Primarily 2 family with 1 store or office
5716 8TH AVENUE
BROOKLYN · BIN 3015887
💬 Discuss this project
1931Year Built
3Stories
S2Building Class
R6Zoning
3,680 sfGross Floor Area
3Units
Rent Stabilized3 Active Violations ▸FDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: De Chun Chen Group · 1,600 sf lot · 2.3 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofMechanical work9p · 1 filing · 12 docs
Floor 36p · 2 filings · 20 docs
Floor 27p · 2 filings · 20 docs
Floor 11988 Toast17p · 4 filings · 20 docs
Cellar1988 Toast5p · 1 filing · 15 docs
Site & exterior1988 Toast1p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1988 Toast2907/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/22/2022$4.7M—V.R. CHU MANAGEMENT CORP → DE CHUN CHEN GROUP INC$1,271/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MSM Engineering Services602/16/2024
ABC Engineering510/26/2023
Yang Engineering512/02/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ABC Engineering603/21/2026
Modern Building Consultant603/21/2026
JRL Skyline1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JZ Construction GroupGeneral Contractor407/08/2026
Winway DevelopmentGeneral Contractor107/08/2026
R.G.M. SignsSign hanger107/08/2026
Dynamic Plumbing & SprinklerPlumbing107/08/2026
Premier Flow Plumbing and HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MSM Engineering Services8449502/16/2024
Great Wall Consultant P.E5633101/08/2024
ABC Engineering1515110/26/2023
Yang Engineering8376512/02/2022
Building Lifecycle
All (88)Filed (16)Permit Issued (6)Signed Off (4)Violation (5)Inspection (5)Objection (22)Special Inspection (30)
11/24/2025
Violation issued (HPD, open)
I
12/04/2024
Violation issued (HPD, open)
I
04/15/2024
Signed off — Alteration
Propose interior renovation at 1st commercial space with new partition work and floor finishes as per plan. No change in use, egress, or occupancy.
B00958709-I1
04/15/2024
Signed off — Alteration
Propose new non-illuminated signage @ commercial space as per plan. No change in use egress or occupancy.
B00984506-I1
02/29/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/20/2024
Permit issued — Sign
B00984506-I1-SG
02/20/2024
Special inspection requirement — Interior lighting power
MOHAMED MAHMOUD
02/20/2024
Special inspection requirement — Energy Code Compliance Inspections
MOHAMED MAHMOUD
02/20/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMED MAHMOUD
02/20/2024
Special inspection requirement — Tenant Protection Plan Compliance
MOHAMED MAHMOUD
02/20/2024
Special inspection requirement — Fire-Resistance Rated Construction
MOHAMED MAHMOUD
02/16/2024
Filed — Alteration
Propose interior renovation at 1st commercial space with new partition work and floor finishes as per plan. No change in use, egress, or occupancy.
B00958709-P1
01/18/2024
Objection raised — Other
01/18/2024
Objection resolved — Addressed
01/18/2024
Objection resolved — Addressed
01/18/2024
Objection resolved — Addressed
01/18/2024
Objection resolved — Addressed
01/18/2024
Objection resolved — Addressed
01/18/2024
Objection resolved — Addressed
01/18/2024
Objection resolved — Addressed
01/18/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Xiong Wei Wu
01/12/2024
Objection raised — Admin
01/12/2024
Objection raised — Admin
01/12/2024
Objection raised — Zoning
01/12/2024
Objection raised — Admin
01/12/2024
Objection raised — Zoning
01/12/2024
Objection raised — Other
01/08/2024
Filed — Alteration
Propose new non-illuminated signage @ commercial space as per plan. No change in use egress or occupancy.
B00984506-I1
01/08/2024
Special inspection requirement — Final
MOHAMED MAHMOUD
12/07/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/01/2023
Filed — Alteration
Propose pluming work at 1st commercial space as per plan. No change in use, egress, or occupancy.
