ECB09/16/2025FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH DEPARTMENT OF BUILDING FOR SUMMONS 39519343X., FILE A CERTIFICATE OF CORRECTION$6K due
DOB08/18/2024STRUCTURING RENDERED NON COMPLIANT DAMAGE OBSERVED TO SIDE WALK SHED TO HAVE BEEN CAUSED BY VEHICLE IMPACT CAUSING SIDEWALK SHED TO COLLAPS ED COMPLETELY
DOB11/22/2023FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB07/18/2023INSTALL APPROXIMATELY 20 LINEAR FEET OF SIDEWALKSHED ALONG THE LORIMER SIDEOF PREMISES. THE SECTION OF SIDEWALK SHED SHALL BE CENTERED BELOW THIS 2NDSTORY WINDOW LOCATED AT CENTER SPAN OF THE THREE STORY PORTION OF THE BUILDING
ECB07/17/2023NOTED : OBSERVED BRICK WALL OVER THE SIDEWALK OF LORIMER STREET SIDE HAS SEVERAL CRACKS AND IS BULGING BELOW THE SECOND FLOOR.$1K due
DOB10/01/2015VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
DOB09/28/2009V-DOB VIOLATION - ACTIVE
HPD03/31/2005SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE SAGGING WOOD FLOOR AT PUBLIC HALL, 2nd STORY
HPD03/31/2005SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR FIRE RETARDING CEILINGS AND WALLS FROM 1ST TO 3RD STY AT PUBLIC HALL
HPD03/31/2005SECTION 27-2005 ADMIN. CODE: PROPERLY SECURE THE LOOSE 8 BALUSTER AT HANDRAIL/BANISTER AT PUBLIC HALL, 2nd STORY
HPD03/31/2005SECTION 27-2005 ADMIN. CODE: REPLACE WITH NEW THE MISSING 5 BALUSTERS AT HANDRAIL/BANISTER AT PUBLIC HALL, 2nd STORY
DOB02/27/2001V-DOB VIOLATION - ACTIVE
ECB09/25/2009FAILURE TO MAINTAIN BLDG EXTERIOR WALL. DEFECT NOTED: AT EXP 2 BRICK WALL BULGING THROUGHOUT WALL, CRACK IN BRICK ABOVE 2ND STY WINDOW THROUGH 3RD STY WINDOW. REMEDY: PROVIDE DOB ENGINEERS REPORT ENSURINGNothing owed — awaiting certificate of correction
ECB07/24/2007FAILURE TO MAINTAIN BUILDING EAST ELEVATION EXTERIOR BLDG WALL IS OUT OF PLUMB AND BULGING B/W 2ND & 3RD FLR WINDOWS. ALSO, NUMEROUS VERTICAL CRACKS. REMEDY: REPAIR WALL AND OBTAIN ENGINEERS REPORT.Nothing owed — awaiting certificate of correction
ECB08/28/199024A,24B,31A,18B,422 INSTALL STACH CLEANOUT DOOR AT BASE OF CHIMNEY.Nothing owed — awaiting certificate of correction
Single or multiple dwelling with stores or offices · 1,850 sf lot · 1.6 FAR built · Flood zone X