| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| Q01445076 | 10-16 BEACH 19 STREET QUEENS | New Job Filing | Job in process | 08/19/2026 | 08/19/2026 | — | Temp light and power |
| B01369527 | 257 HEGEMAN AVENUE BROOKLYN | New Job Filing | Complete | 03/12/2026 | 03/12/2026 | — | Furnish a new 200-amp rated tap off of panel MDB and install new Con Ed 89L fused disconnect.• Run [1] set of [4] 3/0 Copper cabling and #4 … |
| X01342703 | 977 EAST 149 STREET BRONX | New Job Filing | Job in process | 01/07/2026 | 01/09/2026 | — | Disconnect and removal of 7 heaters 3 phase and 10 exhaust fans. Furnish and install 4 120V circuits for damper motors. Furnish and install … |
| X01279220 | 1852 WASHINGTON AVENUE BRONX | New Job Filing | Job in process | 09/08/2025 | 09/09/2025 | — | Existing bldg 8 stories. Remove existing smoke detectors and replace with new. Existing wiring to be reused. Remove existing and replace wit… |
| Q01282043 | 62-86 DRY HARBOR ROAD QUEENS | New Job Filing | Complete | 09/04/2025 | 09/04/2025 | — | FILING PERMIT IS REMOVE OATH ECB VIOLATION 39145177X. WORK WAS DONE BY OTHERS. |
| Q01270926 | 41-19 31 AVENUE QUEENS | New Job Filing | Complete | 08/13/2025 | 08/13/2025 | — | Partial renovation: Furnish code compliant wiring throughout 2nd and 3rd floor apartments; F & I power to (3) split units on 2nd floor and (… |
| Name | Projects together | Most recent |
|---|---|---|
| Procida Construction | 16 | — |
| The Bridge Inc | 3 | — |
| Westchester Mews Llc | 3 | — |
| Ebenezer Plaza Owner Phase Ii Llc | 2 | — |
| Cp Contractors Llc | 2 | — |
| Cristom Construction Services | 2 | — |
| Jvnorth12Th | 2 | — |
| Lpc Development Group Llc | 2 | — |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| Q01445076 | 10-16 BEACH 19 STREET QUEENS | New Job Filing | Job in process | 08/19/2026 | 08/19/2026 | — | Temp light and power |
| B01369527 | 257 HEGEMAN AVENUE BROOKLYN | New Job Filing | Complete | 03/12/2026 | 03/12/2026 | — | Furnish a new 200-amp rated tap off of panel MDB and install new Con Ed 89L fused disconnect.• Run [1] set of [4] 3/0 Copper cabling and #4 … |
| X01342703 | 977 EAST 149 STREET BRONX | New Job Filing | Job in process | 01/07/2026 | 01/09/2026 | — | Disconnect and removal of 7 heaters 3 phase and 10 exhaust fans. Furnish and install 4 120V circuits for damper motors. Furnish and install … |
| X01279220 | 1852 WASHINGTON AVENUE BRONX | New Job Filing | Job in process | 09/08/2025 | 09/09/2025 | — | Existing bldg 8 stories. Remove existing smoke detectors and replace with new. Existing wiring to be reused. Remove existing and replace wit… |
| Q01282043 | 62-86 DRY HARBOR ROAD QUEENS | New Job Filing | Complete | 09/04/2025 | 09/04/2025 | — | FILING PERMIT IS REMOVE OATH ECB VIOLATION 39145177X. WORK WAS DONE BY OTHERS. |
| Q01270926 | 41-19 31 AVENUE QUEENS | New Job Filing | Complete | 08/13/2025 | 08/13/2025 | — | Partial renovation: Furnish code compliant wiring throughout 2nd and 3rd floor apartments; F & I power to (3) split units on 2nd floor and (… |
