← Back
Elevator apt, fireproof with stores
Oskar
572 11 AVENUE · BIN 1090460
💬 Discuss this project
2016Year Built
13Stories
D6Building Class
R9Zoning
184,117 sfGross Floor Area
165Units
LL97 CoveredRent Stabilized17 Open Violations ▸FISP: SWARMP
Elevator apt, fireproof with stores · Owner of record: VHH OSKAR, LP · 16,969 sf lot · 10.85 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Roof2p · 3 filings · 11 docs
Floor 113p · 3 filings · 20 docs
Cellar2p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MOINIAN GROUP4607/08/2026
BLUE JAY CONTRACTING404/09/2026
RELIABLE ENTERPRISES603/22/2026
VHH OSKAR, LP103/22/2026
GREEN BUILDERS GROUP NY203/21/2026
MENUYON LLC C/O THE MOINAN GROUP203/21/2026
MEZUYON2803/21/2026
MEZUYON LLC C O THE MOINAN GROUP2503/21/2026
MEZUYON LLC C O THE MOINIAN GRP603/21/2026
MENUYON LLC C O THE MOINAN GROUP203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SNR EXPEDITING DESIGN403/21/2026
SYNERGY BUILDING CONSULTANTS203/21/2026
WILLIAM VITACCO ASSOCIATES803/21/2026
EA DESIGN GROUP603/21/2026
AE DESIGN SOLUTION203/21/2026
LOUIS STRIAR203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
THESQUARE.NYC CORPGeneral Contractor407/08/2026
ZAQ CONSTRUCTION INCGeneral Contractor307/08/2026
BLUE JAY CONTRACTING INCGeneral Contractor204/09/2026
BEDROCK PLBG. & HTG., INCPlumbing207/08/2026
RELIABLE ENTERPRISES INCGeneral Contractor203/21/2026
EVEREST SCAFFOLDING INCGeneral Contractor107/08/2026
PLESCIA CONSTR & DEV LLCGeneral Contractor107/08/2026
AGIUS PLUMBING & HTG INCPlumbing107/08/2026
HP SERVICES INCPlumbing107/08/2026
RICHARD NEUElectrical103/22/2026
A1 SPECIALIZED, INCScaffold105/29/2026
RICHARD NEUElectrical103/21/2026
EXPERT FIRE SPRINKLER,LLCFire Protection107/08/2026
PSI PARTNERS, LLCFire Protection107/08/2026
ABMG GENERAL CONTRACTINGGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KZ ENGINEERING, P.C.4665208/26/2025
VERSAI LLC8133206/11/2025
TL ENGINEERING, PC1222605/02/2025
JACK GREEN ASSOCIATES422401/14/2025
M/P/S ENGINEERING PLLC1588110/15/2020
SPECIAL TESTING & CONSULT1688103/11/2020
Building Lifecycle
All (166)Filed (22)Permit Issued (18)Signed Off (15)Facade (FISP) (3)Violation (60)Inspection (14)Objection (4)Special Inspection (30)
08/14/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/27/2026
Signed off — Alteration
ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - NAIL STUDIO LURE. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M01224231-I1
05/11/2026
Permit issued — Sign
M01224231-I1-SG
05/11/2026
Violation issued (HPD, open)
B
05/11/2026
Violation issued (HPD, open)
B
05/11/2026
Violation issued (HPD, open)
B
03/07/2026
Violation issued (HPD, open)
B
02/13/2026
Signed off — Alteration
Installation of suspended scaffold for facade inspection/ repair.
M01229628-I1
01/21/2026
Signed off — Alteration
M01239373-I1
12/01/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/26/2025
Violation issued (HPD, closed)
B
10/28/2025
Violation issued (HPD, closed)
B
10/28/2025
Violation issued (HPD, open)
A
10/28/2025
Violation issued (HPD, open)
B
10/28/2025
Violation issued (HPD, closed)
B
08/29/2025
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01279122-I1
08/29/2025
Permit issued — Supported Scaffold
M01279122-I1-SF
08/28/2025
Special inspection requirement — Post-installed Anchors
Karol Zdancewicz
08/28/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Karol Zdancewicz
08/27/2025
Objection raised — Other
08/27/2025
Objection resolved — Addressed
08/26/2025
Filed — Alteration
Installation of suspended scaffold for facade inspection/ repair.
