mechanical Scope to be filed as per plans filed herewith.
On file for this project
19 documents · 1 drawing sheet
Floor 271p · 1 filing · 19 docs
Mechanical
Mechanical Scope to be filed as per plans filed herewith.
On file for this project
19 documents · 1 drawing sheet
Floor 261p · 1 filing · 19 docs
Mechanical
Mechanical Scope to be filed as per plans filed herewith.
On file for this project
19 documents · 1 drawing sheet
Floor 251p · 1 filing · 19 docs
Mechanical
Mechanical Scope to be filed as per plans filed herewith.
On file for this project
19 documents · 1 drawing sheet
Floor 241p · 1 filing · 19 docs
Mechanical
Mechanical Scope to be filed as per plans filed herewith.
On file for this project
19 documents · 1 drawing sheet
Floor 238p · 4 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Installation of a new domestic water, gas system, sewer, and storm water, sanitary water system as indicated on plans.
On file for this project
16 documents · 3 drawing sheets
Mechanical Scope to be filed as per plans filed herewith.
On file for this project
19 documents · 4 drawing sheets
Structural application filed in conjunction to NB B00564411
On file for this project
11 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 229p · 3 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Installation of a new domestic water, gas system, sewer, and storm water, sanitary water system as indicated on plans.
On file for this project
16 documents · 5 drawing sheets
Mechanical Scope to be filed as per plans filed herewith.
On file for this project
19 documents · 4 drawing sheets
INSTALLATION OF OUTRIGGER PLATFORM IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
On file for this project
2 documents · 1 drawing sheet
Floor 2110p · 3 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Installation of a new domestic water, gas system, sewer, and storm water, sanitary water system as indicated on plans.
On file for this project
16 documents · 6 drawing sheets
Mechanical Scope to be filed as per plans filed herewith.
On file for this project
19 documents · 4 drawing sheets
INSTALLATION OF OUTRIGGER PLATFORM IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
On file for this project
2 documents · 1 drawing sheet
Floor 205p · 4 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Installation of a new domestic water, gas system, sewer, and storm water, sanitary water system as indicated on plans.
On file for this project
16 documents · 3 drawing sheets
Mechanical Scope to be filed as per plans filed herewith.
On file for this project
19 documents · 2 drawing sheets
Structural application filed in conjunction to NB B00564411
On file for this project
11 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 196p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Installation of a new domestic water, gas system, sewer, and storm water, sanitary water system as indicated on plans.
On file for this project
16 documents · 3 drawing sheets
Mechanical Scope to be filed as per plans filed herewith.
On file for this project
19 documents · 3 drawing sheets
Structural application filed in conjunction to NB B00564411
On file for this project
11 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 184p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Installation of a new domestic water, gas system, sewer, and storm water, sanitary water system as indicated on plans.
On file for this project
16 documents · 2 drawing sheets
Mechanical Scope to be filed as per plans filed herewith.
On file for this project
19 documents · 2 drawing sheets
Structural application filed in conjunction to NB B00564411
On file for this project
11 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 175p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Installation of a new domestic water, gas system, sewer, and storm water, sanitary water system as indicated on plans.
On file for this project
16 documents · 3 drawing sheets
Mechanical Scope to be filed as per plans filed herewith.
On file for this project
19 documents · 2 drawing sheets
Structural application filed in conjunction to NB B00564411
On file for this project
11 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 164p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Installation of a new domestic water, gas system, sewer, and storm water, sanitary water system as indicated on plans.
On file for this project
16 documents · 3 drawing sheets
Mechanical Scope to be filed as per plans filed herewith.
On file for this project
19 documents · 1 drawing sheet
Structural application filed in conjunction to NB B00564411
On file for this project
11 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 159p · 4 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
Installation of a new domestic water, gas system, sewer, and storm water, sanitary water system as indicated on plans.
On file for this project
16 documents · 4 drawing sheets
Mechanical Scope to be filed as per plans filed herewith.
On file for this project
19 documents · 4 drawing sheets
Structural application filed in conjunction to NB B00564411
On file for this project
11 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 148p · 4 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
Installation of a new domestic water, gas system, sewer, and storm water, sanitary water system as indicated on plans.
On file for this project
16 documents · 3 drawing sheets
Mechanical Scope to be filed as per plans filed herewith.
On file for this project
19 documents · 4 drawing sheets
Installation of temporary heavy duty sidewalk shed and supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
On file for this project
11 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 139p · 3 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Installation of a new domestic water, gas system, sewer, and storm water, sanitary water system as indicated on plans.
On file for this project
16 documents · 5 drawing sheets
Mechanical Scope to be filed as per plans filed herewith.
On file for this project
19 documents · 4 drawing sheets
INSTALLATION OF OUTRIGGER PLATFORM IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
On file for this project
2 documents · 1 drawing sheet
Floor 127p · 3 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
Installation of a new domestic water, gas system, sewer, and storm water, sanitary water system as indicated on plans.
