Elevator apt, fireproof with stores
Ebenezer Plaza Phase 2 Condominium
589 CHRISTOPHER AVENUE · Brownsville · BIN 3428616
💬 Discuss this project
2023Year Built
11Stories
D6Building Class
R7DZoning
204,369 sfGross Floor Area
209Units
Rent Stabilized10 Active Violations ▸FDNY Report ↗
Elevator apt, fireproof with stores · Owner of record: HP Ebenezer 2 Housing Development Fund C Ompany · 36,833 sf lot · 5.55 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsEbenezer Plaza Ii6 filings
Roof86 kw solar energy system installation on roof1p · 1 filing · 2 docs
Floor 1New Lots Deli, New Lots SupermarketUnder Construction3p · 4 filings · 20 docs
Cellar86 kw solar energy system installation on roof1p · 1 filing · 2 docs
Site & exteriorNorth Hoist for construction7 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Ebenezer Plaza Owner Phase II1403/21/2026
Ebanezer Plaza Owner203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/22/2018$4.4M—HP MJM HOUSING DEVELOPMENT FUND COMPANY, INC. → HP EBENEZER 2 HOUSING DEVELOPMENT FUND COMPANY INC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Skypeak309/24/2026
203/17/2026
Andrew Fredman Architect103/17/2026
Synergic Design Architects107/28/2025
Morozov1705/01/2025
Tohfaz Uddin PE808/09/2023
Ikra Consulting104/14/2023
Howard I Shapiro & Associates307/13/2022
McNamara Salvia205/04/2022
Becker Engineering109/15/2021
AKRF108/20/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Howard I Shapiro Associates803/21/2026
JM Zoning3603/21/2026
A1 Expediting Service1203/21/2026
AK Consulting Services203/21/2026
Synergy Building Consultants103/21/2026
Spring Scaffolding203/21/2026
Insha Building Consultants203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Miller Plumbing & HeatingFire Protection1009/07/2026
Procida ConstructionScaffold807/08/2026
Miller Plumbing & HeatingPlumbing707/08/2026
Xtreme ElectricGeneral Contractor603/22/2026
Xtreme ElectricElectrical603/21/2026
Procida ConstructionGeneral Contractor609/13/2026
Spring ScaffoldingScaffold604/09/2026
Northeast Masonry & RestorationScaffold507/08/2026
Colgate EnterpriseScaffold304/09/2026
Accord PowerGeneral Contractor203/21/2026
Total Electric SolutionsGeneral Contractor203/22/2026
Urban Construction & DesignGeneral Contractor104/09/2026
Total Electric SolutionsElectrical103/22/2026
Bradford Mechanical ContractingPlumbing107/08/2026
Accord Power ElectricElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
American Construction Tes9731303/17/2026
Buildtech Engineering6369112/24/2025
Synergic Design8561107/28/2025
Big Apple Group NY A Rma91681805/01/2025
Ikra Consulting7032104/14/2023
Building Lifecycle
All (194)Filed (40)Permit Issued (43)Signed Off (16)Violation (24)Inspection (17)Objection (24)Special Inspection (30)
09/29/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/24/2026
Filed — Alteration
Filing to add plumbing work type in conjunction with GC/MS DOB now job# B01331931, install (1) three compartment sink, and (2) hand-wash sinks, and (1) grease trap inside 1st commercial space (DELI) as per plans.
B01395090-P1
09/24/2026
Special inspection requirement — Tenant Protection Plan Compliance
09/11/2026
Permit issued — Mechanical Systems
B01366019-S1-MS
09/01/2026
Permit issued — Sprinklers
B01366019-S2-EW-SP
08/28/2026
Violation issued (HPD, open)
B
08/28/2026
Violation issued (HPD, open)
C
08/27/2026
Permit issued — General Construction
B01366019-I1-GC
08/13/2026
Objection resolved — Resolved
08/13/2026
Objection resolved — Resolved
08/05/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
07/29/2026
Objection resolved — Addressed
07/15/2026
Objection resolved — Addressed
07/15/2026
Objection resolved — Addressed
07/15/2026
Objection resolved — Addressed
06/25/2026
Violation issued (HPD, open)
C
06/25/2026
Violation issued (HPD, open)
C
06/10/2026
Permit issued — Plumbing
B01395090-I1-PL
05/12/2026
Filed — Alteration
Filing to add plumbing work type in conjunction with GC/MS DOB now job# B01331931, install (1) three compartment sink, and (2) hand-wash sinks, and (1) grease trap inside 1st commercial space (DELI) as per plans.
