Roof9p · 5 filings · 20 docs
ArchitectureDMGeneralMechanicalPlumbingOther
Installation of Fuel Oil Piping for Generator in an existing commercial building. No change in egress, use or occupancy.
On file for this project
9 documents · 1 drawing sheet
Filing for the Installation of interior non-bearing partitions and related finishes for the 12th Floor as per plans as per plans filed herewith. No change in Egress, Use or Occupancy.
On file for this project
23 documents · 1 drawing sheet
FILING FOR EXTERIOR FACADE REPAIR WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
8 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 981p · 1 filing · 8 docs
Architecture
FILING FOR ARCHITECTURAL INTERIOR RENOVATION INCLULDING DEMO AND ERECTION OF INTERIOR NON-LOAD BEARING PARTITIONS OF 9TH FLOOR SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
8 documents · 1 drawing sheet
Floor 97
Floor 96
Floor 95
Floor 94
Floor 93
Floor 92
Floor 91
Floor 90
Floor 89
Floor 88
Floor 87
Floor 86
Floor 85
Floor 84
Floor 83
Floor 82
Floor 81
Floor 80
Floor 79
Floor 78
Floor 77
Floor 76
Floor 75
Floor 74
Floor 73
Floor 72
Floor 71
Floor 70
Floor 69
Floor 68
Floor 67
Floor 66
Floor 65
Floor 64
Floor 63
Floor 62
Floor 61
Floor 60
Floor 59
Floor 58
Floor 57
Floor 56
Floor 55
Floor 54
Floor 53
Floor 52
Floor 51
Floor 50
Floor 49
Floor 48
Floor 47
Floor 46
Floor 45
Floor 44
Floor 43
Floor 42
Floor 41
Floor 40
Floor 39
Floor 38
Floor 37
Floor 36
Floor 35
Floor 34
Floor 33
Floor 32
Floor 31
Floor 30
Floor 29
Floor 28
Floor 27
Floor 26
Floor 25
Floor 24
Floor 23
Floor 22
Floor 21
Floor 20
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 1212p · 3 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Filing for the Installation of interior non-bearing partitions and related finishes for the 12th Floor as per plans as per plans filed herewith. No change in Egress, Use or Occupancy.
On file for this project
23 documents · 4 drawing sheets
FILING FOR ARCHITECTURAL INTERIOR RENOVATION INCLULDING DEMO AND ERECTION OF INTERIOR NON-LOAD BEARING PARTITIONS OF 12TH FLOOR SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
5 documents · 4 drawing sheets
Filing for Mechanical in conjunction with DOBNOW # M00734109-I1
On file for this project
27 documents · 4 drawing sheets
Floor 1110p · 3 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingOther
Filing for the Installation of interior non-bearing partitions and related finishes for the 11th Floor as per plans as per plans filed herewith. No change in Egress, Use or Occupancy.
On file for this project
27 documents · 7 drawing sheets
FILING FOR ARCHITECTURAL INTERIOR RENOVATION INCLULDING DEMO AND ERECTION OF INTERIOR NON-LOAD BEARING PARTITIONS OF 11TH FLOOR SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
8 documents · 3 drawing sheets
No filed description on record for this project.