M01229628-P1
08/25/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Karol Zdancewicz
08/25/2025
Special inspection requirement — Post-installed Anchors
Karol Zdancewicz
06/27/2025
Signed off — Alteration
SPRINKLERS WORK FOR NAIL SALON ON FIRST FLOOR AT EXISTING 13-STORY MIXED USE BUILDING. NO CHANGE IN USE, OCCUPANCY, EGRESS AND STRUCTURE UNDER THIS APPLICATION.
M01115945-S3
06/24/2025
Permit issued — General Construction
M01239373-I1-GC
06/11/2025
Filed — Alteration
M01239373-I1
06/03/2025
Signed off — Alteration
SPRINKLERS WORK FOR NAIL SALON ON FIRST FLOOR AT EXISTING 13-STORY MIXED USE BUILDING. NO CHANGE IN USE, OCCUPANCY, EGRESS AND STRUCTURE UNDER THIS APPLICATION.
M01115945-S1
05/22/2025
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01230139-I1
05/22/2025
Permit issued — Sidewalk Shed
M01230139-I1-SH
05/22/2025
Permit issued — Suspended Scaffold
M01229628-I1-SC
05/22/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/21/2025
Filed — Alteration
Installation of suspended scaffold for facade inspection/ repair.
M01229628-I1
05/20/2025
Violation issued (ECB, closed)
Local Law
05/19/2025
Filed — Alteration
ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - NAIL STUDIO LURE. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M01224231-I1
05/19/2025
Signed off — Alteration
SPRINKLERS WORK FOR NAIL SALON ON FIRST FLOOR AT EXISTING 13-STORY MIXED USE BUILDING. NO CHANGE IN USE, OCCUPANCY, EGRESS AND STRUCTURE UNDER THIS APPLICATION.
M01115945-I1
05/19/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/16/2025
Signed off — Alteration
SPRINKLERS WORK FOR NAIL SALON ON FIRST FLOOR AT EXISTING 13-STORY MIXED USE BUILDING. NO CHANGE IN USE, OCCUPANCY, EGRESS AND STRUCTURE UNDER THIS APPLICATION.
M01115945-S2
05/14/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
05/09/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/05/2025
Special inspection requirement — Energy Code Compliance Inspections
Simon Lee
05/05/2025
Special inspection requirement — Tenant Protection Plan Compliance
Simon Lee
05/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Simon Lee
05/05/2025
Special inspection requirement — Interior lighting power
Simon Lee
05/05/2025
Special inspection requirement — Lighting controls
Simon Lee
05/02/2025
Filed — Alteration
SPRINKLERS WORK FOR NAIL SALON ON FIRST FLOOR AT EXISTING 13-STORY MIXED USE BUILDING. NO CHANGE IN USE, OCCUPANCY, EGRESS AND STRUCTURE UNDER THIS APPLICATION.
M01115945-P3
04/29/2025
Filed — Alteration
SPRINKLERS WORK FOR NAIL SALON ON FIRST FLOOR AT EXISTING 13-STORY MIXED USE BUILDING. NO CHANGE IN USE, OCCUPANCY, EGRESS AND STRUCTURE UNDER THIS APPLICATION.
M01115945-P2
04/29/2025
Filed — Alteration
SPRINKLERS WORK FOR NAIL SALON ON FIRST FLOOR AT EXISTING 13-STORY MIXED USE BUILDING. NO CHANGE IN USE, OCCUPANCY, EGRESS AND STRUCTURE UNDER THIS APPLICATION.
