← Back
Elevator apt, fireproof with stores
58 AVENUE A
MANHATTAN · BIN 1005010
💬 Discuss this project
1940Year Built
6Stories
D6Building Class
R7AZoning
79,956 sfGross Floor Area
84Units
LL97 CoveredRent Stabilized5 Open Violations 1 unresolved · 4 paperwork only ▸
Elevator apt, fireproof with stores · Owner of record: DERBY ALPHABET BLUES 5872, LLC · 19,266 sf lot · 4.15 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionCivilGeneral
Roof15p · 3 filings · 20 docs
Floor 693p · 6 filings · 20 docs
Floor 583p · 5 filings · 20 docs
Floor 430p · 2 filings · 20 docs
Floor 380p · 4 filings · 20 docs
Floor 275p · 4 filings · 20 docs
Floor 152p · 4 filings · 20 docs
Cellar38p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MONDAY MORNING MANAGEMENT4709/13/2026
DERBY ALPHABET BLUES 5872, LLC1403/22/2026
METHOD GENERAL CONTRACTOR103/22/2026
72 A REALTY ASSOCIATES1903/22/2026
DERBY COPELAND CAPITAL203/22/2026
APPOLODINE803/21/2026
N103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/12/2022$64.0M—72A REALTY ASSOCIATES, L.P. → DERBY ALPHABET BLUES 5872, LLC$800/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KUSHNER STUDIOS1704/08/2026
BASIC GROUPS CORP901/05/2026
HANSEN ENGINEERING, PC1611/12/2024
ALPHA HOME DESIGN LLC309/21/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Bealin Groups Corp603/21/2026
BASIC GROUPS1203/21/2026
KUSHNER STUDIOS3203/21/2026
INDESIGN STUDIO603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
METHOD GENERAL CONTRACTORGeneral Contractor1907/08/2026
P.H. WORKS INCPlumbing407/08/2026
5 J'S ELECTL CONTS CORPElectrical203/22/2026
BENJAMIN DREBINElectrical203/21/2026
METHOD ELECTRIC LLCElectrical203/22/2026
BADGER MANAGEMENT INCGeneral Contractor204/09/2026
WNW & SONS PLBG & HTG INCPlumbing107/08/2026
NEPTUNE SIGNS AWNINGSScaffold107/08/2026
JOE MIDDLETONElectrical103/21/2026
CHAIM ELEC. CORPORATIONElectrical103/22/2026
PIPESTYLISTS, INCPlumbing106/28/2026
?JOSEPH CANTALINOElectrical103/21/2026
JOSEPH CANTALINOElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DAL H CHUN ENGINEER PC19721004/08/2026
M. INT'L ENGINEERING PLLC31291904/08/2026
BEALIN GROUPS CORP9869101/05/2026
ANDREW GOODRICH, P.E., PL965604/09/2025
CHUN ENGINEERING CONSULTA9605709/21/2023
YAN GAO6619309/21/2023
Building Lifecycle
All (257)Filed (45)Permit Issued (20)Signed Off (9)Violation (60)Inspection (29)Objection (64)Special Inspection (30)
05/18/2026
Signed off — Alteration
DEFERRED MAINTENANCE OF EXISTING APARTMENTS INCLUDING THE REMOVAL AND INSTALLATION OFNONLOAD BEARING PARTITIONS, NEW KITCHEN CABINETS THROUGHOUT APARTMENTS AS INDICATED ONTHE DRAWINGS FILED HEREIN. NO CHANGE OF USE, OCCUPANCY OR EGRESS
M00886122-S2
04/08/2026
Filed — Alteration
DEFERRED MAINTENANCE OF EXISTING APARTMENTS INCLUDING THE REMOVAL AND INSTALLATION OFNONLOAD BEARING PARTITIONS, NEW KITCHEN CABINETS THROUGHOUT APARTMENTS AS INDICATED ONTHE DRAWINGS FILED HEREIN. NO CHANGE OF USE, OCCUPANCY OR EGRESS
M00886122-P1
02/24/2026
Objection resolved — Addressed
02/24/2026
Objection resolved — Addressed
02/19/2026
Objection resolved — Addressed
02/05/2026
Objection resolved — Addressed
02/05/2026
Objection resolved — Addressed
02/05/2026
Objection resolved — Addressed
02/05/2026
