← Back
Elevator apt, fireproof with stores
5712 7TH AVENUE
BROOKLYN · BIN 3015852
💬 Discuss this project
2023Year Built
9Stories
D6Building Class
R7AZoning
84,064 sfGross Floor Area
55Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Elevator apt, fireproof with stores · Owner of record: GOLDEN 5722 LLC · 10,000 sf lot · 8.41 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneralOther
Roof23p · 1 filing · 20 docs
Floor 923p · 1 filing · 20 docs
Floor 824p · 1 filing · 20 docs
Floor 722p · 1 filing · 20 docs
Floor 620p · 1 filing · 20 docs
Floor 522p · 1 filing · 20 docs
Floor 422p · 1 filing · 20 docs
Floor 397p · 1 filing · 20 docs
Floor 298p · 1 filing · 20 docs
Floor 1105p · 2 filings · 20 docs
Cellar102p · 2 filings · 20 docs
Sub-Cellar97p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PLATINUM SERVICES NY1307/08/2026
KAJ NY CONSTRUCTION INC503/22/2026
GOLDEN 5722 LLC703/22/2026
CONSTRUCTION MNGT AA403/22/2026
BUILDERS CONSTRUCTION NYC203/22/2026
A PLUS QUICK MANAGEMENT203/21/2026
EMPIRE SCAFFOLDING SYSTEMS303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEW AIR SOLUTION INC.1306/10/2026
HPL ENGINEERING P.C.1302/05/2026
HRM ENGINEERING SERVICES, PC601/22/2025
ASHRAF CORP308/21/2024
PATUXENT ENGINEERING LLC201/09/2024
TOHFAZ UDDIN PE PC112/28/2023
LU ENGINEERING SERVICE PC106/03/2022
MOHAMMAD AHEAD, PE105/24/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PLATINUM SERVICES NY603/21/2026
GREEN STUDIO403/21/2026
PATUXENT ENGINEERING403/21/2026
H Z BUILDING NY4003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CONSTRUCTION MNGT. AA,LLCGeneral Contractor1707/08/2026
BUILDERS CONSTRUCTION NYCGeneral Contractor607/08/2026
WATSON'S PLUMBING HEATINGGeneral Contractor404/09/2026
PLATINUM SERVICES NY LLCGeneral Contractor407/08/2026
SAFEPIPE PLUMBING INCFire Protection307/08/2026
KAJ NY CONSTRUCTION INCGeneral Contractor303/21/2026
KJK ELECTRIC INCElectrical203/22/2026
DPH PLUMBING & HTG CORPPlumbing207/08/2026
RRP PLUMBING CORPFire Protection107/08/2026
S & Q ELEVATOR INCGeneral Contractor107/08/2026
R & T ELECTRICAL CORPElectrical103/22/2026
WATSON'S PLBG, HTG, & BDGPlumbing107/08/2026
VIP FIRE SPRINKLER INCFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
STONE ENGR CONSULTANT LLC9606306/10/2026
HPL ENGINEERING PC56131502/05/2026
NEW AIR SOLUTION INC8418712/18/2025
Building Lifecycle
All (222)Filed (40)Permit Issued (37)Signed Off (14)Violation (30)Inspection (31)Objection (40)Special Inspection (30)
06/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
zhixin deng
06/11/2026
Special inspection requirement — Sprinkler Systems
zhixin deng
06/10/2026
Filed — Alteration
install plumbing system for kitchen sinks and cooking equipment include HW/CW, Sewer and gas pipe.