M01115945-P1
04/23/2025
Special inspection requirement — Final
Simon Lee
04/23/2025
Special inspection requirement — Mechanical Systems
Simon Lee
04/23/2025
Special inspection requirement — Energy Code Compliance Inspections
Simon Lee
04/23/2025
Special inspection requirement — Duct leakage testing, insulation and design
04/23/2025
Special inspection requirement — Tenant Protection Plan Compliance
04/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Simon Lee
04/21/2025
Special inspection requirement — Lighting controls
04/21/2025
Special inspection requirement — Energy Code Compliance Inspections
Simon Lee
04/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Simon Lee
04/21/2025
Special inspection requirement — Tenant Protection Plan Compliance
04/21/2025
Special inspection requirement — Interior lighting power
04/14/2025
Signed off — Alteration
APPLICATION FILED FOR MECHANICAL MODIFICATIONS/ADDITIONS ON THE 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01113048-S1
Latest 60 of 166 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offMAD SIGNS INC05/11/2026
DOB NOWSupported ScaffoldPermit IssuedBLUE JAY CONTRACTING08/29/2025
DOB NOWGeneral ConstructionSigned-offBLUE JAY CONTRACTING06/24/2025
DOB NOWSidewalk ShedPermit IssuedRELIABLE ENTERPRISES INC05/22/2025
DOB NOWSuspended ScaffoldSigned-offSHR3 CONSTRUCTION CORP05/22/2025
DOB NOWGeneral ConstructionSigned-offPLESCIA CONSTR & DEV LLC03/18/2025
DOB NOWGeneral ConstructionSigned-offZAQ CONSTRUCTION INC11/24/2024
DOB NOWMechanical SystemsSigned-offTHESQUARE.NYC CORP11/19/2024
DOB NOWPlumbingSigned-offHP SERVICES INC11/13/2024
DOB NOWSprinklersSigned-offEXPERT FIRE SPRINKLER,LLC11/13/2024
DOB NOWMechanical SystemsSigned-offZAQ CONSTRUCTION INC11/13/2024
DOB NOWPlumbingSigned-offAGIUS PLUMBING & HTG INC10/25/2024
DOB NOWGeneral ConstructionSigned-offTHESQUARE.NYC CORP10/21/2024
DOB NOWPlumbingSigned-offBEDROCK PLBG. & HTG., INC03/30/2022
DOB NOWSprinklersSigned-offMORA FIRE PROTECTION LLC03/02/2022
DOB NOWPlumbingSigned-offBEDROCK PLBG. & HTG., INC03/30/2020
DOB NOWMechanical SystemsSigned-offABMG GENERAL CONTRACTING03/27/2020
DOB NOWSupported ScaffoldSigned-offEVEREST SCAFFOLDING INC10/05/2018
BISOTISSUEDABMG GENERAL CONTRACTING04/01/2021
BISOTISSUEDABMG GENERAL CONTRACTING04/01/2021
BISOTISSUEDPRODUCTION CONTRACT. LLC04/27/2020
BISOTISSUEDABMG GENERAL CONTRACTING04/16/2020
BISOTISSUEDABMG GENERAL CONTRACTING04/16/2020
BISSDISSUEDHEADQUARTERS MECH INC12/04/2019
BISSPISSUEDPLUMBING NYC, INC10/11/2019
BISPLISSUEDSCHUMACHER & FARLEY P&H C10/01/2019
BISOTISSUEDPRODUCTION CONTRACT. LLC06/10/2019
BISPLISSUEDHEADQUARTERS MECH INC05/09/2019
BIS—RE-ISSUEDTISHMAN CONSTRUCTION CORP09/19/2018
BISSPISSUEDPRECISION PLBG SVCS., INC07/30/2018
BISEQISSUEDTISHMAN CONSTRUCTION CORP06/21/2018
BISSDISSUEDHEADQUARTERS MECH INC04/06/2018
BISOTISSUEDTISHMAN CONSTRUCTION CORP03/19/2018
BISEQISSUEDSAFWAY ATLANTIC, LLC03/07/2018
BISPLISSUEDHEADQUARTERS MECH INC03/01/2018
BISEQISSUEDSAFWAY ATLANTIC, LLC01/31/2018
BISEQISSUEDSAFWAY ATLANTIC, LLC01/23/2018
BISSDISSUEDHEADQUARTERS MECH INC01/09/2018
BISBLISSUEDG.BASSOLINO PLUMBING LTD12/29/2017
BISOTISSUEDTISHMAN CONSTRUCTION CORP12/22/2017
+ 28 more permits on file
12 projects · most recent 03/11/2026
General Wiring
FiledStatusContractorScope
03/11/2026Permit IssuedA ELECTRICAL MAIN SVC INC—