| B01258889 | 3090 FULTON STREET BROOKLYN | New Job Filing | Job in process | 07/21/2025 | 07/21/2025 | — | Power turn on only. No work done. Existing service, meter power turn on. PAA to show there were 5 existing meters. |
| M01224467 | PARK AVENUE MANHATTAN | New Job Filing | Complete | 05/13/2025 | 05/13/2025 | — | New construction 13 stories 47 apartments. Temporary power for personnel and materials hoist. |
| Q01222343 | 135-26 DESARC ROAD QUEENS | New Job Filing | Job in process | 05/07/2025 | 05/07/2025 | — | Install lights inside of awning in front of building. Light switch and power for lights in awning. |
| M01145109 | PARK AVENUE MANHATTAN | New Job Filing | Job in process | 11/25/2024 | 11/25/2024 | — | NEW CONSTRUCTION 13 STORIES + ROOF. 47 APARTMENTS (10 STUDIOS) (22 ONE BEDROOM) AND (15 TWO BEDROOMS). PAA TO CHANGE TO 1 4 WIRE METER AND 2… |
| M01143652 | 507 EAST 118TH STREET MANHATTAN | New Job Filing | Job in process | 11/22/2024 | 11/22/2024 | — | NEW CONSTRUCTION 6 STORIES 18 APARTMENTS. 2000AMP SERVICE |
| M01141572 | 338 EAST 117 STREET MANHATTAN | New Job Filing | Job in process | 11/20/2024 | 11/20/2024 | — | NEW CONSTRUCTION 5 STORIES + ROOF, 7 APARTMENTS. PAA to add (1) 400A switch |
| M01143091 | 507 EAST 118TH STREET MANHATTAN | New Job Filing | Complete | 11/19/2024 | 11/19/2024 | — | NEW CONSTRUCTION 6 STORIES + ROOF 18 APARTMENTS. TEMP LIGHT AND POWER 400A TEMP SERVICE |
| M01138913 | 303 EAST 102 STREET MANHATTAN | New Job Filing | Complete | 11/18/2024 | 11/18/2024 | — | NEW CONSTRUCTION 5 STORIES + ROOF; 6 APARTMENTS |
| M01143050 | PARK AVENUE MANHATTAN | New Job Filing | Job in process | 11/18/2024 | 11/18/2024 | — | NEW CONSTRUCTION 13 STORIES 47 APARTMENTS. TEMP LIGHT AND POWER 800A TEMP SERVICE |
| Q01077817 | 50-25 BARNETT AVENUE QUEENS | New Job Filing | Job in process | 11/06/2024 | 11/06/2024 | — | NEW CONSTRUCTION OF 7 STORY BUILDING 185 APARTMENTS. GENERAL WIRING. PAA TO AMEND WORK SCOPE DUE TO THE FACT THAT WE ARE NO LONGER THE ELECT… |
| Q01125808 | 50-25 BARNETT AVENUE QUEENS | New Job Filing | Job in process | 11/01/2024 | 11/01/2024 | — | NEW CONSTRUCTION 7 STORY 185 APARTMENTS: TEMPORARY POWER FOR PERSONNEL HOISTS. 600A 208 volts. Removal of the two temp generators previousl… |
| X01116218 | 450 EAST 158 STREET BRONX | New Job Filing | Complete | 10/16/2024 | 10/16/2024 | — | NEW CONSTRUCTION 8 STORIES 84 UNITS. ADVISORY BOARD APPROVAL BX02917A1 DATED 8/22/24. |
| X01127641 | 450 EAST 158 STREET BRONX | New Job Filing | Complete | 10/16/2024 | 10/16/2024 | — | New construction 8 stories 84 units. Temporary power for personnel and materials hoist 200A/3ph. |
| M01113408 | 235 WEST 75 STREET MANHATTAN | New Job Filing | Job in process | 09/19/2024 | 09/19/2024 | — | Furnish and install power for all general, convenience, mechanical and lighting throughout apartment 801/PH3 (duplex apt). 100A riser from e… |