Objection resolved — Addressed
02/05/2026
Objection resolved — Addressed
02/05/2026
Objection resolved — Addressed
02/02/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/26/2026
Objection raised — Zoning
01/26/2026
Objection raised — Inspections
01/26/2026
Objection raised — Scope
01/26/2026
Objection raised — Scope
01/26/2026
Objection raised — Scope
01/23/2026
Objection raised — Fire_Protection
01/23/2026
Objection raised — Scope
01/23/2026
Objection raised — Fire_Protection
01/23/2026
Objection raised — Other
01/05/2026
Filed — Alteration
PROPOSED MECHANICAL WORK AT 1ST FLOOR RETAIL STORE, WORK AS PER PLANS. NO CHANGEIN USE, EGRESS OR OCCUPANCY. FILED IN CONJUNCTION WITH M01335697-I1
M01335697-I1
01/05/2026
Filed — Alteration
PROPOSED MECHANICAL WORK AT 1ST FLOOR RETAIL STORE, WORK AS PER PLANS. NO CHANGEIN USE, EGRESS OR OCCUPANCY. FILED IN CONJUNCTION WITH M01335697-I1
M01335697-S2
01/05/2026
Filed — Alteration
PROPOSED MECHANICAL WORK AT 1ST FLOOR RETAIL STORE, WORK AS PER PLANS. NO CHANGEIN USE, EGRESS OR OCCUPANCY. FILED IN CONJUNCTION WITH M01335697-I1
M01335697-S1
01/05/2026
Special inspection requirement — Energy Code Compliance Inspections
01/05/2026
Special inspection requirement — Maintenance information
01/05/2026
Special inspection requirement — HVAC-R and service water heating system controls
01/05/2026
Special inspection requirement — HVAC-R and service water heating equipment
01/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
12/31/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
12/31/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
12/31/2025
Special inspection requirement — Final
12/31/2025
Special inspection requirement — Tenant Protection Plan Compliance
12/31/2025
Special inspection requirement — Mechanical Systems
12/31/2025
Special inspection requirement — Energy Code Compliance Inspections
12/31/2025
Special inspection requirement — Tenant Protection Plan Compliance
12/31/2025
Special inspection requirement — HVAC-R and service water heating system controls
12/18/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANDREW GOODRICH
12/17/2025
Special inspection requirement — Insulation placement and R values
ANDREW GOODRICH
12/17/2025
Special inspection requirement — Energy Code Compliance Inspections
ANDREW GOODRICH
12/17/2025
Special inspection requirement — Interior lighting power
ANDREW GOODRICH
12/17/2025
Special inspection requirement — Tenant Protection Plan Compliance
ANDREW GOODRICH
12/17/2025
Special inspection requirement — Fire-Resistance Rated Construction
ANDREW GOODRICH
08/18/2025
Signed off — Alteration
INSTALLATION OF A NEW SPLIT SYSTEM HEAT PUMP UNIT & ASSOCIATELD PIPING & DUCTWORK ALONG WITH ERV UNITS AS INDICATED ON THE DRAWINGS FILED HEREIN. FILED IN CONJUNCTION WITH GC #M00829836-I1
M00829836-S1
08/18/2025
Signed off — Alteration
DEFERRED MAINTENANCE OF EXISTING APARTMENTS INCLUDING THE REMOVAL AND INSTALLATION OF NONLOAD BEARING PARTITIONS, NEW KITCHEN CABINETS THROUGHOUT APARTMENTS AS INDICATED ON THEDRAWINGS FILED HEREIN. NO CHANGE OF USE,OCCUPANCY OR EGRESS
M00914385-S1
07/30/2025
Signed off — Alteration
