← Back
Factory, heavy manufacturing, fireproof
58-80 BORDEN AVENUE
QUEENS · Maspeth · BIN 4059717
💬 Discuss this project
1965Year Built
1Stories
F1Building Class
M1-1Zoning
31,600 sfGross Floor Area
1Units
LL97 Covered3 Open Violations ▸
Factory, heavy manufacturing, fireproof · Owner of record: CPI/SITEX MASPETH INDUSTRIAL OWNER, L.L. C. · 146,700 sf lot · 0.22 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalFire Protection
Roof1p · 1 filing · 5 docs
Floor 18p · 3 filings · 16 docs
Mezzanine6p · 2 filings · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Sitex Group603/22/2026
CPI/SITEX MASPETH INDUSTRIAL OWNER, L.L. C.103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/29/2021$49.5M—54-60 44TH STREET, LLC → CPI/SITEX MASPETH INDUSTRIAL OWNER, L.L.C.$1,566/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
WHITMAN ENGINGERING103/15/2023
CAPITOL FIRE SPRINKLER CO.111/23/2022
GILSANZ MURRAY STEFICEK LLP109/20/2022
CASEWORKS ARCHITECT, PLLC112/06/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS303/21/2026
CAPITOL FIRE SPRINKLER203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
W.J. NORTHRIDGE CONST CORGeneral Contractor507/08/2026
PHILIP GOEHRINGElectrical203/21/2026
JUSTAN ELEC'L CONTR'G.Electrical103/22/2026
CAPITOL FIRE SPRINKLER COFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ATLAS ATC ENGINEERING INC8011203/15/2023
GILSANZ MURRAY STEFICEK240109/20/2022
Building Lifecycle
All (33)Filed (4)Permit Issued (4)Signed Off (4)Violation (10)Inspection (3)Special Inspection (8)
12/01/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/02/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/02/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/22/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/01/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/02/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/02/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/02/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/04/2023
Signed off — Alteration
Installation of a New Sprinkler System as plans filed. No change in use, occupancy or egress.
Q08041999-I1
03/27/2023
Signed off — Alteration
MECHANICAL WORK ON THE ROOF AS PER PLANS FILED HEREWITH. WORK INCLUDES REPLACEMENT IN-KIND AN EXISTING 15 TON RTU. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
Q00842342-I1
03/22/2023
Permit issued — Mechanical Systems
Q00842342-I1-MS
03/21/2023
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
03/21/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/15/2023
Filed — Alteration
MECHANICAL WORK ON THE ROOF AS PER PLANS FILED HEREWITH. WORK INCLUDES REPLACEMENT IN-KIND AN EXISTING 15 TON RTU. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
Q00842342-I1
03/13/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/10/2023
Special inspection requirement — Final
GIORGI KHARDZEISHVILI
03/10/2023
Special inspection requirement — Mechanical Systems
GIORGI KHARDZEISHVILI
03/08/2023
Signed off — Alteration
Q08003581-I1
03/07/2023
Signed off — Alteration
Q00633178-I1
12/02/2022
Permit issued — Sprinklers
Q08041999-I1-EW-SP
11/23/2022
Filed — Alteration
Installation of a New Sprinkler System as plans filed. No change in use, occupancy or egress.
Q08041999-I1
09/28/2022
Permit issued — Structural
Q08003581-I1-ST
09/20/2022
Filed — Alteration
Q08003581-I1
09/20/2022
Special inspection requirement — Structural Steel - Welding
Karl Rubenacker
09/14/2022
Special inspection requirement — Structural Steel - Details
Karl Rubenacker
09/14/2022
Special inspection requirement — Final
ANTHONY PAGNOTTA
05/19/2022
Permit issued — General Construction
Q00633178-I1-GC
12/06/2021
Filed — Alteration
Q00633178-I1
11/17/2021
Special inspection requirement — Energy Code Compliance Inspections
John Murray
11/17/2021
Special inspection requirement — Interior lighting power
John Murray
11/17/2021
Special inspection requirement — Final
John Murray
08/02/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/02/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offW.J. NORTHRIDGE CONST COR03/22/2023
DOB NOWSprinklersSigned-offCAPITOL FIRE SPRINKLER CO12/02/2022
DOB NOWStructuralSigned-offW.J. NORTHRIDGE CONST COR09/28/2022
DOB NOWGeneral ConstructionSigned-offW.J. NORTHRIDGE CONST COR05/19/2022
BIS—ISSUEDMAUCERI SIGN CO., INC09/07/2005
BISMHISSUEDPALONE BROTHERS AIR08/17/2004
1 project · most recent 03/28/2023
General Wiring
FiledStatusContractorScope
03/28/2023CompleteJUSTAN ELEC'L CONTR'G.General Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
03/21/2023Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
03/21/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/13/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
03/10/2023FinalGIORGI KHARDZEISHVILIprogress
03/10/2023Mechanical SystemsGIORGI KHARDZEISHVILIspecial
09/20/2022Structural Steel - WeldingKarl Rubenackerspecial
09/14/2022Structural Steel - DetailsKarl Rubenackerspecial
09/14/2022FinalANTHONY PAGNOTTAprogress
11/17/2021Energy Code Compliance InspectionsJohn Murrayprogress
11/17/2021Interior lighting powerJohn Murrayenergy_progress
11/17/2021FinalJohn Murrayprogress
▾Documents — 21 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/26/2026Q00633178-I1Request digital key ↗
08/25/2026Q08003581-I1Request digital key ↗
08/25/2026Q08041999-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications12
▸DOB NOWProgress Inspector Seal & Signature5
09/01/2026Q00633178-I1Open ↗
09/01/2026Q00633178-I1Open ↗
09/01/2026Q00633178-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/25/2026Q08003581-I1Open ↗
08/25/2026Q08041999-I1Open ↗
08/25/2026Q00842342-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/28/2026Q00842342-I1Open ↗
08/24/2026Q08003581-I1Open ↗
08/24/2026Q08003581-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/25/2026Q08041999-I1Open ↗
08/25/2026Q00842342-I1Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/25/2026Q08003581-I1Open ↗
08/13/2026Q00633178-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026Q00633178-I1Open ↗