B01225555-P9
06/09/2026
Special inspection requirement — Sprinkler Systems
zhixin deng
06/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
zhixin deng
04/30/2026
Violation issued (HPD, closed)
A
03/27/2026
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
03/04/2026
Special inspection requirement — Lowest Floor Elevation
Fran Huang
03/04/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Fran Huang
03/04/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Fran Huang
03/04/2026
Special inspection requirement — Protection of exposed foundation insulation
Fran Huang
03/04/2026
Special inspection requirement — Maintenance information
Fran Huang
03/04/2026
Special inspection requirement — Fenestration air leakage
Fran Huang
03/04/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Fran Huang
03/04/2026
Special inspection requirement — Fire-Resistance Rated Construction
Fran Huang
03/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
03/04/2026
Special inspection requirement — Concrete - Cast-In-Place
Fran Huang
03/04/2026
Special inspection requirement — Air barrier — testing
Fran Huang
03/04/2026
Special inspection requirement — Lighting controls
Fran Huang
03/04/2026
Special inspection requirement — Energy Code Compliance Inspections
Fran Huang
03/04/2026
Special inspection requirement — Insulation placement and R values
Fran Huang
03/04/2026
Special inspection requirement — Interior lighting power
Fran Huang
03/04/2026
Special inspection requirement — Electrical motors and elevators
Fran Huang
03/04/2026
Special inspection requirement — Lighting in dwelling units
Fran Huang
03/04/2026
Special inspection requirement — Air barrier - visual inspection
Fran Huang
03/04/2026
Special inspection requirement — Vestibules
Fran Huang
03/04/2026
Special inspection requirement — Fenestration areas
Fran Huang
03/04/2026
Special inspection requirement — Metering
Fran Huang
03/04/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
Fran Huang
03/04/2026
Special inspection requirement — Masonry
Fran Huang
03/04/2026
Special inspection requirement — Subgrade Inspections
Fran Huang
03/04/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
SAMER ABOU-GHAIDA
03/04/2026
Special inspection requirement — Exterior lighting power
Fran Huang
02/05/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Filing Mechanical systems in conjunction with CO application B00741243-I1.
B00741243-A1
01/06/2026
Filed — No Work
B01342654-I1
01/05/2026
Violation issued (FDNY_ORDER, closed)
01/02/2026
Signed off — Alteration
install plumbing system for kitchen sinks and cooking equipment include HW/CW, Sewer and gas pipe.
B01225555-S1
12/19/2025
Signed off — Alteration
install plumbing system for kitchen sinks and cooking equipment include HW/CW, Sewer and gas pipe.
B01225555-I1
12/18/2025
Filed — No Work
B01333572-I1
12/18/2025
Filed — Alteration
install plumbing system for kitchen sinks and cooking equipment include HW/CW, Sewer and gas pipe.
B01225555-P8
12/03/2025
Objection resolved — Addressed
12/03/2025
Objection resolved — Addressed
12/02/2025
Permit issued — General Construction
B01225555-I1-MS
11/21/2025
Objection raised — Other
10/31/2025
Objection resolved — Addressed
10/30/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/16/2025
Filed — Alteration
install plumbing system for kitchen sinks and cooking equipment include HW/CW, Sewer and gas pipe.
B01225555-P6
10/16/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/08/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/06/2025
Filed — Alteration
install plumbing system for kitchen sinks and cooking equipment include HW/CW, Sewer and gas pipe.
B01225555-P5
10/06/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/06/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/29/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/24/2025
Objection raised — Other
09/18/2025
Filed — Alteration
install plumbing system for kitchen sinks and cooking equipment include HW/CW, Sewer and gas pipe.
B01225555-P4
08/28/2025
Objection raised — Scope
08/08/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
Filing Mechanical systems in conjunction with CO application B00741243-I1.
B00741243-P9
07/29/2025
Permit issued — Sprinklers
B01225555-S4-EW-SP
07/18/2025
Filed — Alteration
install plumbing system for kitchen sinks and cooking equipment include HW/CW, Sewer and gas pipe.
