← Back
Other college and university
Rockefeller University Main Campus
590 EAST 68 STREET · Upper East Side-Lenox Hill-Roosevelt Island · BIN 1087129
💬 Discuss this project
1940Year Built
6Stories
W6Building Class
R9Zoning
1,200,000 sfGross Floor Area
1Units
LL97 CoveredRent Stabilized49 Open Violations 32 unresolved · 17 paperwork only ▸FISP: UNSAFE
Other college and university · 445,942 sf lot · 2.69 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Permit Issued — active, not yet Signed-off
Roof3p · 4 filings · 16 docs
Penthouse3p · 4 filings · 20 docs
Floor 96p · 5 filings · 16 docs
Floor 8
Floor 7
Floor 66 filings · 16 docs
Floor 56 filings · 16 docs
Floor 46 filings · 16 docs
Floor 31 filing · 3 docs
Floor 21 filing · 3 docs
Floor 11 filing · 3 docs
Cellar1 filing · 3 docs
Site & exteriorUnder Construction1 filing · 3 docs
Filed — no permit issued1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KINGS GROUP NY2207/08/2026
OFFICE OF DESIGN CONSTRUCTION603/21/2026
PLANNING CONSTRUCTION703/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J CALLAHAN CONSULTING1203/21/2026
OCULUS CONSULTING GROUP503/21/2026
SYNERGY BUILDING CONSULTANTS103/21/2026
PATUXENT ENGINEERING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KINGS GROUP NY CORPGeneral Contractor2007/08/2026
CALDWELL & WALSH BUILDING CONSTGeneral Contractor1307/08/2026
THE ROCKEFELLER UNIVERSITYGeneral Contractor707/08/2026
DEVO FIRE PROTECTION INCFire Protection407/08/2026
OLYMPIC PLBG & HTG SVC INPlumbing207/08/2026
NYC FIRE SPRINKLER CORPFire Protection207/08/2026
NASH ELECTRIC SERVICES INElectrical103/22/2026
ALLIANCE PLUMBING CORPPlumbing107/08/2026
CARDOZA PLUMBING CORPPlumbing107/08/2026
ECO ELECTRICAL SERVCS LLCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KZ ENGINEERING, P.C.4665103/28/2024
JAJ ENGINEERING PLLC930501/10/2024
ATLAS ATC ENGINEERING INC8011410/05/2022
Building Lifecycle
All (125)Filed (15)Permit Issued (38)Signed Off (10)Facade (FISP) (10)Violation (24)Inspection (14)Special Inspection (14)
07/08/2026
Signed off — Alteration
Modifications to existing Sprinkler System associated with interior renovation of existing laboratories on 9th Floor - Bronk Lab Bldg, Rockefeller University. No change in use, occupancy or egress.
M00966087-I1
04/30/2026
Signed off — Alteration
Modifications to ex Plumbing System assoc. with int renovation of ex labs on 9th Fl - Bronk Lab Bldg, Rockefeller Univ. New CO2 manifold system. New vacuum pump system at Penthouse Level for labs. New Roof drain. No change in use, occupancy or egress
M00966080-I1
04/30/2026
Signed off — Alteration
Interior renovation of existing laboratories on 9th Floor / Penthouse / Roofs - Bronk Lab Bldg, Rockefeller University. New partitions, cabinets, counters and finishes. Modification to suspended ceiling system. No change in use, occupancy or egress.
M00966047-I1
04/30/2026
Signed off — Alteration
Structural modifications associated with interior renovation of existing laboratories on 9th Floor / Penthouse / Roofs - Bronk Lab Bldg, Rockefeller University. No change in use, occupancy or egress.