| Q01099756 | 15-21 COOPER AVENUE QUEENS | New Job Filing | Job in process | 08/21/2024 | 08/21/2024 | — | Furnish and install new 200 amp 3 phase outdoor service. This permit supercedes permit Q01094726. Q01094726 was filed under wrong address. |
| Q01094924 | 77-14 79 PLACE QUEENS | New Job Filing | Job in process | 08/13/2024 | 08/13/2024 | — | Furnish and install power for all general, convenience, mechanical and lighting throughout 2 family house.Furnish and install new 200 amp 2 … |
| Q01094726 | 1518 DECATUR STREET QUEENS | New Job Filing | Job in process | 08/12/2024 | 08/12/2024 | — | Furnish and install new 200 amp 3 phase outdoor service |
| M01091869 | 303 EAST 102 STREET MANHATTAN | New Job Filing | Complete | 08/08/2024 | 08/08/2024 | — | NEW CONSTRUCTION 5 STORIES + ROOF. TEMP LIGHT AND POWER . 400A TEMP POWER |
| M01093376 | 338 EAST 117 STREET MANHATTAN | New Job Filing | Complete | 08/08/2024 | 08/08/2024 | — | NEW CONSTRUCTION 5 STORIES + ROOF, 7 APARTMENTS. TEMP LIGHT AND POWER. 400A TEMP SERVICE |
| B01089983 | 487 4 AVENUE BROOKLYN | New Job Filing | Complete | 08/01/2024 | 08/01/2024 | — | Temporary power for personnel hoist. 400A fused switch for elevator power to transformer. 11 story new construction |
| Q01069376 | 50-25 BARNETT AVENUE QUEENS | New Job Filing | Job in process | 07/01/2024 | 07/01/2024 | — | NEW CONSTRUCTION; 7 STORY 185 APARTMENTS; TEMP LIGHT AND POWER 1200AMP; Changed apt count from 183 to 185 and removed temp power to standpip… |
| X01026369 | 450 EAST 158 STREET BRONX | New Job Filing | Complete | 06/07/2024 | 06/07/2024 | — | NEW CONSTRUCTION 8 STORIES 84 UNITS. GENERAL WIRING. |
| B01040182 | DEKALB AVE BROOKLYN | New Job Filing | Complete | 04/23/2024 | 04/23/2024 | — | TEMPORARY POWER FOR PERSONNEL HOIST. 200 AMP DISCONNECT FUSED SWITCH FOR ELEVATOR POWER TO TRANSFORMER. 7 STORY BUILDING NEW CONSTRUCTION |
| B01038133 | 257 HEGEMAN AVENUE BROOKLYN | New Job Filing | Complete | 04/22/2024 | 04/22/2024 | — | GENERAL POWER FOR FIVE ELEVATORS IN TOTAL. PERMIT FOR POWER ONLY |
| B01032813 | 805 ROCKAWAY AVENUE BROOKLYN | New Job Filing | Job in process | 04/09/2024 | 04/09/2024 | — | new construction 174 unit apartment building. Advisory board permit job# BK01458A1PAA to add solar feeders to permit |
| X01010684 | 450 EAST 158 STREET BRONX | New Job Filing | Complete | 03/26/2024 | 03/27/2024 | — | NEW CONTRUCTION 8 STORIES + ROOF. TEMP LIGHT AND POWER. 800AMP TEMP POWER.TEMP POWER FOR STANDPIPE |
| B00988851 | DEKALB AVE BROOKLYN | New Job Filing | Job in process | 01/29/2024 | 01/29/2024 | — | SITE 2 7 STORIES NEW CONSTRUCTION 45 APARTMENTS. PAA CHANGED 30A DISCONNECT TO 60A DISCONNECT. PAA REMOVAL OF ADVISORY BOARD IN DESCRIPTION.… |
| B00974931 | 257 HEGEMAN AVENUE BROOKLYN | New Job Filing | Complete | 01/09/2024 | 01/09/2024 | — | NEW CONSTRUCTION 7 STORY 84 APARTMENTS - GENERAL WIRING |
| B00933449 | BIN 3822813 | New Job Filing | Complete | 12/19/2023 | 12/19/2023 | — | Furnish and install new 200 amp 3 phase outdoor service. |
| B00966075 | DEKALB AVE BROOKLYN | New Job Filing | Complete | 12/06/2023 | 12/06/2023 | — | 7 stories 42 apartments new construction |
