← Back
Elevator apt, semi-fireproof with stores
Union Channel
585 UNION STREET · BIN 3429819
💬 Discuss this project
2023Year Built
9Stories
D7Building Class
M1-4/R7AZoning
246,316 sfGross Floor Area
216Units
LL97 CoveredRent Stabilized0 Open ViolationsFDNY Report ↗
Elevator apt, semi-fireproof with stores · Owner of record: GOWANUS UNION STREET LLC · 33,550 sf lot · 7.34 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 2 docs
Floor 512p · 2 filings · 20 docs
Floor 413p · 2 filings · 20 docs
Floor 313p · 2 filings · 20 docs
Floor 213p · 1 filing · 20 docs
Floor 1Under Construction13p · 2 filings · 20 docs
Cellar13p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNERS REP2807/08/2026
BROADWAY CONSTRUCTION GROUP303/22/2026
MEPA REALTY203/21/2026
SBC REALTY GROUP IN403/21/2026
TAVROS303/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/17/2019$32.7M—SBC REALTY GROUP, INC → GOWANUS UNION STREET LLC— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WILLIAM VITACCO ASSOCIATES4203/21/2026
AE DESIGN SOLUTION3003/21/2026
EXPEDITE DEM203/21/2026
DVA Advisors103/21/2026
PROFESSIONAL DESIGN CONSULTANTS LL403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CORE SCAFFOLD SYSTEMS INC.General Contractor2807/08/2026
BROADWAY CONSTRUCTION GROGeneral Contractor2707/08/2026
SAFETY FIRE SPRINKLER CORPFire Protection407/08/2026
PRIME PIPING & HEATING INPlumbing307/08/2026
M.R. ELEC'L SERVICE LLCElectrical103/22/2026
LEONID SIMKINElectrical103/21/2026
EST REMODELING INCGeneral Contractor104/09/2026
PHILIP HABIB ASSOCIATESGeneral Contractor103/22/2026
XOLLE DEMO LLCGeneral Contractor107/08/2026
CHRISTOPHER FOGARTYElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BITOPI CONSULTANTS LLC7036105/26/2026
WEI STUDIO7998204/29/2026
THE VILNITS GROUP LLC1223204/07/2026
BIG APPLE GROUP NY A RMA91681906/25/2025
GEOTECHNICAL ENGINEERING734610/31/2024
ADVANCED ENGINEERING & IN1224210/15/2024
LEO Y LEE ASSOCIATES2481107/17/2023
Building Lifecycle
All (248)Filed (45)Permit Issued (43)Signed Off (21)Violation (6)Inspection (20)Objection (80)Special Inspection (30)Tax Incentive (3)
06/15/2026
421-a(16) construction completed
05/26/2026
Filed — Alteration
Filing to install first floor Cafe store kitchen hood, make up air and ductwork as per plans. No change in use, egress or occupancy.
B01377465-I1
05/08/2026
Permit issued — Plumbing
B01373219-S1-PL
04/29/2026
Filed — Alteration
1ST FLOOR INTERIOR RENOVATION. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01373219-I1
04/29/2026
Filed — Alteration
1ST FLOOR INTERIOR RENOVATION. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01373219-S1
04/28/2026
Signed off — Alteration
PARTITION WORK AT GROUND FLOOR COMMERCIAL SPACE. NO CHANGE TO USE, EGRESS OR OCCUPANCY. PRIOR DESIGNATION OF UG 6 TO REMAIN, ALTERATION-CO NOT REQUIRED PER BB 2025-002 AND AC 28-118.3 EXCEPTION.
B01306303-I1
04/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ILYA VILNITS
04/16/2026
Special inspection requirement — Tenant Protection Plan Compliance
ILYA VILNITS
04/16/2026
Special inspection requirement — Energy Code Compliance Inspections
ILYA VILNITS
04/16/2026
Special inspection requirement — Fire-Resistance Rated Construction
ILYA VILNITS
04/16/2026
Special inspection requirement — Final
ILYA VILNITS
04/16/2026
Special inspection requirement — Interior lighting power
ILYA VILNITS
04/14/2026
Signed off — New Building
Application to be assigned to HUB per Consultation meeting with SPV on 9/28/2021, 25% inclusionary housing. Application filed in order to erect 9 story mixed use new building.