05/22/2025Permit IssuedRICHARD NEU—
01/15/2025CompleteASKO ELEC CONST & MAIN INGeneral Wiring
10/30/2024CompleteRONAN ELECTRICAL LLCGeneral Wiring
09/11/2024Permit IssuedOMD ELECTRICAL CORP1 meters, 1 new_meters
02/25/2022Permit IssuedTOP SHELF ELECTRIC CORPGeneral Wiring
04/19/2020Permit IssuedREM & SONS LIC ELEC CONTGeneral Wiring
10/09/2019CompleteTOP SHELF ELECTRIC CORP6 meters, 1 new_meters
10/02/2019CompleteM.C. ELECTRICAL NY INCGeneral Wiring
09/27/2019CompleteM.C. ELECTRICAL NY INC—
07/29/2019CompleteTOP SHELF ELECTRIC CORP6 meters
02/01/2019CompleteTOP SHELF ELECTRIC CORPGeneral Wiring
2 projects · most recent 08/29/2025
Scaffold Sidewalk Shed
FiledStatusContractorScope
08/29/2025Permit IssuedBLUE JAY CONTRACTING INCScaffold
05/22/2025Permit IssuedRELIABLE ENTERPRISES INCSidewalk Shed
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
08/14/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/01/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/22/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/19/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/14/2025Pass-Final General Construction Non-Directive 14PassView ↗
05/09/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/27/2025Certified Water and Sanitary-WS-Sanitary Piping-Water TestCertifiedView ↗
03/20/2025Certified Water and Sanitary-WS-Sanitary Piping-Water TestCertifiedView ↗
03/17/2025Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
03/17/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/12/2025Certified Water and Sanitary-WS-Sanitary Piping-Water TestCertifiedView ↗
02/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/25/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/24/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 50
DateRequirementInspectorRole
08/28/2025Post-installed AnchorsKarol Zdancewiczspecial
08/28/2025Alternative Materials - OTCR Buildings Bulletin NumberKarol Zdancewiczspecial
08/25/2025Alternative Materials - OTCR Buildings Bulletin NumberKarol Zdancewiczspecial
08/25/2025Post-installed AnchorsKarol Zdancewiczspecial
05/05/2025Energy Code Compliance InspectionsSimon Leeprogress
05/05/2025Tenant Protection Plan ComplianceSimon Leespecial
05/05/2025Fire-Resistant Penetrations and JointsSimon Leespecial
05/05/2025Interior lighting powerSimon Leeenergy_progress
05/05/2025Lighting controlsSimon Leeenergy_progress
04/23/2025FinalSimon Leeprogress
04/23/2025Mechanical SystemsSimon Leespecial
04/23/2025Energy Code Compliance InspectionsSimon Leeprogress
04/23/2025Duct leakage testing, insulation and design—energy_progress
04/23/2025Tenant Protection Plan Compliance—special
04/23/2025Fire-Resistant Penetrations and JointsSimon Leespecial
04/21/2025Lighting controls—energy_progress
04/21/2025Energy Code Compliance InspectionsSimon Leeprogress
04/21/2025Fire-Resistant Penetrations and JointsSimon Leespecial
04/21/2025Tenant Protection Plan Compliance—special
04/21/2025Interior lighting power—energy_progress
12/31/2024Fenestration and door U-factor and product ratingsLAWRENCE GREENenergy_progress
12/31/2024Tenant Protection Plan ComplianceLAWRENCE GREENspecial
12/23/2024FinalLAWRENCE GREENprogress
10/07/2024Fire-Resistant Penetrations and JointsJACK GREENspecial
10/07/2024Energy Code Compliance InspectionsJACK GREENprogress
Latest 25 of 50.