B00958717-P1
12/01/2023
Special inspection requirement — Tenant Protection Plan Compliance
12/01/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMED MAHMOUD
12/01/2023
Special inspection requirement — Tenant Protection Plan Compliance
12/01/2023
Special inspection requirement — Energy Code Compliance Inspections
MOHAMED MAHMOUD
12/01/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMED MAHMOUD
12/01/2023
Special inspection requirement — Energy Code Compliance Inspections
MOHAMED MAHMOUD
11/28/2023
Violation issued (HPD, open)
I
11/16/2023
Permit issued — Mechanical Systems
B00958722-I1-MS
11/14/2023
Permit issued — General Construction
B00958709-I1-GC
11/14/2023
Permit issued — Plumbing
B00958717-I1-PL
11/10/2023
Filed — Alteration
Propose mechanical work at 1st commercial space and roof as per plan. No change in use, egress, or occupancy.
B00958722-I1
11/10/2023
Special inspection requirement — Ventilation and air distribution system
MOHAMED MAHMOUD
11/10/2023
Special inspection requirement — Maintenance information
MOHAMED MAHMOUD
11/10/2023
Special inspection requirement — Fire-Resistance Rated Construction
MOHAMED MAHMOUD
11/10/2023
Special inspection requirement — Energy Code Compliance Inspections
MOHAMED MAHMOUD
11/10/2023
Special inspection requirement — Tenant Protection Plan Compliance
MOHAMED MAHMOUD
11/10/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMED MAHMOUD
11/10/2023
Special inspection requirement — Duct leakage testing, insulation and design
MOHAMED MAHMOUD
11/08/2023
Filed — Alteration
Propose interior renovation at 1st commercial space with new partition work and floor finishes as per plan. No change in use, egress, or occupancy.
B00958709-I1
11/08/2023
Filed — Alteration
Propose pluming work at 1st commercial space as per plan. No change in use, egress, or occupancy.
B00958717-I1
11/06/2023
Special inspection requirement — Final
MOHAMED MAHMOUD
11/06/2023
Special inspection requirement — Mechanical Systems
MOHAMED MAHMOUD
10/26/2023
Filed — Alteration
REMOVAL OF EXISTING NON-BEARING STOREFRONT PARTITION, INTERIOR WALL FINISH, CEILING FINISH, AND FLOOR FINISH OF EXIST COMMERCIAL SPACE AT 1ST FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00953582-I1
10/26/2023
Special inspection requirement — Final
HUI ZENG
10/25/2023
Special inspection requirement — Tenant Protection Plan Compliance
HUI ZENG
10/16/2023
Filed — Alteration
B00948358-I1
10/11/2023
Objection resolved — Addressed
10/05/2023
Objection raised — Scope
10/05/2023
Objection resolved — Addressed
Latest 60 of 88 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offR.G.M. Signs02/20/2024
DOB NOWMechanical SystemsPermit IssuedJZ Construction Group11/16/2023
DOB NOWGeneral ConstructionSigned-offJZ Construction Group11/14/2023
DOB NOWPlumbingPermit IssuedGalicja Plumbing and Heating11/14/2023
DOB NOWPlumbingSigned-offCitywide Plumbing & Heating & SPKLS10/03/2022
DOB NOWGeneral ConstructionSigned-offWinway Development09/26/2022
BISOTRE-ISSUEDA-1 Watermain & Sewer06/11/2004
BISPLRE-ISSUEDRayward Plumbing09/09/1991
BISOTISSUEDArts Building08/22/1991
1 project · most recent 11/10/2023
Ventilation Systems
FiledStatusContractorScope
11/10/2023Permit IssuedJZ Construction GroupVentilation Systems
2 projects · most recent 12/01/2023
Water/Sanitary
FiledStatusContractorScope
12/01/2023Permit IssuedPremier Flow Plumbing and HeatingWater/Sanitary
10/04/2023——Water/Sanitary
1 project · most recent 10/04/2023