B00621076-I1
04/07/2026
Filed — Alteration
PARTITION WORK AT GROUND FLOOR COMMERCIAL SPACE. NO CHANGE TO USE, EGRESS OR OCCUPANCY. PRIOR DESIGNATION OF UG 6 TO REMAIN, ALTERATION-CO NOT REQUIRED PER BB 2025-002 AND AC 28-118.3 EXCEPTION.
B01306303-P1
04/07/2026
Special inspection requirement — Final
ILYA VILNITS
04/07/2026
Special inspection requirement — Interior lighting power
ILYA VILNITS
04/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ILYA VILNITS
04/07/2026
Special inspection requirement — Fire-Resistance Rated Construction
ILYA VILNITS
04/07/2026
Special inspection requirement — Tenant Protection Plan Compliance
04/07/2026
Special inspection requirement — Energy Code Compliance Inspections
ILYA VILNITS
03/25/2026
Special inspection requirement — Tenant Protection Plan Compliance
KAMRUL AHSAN
03/24/2026
Special inspection requirement — Mechanical Systems
KAMRUL AHSAN
03/24/2026
Special inspection requirement — Final
KAMRUL AHSAN
03/17/2026
Special inspection requirement — Final
Ruoyu Wei
03/17/2026
Special inspection requirement — Energy Code Compliance Inspections
Ruoyu Wei
03/17/2026
Special inspection requirement — Tenant Protection Plan Compliance
Ruoyu Wei
03/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ruoyu Wei
03/17/2026
Special inspection requirement — Fire-Resistance Rated Construction
Ruoyu Wei
11/25/2025
Permit issued — General Construction
B01306303-I1-GC
11/11/2025
Objection resolved — Addressed
11/11/2025
Objection resolved — Addressed
11/10/2025
Objection resolved — Addressed
11/10/2025
Objection resolved — Addressed
10/29/2025
Objection resolved — Addressed
10/28/2025
Objection raised — Fire_Protection
10/28/2025
Objection raised — Scope
10/28/2025
Objection raised — Zoning
10/28/2025
Objection raised — Fire_Protection
10/28/2025
Objection raised — Cost
10/22/2025
Filed — Alteration
PARTITION WORK AT GROUND FLOOR COMMERCIAL SPACE. NO CHANGE TO USE, EGRESS OR OCCUPANCY. PRIOR DESIGNATION OF UG 6 TO REMAIN, ALTERATION-CO NOT REQUIRED PER BB 2025-002 AND AC 28-118.3 EXCEPTION.
B01306303-I1
08/18/2025
Signed off — New Building
Application to be assigned to HUB per Consultation meeting with SPV on 9/28/2021, 25% inclusionary housing. Application filed in order to erect 9 story mixed use new building.
B00621076-S4
08/06/2025
Special inspection requirement — HVAC-R and service water heating equipment
Waldir Alvarez
08/06/2025
Special inspection requirement — Maintenance information
Waldir Alvarez
08/06/2025
Special inspection requirement — Metering
Waldir Alvarez
08/06/2025
Special inspection requirement — Final
Soorjbally Harilall
08/06/2025
Special inspection requirement — Electrical motors and elevators
Waldir Alvarez
08/06/2025
Special inspection requirement — Duct leakage testing, insulation and design
Waldir Alvarez
08/06/2025
Special inspection requirement — Mechanical Systems
SOORJBALLY HARILALL
08/06/2025
Special inspection requirement — HVAC-R and service water heating system controls
Waldir Alvarez
08/06/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Waldir Alvarez
08/06/2025
Special inspection requirement — Shutoff dampers
Waldir Alvarez
07/16/2025
Objection resolved — Addressed
07/15/2025
Objection raised — Other
06/25/2025
Filed — New Building
Application to be assigned to HUB per Consultation meeting with SPV on 9/28/2021, 25% inclusionary housing. Application filed in order to erect 9 story mixed use new building.