B01395090-I1
05/12/2026
Special inspection requirement — Tenant Protection Plan Compliance
Luis Pichardo
04/29/2026
Violation issued (HPD, closed)
A
04/29/2026
Violation issued (HPD, closed)
A
04/29/2026
Violation issued (HPD, closed)
A
04/29/2026
Violation issued (HPD, closed)
A
04/25/2026
Violation issued (HPD, closed)
C
04/25/2026
Violation issued (HPD, closed)
A
04/25/2026
Violation issued (HPD, closed)
A
04/25/2026
Violation issued (HPD, open)
B
04/21/2026
Signed off — Alteration
B00373664-I1
04/03/2026
Objection raised — Scope
04/03/2026
Objection raised — Scope
04/03/2026
Objection raised — Fire_Protection
04/03/2026
Objection raised — Plumbing
04/03/2026
Objection raised — Scope
04/03/2026
Objection raised — Cost
04/01/2026
Objection raised — Scope
04/01/2026
Objection raised — Cost
03/17/2026
Filed — Alteration
INTERIOR PARTITION WORK WITH RELATED CEILING AND LIGHTING FOR RETAIL SPACES (9600 SF) AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
B01366019-I1
03/17/2026
Filed — Alteration
INTERIOR PARTITION WORK WITH RELATED CEILING AND LIGHTING FOR RETAIL SPACES (9600 SF) AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
B01366019-S2
03/17/2026
Filed — Alteration
INTERIOR PARTITION WORK WITH RELATED CEILING AND LIGHTING FOR RETAIL SPACES (9600 SF) AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
B01366019-S1
03/17/2026
Special inspection requirement — Maintenance information
EDWIN HOPKINS
03/17/2026
Special inspection requirement — Shutoff dampers
EDWIN HOPKINS
03/17/2026
Special inspection requirement — HVAC-R and service water heating system controls
EDWIN HOPKINS
03/17/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
EDWIN HOPKINS
03/17/2026
Special inspection requirement — Fire-Resistance Rated Construction
EDWIN HOPKINS
03/17/2026
Special inspection requirement — Energy Code Compliance Inspections
EDWIN HOPKINS
03/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
EDWIN HOPKINS
03/17/2026
Special inspection requirement — Heating Systems
EDWIN HOPKINS
03/17/2026
Special inspection requirement — HVAC-R and service water heating equipment
EDWIN HOPKINS
03/03/2026
Special inspection requirement — Tenant Protection Plan Compliance
EDWIN HOPKINS
03/03/2026
Special inspection requirement — Tenant Protection Plan Compliance
EDWIN HOPKINS
03/03/2026
Special inspection requirement — Lighting controls
EDWIN HOPKINS
03/03/2026
Special inspection requirement — Interior lighting power
EDWIN HOPKINS
03/03/2026
Special inspection requirement — Final
EDWIN HOPKINS
03/03/2026
Special inspection requirement — Fire-Resistance Rated Construction
EDWIN HOPKINS
03/03/2026
Special inspection requirement — Energy Code Compliance Inspections
EDWIN HOPKINS
03/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
EDWIN HOPKINS
03/02/2026
Special inspection requirement — Mechanical Systems
EDWIN HOPKINS
03/02/2026
Special inspection requirement — Final
EDWIN HOPKINS
01/09/2026
Permit issued — General Construction
B01331931-I1-GC-CX
Latest 60 of 194 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedProcida Construction09/11/2026
DOB NOWSprinklersPermit IssuedMiller Plumbing & Heating09/01/2026
DOB NOWGeneral ConstructionPermit IssuedProcida Construction08/27/2026
DOB NOWPlumbingPermit IssuedMiller Plumbing & Heating06/10/2026
DOB NOWGeneral ConstructionPermit IssuedUrban Construction & Design01/09/2026
DOB NOWSolarSigned-offAccord Power07/30/2025
DOB NOWBoiler EquipmentSigned-offMiller Plumbing & Heating03/20/2025
DOB NOWBoiler EquipmentSigned-offMiller Plumbing & Heating03/05/2025
DOB NOWStandpipeSigned-offMiller Plumbing & Heating09/16/2024
DOB NOWStandpipeSigned-offMiller Plumbing & Heating09/04/2024
DOB NOWSprinklersSigned-offMiller Plumbing & Heating09/04/2024
