BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
The Beekman East Condominium
58 WEST 58TH STREET · BIN 1035078
💬 Discuss this project
1969Year Built
33Stories
RMBuilding Class
C5-1Zoning
198,816 sfGross Floor Area
176Units
LL97 CoveredRent Stabilized13 Active Violations 11 old, status unconfirmed ▸FISP: SAFE
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: 58 West 58th St Condominium · 17,029 sf lot · 11.68 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsAkam Associates, INC3 filings
RoofAkam Associates, INC.Under Construction4p · 4 filings · 20 docs
PenthouseAkam Associates, INC.1p · 1 filing · 8 docs
Floor 34Unit 34E1 filing · 7 docs
Floor 33
Floor 32Unit 32AUnder Construction1 filing · 7 docs
Floor 31Unit 31A, Unit 31CUnder Construction3 filings · 20 docs
Floor 30Unit 30F2p · 1 filing · 4 docs
Floor 29
Floor 28
Floor 27
Floor 26Unit 27C6p · 2 filings · 14 docs
Floor 25
Floor 24
Floor 23Unit 23A1p · 1 filing · 3 docs
Floor 22
Floor 21Unit 21C1 filing · 12 docs
Floor 20Akam Associates, INC.1p · 1 filing · 8 docs
Floor 19
Floor 18
Floor 17Unit 17C1 filing · 20 docs
Floor 16
Floor 15
Floor 14Unit 14EUnder Construction1 filing · 7 docs
Floor 13
Floor 12
Floor 11Unit 11E1 filing · 3 docs
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5Unit 5E1p · 2 filings · 20 docs
Floor 4Unit 4AUnder Construction5p · 2 filings · 20 docs
Floor 3
Floor 2Vornado Realty TrustUnder Construction9p · 3 filings · 14 docs
Floor 1Akam Associates, INC.Under Construction4p · 4 filings · 20 docs
CellarCenterpark2p · 3 filings · 14 docs
Sub-CellarAkam Associates, INC1p · 1 filing · 7 docs
Site & exteriorAkam Associates, INC.5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
58 West 58th St Condominium2103/21/2026
49 West 57th Street Owner1903/21/2026
Vornado Realty Trust1503/22/2026
Sedesco1009/13/2026
West 58603/21/2026
27 West 57th St603/21/2026
Tower 58503/21/2026
Holy Properties303/21/2026
Beekman East Condominium203/21/2026
International Investors203/21/2026
Chase C103/21/2026
Lefrak103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Intersystem InstallationScaffold1107/08/2026
Pyramid Restoration NYspecialty_contractor807/08/2026
Platinum Services NYScaffold603/21/2026
Aled TechnologiesGeneral Contractor407/08/2026
DBF StudioGeneral Contractor407/08/2026
York Mechanicalspecialty_contractor303/21/2026
Mace RenovationsGeneral Contractor303/21/2026
Clune Construction CoGeneral Contractor303/21/2026
Northstar Contracting GroupGeneral Contractor303/21/2026
P.S. Marcato Elev. CoElectrical303/21/2026
Stepping Stone Construction*General Contractor206/28/2026
W5 GroupGeneral Contractor203/21/2026
OmnivorousGeneral Contractor203/21/2026
Hertler Nadile P & HPlumbing207/10/2026
Marek SzmacinskiGeneral Contractor203/21/2026
KG SprinklerFire Protection107/08/2026
Master Tech PlumbingPlumbing107/08/2026
McManus Mechanical Maintenance P&HPlumbing107/08/2026
Mega PlumbingPlumbing107/08/2026
Midtown Plumbing & HeatingPlumbing110/06/2026
Monarch Plumbing & HeatingPlumbing107/08/2026
New York Park Plumbing & Heating CoPlumbing107/08/2026
Smart Plumbing & HeatingPlumbing107/08/2026
K.N.C. ElectricElectrical103/21/2026
TMS Plumbing & HeatingPlumbing106/28/2026
Smart Electric ServicesElectrical103/22/2026