DEFERRED MAINTENANCE OF EXISTING APARTMENTS INCLUDING THE REMOVAL AND INSTALLATION OF NONLOAD BEARING PARTITIONS, NEW KITCHEN CABINETS THROUGHOUT APARTMENTS AS INDICATED ON THEDRAWINGS FILED HEREIN. NO CHANGE OF USE,OCCUPANCY OR EGRESS
M00858485-S1
07/24/2025
Signed off — Alteration
INSTALLATION OF NEW SPLIT HVAC SYSTEMS AS INDICATED ON THE DRAWINGS FILED HEREIN AND OBTAIN NECESSARY CERTIFICATE OF COMPLIANCE (EQ CARDS). INSTALLATION OF NEW KITCHEN/BATHROOM EXHAUSTS. FILED IN CONJUNCTION WITH GC APPLICATION #M00822670-I1
M00822670-S2
07/23/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/14/2025
Violation issued (ECB, open)
Construction
07/14/2025
Violation issued (ECB, open)
Construction
05/29/2025
Violation issued (HPD, closed)
A
05/29/2025
Violation issued (HPD, closed)
A
05/29/2025
Violation issued (HPD, closed)
B
05/29/2025
Violation issued (HPD, closed)
A
05/29/2025
Violation issued (HPD, closed)
A
05/29/2025
Violation issued (HPD, closed)
B
05/29/2025
Violation issued (HPD, closed)
A
05/29/2025
Violation issued (HPD, closed)
A
05/29/2025
Violation issued (HPD, closed)
C
Latest 60 of 257 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedT & T PLUMBING INC03/26/2025
DOB NOWMechanical SystemsPermit IssuedBADGER MANAGEMENT03/19/2025
DOB NOWGeneral ConstructionPermit IssuedBADGER MANAGEMENT03/19/2025
DOB NOWMechanical SystemsPermit IssuedMETHOD GENERAL CONTRACTOR08/14/2024
DOB NOWMechanical SystemsPermit IssuedMETHOD GENERAL CONTRACTOR10/16/2023
DOB NOWGeneral ConstructionSigned-offMETHOD GENERAL CONTRACTOR10/16/2023
DOB NOWPlumbingSigned-offP.H. WORKS INC10/16/2023
DOB NOWMechanical SystemsSigned-offMETHOD GENERAL CONTRACTOR10/13/2023
DOB NOWSignSigned-offDESTHERS, JOSEPH10/06/2023
DOB NOWPlumbingSigned-offWNW & SONS PLBG & HTG INC09/07/2023
DOB NOWPlumbingSigned-offP.H. WORKS INC08/28/2023
DOB NOWGeneral ConstructionSigned-offMETHOD GENERAL CONTRACTOR07/03/2023
DOB NOWMechanical SystemsPermit IssuedMETHOD GENERAL CONTRACTOR06/14/2023
DOB NOWPlumbingSigned-offP.H. WORKS INC06/14/2023
DOB NOWGeneral ConstructionSigned-offMETHOD GENERAL CONTRACTOR06/09/2023
DOB NOWMechanical SystemsSigned-offMETHOD GENERAL CONTRACTOR06/09/2023
DOB NOWGeneral ConstructionSigned-offMETHOD GENERAL CONTRACTOR06/02/2023
DOB NOWPlumbingSigned-offP.H. WORKS INC04/26/2023
DOB NOWGeneral ConstructionSigned-offMETHOD GENERAL CONTRACTOR04/10/2023
DOB NOWGeneral ConstructionSigned-offMETHOD GENERAL CONTRACTOR03/21/2023
BISEQRE-ISSUEDBRIAN S CONTRACTOR INC09/26/2016
BISOTISSUEDBRIAN S CONTRACTOR INC09/26/2016
BISPLISSUEDQMB PLUMBING & HEATING INC04/20/2016
BISOTISSUEDNEW HO XIN DEVELOPMENT INC04/06/2016
BISMHISSUEDNEW HO XIN DEVELOPMENT INC04/06/2016
BISOTISSUEDGLOBAL GROUP INDUSTRIES C03/23/2016
BISOTISSUEDHONG KONG HOOD INC02/10/2016
BISOTISSUEDAPPROVED OIL CO BROOKLYN01/23/2013
BISPLISSUEDBELL FUEL OIL, LLC01/23/2013
BISPLISSUEDINFINITI ESC PLUMBING COR08/17/2012
BISOTISSUEDCROISSANTERIA INC08/15/2012
BISEQISSUEDOUTDOOR INSTALLATIONS LLC07/29/2008
BISEQISSUEDOOUTDOOR INSTALLATIONS LLC03/18/2008
BISEQISSUEDOUTDOOR INSTALLATIONS LLC03/16/2007
BISMHISSUEDMID-STATE CONSTRUCTION01/29/1998
BISEQISSUEDMID-STATE CONSTRUCTION01/29/1998
7 projects · most recent 04/08/2026