M00966090-I1
04/20/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/20/2026
Violation issued (ECB, open)
Local Law
04/20/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/08/2026
Permit issued — Sprinklers
M08013236-I1-EW-SP
12/16/2025
Permit issued — Sidewalk Shed
M00671022-I1-SH
12/11/2025
Permit issued — Supported Scaffold
M00671022-I1-SF
09/24/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/20/2025
Permit issued — Sprinklers
M08013236-I1-EW-SP
08/19/2025
Permit issued — Sprinklers
M00966087-I1-EW-SP
05/22/2025
Permit issued — General Construction
M00966047-I1-GC
05/22/2025
Permit issued — Structural
M00966090-I1-ST
05/21/2025
Permit issued — Mechanical Systems
M00966068-I1-MS
04/28/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
04/28/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/25/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
04/25/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/21/2025
Permit issued — Plumbing
M00966080-I1-PL
01/10/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/20/2024
Permit issued — Supported Scaffold
M00671022-I1-SH
12/19/2024
Permit issued — Sidewalk Shed
M00671022-I1-SF
11/20/2024
Permit issued — Sprinklers
M00966087-I1-EW-SP
06/12/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/22/2024
Permit issued — Plumbing
M00966080-I1-PL
04/19/2024
Permit issued — Structural
M00966090-I1-ST
04/19/2024
Permit issued — General Construction
M00966047-I1-GC
04/19/2024
Permit issued — Mechanical Systems
M00966068-I1-MS
03/29/2024
Permit issued — Suspended Scaffold
M01027532-I1-SC
03/28/2024
Filed — Alteration
M01027532-I1
03/18/2024
Violation issued (ECB, open)
Local Law
03/15/2024
Permit issued — Mechanical Systems
M00966068-I1-MS
03/04/2024
Permit issued — Structural
M00966090-I1-ST
03/04/2024
Permit issued — General Construction
M00966047-I1-GC
01/31/2024
Signed off — Alteration
Herewith filing interior alterations work on 4th, 5th and 6th floor. General construction work, as per plans submitted. No change to use, egress or occupancy.
M00652869-I1
01/23/2024
Signed off — Alteration
M00652875-I1
01/10/2024
Filed — Alteration
Modifications to existing Sprinkler System associated with interior renovation of existing laboratories on 9th Floor - Bronk Lab Bldg, Rockefeller University. No change in use, occupancy or egress.
M00966087-I1
01/10/2024
Filed — Alteration
Modifications to ex Plumbing System assoc. with int renovation of ex labs on 9th Fl - Bronk Lab Bldg, Rockefeller Univ. New CO2 manifold system. New vacuum pump system at Penthouse Level for labs. New Roof drain. No change in use, occupancy or egress
M00966080-I1
01/10/2024
Filed — Alteration
Modifications to exist Mechanical System associated with interior renovation of exist laboratories on 9th Floor / Penthouse / Roofs - Bronk Lab Bldg, Rockefeller University. No change in use, occupancy or egress. Refer to comments for additional info.
M00966068-I1
01/09/2024
Filed — Alteration
Structural modifications associated with interior renovation of existing laboratories on 9th Floor / Penthouse / Roofs - Bronk Lab Bldg, Rockefeller University. No change in use, occupancy or egress.
M00966090-I1
01/05/2024
Filed — Alteration
Interior renovation of existing laboratories on 9th Floor / Penthouse / Roofs - Bronk Lab Bldg, Rockefeller University. New partitions, cabinets, counters and finishes. Modification to suspended ceiling system. No change in use, occupancy or egress.
M00966047-I1
12/28/2023
Permit issued — Mechanical Systems
M00652875-I1-MS
12/28/2023
Permit issued — Supported Scaffold
M00671022-I1-SH
12/27/2023
Permit issued — Supported Scaffold
M00671022-I1-SF
12/15/2023
Signed off — Alteration
M00656858-I1
11/28/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph Jabour
11/28/2023
Special inspection requirement — Post-installed Anchors
Joseph Jabour
11/28/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph Jabour
11/28/2023
Special inspection requirement — Energy Code Compliance Inspections
Joseph Jabour
11/21/2023