#1 Lorza RenovationsGeneral Contractor110/14/2026
Ajl BuildersGeneral Contractor107/08/2026
All Boro Cleaning ServiceGeneral Contractor107/08/2026
Atlantic Building & Cons*General Contractor107/08/2026
Crystal ComfortGeneral Contractor107/08/2026
Interior Major RenovationGeneral Contractor104/09/2026
New Line ContractorsGeneral Contractor104/09/2026
RK DesignGeneral Contractor106/28/2026
Yeung's ContractingGeneral Contractor107/08/2026
York Interiors GroupGeneral Contractor107/08/2026
A.M.NPlumbing107/08/2026
Cape PlumbingPlumbing107/08/2026
Crown PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Giovanni Zapata R.A3882510/15/2026
Mancini Duffy Architectur2985109/23/2026
AA Building & Inspection1519305/29/2026
Socotec Engineering4983305/20/2026
Bendix Engineering4293205/20/2026
Michael Zenreich Architects1724104/30/2026
New Age Engineering7746210/31/2025
A&B World Consulting5704110/08/2025
HT Engineering6274307/28/2025
EDG2578204/11/2025
Integrity Consulting Service666304/11/2025
GM Huang Architecture PLL1398103/10/2025
Howard L Zimmerman Architects1712206/24/2024
AK Consulting Services, I6198603/11/2024
Group-S5216107/19/2023
Hansen Engineering8174305/05/2023
Flushing Engineering Service4373504/26/2023
HRF Services5616101/16/2023
Alan Margolin & Associates423104/08/2022
Alan D Marcus, PE1761104/06/2022
Cherny Architect1925204/15/2021
Ancora Engineering6818111/11/2020
Building Lifecycle
All (300)Filed (62)Permit Issued (51)Signed Off (21)Facade (FISP) (8)Violation (60)Inspection (26)Objection (42)Special Inspection (30)
10/15/2026
Filed — Alteration
Replace 3 toilets, 3 lavatories, 1 kitchen sink, 1 dishwasher, with new on existing roughing. Remove 2 bathtubs. Install 2 new showers on existing roughing. Relocate and Install a new Gas Range.
M00658563-P5
10/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
GIOVANNI ZAPATA
10/13/2026
Permit issued — General Construction
M01462619-I1-GC
10/05/2026
Permit issued — Plumbing
M01462619-S1-PL
09/23/2026
Filed — Alteration
APPLICATION FILED TO SUPERSEDE 1994 APPLICATION 100869696 FOR APARTMENT 32-A FOR A NEW SHOWER AND MINOR PARTITIONS. NO NEW WORK IS PROPOSED. THE GENERAL CONSTRUCTION PORTION WAS PERMITTED UNDER THE ORIGINAL FILING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01462619-S1
09/23/2026
Filed — Alteration
APPLICATION FILED TO SUPERSEDE 1994 APPLICATION 100869696 FOR APARTMENT 32-A FOR A NEW SHOWER AND MINOR PARTITIONS. NO NEW WORK IS PROPOSED. THE GENERAL CONSTRUCTION PORTION WAS PERMITTED UNDER THE ORIGINAL FILING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01462619-I1
09/22/2026
Permit issued — General Construction
M01278920-I1-GC
09/22/2026
Special inspection requirement — Lighting in dwelling units
William Mandara
09/22/2026
Special inspection requirement — Final
William Mandara
09/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Mandara
07/09/2026
Permit issued — Plumbing
M00658563-S1-PL
06/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
GIOVANNI ZAPATA
06/26/2026
Filed — Alteration
Replace 3 toilets, 3 lavatories, 1 kitchen sink, 1 dishwasher, with new on existing roughing. Remove 2 bathtubs. Install 2 new showers on existing roughing. Relocate and Install a new Gas Range.