B01225555-P3
07/08/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
Latest 60 of 222 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offWATSON'S PLUMBING HEATING12/02/2025
DOB NOWSprinklersPermit IssuedRALPH W. LANDOLFI JR.07/29/2025
DOB NOWGeneral ConstructionSigned-offWATSON'S PLUMBING HEATING05/21/2025
DOB NOWPlumbingSigned-offWATSON'S PLBG, HTG, & BDG05/21/2025
DOB NOWStandpipeSigned-offBELLEROSE PLBG & HEATING01/27/2025
DOB NOWCurb CutSigned-offCONSTRUCTION MNGT. AA,LLC10/29/2024
DOB NOWSupported ScaffoldSigned-offPLATINUM SERVICES NY LLC10/15/2024
DOB NOWPlumbingSigned-offDPH PLUMBING & HTG CORP10/07/2024
DOB NOWConstruction FenceSigned-offCONSTRUCTION MNGT. AA,LLC10/07/2024
DOB NOWStandpipeSigned-offBELLEROSE PLBG & HEATING10/07/2024
DOB NOWSprinklersSigned-offBELLEROSE PLBG & HEATING10/07/2024
DOB NOWProtection and Mechanical MethodsSigned-offPLATINUM SERVICES NY LLC12/28/2023
DOB NOWSupported ScaffoldSigned-offPLATINUM SERVICES NY LLC12/21/2023
DOB NOWGeneral ConstructionPermit IssuedCONSTRUCTION MNGT. AA,LLC12/20/2023
DOB NOWStandpipeSigned-offVIP FIRE SPRINKLER INC11/09/2023
DOB NOWStructuralSigned-offCONSTRUCTION MNGT. AA,LLC11/06/2023
DOB NOWGeneral ConstructionPermit IssuedCONSTRUCTION MNGT. AA,LLC11/06/2023
DOB NOWMechanical SystemsPermit IssuedCONSTRUCTION MNGT. AA,LLC11/01/2023
DOB NOWProtection and Mechanical MethodsSigned-offS & Q ELEVATOR INC10/24/2023
DOB NOWGeneral ConstructionPermit IssuedCONSTRUCTION MNGT. AA,LLC10/20/2023
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC10/17/2023
DOB NOWConstruction FenceSigned-offCONSTRUCTION MNGT. AA,LLC10/16/2023
DOB NOWStructuralSigned-offCONSTRUCTION MNGT. AA,LLC10/12/2023
DOB NOWGeneral ConstructionPermit IssuedCONSTRUCTION MNGT. AA,LLC09/07/2023
DOB NOWPlumbingSigned-offDPH PLUMBING & HTG CORP08/31/2023
DOB NOWFoundationSigned-offCONSTRUCTION MNGT. AA,LLC07/24/2023
DOB NOWFoundationSigned-offCONSTRUCTION MNGT. AA,LLC06/15/2023
DOB NOWFoundationSigned-offCONSTRUCTION MNGT. AA,LLC04/17/2023
DOB NOWConstruction FenceSigned-offCONSTRUCTION MNGT. AA,LLC04/15/2023
DOB NOWSupport of ExcavationSigned-offCONSTRUCTION MNGT. AA,LLC04/15/2023
DOB NOWSupport of ExcavationSigned-offBUILDERS CONSTRUCTION NYC11/16/2022
DOB NOWFoundationSigned-offBUILDERS CONSTRUCTION NYC11/16/2022
DOB NOWFoundationSigned-offBUILDERS CONSTRUCTION NYC09/30/2022
DOB NOWFoundationSigned-offBUILDERS CONSTRUCTION NYC06/10/2022
DOB NOWSupport of ExcavationSigned-offBUILDERS CONSTRUCTION NYC06/07/2022
DOB NOWSidewalk ShedSigned-offKAJ NY CONSTRUCTION INC05/25/2022
DOB NOWConstruction FenceSigned-offBUILDERS CONSTRUCTION NYC04/29/2022
BIS—ISSUEDH&Z BUILDING CONSULTING I06/03/2022
BISBLISSUEDWAGNER ZIV PLUMBING AND HEATING05/17/2007
BISPLISSUEDWAGNER ZIV PLUMBING & HEATING07/17/2006
+ 5 more permits on file
2 projects · most recent 06/10/2026
Heating and Air Conditioning Systems Ventilation Systems Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/10/2026Signed-offWATSON'S PLUMBING HEATINGAir Conditioning Systems, Heating and Air Conditioning Systems, Ventilation Systems
Cooling
Daikin RXYQ264AATJB 22 tons · Vrf Outdoor ×3
Heat / Cool
Daikin RXYQ384AATJB 32 tons · Vrf Outdoor ×3
Ventilation
Econ-Air EA-A4-30D 9,472 CFM · Makeup Air ×4
EA-USBI24DD-RM, 5,579 CFM · Kitchen Exhaust ×4
EA-A3-24D 3,600 CFM ×2
EA-USBI36DD-RM 7,953 CFM · Kitchen Exhaust ×2
02/05/2026Permit IssuedCONSTRUCTION MNGT. AA,LLCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Gree GMV-36WL/B-T(U) 36,000 BTU · Vrf Outdoor ×53
GMV-24WL/C-T(U) 24,000 BTU · Vrf Outdoor ×5
General Electric AZ45E12DBM 1 tons · Ptac ×1
Ventilation
Greenheck CUE-090-VG 435 CFM · Exhaust Fan ×5
SP-A90-130-VG 70 CFM · Exhaust Fan ×5
SQ-120-VG 1,000 CFM · Exhaust Fan ×3
CUE-080-VG 160 CFM · Exhaust Fan ×2
CUE-130-VG 1,000 CFM · Exhaust Fan ×2
SQ-99-VG 600 CFM · Exhaust Fan ×2
AX-63-160-0622-A30 6,295 CFM · Exhaust Fan ×1
CUE-070-VG 250 CFM · Exhaust Fan ×1
CUE-095-VG 340 CFM · Exhaust Fan ×1
CUE-099-VG 600 CFM · Exhaust Fan ×1
CUE-120-VG 1,200 CFM · Exhaust Fan ×1
CUE-140-VG 1,800 CFM · Exhaust Fan ×1
Lf Systems DEF 035 2,000 CFM · Exhaust Fan ×2
Aaon RN-010-8-0-EB09-3L B 10 tons · Rooftop Unit ×1
2 projects · most recent 06/10/2026