DOB NOWPlumbingSigned-offMiller Plumbing & Heating09/04/2024
DOB NOWBoiler EquipmentSigned-offBradford Mechanical Contracting05/30/2024
DOB NOWPlumbingSigned-offMiller Plumbing & Heating05/09/2024
DOB NOWProtection and Mechanical MethodsSigned-offSpring Scaffolding05/07/2024
DOB NOWProtection and Mechanical MethodsSigned-offSpring Scaffolding05/07/2024
DOB NOWConstruction FenceSigned-offProcida Construction04/24/2024
DOB NOWSupported ScaffoldSigned-offColgate Enterprise04/04/2024
DOB NOWSidewalk ShedSigned-offSpring Scaffolding02/15/2024
DOB NOWSupported ScaffoldSigned-offNortheast Masonry & Restoration12/21/2023
DOB NOWSupported ScaffoldSigned-offNortheast Masonry & Restoration11/08/2023
DOB NOWSprinklersSigned-offMiller Plumbing & Heating10/23/2023
DOB NOWStandpipeSigned-offMiller Plumbing & Heating10/23/2023
DOB NOWProtection and Mechanical MethodsSigned-offSpring Scaffolding05/06/2023
DOB NOWProtection and Mechanical MethodsSigned-offSpring Scaffolding05/06/2023
DOB NOWSupported ScaffoldSigned-offColgate Enterprise04/25/2023
DOB NOWConstruction FenceSigned-offProcida Construction04/18/2023
DOB NOWSupported ScaffoldSigned-offNortheast Masonry & Restoration04/15/2023
DOB NOWSidewalk ShedSigned-offSpring Scaffolding02/14/2023
DOB NOWStandpipeSigned-offMiller Plumbing & Heating01/06/2023
DOB NOWPlumbingSigned-offMiller Plumbing & Heating01/06/2023
DOB NOWPlumbingSigned-offMiller Plumbing & Heating12/02/2022
DOB NOWStandpipeSigned-offMiller Plumbing & Heating11/29/2022
DOB NOWStructuralSigned-offProcida Construction10/26/2022
DOB NOWConstruction FenceSigned-offProcida Construction07/14/2022
DOB NOWConstruction FenceSigned-offProcida Construction04/21/2022
DOB NOWConstruction FenceSigned-offProcida Construction09/22/2021
DOB NOWStandpipeSigned-offMiller Plumbing & Heating08/30/2021
DOB NOWConstruction FenceSigned-offProcida Construction05/26/2021
DOB NOWStandpipeSigned-offMiller Plumbing & Heating05/07/2021
+ 21 more permits on file
1 project · most recent 12/24/2025
Ventilation Systems
FiledStatusContractorScope
12/24/2025Permit IssuedUrban Construction & DesignVentilation Systems
1 project · most recent 09/24/2026
Water/Sanitary
FiledStatusContractorScope
09/24/2026Permit IssuedMiller Plumbing & HeatingWater/Sanitary
13 projects · most recent 10/20/2026
General Wiring Lighting
FiledStatusContractorScope
10/20/2026Permit IssuedAccord Power Electric—
08/27/2026Permit IssuedBDS ElectricGeneral Wiring, Lighting
03/12/2026CompleteXtreme Electric—
09/09/2025CompleteTotal Electric SolutionsGeneral Wiring
07/29/2025CompleteXtreme ElectricGeneral Wiring
04/22/2024CompleteXtreme ElectricGeneral Wiring
01/09/2024CompleteXtreme ElectricGeneral Wiring
06/21/2023CompleteXtreme Electric—
05/01/2023CompleteXtreme Electric—
02/01/2023CompleteTop Shelf Electric—
10/19/2022CompleteXtreme ElectricGeneral Wiring
08/29/2022CompleteRainbow Electric Co1 meters, 1 new_meters
08/29/2022CompleteRainbow Electric Co1 meters, 1 new_meters
1 project · most recent 07/28/2025
FiledStatusContractorScope
07/28/2025Signed-offAccord Power215 panels, 86 kw, 28,309.31 roof_area_sqft
▾Field Inspections (DOB CAP) — 17
DateTypeResultReport
09/29/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/05/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
03/21/2025Pass-Final Boiler Equipment InspectionPassView ↗
03/19/2025Pass-Final Boiler Equipment InspectionPassView ↗
12/18/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/13/2024Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
12/05/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/03/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/08/2024Fail-Final Boiler Equipment InspectionFailView ↗
09/19/2024Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
09/16/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