M00658563-P4
06/25/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/24/2026
Permit issued — Mechanical Systems
M01386352-S1-MS
06/17/2026
Permit issued — Plumbing
M01386352-S2-PL
06/11/2026
Permit issued — General Construction
M01386352-I1-GC
06/05/2026
Permit issued — Plumbing
M01278920-S1-PL
05/29/2026
Filed — Alteration
PLUMBING MODIFICATIONS
M01349245-S2
05/20/2026
Filed — Alteration
Application filed for interior build-out of office space on the 4th floor. Work includes installation of interior non-load bearing partitions. Plumbing filed subsequently in DOB NOW. No change to use, egress or occupancy.
M01386352-S1
05/20/2026
Filed — Alteration
Application filed for interior build-out of office space on the 4th floor. Work includes installation of interior non-load bearing partitions. Plumbing filed subsequently in DOB NOW. No change to use, egress or occupancy.
M01386352-S2
04/30/2026
Filed — Alteration
Application filed for interior build-out of office space on the 4th floor. Work includes installation of interior non-load bearing partitions. Plumbing filed subsequently in DOB NOW. No change to use, egress or occupancy.
M01386352-I1
04/22/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/14/2026
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
04/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Matthew Bendix
04/13/2026
Special inspection requirement — HVAC-R and service water heating equipment
Matthew Bendix
04/13/2026
Special inspection requirement — Energy Code Compliance Inspections
Matthew Bendix
04/13/2026
Special inspection requirement — Lighting controls
Michael Zenreich
04/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Matthew Bendix
04/13/2026
Special inspection requirement — HVAC-R and service water heating system controls
Matthew Bendix
04/13/2026
Special inspection requirement — Interior lighting power
Michael Zenreich
04/13/2026
Special inspection requirement — Maintenance information
Matthew Bendix
04/13/2026
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
04/13/2026
Special inspection requirement — Mechanical Systems
Matthew Bendix
04/13/2026
Special inspection requirement — Post-installed Anchors
Michael Zenreich
04/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michael Zenreich
04/13/2026
Special inspection requirement — Final
Michael Zenreich
04/13/2026
Special inspection requirement — Final
Matthew Bendix
04/13/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Matthew Bendix
04/13/2026
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
04/02/2026
Permit issued — Plumbing
M01349245-S1-PL
03/17/2026
Permit issued — General Construction
M01349245-I1-GC
02/25/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/11/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/11/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/30/2026
Filed — Alteration
PLUMBING MODIFICATIONS
M01349245-S1
01/30/2026
Filed — Alteration
PLUMBING MODIFICATIONS
M01349245-I1
01/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
01/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
01/20/2026
Special inspection requirement — Final
TREVOR O. FLOWERS
01/12/2026
Permit issued — Plumbing
M01309327-S1-PL
12/12/2025
Signed off — Alteration
Interior renovation of existing apartment unit as per plan submitted herewith. No change in use, egress, or occupancy under this application
M01173669-S1
12/12/2025
Signed off — Alteration
Interior renovation of existing apartment unit as per plan submitted herewith. No change in use, egress, or occupancy under this application
M01173669-I1
12/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stephen Shishko
12/05/2025
Objection resolved — Addressed