▾Documents — 817 on file (BIS + DOB NOW)
▸Plans & Drawings23
▸DOB NOWPlans/Sketch19
09/06/2026M01239186-I1Request digital key ↗
09/06/2026M00083437-I1Request digital key ↗
08/26/2026M01113047-I1Request digital key ↗
Showing 3 of 19 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/05/2026M00309154-I1Request digital key ↗
08/15/2026M00309154-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/05/2026M00309165-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/04/2026M00405594-I1Request digital key ↗
▸Applications & Permits147
▸BISPLAN / WORK APPROVAL APPLICATION105
11/03/2025122459375Open ↗
10/28/2025122459375Open ↗
05/29/2022103940176Open ↗
Showing 3 of 105 on file for this type
▸BISWORK PERMIT APPLICATION38
04/01/2021123841218Open ↗
04/01/2021123841218Open ↗
04/27/2020123841218Open ↗
Showing 3 of 38 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISApplication Withdrawal/Address Change Form OP-1131
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWHPD Certification Letter or CPC Special Permit1
08/13/2026M01239373-I1Open ↗
▸Seals & Professional Certifications181
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION76
07/17/2020122459375Open ↗
04/06/2020122926067Open ↗
04/06/2020122932835Open ↗
Showing 3 of 76 on file for this type
▸DOB NOWProgress Inspector Seal & Signature26
09/02/2026M01115945-P1Open ↗
09/02/2026M01115945-P1Open ↗
09/02/2026M01115945-P1Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature21
09/05/2026M00309154-I1Open ↗
09/05/2026M00309154-P1Open ↗
09/05/2026M00309165-I1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature19
09/02/2026M01115945-P1Open ↗
09/01/2026M01113047-I1Open ↗
09/01/2026M01115945-S3Open ↗
Showing 3 of 19 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST14
04/04/2022123841218Open ↗
02/14/2020123841218Open ↗
06/06/2019123684110Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT13
04/07/2021141000967Open ↗
02/14/2020123841218Open ↗
02/14/2020123841218Open ↗
Showing 3 of 13 on file for this type
▸BISAPPLICANT OWNER SIGNATURE4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
04/07/2021141000967Open ↗
Showing 1 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
04/07/2021141000967Open ↗
Showing 1 of 3 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment29
▸BISSCHEDULE B - PLUMBING10
09/27/2019140457495Open ↗
Showing 1 of 10 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE7
06/06/2019123684110Open ↗
Showing 1 of 7 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA5
06/07/2021123889934Open ↗
Showing 1 of 5 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISEQUIPMENT USE PERMITS2
10/21/2022122459375Open ↗
Showing 1 of 2 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Safety & Tenant Protection39
▸DOB NOWHPD-2: Clinton Special District Anti-Harassment Checklist20
09/05/2026M00309165-I1Open ↗
08/13/2026M00309154-I1Open ↗
08/13/2026M00405594-I1Open ↗
Showing 3 of 20 on file for this type
▸BISANTI-HARASSMENT CHECKLIST: CLINTON8
02/14/2020123841218Open ↗
02/14/2020123841218Open ↗
06/10/2019123684110Open ↗
Showing 3 of 8 on file for this type
▸BISTENANT PROTECTION PLAN AND NOTES3
08/20/2021123889934Open ↗
04/16/2021123841218Open ↗
Showing 2 of 3 on file for this type
▸BISCLINTON DISTRICT: ANTI-HARASSMENT CHECKLIST2
04/07/2021141000967Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWCertificate of No Harassment2
08/13/2026M01113047-I1Open ↗
08/13/2026M01239373-I1Open ↗
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTREET TREE SIGNOFF1
09/22/2020122459375Open ↗
▸BISTPP1: TENANT PROTECTION PLAN1
04/01/2021123841218Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026M00309154-I1Open ↗
▸Environmental & Asbestos35
▸DOB NOWOER: Notice to Proceed10
08/13/2026M01113047-I1Open ↗
08/13/2026M00083437-I1Open ↗
08/13/2026M00309154-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWOER: Notice of Satisfaction8