Special inspection requirement — Sprinkler Systems
Joseph Jabour
11/15/2023
Signed off — Alteration
M00652878-I1
11/09/2023
Filed — Alteration
Facade Repair to include Stone Patching, Replacing/repointing of brick, installation of caulking and sealants
M00918906-I1
10/04/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/04/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/12/2023
Signed off — Alteration
Sprinkler work
M00652882-I1
08/14/2023
Special inspection requirement — Final
08/14/2023
Special inspection requirement — Masonry
08/11/2023
Inspection — Certified Medical Gas - MG - PL - Finish
Certified
View inspection ↗
Latest 60 of 125 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedDEVO FIRE PROTECTION INC04/08/2026
DOB NOWSidewalk ShedPermit IssuedKINGS GROUP NY CORP12/16/2025
DOB NOWSupported ScaffoldPermit IssuedKINGS GROUP NY CORP12/11/2025
DOB NOWSprinklersPermit IssuedDEVO FIRE PROTECTION INC08/20/2025
DOB NOWSprinklersSigned-offDEVO FIRE PROTECTION INC08/19/2025
DOB NOWGeneral ConstructionSigned-offTHE ROCKEFELLER UNIVERSIT05/22/2025
DOB NOWStructuralSigned-offTHE ROCKEFELLER UNIVERSIT05/22/2025
DOB NOWMechanical SystemsSigned-offTHE ROCKEFELLER UNIVERSIT05/21/2025
DOB NOWPlumbingSigned-offOLYMPIC PLBG & HTG SVC IN04/21/2025
DOB NOWSupported ScaffoldPermit IssuedKINGS GROUP NY CORP12/20/2024
DOB NOWSidewalk ShedPermit IssuedKINGS GROUP NY CORP12/19/2024
DOB NOWSprinklersSigned-offDEVO FIRE PROTECTION INC11/20/2024
DOB NOWPlumbingSigned-offOLYMPIC PLBG & HTG SVC IN04/22/2024
DOB NOWStructuralSigned-offTHE ROCKEFELLER UNIVERSIT04/19/2024
DOB NOWGeneral ConstructionSigned-offTHE ROCKEFELLER UNIVERSIT04/19/2024
DOB NOWMechanical SystemsSigned-offTHE ROCKEFELLER UNIVERSIT04/19/2024
DOB NOWSuspended ScaffoldPermit IssuedSUMMIT DEVELOPMENT CORP03/29/2024
DOB NOWMechanical SystemsSigned-offCALDWELL & WALSH BUILDING CONST03/15/2024
DOB NOWStructuralSigned-offCALDWELL & WALSH BUILDING CONST03/04/2024
DOB NOWGeneral ConstructionSigned-offCALDWELL & WALSH BUILDING CONST03/04/2024
DOB NOWMechanical SystemsSigned-offCALDWELL & WALSH BUILDING CONST12/28/2023
DOB NOWSupported ScaffoldPermit IssuedKINGS GROUP NY CORP12/28/2023
DOB NOWSupported ScaffoldPermit IssuedKINGS GROUP NY CORP12/27/2023
DOB NOWPlumbingSigned-offCARDOZA PLUMBING WMBE08/10/2023
DOB NOWProtection and Mechanical MethodsSigned-offKINGS GROUP NY CORP03/03/2023
DOB NOWSidewalk ShedPermit IssuedKINGS GROUP NY CORP01/26/2023
DOB NOWSupported ScaffoldPermit IssuedKINGS GROUP NY CORP01/26/2023
DOB NOWGeneral ConstructionSigned-offCALDWELL & WALSH BUILDING CONST01/03/2023
DOB NOWMechanical SystemsSigned-offCALDWELL & WALSH BUILDING CONST01/03/2023
DOB NOWGeneral ConstructionSigned-offTHE ROCKEFELLER UNIVERSIT10/15/2022
DOB NOWSprinklersPermit IssuedNYC FIRE SPRINKLER CORP10/11/2022
DOB NOWPlumbingSigned-offCARDOZA PLUMBING CORP09/19/2022
DOB NOWMechanical SystemsSigned-offCALDWELL & WALSH BUILDING CONST09/15/2022
DOB NOWGeneral ConstructionSigned-offCALDWELL & WALSH BUILDING CONST09/15/2022
DOB NOWSprinklersSigned-offNYC FIRE SPRINKLER CORP09/13/2022
DOB NOWProtection and Mechanical MethodsSigned-offKINGS GROUP NY CORP03/02/2022
DOB NOWSupported ScaffoldPermit IssuedKINGS GROUP NY CORP01/28/2022
DOB NOWSupported ScaffoldPermit IssuedKINGS GROUP NY CORP01/28/2022
BISOTISSUEDNICHOLSON & GALLOWAY, INC.10/02/2012
BISPLISSUEDOLYMPIC PLBG & HTG SVC IN09/21/2011
+ 12 more permits on file
1 project · most recent 01/10/2024
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
01/10/2024Signed-offTHE ROCKEFELLER UNIVERSITHeating and Air Conditioning Systems
Heat / Cool
Temtrol TEMTROL ITF-RDH14 270,900 BTU · Fan Coil Indoor ×1
2 projects · most recent 01/10/2024
FiledStatusContractorScope
01/10/2024Signed-offDEVO FIRE PROTECTION INC—
10/05/2022Permit IssuedDEVO FIRE PROTECTION INC13 heads
3 projects · most recent 05/20/2026
General Wiring
FiledStatusContractorScope
05/20/2026Permit IssuedHIGH QUALITY ELEC.OF NYC—
01/13/2022CompleteNASH ELECTRIC SERVICES IN—