12/05/2025
Objection resolved — Addressed
12/05/2025
Objection resolved — Addressed
12/05/2025
Objection resolved — Addressed
12/05/2025
Objection resolved — Addressed
12/03/2025
Permit issued — General Construction
M00658563-I1-GC
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit Issued#1 Lorza Renovations10/13/2026
DOB NOWPlumbingPermit IssuedMidtown Plumbing & Heating10/05/2026
DOB NOWGeneral ConstructionPermit IssuedCreo Projects09/22/2026
DOB NOWPlumbingPermit IssuedHertler Nadile P & H07/09/2026
DOB NOWMechanical SystemsPermit IssuedStepping Stone Construction*06/24/2026
DOB NOWPlumbingPermit IssuedNew York Park Plumbing & Heating Co06/17/2026
DOB NOWGeneral ConstructionPermit IssuedStepping Stone Construction*06/11/2026
DOB NOWPlumbingPermit IssuedMonarch Plumbing & Heating06/05/2026
DOB NOWPlumbingSigned-offCape Plumbing04/02/2026
DOB NOWGeneral ConstructionPermit IssuedAjl Builders03/17/2026
DOB NOWPlumbingSigned-offTMS Plumbing & Heating01/12/2026
DOB NOWGeneral ConstructionPermit IssuedNew Line Contractors12/03/2025
DOB NOWGeneral ConstructionPermit IssuedRK Design11/25/2025
DOB NOWGeneral ConstructionPermit IssuedMace Renovations11/07/2025
DOB NOWMechanical SystemsPermit IssuedYork Mechanical08/29/2025
DOB NOWGeneral ConstructionSigned-offInterior Major Renovation05/07/2025
DOB NOWPlumbingSigned-offMaster Tech Plumbing05/06/2025
DOB NOWPlumbingSigned-offMcManus Mechanical Maintenance P&H02/18/2025
DOB NOWMechanical SystemsSigned-offAled Technologies08/20/2024
DOB NOWGeneral ConstructionSigned-offAled Technologies08/20/2024
DOB NOWGeneral ConstructionPermit IssuedDBF Studio01/11/2024
DOB NOWGeneral ConstructionSigned-offYeung's Contracting10/19/2023
DOB NOWMechanical SystemsSigned-offCrystal Comfort09/11/2023
DOB NOWPlumbingSigned-offA.M.N04/11/2023
DOB NOWGeneral ConstructionSigned-offMarek Szmacinski04/07/2023
DOB NOWGeneral ConstructionPermit IssuedDBF Studio02/06/2023
DOB NOWSprinklersPermit IssuedH M Sprinkler10/18/2022
DOB NOWGeneral ConstructionSigned-offClune Construction Co10/17/2022
DOB NOWPlumbingPermit IssuedCrown Plumbing09/27/2022
DOB NOWGeneral ConstructionPermit IssuedYork Interiors Group09/20/2022
DOB NOWConstruction FencePermit IssuedPlatinum Services NY09/03/2022
DOB NOWGeneral ConstructionSigned-offPyramid Restoration NY08/26/2022
DOB NOWGeneral ConstructionSigned-offW5 Group08/25/2022
DOB NOWSidewalk ShedPermit IssuedPlatinum Services NY08/17/2022
DOB NOWGeneral ConstructionSigned-offAll Boro Cleaning Service06/24/2022
DOB NOWStructuralSigned-offPyramid Restoration NY05/25/2022
DOB NOWGeneral ConstructionSigned-offPyramid Restoration NY05/02/2022
DOB NOWStructuralPermit IssuedAtlantic Building & Cons*04/06/2022
DOB NOWPlumbingPermit IssuedHertler Nadile P & H02/25/2022
DOB NOWGeneral ConstructionPermit IssuedPyramid Restoration NY01/25/2022
+ 60 more permits on file
4 projects · most recent 05/29/2026
Heating and Air Conditioning Systems Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/29/2026Permit IssuedAjl BuildersHeating and Air Conditioning Systems
Heat / Cool
Carrier TDV-V60 WMN1T 60,000 BTU · Condensing Unit ×3
TDV-V48 WMN1T 48,000 BTU · Condensing Unit ×2
Tuttokool A4AH4P60E1B00A 60,000 BTU · Ahu ×3
A4AH4P49E1B00A 48,000 BTU · Ahu ×2
05/20/2026Permit IssuedStepping Stone Construction*Heating and Air Conditioning Systems
Heat / Cool
Daikin FXTA36ABVJUA 36,000 BTU · Vrf Indoor ×1
FXTA48ABVJUD 51,000 BTU · Vrf Indoor ×1
FXTA60ABVJUA 60,000 BTU · Vrf Indoor ×1
RXTA36AAVJU 36,000 BTU · Vrf Outdoor ×1
RXTA48AAVJU 48,000 BTU · Vrf Outdoor ×1
RXTA60AAVJU 60,000 BTU · Vrf Outdoor ×1
07/28/2025Permit IssuedYork MechanicalAir Conditioning Systems, Heating and Air Conditioning Systems, Ventilation Systems