B00621076-A6
06/16/2025
Violation issued (HPD, closed)
A
06/10/2025
Signed off — Alteration
FLOOR NUMBERS UPDATED, 1ST FLOOR IS NOW 2ND FLOOR AND 7TH IS NOW 10TH FLOOR
B01114326-I1
05/22/2025
Signed off — New Building
Application to be assigned to HUB per Consultation meeting with SPV on 9/28/2021, 25% inclusionary housing. Application filed in order to erect 9 story mixed use new building.
B00621076-S2
05/16/2025
Permit issued — Suspended Scaffold
B01114326-I1-SC
05/13/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/09/2025
Signed off — Alteration
installation of construction fence to protect site, during full demolition of 577 & 585 Union St, under DM application job #s322095923/322095656, both structures are under the same lot.
B00648850-I1
Latest 60 of 248 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedPRIME PIPING & HEATING IN05/08/2026
DOB NOWGeneral ConstructionSigned-offEST REMODELING INC11/25/2025
DOB NOWSuspended ScaffoldSigned-offBIG APPLE RENOVATION & RE05/16/2025
DOB NOWCurb CutSigned-offBROADWAY CONSTRUCTION GRO01/07/2025
DOB NOWConstruction FenceSigned-offBROADWAY CONSTRUCTION GRO12/24/2024
DOB NOWGeneral ConstructionPermit IssuedBROADWAY CONSTRUCTION GRO12/23/2024
DOB NOWSuspended ScaffoldPermit IssuedBIG APPLE RENOVATION & RE10/25/2024
DOB NOWSuspended ScaffoldSigned-offBIG APPLE RENOVATION & RE09/30/2024
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC07/24/2024
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC07/24/2024
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC07/12/2024
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC06/28/2024
DOB NOWStandpipeSigned-offSAFETY FIRE SPRINKLER CORP05/23/2024
DOB NOWStandpipeSigned-offSAFETY FIRE SPRINKLER CORP02/21/2024
DOB NOWSprinklersSigned-offSAFETY FIRE SPRINKLER CORP02/21/2024
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN02/14/2024
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC01/30/2024
DOB NOWStructuralSigned-offBROADWAY CONSTRUCTION GRO01/26/2024
DOB NOWGeneral ConstructionPermit IssuedBROADWAY CONSTRUCTION GRO12/29/2023
DOB NOWMechanical SystemsSigned-offBROADWAY CONSTRUCTION GRO12/26/2023
DOB NOWConstruction FenceSigned-offBROADWAY CONSTRUCTION GRO12/22/2023
DOB NOWSupport of ExcavationSigned-offBROADWAY CONSTRUCTION GRO12/22/2023
DOB NOWFoundationSigned-offBROADWAY CONSTRUCTION GRO12/22/2023
DOB NOWFoundationSigned-offBROADWAY CONSTRUCTION GRO12/22/2023
DOB NOWFoundationSigned-offBROADWAY CONSTRUCTION GRO12/22/2023
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC08/04/2023
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC08/01/2023
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC07/27/2023
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC07/17/2023
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC07/07/2023
DOB NOWStructuralSigned-offBROADWAY CONSTRUCTION GRO03/29/2023
DOB NOWGeneral ConstructionPermit IssuedBROADWAY CONSTRUCTION GRO03/21/2023
DOB NOWFoundationSigned-offBROADWAY CONSTRUCTION GRO03/11/2023
DOB NOWStandpipeSigned-offSAFETY FIRE SPRINKLER CORP03/10/2023
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN02/14/2023
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC02/04/2023
DOB NOWConstruction FenceSigned-offBROADWAY CONSTRUCTION GRO01/10/2023
DOB NOWSupport of ExcavationSigned-offBROADWAY CONSTRUCTION GRO01/10/2023
DOB NOWSupport of ExcavationSigned-offBROADWAY CONSTRUCTION GRO11/29/2022
DOB NOWConstruction FenceSigned-offBROADWAY CONSTRUCTION GRO11/15/2022
+ 5 more permits on file
2 projects · most recent 05/26/2026
Ventilation Systems Air Conditioning Systems Associated Ducts and Piping
FiledStatusContractorScopeMake / Model / Capacity
05/26/2026——Ventilation Systems
Ventilation
Canarm 210 4,600 CFM · Kitchen Exhaust ×1