| X00959303 | 87 WEST 169 STREET BRONX | New Job Filing | Job in process | 11/28/2023 | 11/28/2023 | — | New Construction 9 story, 105 apartments. General wiring. PAA to add 400A panel additional lights and switches and receptacles, boilers |
| B00960704 | 487 4 AVENUE BROOKLYN | New Job Filing | Job in process | 11/20/2023 | 11/20/2023 | — | Advisory board approval #BK02409A1 SERVICE ROOM . 3200 AMP 120/208 SERVICE 5 SERVICE SWS . LOCATION BASEMENT |
| X00962934 | 87 WEST 169 STREET BRONX | New Job Filing | Complete | 11/16/2023 | 11/16/2023 | — | Temporary power for personnel and materials hoist. 200 amp fused switch for elevator power to transformer.9 story new construction |
| B00945508 | 487 4 AVENUE BROOKLYN | New Job Filing | Complete | 11/06/2023 | 11/06/2023 | — | NEW CONSTRUCTION 11 STORIES + ROOF |
| B00955688 | 805 ROCKAWAY AVENUE BROOKLYN | New Job Filing | Complete | 10/31/2023 | 10/31/2023 | — | GENERAL POWER FOR TWO ELEVATORS (PE 1 AND 2, PE 3 AND 4) AND DUMBWAITER. PERMIT FOR POWER ONLY. |
| Q00943928 | 88-19 PARSONS BOULEVARD QUEENS | New Job Filing | Complete | 10/12/2023 | 10/12/2023 | — | this permit is to supersede old permit q00842195 filed in error with wrong address and bin # |
| X00940721 | 1761 WALTON AVENUE BRONX | New Job Filing | Complete | 09/28/2023 | 09/28/2023 | — | GENERAL POWER FOR TWO ELEVATORS. PERMIT FOR POWER ONLY |
| X00940782 | 87 WEST 169 STREET BRONX | New Job Filing | Job in process | 09/28/2023 | 09/28/2023 | — | General power for two elevators. Permit for power only. PAA to add (2) #2 feeders to permit9 story building |
| B00937184 | DEKALB AVE BROOKLYN | New Job Filing | Job in process | 09/25/2023 | 09/26/2023 | — | NEW CONSTRUCTION 7 STORIES + ROOF. TEMP LIGHT AND POWER. 800 AMP TEMP POWER. POWER FOR TEMP STANDPIPE. PAA TO AMEND WIRE SIZE |
| X00910712 | 87 WEST 169 STREET BRONX | New Job Filing | Job in process | 08/28/2023 | 08/28/2023 | — | New construction of 9 story building, 105 apartments [ PERMANENT SERVICE ADVISORY BOARD PERMIT ]. Revised meter count. changed to (2) 10 po… |
| B00912577 | 487 4 AVENUE BROOKLYN | New Job Filing | Complete | 08/02/2023 | 08/02/2023 | — | NEW CONSTRUCTION 11 STORIES + ROOF. TEMP LIGHT AND POWER. 800 AMP TEMP POWER., power for standpipe and hoist |
| Q00912194 | 24-07 23 AVENUE QUEENS | New Job Filing | Job in process | 08/01/2023 | 08/01/2023 | — | renovation of 2 apartments and 1 commercial space , appts located on 2 floor front and back . store basement and ground floor [ adding on p… |
| B00893848 | 257 HEGEMAN AVENUE BROOKLYN | New Job Filing | Complete | 06/21/2023 | 06/21/2023 | — | Temporary power for personnel hoist. 400 amp fused switch for elevator power to transformer. 7 Story new construction. |
| X00893360 | 87 WEST 169 STREET BRONX | New Job Filing | Complete | 06/21/2023 | 06/21/2023 | — | New construction 9 stories + roof. 800-amp temp power. |