Sprinkler System
FiledStatusContractorScope
06/10/2026Permit IssuedRRP PLUMBING CORPSprinkler System
02/05/2026Signed-offSAFEPIPE PLUMBING INCSprinkler System
2 projects · most recent 06/10/2026
Gas Water/Sanitary Storm
FiledStatusContractorScope
06/10/2026Signed-offWATSON'S PLBG, HTG, & BDGGas, Water/Sanitary
02/05/2026Signed-offDPH PLUMBING & HTG CORPGas, Storm, Water/Sanitary
10 projects · most recent 10/16/2025
General Wiring
FiledStatusContractorScope
10/16/2025CompleteR & T ELECTRICAL CORPGeneral Wiring
07/15/2025Permit IssuedKJK ELECTRIC INC—
01/23/2025CompleteRIGHTWAY ELECTRICAL INCGeneral Wiring
10/01/2024CompleteRIGHTWAY ELECTRICAL INC1 meters, 1 new_meters
04/03/2024CompleteKJK ELECTRIC INC—
02/21/2024CancelledKJK ELECTRIC INC—
02/20/2024CompleteKJK ELECTRIC INC—
01/22/2024CompleteKJK ELECTRIC INC—
10/17/2023CompleteKJK ELECTRIC INC—
10/09/2023CompleteILLUMINOUS ELECTRIC CORP.General Wiring
1 project · most recent 06/10/2026
Fence
FiledStatusContractorScope
06/10/2026Signed-offWATSON'S PLUMBING HEATINGFence
▾Field Inspections (DOB CAP) — 31
DateTypeResultReport
03/27/2026Fail-Final Curb Cut Non-Directive 14FailView ↗
10/30/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/16/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/08/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/06/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/06/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/29/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/08/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/08/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/27/2025Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
06/27/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
05/22/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
03/11/2025Pass-Final CND-Occupancy InspectionPassView ↗
02/12/2025Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
01/28/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/28/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
01/24/2025Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
01/18/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
01/17/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/17/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
01/14/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/14/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
01/13/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/15/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/15/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
Latest 25 of 31.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
06/11/2026Sprinkler Systemszhixin dengspecial
06/11/2026Fire-Resistant Penetrations and Jointszhixin dengspecial
06/09/2026Sprinkler Systemszhixin dengspecial
06/09/2026Fire-Resistant Penetrations and Jointszhixin dengspecial
03/04/2026Air barrier - visual inspectionFran Huangenergy_progress
03/04/2026Lighting in dwelling unitsFran Huangenergy_progress
03/04/2026Protection of exposed foundation insulationFran Huangenergy_progress
03/04/2026Electrical motors and elevatorsFran Huangenergy_progress
03/04/2026Interior lighting powerFran Huangenergy_progress
03/04/2026MeteringFran Huangenergy_progress
03/04/2026Lighting controlsFran Huangenergy_progress
03/04/2026Air barrier — testing Fran Huangenergy_progress
03/04/2026Insulation placement and R valuesFran Huangenergy_progress
03/04/2026Fenestration and door U-factor and product ratingsFran Huangenergy_progress
03/04/2026VestibulesFran Huangenergy_progress
03/04/2026Fire-Resistance Rated ConstructionFran Huangprogress
03/04/2026Energy Code Compliance InspectionsFran Huangprogress
03/04/2026Lowest Floor ElevationFran Huangprogress
03/04/2026Structural Stability – Alterations of existing buildingsFran Huangspecial
03/04/2026Concrete - Cast-In-PlaceFran Huangspecial
03/04/2026Fire-Resistant Penetrations and JointsFran Huangspecial
03/04/2026Subsurface Investigations (Borings/Test Pits)SAMER ABOU-GHAIDAspecial
03/04/2026MasonryFran Huangspecial
03/04/2026Subgrade InspectionsFran Huangspecial
03/04/2026Exterior Insulation and Finish Systems (EIFS)Fran Huangspecial
Latest 25 of 150.