06/25/2025Signed-offBROADWAY CONSTRUCTION GROAir Conditioning Systems, Associated Ducts and Piping, Ventilation Systems
Cooling
Mitsubishi Electric PUHY-EP168YNU-A Y Series, PUHY-EP168YNU-A Y Series, PUHY-EP168YNU-A Y Series 168,000 BTU · Vrf Outdoor ×24
PUHY-EP120YNU-A Y Series, PUHY-EP120YNU-A Y Series, PUHY-EP120YNU-A Y Series 168,000 BTU · Vrf Outdoor ×18
PUHY-EP144YNU-A Y Series, PUHY-EP144YNU-A Y Series, PUHY-EP144YNU-A Y Series 144,000 BTU · Vrf Outdoor ×12
PKA-A12LA.TH, PKA-A12LA.TH, PKA-A12LA.TH 12,000 BTU · Vrf Indoor ×6
PUHY-EP72YNU-A Y Series 72,000 BTU · Vrf Outdoor ×6
PUHY-EP96YNU-A Y Series, PUHY-EP96YNU-A Y Series, PUHY-EP96YNU-A Y Series 96,000 BTU · Vrf Outdoor ×6
PUZ-A12NKA7 P Series, PUZ-A12NKA7 P Series, PUZ-A12NKA7 P Series 12,000 BTU · Vrf Outdoor ×6
PUZ-HA36NKA P Series, PUZ-HA36NKA P Series, PUZ-HA36NKA P Series 36,000 BTU · Condensing Unit ×6
PEAD-A36AA7 36,000 BTU · Vrf Indoor ×4
PEFY-P48NMAU-E4, PEFY-P48NMAU-E4 48,000 BTU · Vrf Indoor ×4
PUHY-EP144YNU-A Y Series, PUHY-EP144YNU-A Y Series 144,000 BTU · Vrf Outdoor ×4
PVFY-P12NAMU-E1 12,000 BTU · Vrf Indoor ×4
Ventilation
Captiveaire RARTU1-E.304-13-5T-ERV 1,200 CFM · Erv ×2
RARTU3-E 604-18-12.5T-ERV 2,350 CFM · Erv ×2
Aldes H650-Fi-EC-N 350 CFM · Erv ×2
Ducts & Piping
N/A n/a Ductwork ×2
1 project · most recent 06/25/2025
Sprinkler System
FiledStatusContractorScope
06/25/2025Signed-offSAFETY FIRE SPRINKLER CORSprinkler System
2 projects · most recent 04/29/2026
Water/Sanitary Storm
FiledStatusContractorScope
04/29/2026Permit IssuedA M B MECHANICAL INCWater/Sanitary
06/25/2025Signed-offA M B MECHANICAL INCStorm, Water/Sanitary
14 projects · most recent 08/02/2026
General Wiring
FiledStatusContractorScope
08/02/2026Permit IssuedGT ELECTRICAL COMPANY INCGeneral Wiring
11/25/2025CompleteLENS ELECTRIC, INCGeneral Wiring
05/07/2025CompleteH. & L. ELECTRIC INCGeneral Wiring
10/20/2023CompleteM.R. ELEC'L SERVICE LLCGeneral Wiring
09/06/2023CompleteM.R. ELEC'L SERVICE LLC1 meters, 1 new_meters
07/26/2023CompleteSOLAS ELECTRICAL CORP—
07/19/2023CompleteSOLAS ELECTRICAL CORP—
11/03/2022CompleteTUXEDO ELEC'L CONTR'G INC—
08/03/2022CompleteSOLAS ELECTRICAL CORP—
03/16/2022CancelledNOVA ELECTRIC LLC—
02/09/2022CompleteV. VASS ELECTRIC CORP—
02/01/2022CompleteV. VASS ELECTRIC CORP—
08/19/2020CompleteANTONIO CERIELLO ELEC INC—
08/18/2020CompleteANTONIO CERIELLO ELEC INC—
1 project · most recent 06/25/2025
Steel Concrete Masonry
FiledStatusContractorScope
06/25/2025Signed-offBROADWAY CONSTRUCTION GROSteel, Concrete, Masonry
1 project · most recent 04/07/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
04/07/2026Signed-offEST REMODELING INCTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 20
DateTypeResultReport
05/13/2025Pass-Final CND-Occupancy InspectionPassView ↗
02/11/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
02/04/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
01/30/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
01/15/2025Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
01/15/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/19/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/17/2024Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
12/17/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/17/2024Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
12/17/2024Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
12/12/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
12/10/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
09/08/2023Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
09/08/2023Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
06/26/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/08/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/08/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/08/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/03/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 147