Associated Ducts and Piping Heating and Air Conditioning Systems Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/08/2026Signed-offMETHOD GENERAL CONTRACTORAssociated Ducts and Piping, Heating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric 2A: MITSUBISHI/MXZ-SM36NAM, 2D: MITSUBISHI/MXZ-SM36NAM, 3M: MITSUBISHI/MXZ-SM36NAM, 4K: MITSUBISHI/MXZ-SM36NAM 42,000 BTU · Vrf Outdoor ×4
2J: MITSUBISHI/MXZ-SM36NAM, 2H: MITSUBISHI/MXZ-SM36NAM, 5J: MITSUBISHI/MXZ-SM36NAM, 6B: MITSUBIHSI/MXZ-4C36NA3 36,000 BTU · Vrf Outdoor ×4
MITSUBISHI/ MXZ-SM36NAM 42,000 BTU · Vrf Outdoor ×2
Ducts & Piping
N/A N/A 1 BTU · Ductwork ×1
01/05/2026——Air Conditioning Systems
Cooling
Mitsubishi Electric MSZ-FX12NL 12,000 BTU · Fan Coil Indoor ×3
MXZ-5D36NL 36,400 BTU · Vrf Outdoor ×1
05/05/2025Permit IssuedMETHOD GENERAL CONTRACTORAssociated Ducts and Piping, Heating and Air Conditioning Systems—
04/09/2025Permit IssuedBADGER MANAGEMENT INCAir Conditioning Systems, Ventilation Systems
Cooling
Mitsubishi Electric MSZ-GL09NA-U2 9,000 BTU · Fan Coil Indoor ×28
MSZ-GL12NA-U2 12,000 BTU · Fan Coil Indoor ×20
MXZ-2C20NA4-U1 18,000 BTU · Condensing Unit ×10
MXZ-4C36NA3-U1 35,400 BTU · Condensing Unit ×8
Ventilation
Greenheck SFB-9 800 CFM · Exhaust Fan ×4
11/12/2024Signed-offMETHOD GENERAL CONTRACTORAssociated Ducts and Piping, Heating and Air Conditioning Systems—
07/21/2023Permit IssuedMETHOD GENERAL CONTRACTORAssociated Ducts and Piping, Heating and Air Conditioning Systems, Ventilation Systems—
07/11/2023Signed-offMETHOD GENERAL CONTRACTORAssociated Ducts and Piping, Heating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric 1K: MITSUBISHI/ MXZ-SM36NAM, 2K: MITSUBISHI/ MXZ-SM36NAM, 3K: MITSUBISHI/ MXZ-SM36NAM, 6K: MITSUBISHI/ MXZ-SM36NAM, 6F: MITSUBISHI/ MXZ-SM36NAM 42,000 BTU · Vrf Outdoor ×5
4H: MITSUBISHI/MXZ-SM36NAM , 4B: MITSUBISHI/ MXZ-SM36NAM, 5B: MITSUBISHI/MXZ-SM36NAM, 6H: MITSUBISHI/MXZ-SM36NAM 36,000 BTU · Condensing Unit ×4
4G: MITSUBISHI/ MXZ-SM36NAM, 6G: MITSUBISHI/ MITSUBISHI/ MXZ-2C20NA3 22,000 BTU · Condensing Unit ×2
Ducts & Piping
N/A N/A Ductwork ×9
7 projects · most recent 04/08/2026
Water/Sanitary Gas
FiledStatusContractorScope
04/08/2026Signed-offP.H. WORKS INCGas, Water/Sanitary
01/05/2026——Water/Sanitary
05/05/2025Signed-offP.H. WORKS INCGas, Water/Sanitary
04/09/2025Permit IssuedT & T PLUMBING INCGas, Water/Sanitary
11/12/2024Signed-offP.H. WORKS INCGas, Water/Sanitary
07/21/2023Signed-offWNW & SONS PLBG & HTG INCWater/Sanitary
07/11/2023Signed-offP.H. WORKS INCGas, Water/Sanitary
16 projects · most recent 01/26/2026
General Wiring
FiledStatusContractorScope
01/26/2026Permit IssuedDAVEN ELECTRIC CORPGeneral Wiring
11/04/2025CompleteE & M ELECTRICAL NY CORPGeneral Wiring
07/28/2025CompleteE & M ELECTRICAL NY CORPGeneral Wiring
06/17/2025CompleteE & M ELECTRICAL NY CORPGeneral Wiring
05/27/2025Permit IssuedE & M ELECTRICAL NY CORPGeneral Wiring
05/09/2025Permit Issued5 J'S ELECTL CONTS CORP88 meters, 1 new_meters
04/27/2025CompleteMETHOD ELECTRIC LLCGeneral Wiring
04/16/2025CompleteMETHOD ELECTRIC LLCGeneral Wiring
04/16/2025CompleteMETHOD ELECTRIC LLCGeneral Wiring
03/25/2025Permit IssuedE & M ELECTRICAL NY CORPGeneral Wiring
03/12/2025Permit IssuedKWONG MING ELECTRIC INCGeneral Wiring
10/05/2024CompleteMETHOD ELECTRIC LLCGeneral Wiring