▾Documents — 365 on file (BIS + DOB NOW)
▸Plans & Drawings41
▸DOB NOWPlans/Sketch40
08/29/2026B00743046-I1Request digital key ↗
08/29/2026B00750088-I1Request digital key ↗
08/29/2026B00750413-I1Request digital key ↗
Showing 3 of 40 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Applications & Permits10
▸BISPLAN / WORK APPROVAL APPLICATION4
01/10/2025322119444Open ↗
10/16/2024322119444Open ↗
05/19/2023340888828Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION3
01/14/2025322119444Open ↗
01/14/2025322119444Open ↗
01/14/2025322119444Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation2
06/26/2023340888828Open ↗
05/19/2023340888828Open ↗
▸BISWORK PERMIT APPLICATION1
06/08/2022322102194Open ↗
▸Zoning, Tax Lot & Property Records18
▸DOB NOWZD1: DOB Zoning Diagram7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWZoning Exhibit form (1-5)7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
01/14/2025322119444Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
01/14/2025322119444Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
01/14/2025322119444Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications221
▸DOB NOWProgress Inspector Seal & Signature111
09/02/2026B00741243-S7Open ↗
09/02/2026B00741243-S7Open ↗
09/01/2026B01225555-I1Open ↗
Showing 3 of 111 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature71
09/23/2026B01225555-S4Open ↗
09/23/2026B01225555-S4Open ↗
09/02/2026B00741243-S7Open ↗
Showing 3 of 71 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature38
08/29/2026B00743046-I1Open ↗
08/28/2026B00722075-I1Open ↗
08/28/2026B00722075-P2Open ↗
Showing 3 of 38 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
05/19/2023340888828Open ↗
▸Trade Schedules & Equipment8
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWStandpipe Alarms Drawings1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection11
▸BISSTREET TREE CHECKLIST2
06/26/2023340888828Open ↗
05/19/2023340888828Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
06/08/2022322102194Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
06/26/2023340888828Open ↗
▸BISBPP: STREET TREES SITE PLAN1
06/26/2023340888828Open ↗
▸BISSTREET TREE SIGNOFF1
05/22/2025340888828Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
06/08/2022322102194Open ↗
▸BISSTREET TREES SITE PLAN1
05/22/2025340888828Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWStreet Tree Sign Off1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWStreet Trees Site Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos16
▸DOB NOWDEP ACP-5: Asbestos Assessment Report16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports8
▸DOB NOWSOIL REPORT7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership1
▸BISPROJECT-SPECIFIC GL INSURANCE1
06/08/2022322102194Open ↗
▸Filing & Intake Forms3
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
05/19/2023340888828Open ↗
▸BISEFILING COVER SHEET1
11/15/2021322102194Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
05/19/2023340888828Open ↗
▸Other Documents27
▸DOB NOWSite Survey: Initial7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWProperty Ownership Certification7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISRECORDS MGMT FEE PAYMENT RECEIPT2
01/14/2025322119444Open ↗
05/19/2023340888828Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
06/26/2023340888828Open ↗
▸BISRESTRICTION: DEED1
01/14/2025322119444Open ↗
▸DOB NOWAdjoining Owners Notification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWFinal Survey1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type