On file for this project
16 documents · 3 drawing sheets
Mechanical Scope to be filed as per plans filed herewith.
On file for this project
19 documents · 4 drawing sheets
INSTALLATION OF OUTRIGGER PLATFORM IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
On file for this project
2 documents · 1 drawing sheet
Floor 116p · 3 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
Installation of a new domestic water, gas system, sewer, and storm water, sanitary water system as indicated on plans.
On file for this project
16 documents · 3 drawing sheets
Mechanical Scope to be filed as per plans filed herewith.
On file for this project
19 documents · 3 drawing sheets
INSTALLATION OF OUTRIGGER PLATFORM IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
On file for this project
2 documents · 1 drawing sheet
Floor 109p · 4 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
Installation of a new domestic water, gas system, sewer, and storm water, sanitary water system as indicated on plans.
On file for this project
16 documents · 3 drawing sheets
Mechanical Scope to be filed as per plans filed herewith.
On file for this project
19 documents · 4 drawing sheets
Structural application filed in conjunction to NB B00564411
On file for this project
11 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 912p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Installation of a new domestic water, gas system, sewer, and storm water, sanitary water system as indicated on plans.
On file for this project
16 documents · 7 drawing sheets
Mechanical Scope to be filed as per plans filed herewith.
On file for this project
19 documents · 4 drawing sheets
Structural application filed in conjunction to NB B00564411
On file for this project
11 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 812p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Installation of a new domestic water, gas system, sewer, and storm water, sanitary water system as indicated on plans.
On file for this project
16 documents · 6 drawing sheets
Mechanical Scope to be filed as per plans filed herewith.
On file for this project
19 documents · 4 drawing sheets
Structural application filed in conjunction to NB B00564411
On file for this project
11 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 713p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Installation of a new domestic water, gas system, sewer, and storm water, sanitary water system as indicated on plans.
On file for this project
16 documents · 8 drawing sheets
Mechanical Scope to be filed as per plans filed herewith.
On file for this project
19 documents · 3 drawing sheets
Structural application filed in conjunction to NB B00564411
On file for this project
11 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 611p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Installation of a new domestic water, gas system, sewer, and storm water, sanitary water system as indicated on plans.
On file for this project
16 documents · 6 drawing sheets
Mechanical Scope to be filed as per plans filed herewith.
On file for this project
19 documents · 3 drawing sheets
Structural application filed in conjunction to NB B00564411
On file for this project
11 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 5Under Construction135p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction
Installation of a new domestic water, gas system, sewer, and storm water, sanitary water system as indicated on plans.
On file for this project
16 documents · 5 drawing sheets
Mechanical Scope to be filed as per plans filed herewith.
On file for this project
19 documents · 3 drawing sheets
Structural application filed in conjunction to NB B00564411
On file for this project
11 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 4Under Construction133p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction
Installation of a new domestic water, gas system, sewer, and storm water, sanitary water system as indicated on plans.
On file for this project
16 documents · 4 drawing sheets
Mechanical Scope to be filed as per plans filed herewith.
On file for this project
19 documents · 3 drawing sheets
Structural application filed in conjunction to NB B00564411
On file for this project
11 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 3Under Construction134p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction
Installation of a new domestic water, gas system, sewer, and storm water, sanitary water system as indicated on plans.
On file for this project
16 documents · 3 drawing sheets
Mechanical Scope to be filed as per plans filed herewith.
On file for this project
19 documents · 3 drawing sheets
Structural application filed in conjunction to NB B00564411
On file for this project
11 documents · 3 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 2Under Construction133p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction
Installation of a new domestic water, gas system, sewer, and storm water, sanitary water system as indicated on plans.
On file for this project
16 documents · 4 drawing sheets
Mechanical Scope to be filed as per plans filed herewith.
On file for this project
19 documents · 4 drawing sheets
Structural application filed in conjunction to NB B00564411
On file for this project
11 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 1Under Construction131p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction
Installation of a new domestic water, gas system, sewer, and storm water, sanitary water system as indicated on plans.
On file for this project
16 documents · 3 drawing sheets
Mechanical Scope to be filed as per plans filed herewith.
On file for this project
19 documents · 3 drawing sheets
Structural application filed in conjunction to NB B00564411
On file for this project
11 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
CellarUnder Construction134p · 4 filings · 20 docs
ArchitectureCivilFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction
Installation of a new domestic water, gas system, sewer, and storm water, sanitary water system as indicated on plans.
On file for this project
16 documents · 4 drawing sheets
Mechanical Scope to be filed as per plans filed herewith.
On file for this project
19 documents · 3 drawing sheets
Temporary standpipe application in conjunction to NB B00564411-I1
On file for this project
180 documents · 3 drawing sheets
Latest 3 of 4 filings on this floor.