09/19/2023CompleteMETHOD ELECTRIC LLCGeneral Wiring
07/06/2023CompleteCHAIM ELEC. CORPORATIONGeneral Wiring
06/27/2023Permit Issued5 J'S ELECTL CONTS CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 29
DateTypeResultReport
02/02/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/23/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/02/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/02/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/04/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/02/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/31/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/31/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/02/2024Pass-Final CND-Occupancy InspectionPassView ↗
04/08/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/08/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/01/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/26/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/16/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/08/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/28/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/18/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/02/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/26/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
09/18/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/14/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/14/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/28/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/17/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/07/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
Latest 25 of 29.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
01/05/2026HVAC-R and service water heating system controls—energy_progress
01/05/2026Maintenance information—energy_progress
01/05/2026Energy Code Compliance Inspections—progress
01/05/2026Fire-Resistant Penetrations and Joints—special
01/05/2026HVAC-R and service water heating equipment—energy_progress
12/31/2025Mechanical Systems—special
12/31/2025Fire-Resistant Penetrations and Joints—special
12/31/2025Tenant Protection Plan Compliance—special
12/31/2025Energy Code Compliance Inspections—progress
12/31/2025HVAC-R and service water piping design and insulation—energy_progress
12/31/2025HVAC-R and service water heating system controls—energy_progress
12/31/2025Final—progress
12/31/2025Tenant Protection Plan Compliance—special
12/17/2025Fire-Resistant Penetrations and JointsANDREW GOODRICHspecial
12/17/2025Insulation placement and R valuesANDREW GOODRICHenergy_progress
12/17/2025Interior lighting powerANDREW GOODRICHenergy_progress
12/17/2025Energy Code Compliance InspectionsANDREW GOODRICHprogress
12/17/2025Fire-Resistance Rated ConstructionANDREW GOODRICHprogress
12/17/2025Tenant Protection Plan ComplianceANDREW GOODRICHspecial
05/16/2025Tenant Protection Plan ComplianceJAMES CHUNspecial
05/16/2025Energy Code Compliance InspectionsJAMES CHUNprogress
05/16/2025FinalJAMES CHUNprogress
05/16/2025Lighting in dwelling unitsJAMES CHUNenergy_progress
05/16/2025Fire-Resistant Penetrations and JointsJAMES CHUNspecial
05/16/2025Fire-Resistance Rated ConstructionJAMES CHUNprogress
Latest 25 of 150.