08/13/2026M00083437-I1Open ↗
08/13/2026M00309154-I1Open ↗
08/13/2026M01113048-S1Open ↗
Showing 3 of 8 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED7
04/07/2021141000967Open ↗
03/27/2020123841218Open ↗
03/02/2020123841218Open ↗
Showing 3 of 7 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION4
12/04/2025122705322Open ↗
10/28/2020123684110Open ↗
09/16/2020140748485Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISOER NNO TCO PHASE 21
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance17
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS10
03/27/2020123841218Open ↗
02/14/2020123841218Open ↗
01/27/2020122459375Open ↗
Showing 3 of 10 on file for this type
▸BISPRELIMINARY COMMISSIONING REPORT CERTIFICATION2
10/22/2020122459375Open ↗
10/22/2020122459375Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
07/15/2022123841218Open ↗
08/20/2020122459375Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
08/24/2020123684110Open ↗
Showing 1 of 2 on file for this type
▸BISLIGHTING CONTROLS1
07/15/2022123841218Open ↗
▸Inspections & Test Reports33
▸BISTECHNICAL REPORT: RESPONSIBILITY16
04/11/2022123841218Open ↗
04/11/2022123841218Open ↗
04/01/2022123841218Open ↗
Showing 3 of 16 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX8
04/27/2020123841218Open ↗
04/27/2020123841218Open ↗
04/27/2020123841218Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER6
03/27/2020123841218Open ↗
Showing 1 of 6 on file for this type
▸BISSTRUCTURAL STEEL - WELDING1
07/15/2022123841218Open ↗
▸BISHYDRO FLOW TEST LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs68
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST35
09/19/2022123841218Open ↗
08/20/2021123889934Open ↗
07/02/2021123889934Open ↗
Showing 3 of 35 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION16
03/27/2020123841218Open ↗
03/27/2020123841218Open ↗
12/27/2019140457495Open ↗
Showing 3 of 16 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE10
11/03/2025122459375Open ↗
10/30/2025122459375Open ↗
10/28/2025122459375Open ↗
Showing 3 of 10 on file for this type
▸BISSUPERSEDING LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISFA LETTER OF DEFECT : FD-FALD1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership22
▸BISCOST AFFIDAVIT12
08/20/2021123889934Open ↗
07/01/2021123889934Open ↗
04/07/2021141000967Open ↗
Showing 3 of 12 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
07/15/2022123841218Open ↗
04/06/2021123265778Open ↗
10/28/2020123684110Open ↗
▸BISDEPT OF FINANCE VERIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms153
▸BISADDITIONAL INFORMATION64
12/08/2025122459375Open ↗
04/12/2022123841218Open ↗
12/02/2021141000967Open ↗
Showing 3 of 64 on file for this type
▸BISBOROUGH INTAKE FORM62
04/01/2021123841218Open ↗
02/05/2021123841218Open ↗
07/17/2020122459375Open ↗
Showing 3 of 62 on file for this type
▸BISEFILING COVER SHEET20
02/14/2020123841218Open ↗
02/14/2020123841218Open ↗
Showing 2 of 20 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET7
04/07/2021141000967Open ↗
Showing 1 of 7 on file for this type
▸Other Documents31
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISDHCR DOCUMENT4
03/23/2021123265778Open ↗
10/28/2020123684110Open ↗
09/25/2020140748485Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWManufacturer's Specifications2
08/13/2026M01229628-P1Open ↗
08/13/2026M01229628-I1Open ↗
▸DOB NOWCalculations2
08/13/2026M01229628-P1Open ↗
08/13/2026M01229628-I1Open ↗
▸DOB NOWDHCR Document2
08/13/2026M00405594-I1Open ↗
08/13/2026M00309154-I1Open ↗
▸BISHPD: COMPLETION NOTICE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISENVIRONMENTAL "E" DEP NOTICE TO PROCEED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWMultiple Dwelling Special District Feasibility of Government Funded Rehabilitation1
08/13/2026M00083437-I1Open ↗
▸DOB NOWMultiple Dwelling Special District Notice to Community Board1