Cooling
Mitsubishi Electric NTXMSM96A1123AA 96,000 BTU · Vrf Outdoor ×2
Heat / Cool
Warren Technology CBK 120 CFM · Ductwork ×2
Ventilation
Trane TRANE TLGHF1200RVX02A 1,200 CFM · Erv ×2
06/26/2023——Heating and Air Conditioning Systems
Heat / Cool
1 project · most recent 09/26/2022
FiledStatusContractorScope
09/26/2022Permit IssuedKG Sprinkler—
6 projects · most recent 10/15/2026
Water/Sanitary Gas
FiledStatusContractorScope
10/15/2026Permit IssuedHertler Nadile P & HGas, Water/Sanitary
09/23/2026Permit IssuedMidtown Plumbing & HeatingWater/Sanitary
05/29/2026Signed-offCape PlumbingWater/Sanitary
10/31/2025Signed-offTMS & Son PlumbingGas, Water/Sanitary
10/08/2025Permit IssuedMonarch Plumbing & HeatingWater/Sanitary
04/26/2023Permit IssuedCrown PlumbingGas, Water/Sanitary
25 projects · most recent 04/01/2026
General Wiring
FiledStatusContractorScope
04/01/2026Permit IssuedRobert ChimentiGeneral Wiring
01/08/2026Permit IssuedL.J.F. & Sons Electrical ContsGeneral Wiring
11/05/2025Permit IssuedAsko Electric Construction & MaintenanceGeneral Wiring
08/13/2025Permit IssuedDVM Electrical ServicesGeneral Wiring
07/28/2025Permit IssuedCentury ElectricGeneral Wiring
11/19/2024Pending PaymentSmart Electric Services16 meters
09/16/2024CancelledSeabrave ElectricGeneral Wiring
07/07/2024CompleteCircuit City ElectricGeneral Wiring
02/26/2024Permit IssuedAsset ElectricGeneral Wiring
12/14/2023CompletePower Point ElectricGeneral Wiring
10/05/2023CompleteThe Metro Group ElectricGeneral Wiring
08/22/2023Permit IssuedRobert Chimenti3 meters, 1 new_meters
05/24/2023CompleteAllcom Electric1 meters, 1 new_meters
09/23/2022CompleteLive Wire Electric 1General Wiring
08/16/2022Permit IssuedIlluminous ElectricGeneral Wiring
2 projects · most recent 04/11/2025
Concrete Steel
FiledStatusContractorScope
04/11/2025——Concrete
10/26/2021Permit IssuedPyramid Restoration NYSteel
2 projects · most recent 09/02/2022
Fence Sidewalk Shed
FiledStatusContractorScope
09/02/2022Permit IssuedPlatinum Services NYFence
09/02/2022Permit IssuedPlatinum Services NYSidewalk Shed
1 project · most recent 07/28/2025
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
07/28/2025Permit IssuedYork MechanicalTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 26
DateTypeResultReport
06/25/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/22/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/25/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/11/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/11/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/18/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/24/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/09/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/24/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/20/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/04/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/03/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
02/01/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
01/24/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/02/2023Pass-Final SP Permit WithdrawalPassView ↗
05/12/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/28/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/18/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/05/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/28/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
03/17/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/08/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/08/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/01/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
Latest 25 of 26.