DateRequirementInspectorRole
04/16/2026Interior lighting powerILYA VILNITSenergy_progress
04/16/2026Tenant Protection Plan ComplianceILYA VILNITSspecial
04/16/2026Fire-Resistant Penetrations and JointsILYA VILNITSspecial
04/16/2026Energy Code Compliance InspectionsILYA VILNITSprogress
04/16/2026Fire-Resistance Rated ConstructionILYA VILNITSprogress
04/16/2026FinalILYA VILNITSprogress
04/07/2026Fire-Resistance Rated ConstructionILYA VILNITSprogress
04/07/2026Energy Code Compliance InspectionsILYA VILNITSprogress
04/07/2026FinalILYA VILNITSprogress
04/07/2026Interior lighting powerILYA VILNITSenergy_progress
04/07/2026Fire-Resistant Penetrations and JointsILYA VILNITSspecial
04/07/2026Tenant Protection Plan Compliance—special
03/25/2026Tenant Protection Plan ComplianceKAMRUL AHSANspecial
03/24/2026Mechanical SystemsKAMRUL AHSANspecial
03/24/2026FinalKAMRUL AHSANprogress
03/17/2026FinalRuoyu Weiprogress
03/17/2026Fire-Resistant Penetrations and JointsRuoyu Weispecial
03/17/2026Tenant Protection Plan ComplianceRuoyu Weispecial
03/17/2026Fire-Resistance Rated ConstructionRuoyu Weiprogress
03/17/2026Energy Code Compliance InspectionsRuoyu Weiprogress
08/06/2025Duct leakage testing, insulation and designWaldir Alvarezenergy_progress
08/06/2025Mechanical SystemsSOORJBALLY HARILALLspecial
08/06/2025HVAC-R and service water heating system controlsWaldir Alvarezenergy_progress
08/06/2025HVAC-R and service water piping design and insulationWaldir Alvarezenergy_progress
08/06/2025Shutoff dampersWaldir Alvarezenergy_progress
Latest 25 of 147.
▾Documents — 347 on file (BIS + DOB NOW)
▸Plans & Drawings45
▸DOB NOWPlans/Sketch45
08/31/2026B00648850-I1Request digital key ↗
08/31/2026B00671969-I1Request digital key ↗
08/31/2026B00671960-I1Request digital key ↗
Showing 3 of 45 on file for this type
▸Applications & Permits16
▸BISPLAN / WORK APPROVAL APPLICATION8
04/23/2025340870114Open ↗
02/21/2025320205853Open ↗
02/21/2025320202927Open ↗
Showing 3 of 8 on file for this type
▸BISWORK PERMIT APPLICATION5
10/28/2010320205853Open ↗
10/28/2010320211098Open ↗
09/15/2010320202927Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHPD - Permit Notice3
08/23/2026B00621076-I1Open ↗
08/13/2026B00621076-I1Open ↗
08/13/2026B00621076-P5Open ↗
▸Zoning, Tax Lot & Property Records33
▸DOB NOWRestrictive Declaration/Easement 211
08/13/2026B00621076-S3Open ↗
08/13/2026B00621076-A2Open ↗
08/13/2026B00621076-A1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWRestrictive Declaration/Easement 111
08/13/2026B00621076-I1Open ↗
08/13/2026B00621076-P9Open ↗
08/13/2026B00621076-A2Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram5
08/13/2026B00621076-A7Open ↗
08/13/2026B00621076-I1Open ↗
08/13/2026B00621076-P9Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZoning Exhibit form (1-5)5
08/13/2026B00621076-A5Open ↗
08/13/2026B00621076-A7Open ↗
Showing 2 of 5 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications124
▸DOB NOWDPL-1: Design Professional Seal & Signature43
08/31/2026B00648850-I1Open ↗
08/31/2026B00671969-I1Open ↗
08/31/2026B00671960-I1Open ↗
Showing 3 of 43 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature41
09/02/2026B00621076-I1Open ↗
09/01/2026B01306303-I1Open ↗
09/01/2026B01306303-I1Open ↗
Showing 3 of 41 on file for this type
▸DOB NOWProgress Inspector Seal & Signature31
09/02/2026B00621076-I1Open ↗
09/02/2026B00621076-I1Open ↗
09/01/2026B01306303-I1Open ↗
Showing 3 of 31 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
09/02/2010320202927Open ↗
08/26/2010320211098Open ↗
08/24/2010320205853Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
08/26/2010320211098Open ↗