▾Documents — 351 on file (BIS + DOB NOW)
▸Plans & Drawings46
▸DOB NOWPlans/Sketch46
08/31/2026M00822670-I1Request digital key ↗
08/31/2026M00822670-S1Request digital key ↗
08/31/2026M00822670-S2Request digital key ↗
Showing 3 of 46 on file for this type
▸Applications & Permits22
▸BISWORK PERMIT APPLICATION13
10/05/2016122907328Open ↗
10/05/2016122907328Open ↗
04/28/2016122680303Open ↗
Showing 3 of 13 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION9
12/27/2016122907328Open ↗
11/29/2016122907328Open ↗
11/17/2016122907328Open ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications190
▸DOB NOWProgress Inspector Seal & Signature80
09/28/2026M00914385-P5Open ↗
09/28/2026M00914385-P5Open ↗
09/23/2026M00886122-S1Open ↗
Showing 3 of 80 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature48
08/31/2026M00822670-I1Open ↗
08/31/2026M00822670-S1Open ↗
08/31/2026M00822670-S2Open ↗
Showing 3 of 48 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature40
09/28/2026M00914385-P5Open ↗
09/23/2026M00886122-S1Open ↗
09/23/2026M00886122-S1Open ↗
Showing 3 of 40 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION11
06/20/2017122680303Open ↗
06/20/2017122680303Open ↗
05/15/2017121174512Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
10/05/2016122907328Open ↗
02/16/2016122680303Open ↗
01/24/2013121502560Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
01/24/2013121502560Open ↗
08/15/2012121174512Open ↗
08/15/2012121174512Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
10/05/2016122907328Open ↗
02/16/2016122680303Open ↗
▸Trade Schedules & Equipment6
▸BISSELF-CERT PLUMBING NOTICE4
01/16/2014121502560Open ↗
10/15/2013121502560Open ↗
10/15/2012121174512Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
02/16/2016122680303Open ↗
▸BISSCHEDULE B - PLUMBING1
01/24/2013121502560Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
10/05/2016122907328Open ↗
▸Environmental & Asbestos50
▸DOB NOWDEP ACP-5: Asbestos Assessment Report43
08/31/2026M00822670-P3Open ↗
08/31/2026M00822670-I1Open ↗
08/31/2026M00822670-S1Open ↗
Showing 3 of 43 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER4
08/15/2012121174512Open ↗
08/15/2012121174512Open ↗
07/29/2008110292022Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
10/05/2016122907328Open ↗
02/16/2016122680303Open ↗
01/24/2013121502560Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS10
06/20/2017122680303Open ↗
06/20/2017122680303Open ↗
05/15/2017121174512Open ↗
Showing 3 of 10 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
06/20/2017122680303Open ↗
03/20/2015121502560Open ↗
▸Approvals, Objections & Sign-offs12
▸BISADMINISTRATIVE OBJECTIONS4
01/24/2013121502560Open ↗
08/14/2012121174512Open ↗
07/29/2008110292022Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
06/20/2017122680303Open ↗
05/15/2017121174512Open ↗
03/20/2015121502560Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
03/20/2015121502560Open ↗
08/17/2012121174512Open ↗
▸BISSUPERSEDING LETTER2
04/14/2016122680303Open ↗
04/11/2016122680303Open ↗
▸BISSWIMMING POOL: DEP APPROVAL1
06/20/2017122680303Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT7
06/20/2017122680303Open ↗
05/15/2017121174512Open ↗
10/05/2016122907328Open ↗
Showing 3 of 7 on file for this type
▸Filing & Intake Forms5
▸BISEFILING COVER SHEET4
10/05/2016122907328Open ↗
02/16/2016122680303Open ↗
01/24/2013121502560Open ↗
Showing 3 of 4 on file for this type
▸BISeFiling Job Application Cover Sheet1
07/29/2008110292022Open ↗