On file for this project
3 documents · 1 drawing sheet
Floor 107p · 3 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
FILING FOR SPRINKLER INTERIOR WORK FOR 10TH FLOOR SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
24 documents · 3 drawing sheets
FILING FOR ARCHITECTURAL INTERIOR RENOVATION OF 7TH FLOOR & 10TH FLOOR SPACES AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
5 documents · 3 drawing sheets
Filing for Mechanical in conjunction with DOBNOW # M00734109-I1
On file for this project
27 documents · 1 drawing sheet
Floor 96p · 2 filings · 20 docs
ArchitectureDMPlumbing
FILING FOR STRUCTURAL WORK FOR STAIRS IN 9TH FLOOR OFFICE SPACE AS PER PLAN FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
38 documents · 3 drawing sheets
FILING FOR ARCHITECTURAL INTERIOR RENOVATION INCLULDING DEMO AND ERECTION OF INTERIOR NON-LOAD BEARING PARTITIONS OF 9TH FLOOR SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
8 documents · 3 drawing sheets
Floor 810p · 2 filings · 20 docs
ArchitectureDMFire ProtectionGeneralPlumbing
FILING FOR SPRINKLER INTERIOR WORK FOR 8TH FLOOR SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
32 documents · 6 drawing sheets
FILING FOR ARCHITECTURAL INTERIOR RENOVATION INCLULDING DEMO AND ERECTION OF INTERIOR NON-LOAD BEARING PARTITIONS & RELATED FINISHES OF 8TH FLOOR SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
5 documents · 4 drawing sheets
Floor 711p · 3 filings · 20 docs
ArchitectureDMFire ProtectionGeneralPlumbing
Filing for the Installation of interior non-bearing partitions and related finishes for the 11th Floor as per plans as per plans filed herewith. No change in Egress, Use or Occupancy.
On file for this project
27 documents · 1 drawing sheet
FILING FOR SPRINKLER INTERIOR WORK FOR 7TH FLOOR SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
26 documents · 7 drawing sheets
FILING FOR ARCHITECTURAL INTERIOR RENOVATION OF 7TH FLOOR & 10TH FLOOR SPACES AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
5 documents · 3 drawing sheets
Floor 6Under Construction13p · 2 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanical
Issued Permit Scope
General Construction
INSTALLATION OF INTERIOR NON-BEARING PARTITIONS AND RELATED FINISHES FOR 6TH FLOOR SPACE AS PER PLANS. NO EXTERIOR WORK PROPOSED UNDER THIS APPLICATION. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
27 documents · 3 drawing sheets
SUBSEQUENT FILING FOR STRUCTURAL FRAMING FOR 12TH FLOOR AND ROOF FOR DUNNAGE AND ROOF DECK FRAMING AS PER PLANS FILED HEREWITH.
On file for this project
75 documents · 2 drawing sheets
Floor 5Under Construction145p · 3 filings · 20 docs
ArchitectureFire ProtectionPlumbing
Issued Permit Scope
General Construction
FILING FOR PLUMBING INTERIOR WORK FOR 5TH FLOOR SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
23 documents · 3 drawing sheets
SUBSEQUENT FILING FOR STRUCTURAL FRAMING FOR 12TH FLOOR AND ROOF FOR DUNNAGE AND ROOF DECK FRAMING AS PER PLANS FILED HEREWITH.
On file for this project
75 documents · 2 drawing sheets
filing for interior non structural Demo per plans
On file for this project
5 documents · 1 drawing sheet
Floor 4Under Construction13p · 4 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction
FILING FOR SPRINKLER INTERIOR WORK FOR 4TH FLOOR SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
22 documents · 3 drawing sheets
FILING FOR ARCHITECTURAL INTERIOR RENOVATION INCLULDING DEMO AND ERECTION OF INTERIOR NON-LOAD BEARING PARTITIONS OF 4TH FLOOR SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
8 documents · 3 drawing sheets
SUBSEQUENT FILING FOR STRUCTURAL FRAMING FOR 12TH FLOOR AND ROOF FOR DUNNAGE AND ROOF DECK FRAMING AS PER PLANS FILED HEREWITH.
On file for this project
75 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 3Under Construction149p · 5 filings · 20 docs
ArchitectureDMElectricalFire ProtectionPlumbing
Issued Permit Scope
General Construction
FILING FOR SPRINKLER WORK ON BAS, FIRST FLOOR AND THIRD FLOOR IN CONJUNCTION WITH APP# M00794347-I1 AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
18 documents · 2 drawing sheets
SUBSEQUENT FILING FOR STRUCTURAL FRAMING FOR 12TH FLOOR AND ROOF FOR DUNNAGE AND ROOF DECK FRAMING AS PER PLANS FILED HEREWITH.
On file for this project
75 documents · 4 drawing sheets
Installation of interior non-bearing partitions and related finishes, as per plans.