| B00867594 | 257 HEGEMAN AVENUE BROOKLYN | New Job Filing | Complete | 05/01/2023 | 05/01/2023 | — | TEMPORARY POWER FOR PERSONNEL HOIST. 400 amp fused switch for elevator power to transformer 11 story new construction |
| Q00842195 | 88-13 PARSONS BOULEVARD QUEENS | New Job Filing | Job in process | 03/10/2023 | 03/14/2023 | — | Supply and install new 800 amp service in rear LOACTED IN BUILDING NEXT DOOR NOT SAME ADDRESS OR BIN . Supply and install 400 amp service i… |
| Q00841586 | 15-21 COOPER AVENUE QUEENS | New Job Filing | Complete | 03/09/2023 | 03/09/2023 | — | Turn on 2 meters only. NO WORK DONE.Notify utility |
| B08021157 | 257 HEGEMAN AVENUE BROOKLYN | New Job Filing | Complete | 10/19/2022 | 10/19/2022 | — | NEW CONSTRUCTION APT BUILDING 11 STORIES. BASEMENT, GROUND FLOOR, OPEN AREA 1 TO 11 , ROOF PLEASE NOTE THIS BUILDING HAS ONE MAIN SERVIC… |
| B08021707 | 257 HEGEMAN AVENUE BROOKLYN | New Job Filing | Job in process | 10/19/2022 | 10/19/2022 | — | ADVISORY BOASRD PERMIT DOB JOB NUMBER BK0162982. APPROVED 9/23/22 , FILE NO :34434 DRAWING NUMBER D-2207-34434-C-EPR DATED 7/28/22. PAA t… |
| B00781312 | 805 ROCKAWAY AVENUE BROOKLYN | New Job Filing | Job in process | 08/08/2022 | 08/09/2022 | — | new construction 174 unit apartment building, cellar, 7 floors and roof. PAA to add this verbiage ""Building has east and west wing"". Addi… |
| X00737962 | 1761 WALTON AVENUE BRONX | New Job Filing | Complete | 05/16/2022 | 05/16/2022 | — | TEMPORARY POWER FOR PERSONNEL HOIST ONLY |
| X00736056 | 1761 WALTON AVENUE BRONX | New Job Filing | Job in process | 05/12/2022 | 05/13/2022 | — | SUPERCEDE PERMIT X00602705. ADVISORY BOARD PERMIT (BX001223A) Jan 5/2022 [ PAA FOR to correct metering devices). Correction 3 10 point met… |
| X00737157 | 1761 WALTON AVENUE BRONX | New Job Filing | Complete | 05/12/2022 | 05/13/2022 | — | SUPERCEDE PERMIT X00598395.NEW CONSTRUCTION 14 STORY BUILDING |
| Building | Filings | Most Recent |
|---|---|---|
| 338 EAST 117 STREET ↗ | 3 | 08/26/2026 |
| 10-16 BEACH 19 STREET ↗ | 1 | 08/19/2026 |
| 257 HEGEMAN AVENUE ↗ | 8 | 03/12/2026 |
| PARK AVENUE ↗ | 4 | 02/11/2026 |
| 977 EAST 149 STREET ↗ | 1 | 01/07/2026 |
| DEKALB AVE ↗ | 7 | 12/08/2025 |
| 87 WEST 169 STREET ↗ | 10 | 11/03/2025 |
| 50-25 BARNETT AVENUE ↗ | 7 | 09/23/2025 |
| 805 ROCKAWAY AVENUE ↗ | 7 | 09/18/2025 |
| 1852 WASHINGTON AVENUE ↗ | 1 | 09/08/2025 |
| 62-86 DRY HARBOR ROAD ↗ | 1 | 09/04/2025 |
| 41-19 31 AVENUE ↗ | 1 | 08/13/2025 |
| 3090 FULTON STREET ↗ | 2 | 07/24/2025 |
| 135-26 DESARC ROAD ↗ | 1 | 05/07/2025 |
| 77-14 79 PLACE ↗ | 2 | 03/14/2025 |
| 507 EAST 118TH STREET ↗ | 2 | 11/22/2024 |
| 303 EAST 102 STREET ↗ | 2 | 11/18/2024 |
| 1761 WALTON AVENUE ↗ | 8 | 10/24/2024 |
| 450 EAST 158 STREET ↗ | 4 | 10/16/2024 |
| 235 WEST 75 STREET ↗ | 1 | 09/19/2024 |
| 15-21 COOPER AVENUE ↗ | 2 | 08/21/2024 |
| 1518 DECATUR STREET ↗ | 1 | 08/12/2024 |
| 487 4 AVENUE ↗ | 4 | 08/01/2024 |
| BIN 3822813 ↗ | 1 | 12/19/2023 |
| 24-07 23 AVENUE ↗ | 3 | 11/17/2023 |
| 88-13 PARSONS BOULEVARD ↗ | 2 | 11/01/2023 |
| 88-19 PARSONS BOULEVARD ↗ | 1 | 10/12/2023 |