10/26/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/10/2023Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
10/10/2023Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)CertifiedView ↗
07/20/2023Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
07/20/2023Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
12/27/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 57
DateRequirementInspectorRole
09/24/2026Tenant Protection Plan Compliance—special
05/12/2026Tenant Protection Plan ComplianceLuis Pichardospecial
03/17/2026Maintenance informationEDWIN HOPKINSenergy_progress
03/17/2026Shutoff dampersEDWIN HOPKINSenergy_progress
03/17/2026HVAC-R and service water heating system controlsEDWIN HOPKINSenergy_progress
03/17/2026HVAC-R and service water piping design and insulationEDWIN HOPKINSenergy_progress
03/17/2026Fire-Resistance Rated ConstructionEDWIN HOPKINSprogress
03/17/2026Energy Code Compliance InspectionsEDWIN HOPKINSprogress
03/17/2026Fire-Resistant Penetrations and JointsEDWIN HOPKINSspecial
03/17/2026Heating SystemsEDWIN HOPKINSspecial
03/17/2026HVAC-R and service water heating equipmentEDWIN HOPKINSenergy_progress
03/03/2026Tenant Protection Plan ComplianceEDWIN HOPKINSspecial
03/03/2026Tenant Protection Plan ComplianceEDWIN HOPKINSspecial
03/03/2026Lighting controlsEDWIN HOPKINSenergy_progress
03/03/2026Interior lighting powerEDWIN HOPKINSenergy_progress
03/03/2026FinalEDWIN HOPKINSprogress
03/03/2026Fire-Resistance Rated ConstructionEDWIN HOPKINSprogress
03/03/2026Energy Code Compliance InspectionsEDWIN HOPKINSprogress
03/03/2026Fire-Resistant Penetrations and JointsEDWIN HOPKINSspecial
03/02/2026Mechanical SystemsEDWIN HOPKINSspecial
03/02/2026FinalEDWIN HOPKINSprogress
12/19/2025Tenant Protection Plan ComplianceLuis Pichardospecial
12/10/2025FinalRONALD VILLANOprogress
12/10/2025Mechanical SystemsLuis Pichardospecial
05/14/2025Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
Latest 25 of 57.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
New Lots DeliRestaurant / Food ServiceFloor 1
Project B01395090 Alteration · Permit Entire · 05/12/2026
New Lots SupermarketRetailFloor 1
Project B01331931 Alteration · Permit Entire · 12/24/2025
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 239 on file (BIS + DOB NOW)
▸Plans & Drawings42
▸DOB NOWPlans/Sketch21
09/02/2026B00221009-S2Request digital key ↗
09/02/2026B00221009-P4Request digital key ↗
09/02/2026B00221009-S1Request digital key ↗
Showing 3 of 21 on file for this type
▸DOB NOWPlans/Sketch - Standpipe5
09/02/2026B00323382-I1Request digital key ↗
08/29/2026B00323347-I1Request digital key ↗
08/29/2026B00323347-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Plumbing5
09/02/2026B00221134-P4Request digital key ↗
09/01/2026B00221134-P3Request digital key ↗
09/01/2026B00221134-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler3
08/29/2026B00323347-I1Request digital key ↗
08/29/2026B00323347-P2Request digital key ↗
08/15/2026B00323347-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems3
09/02/2026B00221009-P6Request digital key ↗
09/02/2026B00221009-P1Request digital key ↗
09/02/2026B00221009-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence2
09/01/2026B00412108-I1Request digital key ↗
09/01/2026B00412108-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural2
08/29/2026B00220806-P1Request digital key ↗
08/15/2026B00220806-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
09/02/2026B00373664-I1Request digital key ↗
▸Applications & Permits34
▸BISPLAN / WORK APPROVAL APPLICATION24
12/13/2024320688742Open ↗
12/13/2024320691621Open ↗
12/13/2024320688733Open ↗
Showing 3 of 24 on file for this type
▸BISWORK PERMIT APPLICATION8
07/13/2017321324072Open ↗