▾Special Inspection Requirements (DOB NOW) — 128
DateRequirementInspectorRole
10/14/2026Fire-Resistant Penetrations and JointsGIOVANNI ZAPATAspecial
09/22/2026FinalWilliam Mandaraprogress
09/22/2026Fire-Resistant Penetrations and JointsWilliam Mandaraspecial
09/22/2026Lighting in dwelling unitsWilliam Mandaraenergy_progress
06/29/2026Fire-Resistant Penetrations and JointsGIOVANNI ZAPATAspecial
04/14/2026Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
04/14/2026Fire-Resistant Penetrations and JointsMatthew Bendixspecial
04/13/2026Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
04/13/2026Mechanical SystemsMatthew Bendixspecial
04/13/2026Lighting controlsMichael Zenreichenergy_progress
04/13/2026Interior lighting powerMichael Zenreichenergy_progress
04/13/2026FinalMichael Zenreichprogress
04/13/2026Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
04/13/2026Post-installed AnchorsMichael Zenreichspecial
04/13/2026Fire-Resistant Penetrations and JointsMichael Zenreichspecial
04/13/2026Energy Code Compliance InspectionsMatthew Bendixprogress
04/13/2026Maintenance informationMatthew Bendixenergy_progress
04/13/2026HVAC-R and service water piping design and insulationMatthew Bendixenergy_progress
04/13/2026HVAC-R and service water heating equipmentMatthew Bendixenergy_progress
04/13/2026HVAC-R and service water heating system controlsMatthew Bendixenergy_progress
04/13/2026FinalMatthew Bendixprogress
04/13/2026Fire-Resistant Penetrations and JointsMatthew Bendixspecial
01/20/2026FinalTREVOR O. FLOWERSprogress
01/20/2026Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
01/20/2026Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
Latest 25 of 128.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
CenterparkParkingCellar
Project M01160089 Alteration · Approved · 04/11/2025
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 801 on file (BIS + DOB NOW)
▸Plans & Drawings64
▸DOB NOWPlans/Sketch59
10/04/2026M01462619-S1Request digital key ↗
10/04/2026M01462619-I1Request digital key ↗
09/06/2026M00027501-I1Request digital key ↗
Showing 3 of 59 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/06/2026M00027501-I1Request digital key ↗
Showing 1 of 2 on file for this type
▸DOB NOWPlans/Sketch - Structural1
09/04/2026M00398601-I1Request digital key ↗
▸Applications & Permits118
▸BISPLAN / WORK APPROVAL APPLICATION63
03/06/2025104394521Open ↗
02/24/2025104394521Open ↗
02/21/2025104394521Open ↗
Showing 3 of 63 on file for this type
▸BISWORK PERMIT APPLICATION55
05/20/2021123154629Open ↗
05/14/2021123154629Open ↗
11/02/2020123720893Open ↗
Showing 3 of 55 on file for this type
▸Seals & Professional Certifications255
▸DOB NOWDPL-1: Design Professional Seal & Signature63
10/17/2026M00658563-P5Open ↗
10/04/2026M01462619-I1Open ↗
10/04/2026M01462619-S1Open ↗
Showing 3 of 63 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION54
03/12/2020123830444Open ↗
10/08/2019123808807Open ↗
10/08/2019123808807Open ↗
Showing 3 of 54 on file for this type
▸DOB NOWProgress Inspector Seal & Signature45
10/07/2026M00789068-P1Open ↗
10/05/2026M01462619-I1Open ↗
10/05/2026M01462619-I1Open ↗
Showing 3 of 45 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature44
10/17/2026M00658563-P5Open ↗
10/07/2026M00789068-P1Open ↗
10/05/2026M01462619-S1Open ↗
Showing 3 of 44 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST20
03/12/2020123830444Open ↗
05/02/2019123808807Open ↗
12/24/2018123154629Open ↗
Showing 3 of 20 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
03/12/2020123830444Open ↗
08/30/2019140866677Open ↗
05/02/2019123808807Open ↗
Showing 3 of 6 on file for this type
▸BISAPPLICANT OWNER SIGNATURE3
11/02/2020140962457Open ↗
Showing 1 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
08/30/2019140866677Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
08/30/2019140866677Open ↗
Showing 1 of 2 on file for this type
▸BISPC FULL REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment45
▸BISSELF-CERT PLUMBING NOTICE18
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 18 on file for this type
▸BISSCHEDULE B - PLUMBING13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE9
12/24/2018123154629Open ↗
11/21/2018123554705Open ↗