On file for this project
19 documents · 3 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 2Under Construction153p · 7 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction
INTERIOR ALTERATIONS TO EXISTING 2ND FLOOR OFFICE SPACE TO INCLUDE REMOVAL OF 2 NON-LOAD BEARING PARTITIONS AND COSMETIC PATCHING. NO CHANGE TO USE, OCCUPANCY OR EGRESS
On file for this project
4 documents · 3 drawing sheets
New sprinkler design on the 2nd floor only, existing sprinkler risers to remain. No change in use,occupancy or egress.
On file for this project
3 documents · 1 drawing sheet
Removal, Replacement and Installation of plumbing fixtures and piping back to risers and connect new fixtures to existing cold water risers as well as existing vent and waste risers.
On file for this project
10 documents · 4 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 1Under Construction147p · 8 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction
FILING FOR SPRINKLER WORK ON BAS, FIRST FLOOR AND THIRD FLOOR IN CONJUNCTION WITH APP# M00794347-I1 AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
18 documents · 1 drawing sheet
Filing for the Installation of interior non-bearing partitions and related finishes for the 11th Floor as per plans as per plans filed herewith. No change in Egress, Use or Occupancy.
On file for this project
27 documents · 1 drawing sheet
Installation of Fuel Oil Piping for Generator in an existing commercial building. No change in egress, use or occupancy.
On file for this project
9 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
MezzanineUnder Construction145p · 3 filings · 20 docs
ArchitectureDMGeneral
Issued Permit Scope
General Construction
FILING FOR NEW CELLAR MECHANICAL ROOMS AND INTERIOR RATED WALLS. NEW ROOFTOP MECHANICAL UNITS AND GENERATOR ON STRUCTURAL ROOF PLATFORM. NEW EXPOSED CONDENSATE LINES, CONDUITES, ETC PER PLANS
On file for this project
18 documents · 1 drawing sheet
Filing for Mechanical in conjunction with DOBNOW # M00734109-I1
On file for this project
27 documents · 1 drawing sheet
SUBSEQUENT FILING FOR STRUCTURAL FRAMING FOR 12TH FLOOR AND ROOF FOR DUNNAGE AND ROOF DECK FRAMING AS PER PLANS FILED HEREWITH.
On file for this project
75 documents · 4 drawing sheets
CellarUnder Construction166p · 8 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructuralOtherZ
Issued Permit Scope
General Construction · Structural
Arc'teryx-- Plumbing modifications and installations for retail renovation as per plans filed.
On file for this project
58 documents · 15 drawing sheets
ARC'TERYX-- MODIFICATIONS TO EXISTING SPRINKLER SYSTEM IN CONJUNCTION WITH RETAIL RENOVATIONS.
On file for this project
18 documents · 4 drawing sheets
INSTALL NEW TEMP LOOP SPRINKLER SYSTEM AS PER PLANS NO CHANGE TO USE, OCCUPANCY OR EGRESS.
On file for this project
7 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Sub-CellarUnder Construction149p · 4 filings · 20 docs
ArchitectureDMMechanicalStructural
Issued Permit Scope
General Construction
Installation of Fuel Oil Piping for Generator in an existing commercial building. No change in egress, use or occupancy.
On file for this project
9 documents · 2 drawing sheets
FILING FOR NEW CELLAR MECHANICAL ROOMS AND INTERIOR RATED WALLS. NEW ROOFTOP MECHANICAL UNITS AND GENERATOR ON STRUCTURAL ROOF PLATFORM. NEW EXPOSED CONDENSATE LINES, CONDUITES, ETC PER PLANS
On file for this project
18 documents · 3 drawing sheets
Filing for Mechanical in conjunction with DOBNOW # M00734109-I1
On file for this project
27 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Basement4p · 1 filing · 18 docs
Fire Protection
FILING FOR SPRINKLER WORK ON BAS, FIRST FLOOR AND THIRD FLOOR IN CONJUNCTION WITH APP# M00794347-I1 AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
On file for this project
18 documents · 4 drawing sheets