02/15/2013320748642Open ↗
02/15/2013320688742Open ↗
Showing 3 of 8 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
09/05/2024340724979Open ↗
04/21/2021340724979Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
06/20/2025321602191Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
06/20/2025321602191Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
06/20/2025321602191Open ↗
▸Seals & Professional Certifications75
▸DOB NOWDPL-1: Design Professional Seal & Signature39
09/01/2026B00412108-P1Open ↗
09/01/2026B00412108-I1Open ↗
09/01/2026B00590236-I1Open ↗
Showing 3 of 39 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature16
09/29/2026B01366019-I1Open ↗
09/27/2026B00221009-I1Open ↗
09/20/2026B00858383-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/29/2026B01366019-I1Open ↗
09/29/2026B01366019-I1Open ↗
09/27/2026B00221009-I1Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
06/26/2017321324072Open ↗
01/24/2013320688733Open ↗
01/24/2013320688742Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
01/24/2013320688733Open ↗
01/24/2013320688742Open ↗
01/24/2013320748642Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
06/26/2017321324072Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
05/01/2020340724979Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
06/26/2017321324072Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREES SITE PLAN1
12/23/2020340724979Open ↗
▸BISSTREET TREE CHECKLIST1
10/26/2020340724979Open ↗
▸Environmental & Asbestos33
▸DOB NOWOER: Notice to Proceed19
09/01/2026B00412108-I1Open ↗
09/01/2026B00412108-P1Open ↗
08/13/2026B00323382-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWOER: Notice of Satisfaction6
08/13/2026B00221009-S2Open ↗
08/13/2026B00221009-S1Open ↗
08/13/2026B01366019-I1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
01/24/2013320688733Open ↗
01/24/2013320688742Open ↗
01/24/2013320748642Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
11/24/2009320088294Open ↗
11/24/2009320088301Open ↗
11/24/2009320088980Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
10/26/2020340724979Open ↗
▸Energy Compliance4
▸DOB NOWPreliminary Commissioning Report Certification3
08/13/2026B00221009-S2Open ↗
08/13/2026B00221009-S1Open ↗
08/13/2026B00221009-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
06/26/2017321324072Open ↗
▸Inspections & Test Reports1
▸DOB NOWConcrete Testing Exception Report1
08/13/2026B00220806-I1Open ↗
▸Approvals, Objections & Sign-offs9
▸BISADMINISTRATIVE OBJECTIONS7
01/24/2013320688733Open ↗
01/24/2013320688742Open ↗
01/24/2013320748642Open ↗
Showing 3 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
06/20/2025321602191Open ↗
06/20/2025321602191Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT8
06/26/2017321324072Open ↗
01/24/2013320688733Open ↗
01/24/2013320688742Open ↗
Showing 3 of 8 on file for this type
▸Filing & Intake Forms20
▸BISADDITIONAL INFORMATION8
06/29/2022340724979Open ↗
04/21/2021340724979Open ↗
04/08/2021340724979Open ↗
Showing 3 of 8 on file for this type
▸BISBOROUGH INTAKE FORM6
04/01/2020320748642Open ↗
04/01/2020320691621Open ↗
04/01/2020320688742Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING COVER SHEET5
06/30/2017321324072Open ↗
01/24/2013320688733Open ↗
01/24/2013320688742Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
05/01/2020340724979Open ↗
▸Other Documents8
▸BISBPP - SUPPORTING DOCUMENTATION4
06/29/2022340724979Open ↗
04/21/2021340724979Open ↗
11/09/2020340724979Open ↗
Showing 3 of 4 on file for this type
▸BISPLOT DIAGRAM1
06/20/2025321602191Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
06/29/2022340724979Open ↗
▸BISBPP-DOT: RELOCATE STREET LIGHT1
11/09/2020340724979Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
04/08/2021340724979Open ↗