08/24/2010320205853Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
08/26/2010320211098Open ↗
08/24/2010320205853Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/27/2022340870114Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
10/27/2022340870114Open ↗
▸Trade Schedules & Equipment6
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWStandpipe Alarms Drawings1
08/23/2026B00621076-I1—
▸Safety & Tenant Protection12
▸DOB NOWStreet Tree Checklist5
08/23/2026B00621076-A5Open ↗
08/23/2026B00621076-I1Open ↗
08/14/2026B00621076-P5Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREE CHECKLIST1
09/02/2010320202927Open ↗
▸BISSTREET TREES SITE PLAN1
12/19/2023340870114Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
12/19/2023340870114Open ↗
▸BISSITE SAFETY PLAN: BEST APPROVAL REQUIRED1
10/06/2025340870114Open ↗
▸DOB NOWStreet Tree Sign Off1
08/23/2026B00621076-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWStreet Trees Site Plan1
08/23/2026B00621076-I1Open ↗
▸Environmental & Asbestos46
▸DOB NOWOER: Notice to Proceed28
08/17/2026B01306303-I1Open ↗
08/17/2026B01306303-P1Open ↗
Showing 2 of 28 on file for this type
▸DOB NOWOER: Notice of Satisfaction14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
09/02/2010320202927Open ↗
08/26/2010320211098Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
10/27/2022340870114Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
08/24/2010320205853Open ↗
▸Energy Compliance4
▸DOB NOWPreliminary Commissioning Report Certification3
08/23/2026B00621076-I1Open ↗
Showing 1 of 3 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports8
▸DOB NOWSOIL REPORT4
08/13/2026B00621076-S8Open ↗
08/13/2026B00621076-P1Open ↗
Showing 2 of 4 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026B00621076-S8Open ↗
08/13/2026B00621076-S1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026B00621076-S8Open ↗
▸DOB NOWTR5 Test Report1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs4
▸BISADMINISTRATIVE OBJECTIONS3
09/02/2010320202927Open ↗
08/26/2010320211098Open ↗
08/24/2010320205853Open ↗
▸BISCURB CUT (CC) SIGNOFF1
10/06/2025340870114Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
09/02/2010320202927Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
12/08/2025340870114Open ↗
▸Filing & Intake Forms7
▸BISEFILING COVER SHEET3
09/02/2010320202927Open ↗
08/26/2010320211098Open ↗
08/24/2010320205853Open ↗
▸BISADDITIONAL INFORMATION2
05/05/2025340870114Open ↗
12/19/2023340870114Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
10/27/2022340870114Open ↗
▸DOB NOWAI1 Form (from plan PDF)1
08/16/2026B00906822-P1Open ↗
▸Other Documents40
▸DOB NOWProperty Ownership Certification9
08/23/2026B00621076-S7Open ↗
08/23/2026B00621076-I1Open ↗
08/23/2026B00621076-P9Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)6
08/23/2026B00621076-I1Open ↗
08/13/2026B00621076-S2Open ↗
08/13/2026B00621076-S1Open ↗
Showing 3 of 6 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION5
05/29/2025340870114Open ↗
05/29/2025340870114Open ↗
05/05/2025340870114Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSite Survey: Initial5
08/13/2026B00621076-P9Open ↗
08/13/2026B00621076-P5Open ↗
Showing 2 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWCalculations2
08/23/2026B01114326-I1Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWManufacturer's Specifications2
08/23/2026B01114326-I1Open ↗
Showing 1 of 2 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION1
05/05/2025340870114Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
12/19/2023340870114Open ↗
▸DOB NOWHPD - Completion Notice1
08/13/2026B00621076-I1Open ↗
▸DOB NOWFinal Survey1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00621076-S2Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type