06/19/2018104394521Open ↗
Showing 3 of 9 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
11/21/2019123808807Open ↗
Showing 1 of 3 on file for this type
▸BISEQUIPMENT USE PERMITS2
11/21/2019123808807Open ↗
11/21/2019123808807Open ↗
▸Safety & Tenant Protection13
▸BISTenant Protection Plan and Notes10
06/09/2020123830444Open ↗
05/17/2019123720893Open ↗
05/02/2019123808807Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWTenant Protection Plan3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Environmental & Asbestos87
▸DOB NOWDEP ACP-5: Asbestos Assessment Report45
10/17/2026M00658563-P5Open ↗
09/04/2026M00398601-I1Open ↗
09/02/2026M00658563-P4Open ↗
Showing 3 of 45 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)18
03/12/2020123830444Open ↗
07/18/2019123720893Open ↗
07/18/2019123720893Open ↗
Showing 3 of 18 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/31/2026M00841924-I1Open ↗
08/28/2026M00842136-I1Open ↗
Showing 2 of 4 on file for this type
▸Energy Compliance35
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS14
03/12/2020123830444Open ↗
10/08/2019123808807Open ↗
05/17/2019123720893Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY7
04/11/2023123720893Open ↗
04/06/2023123720893Open ↗
08/24/2021123154629Open ↗
Showing 3 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
04/11/2023123720893Open ↗
04/06/2023123720893Open ↗
08/24/2021123154629Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
04/03/2023123720893Open ↗
06/26/2022123830444Open ↗
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISELECTRICAL ENERGY CONSUMPTION1
06/26/2022123830444Open ↗
▸BISLIGHTING IN DWELLING UNITS1
06/26/2022123830444Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
06/26/2022123830444Open ↗
▸Inspections & Test Reports18
▸BISTECHNICAL REPORT: RESPONSIBILITY12
03/24/2025104394521Open ↗
04/11/2023123720893Open ↗
04/06/2023123720893Open ↗
Showing 3 of 12 on file for this type
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
04/03/2023123720893Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
06/26/2022123830444Open ↗
▸BISMASONRY1
04/03/2023123720893Open ↗
▸BISPOST-INSTALLED ANCHORS1
06/26/2022123830444Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
07/18/2020123830444Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
07/26/2018120409003Open ↗
▸Approvals, Objections & Sign-offs48
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST22
03/26/2025104394521Open ↗
04/11/2023123720893Open ↗
01/19/2023140866677Open ↗
Showing 3 of 22 on file for this type
▸BISADMINISTRATIVE OBJECTIONS19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸BISFINAL3
04/03/2023123720893Open ↗
01/11/2023140866677Open ↗
06/26/2022123830444Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTAP LETTER - DOM SVC : DEP-DOM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership56
▸BISCOST AFFIDAVIT49
04/11/2023123720893Open ↗
04/06/2023123720893Open ↗
08/24/2021123154629Open ↗
Showing 3 of 49 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
12/23/2024104394521Open ↗
04/03/2023123720893Open ↗
06/26/2022123830444Open ↗
▸BISHIC LICENSE OR AFFIDAVIT2
06/30/2020123830444Open ↗
Showing 1 of 2 on file for this type
▸BISCIVIL PENALTY AFFIDAVIT/REQUEST1
05/20/2021123154629Open ↗
▸BISCIVIL PENALTY AFFADAVIT/REQUEST1
09/04/2019140866677Open ↗
▸Filing & Intake Forms49
▸BISEFILING COVER SHEET22
03/12/2020123830444Open ↗
05/17/2019123720893Open ↗
05/02/2019123808807Open ↗
Showing 3 of 22 on file for this type
▸BISADDITIONAL INFORMATION10
01/25/2021123830444Open ↗
09/20/2019123808807Open ↗
01/31/2017122826923Open ↗
Showing 3 of 10 on file for this type
▸BISBOROUGH INTAKE FORM9
11/02/2020123720893Open ↗
10/28/2020123720893Open ↗
10/02/2020140866677Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET8
11/02/2020140962457Open ↗
08/30/2019140866677Open ↗
Showing 2 of 8 on file for this type
▸Other Documents13
▸DOB NOWDHCR Document10
09/01/2026M00762614-P1Open ↗
09/01/2026M00762614-I1Open ↗
Showing 2 of 10 on file for this type
▸BISSupporting Document: Fee Exempt1
10/20/2016122826923Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
07/26/2018120409003Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
08/30/2019140866677Open ↗