Fence
FiledStatusContractorScope
10/04/2023——Fence
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
02/29/2024Pass-Final General Construction Non-Directive 14PassView ↗
12/07/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/30/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/27/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/25/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 47
DateRequirementInspectorRole
02/20/2024Interior lighting powerMOHAMED MAHMOUDenergy_progress
02/20/2024Energy Code Compliance InspectionsMOHAMED MAHMOUDprogress
02/20/2024Fire-Resistant Penetrations and JointsMOHAMED MAHMOUDspecial
02/20/2024Tenant Protection Plan ComplianceMOHAMED MAHMOUDspecial
02/20/2024Fire-Resistance Rated ConstructionMOHAMED MAHMOUDprogress
01/18/2024Structural Stability – Alterations of existing buildingsXiong Wei Wuspecial
01/08/2024FinalMOHAMED MAHMOUDprogress
12/01/2023Tenant Protection Plan Compliance—special
12/01/2023Fire-Resistant Penetrations and JointsMOHAMED MAHMOUDspecial
12/01/2023Tenant Protection Plan Compliance—special
12/01/2023Energy Code Compliance InspectionsMOHAMED MAHMOUDprogress
12/01/2023Fire-Resistant Penetrations and JointsMOHAMED MAHMOUDspecial
12/01/2023Energy Code Compliance InspectionsMOHAMED MAHMOUDprogress
11/10/2023Ventilation and air distribution systemMOHAMED MAHMOUDenergy_progress
11/10/2023Maintenance informationMOHAMED MAHMOUDenergy_progress
11/10/2023Fire-Resistance Rated ConstructionMOHAMED MAHMOUDprogress
11/10/2023Energy Code Compliance InspectionsMOHAMED MAHMOUDprogress
11/10/2023Tenant Protection Plan ComplianceMOHAMED MAHMOUDspecial
11/10/2023Fire-Resistant Penetrations and JointsMOHAMED MAHMOUDspecial
11/10/2023Duct leakage testing, insulation and designMOHAMED MAHMOUDenergy_progress
11/06/2023FinalMOHAMED MAHMOUDprogress
11/06/2023Mechanical SystemsMOHAMED MAHMOUDspecial
10/26/2023FinalHUI ZENGprogress
10/25/2023Tenant Protection Plan ComplianceHUI ZENGspecial
10/03/2023Tenant Protection Plan Compliance—special
Latest 25 of 47.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
1988 ToastRestaurant / Food ServiceCellar, Floor 1
Project B00984506 Alteration · LOC Issued · 01/08/2024
Project B00958709 Alteration · LOC Issued · 11/08/2023
Project B00958717 Alteration · Permit Entire · 11/08/2023
Project B00953582 Alteration · Permit Entire · 10/26/2023
Project B00939172 Alteration · Filing Withdrawn · 09/27/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 79 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch18
08/28/2026B08005307-P1Request digital key ↗
08/28/2026B08005307-I1Request digital key ↗
08/28/2026B08005338-I1Request digital key ↗
Showing 3 of 18 on file for this type
▸Seals & Professional Certifications47
▸DOB NOWDPL-1: Design Professional Seal & Signature18
08/28/2026B08005307-P1Open ↗
08/28/2026B08005307-I1Open ↗
08/28/2026B08005338-P2Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWProgress Inspector Seal & Signature15
09/01/2026B00953582-I1Open ↗
09/01/2026B00958717-P3Open ↗
08/31/2026B00958722-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
09/01/2026B08005338-P2Open ↗
09/01/2026B00953582-I1Open ↗
09/01/2026B08005338-I1Open ↗
Showing 3 of 14 on file for this type
▸Environmental & Asbestos14
▸DOB NOWDEP ACP-5: Asbestos Assessment Report14
08/28/2026B08005307-P1Open ↗
08/28/2026B08005307-I1Open ↗
08/28/2026B08005338-I1Open ↗
Showing 3 of 14 on file for this type