12/17/2021Permit IssuedECO ELECTRICAL SERVCS LLCGeneral Wiring
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
09/24/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/28/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
04/28/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/25/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
04/25/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/10/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/11/2023Certified Medical Gas - MG - PL - FinishCertifiedView ↗
08/11/2023Certified Medical Gas - MG - PL - TestCertifiedView ↗
02/27/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/16/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/08/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/01/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/21/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/12/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
11/28/2023Fire-Resistant Penetrations and JointsJoseph Jabourspecial
11/28/2023Post-installed AnchorsJoseph Jabourspecial
11/28/2023Fire-Resistant Penetrations and JointsJoseph Jabourspecial
11/28/2023Energy Code Compliance InspectionsJoseph Jabourprogress
11/21/2023Sprinkler SystemsJoseph Jabourspecial
08/14/2023Final—progress
08/14/2023Masonry—special
08/25/2022Fire-Resistant Penetrations and JointsGIORGI KHARDZEISHVILIspecial
08/24/2022Interior lighting powerGIORGI KHARDZEISHVILIenergy_progress
08/24/2022Sprayed fire-resistant materialsGIORGI KHARDZEISHVILIspecial
08/24/2022Lighting controlsGIORGI KHARDZEISHVILIenergy_progress
01/04/2022FinalJames Braddockprogress
12/23/2021Sprinkler SystemsGIORGI KHARDZEISHVILIspecial
12/23/2021FinalJames Braddockprogress
▾Documents — 110 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch15
09/02/2026M00671022-I1Request digital key ↗
09/02/2026M00661018-I1Request digital key ↗
09/02/2026M00652869-I1Request digital key ↗
Showing 3 of 15 on file for this type
▸Applications & Permits7
▸BISPLAN / WORK APPROVAL APPLICATION5
09/21/2012121369704Open ↗
03/07/2012120762460Open ↗
03/06/2012120762460Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION2
10/04/2012121369704Open ↗
10/08/2011120762460Open ↗
▸Seals & Professional Certifications30
▸DOB NOWDPL-1: Design Professional Seal & Signature14
09/02/2026M00671022-I1Open ↗
09/02/2026M00661018-I1Open ↗
09/01/2026M00652878-I1Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
09/21/2012121369704Open ↗
09/26/2011120762460Open ↗
07/20/2011120762460Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026M00652882-I1Open ↗
08/27/2026M00966087-I1Open ↗
08/25/2026M00966080-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/28/2026M00656858-I1Open ↗
08/25/2026M00966080-I1Open ↗
08/22/2026M00652869-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
09/21/2012121369704Open ↗
07/20/2011120762460Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
09/21/2012121369704Open ↗
07/20/2011120762460Open ↗
▸Trade Schedules & Equipment4
▸BISSCHEDULE B - PLUMBING4
03/19/2012120762460Open ↗
03/06/2012120762460Open ↗
12/28/2011120762460Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos27
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
09/01/2026M00652878-I1Open ↗
09/01/2026M00656858-I1Open ↗
09/01/2026M00652875-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWOER: Notice to Proceed7
08/13/2026M00918906-I1Open ↗
08/13/2026M00652878-I1Open ↗
08/13/2026M00656858-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWOER: Notice of Satisfaction6
08/13/2026M00652878-I1Open ↗
08/13/2026M00656858-I1Open ↗
08/13/2026M00966090-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
07/20/2011120762460Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
09/21/2012121369704Open ↗
▸Energy Compliance4
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026M00652875-I1Open ↗
08/13/2026M00652869-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
09/21/2012121369704Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/28/2026M00966068-I1Open ↗
▸Approvals, Objections & Sign-offs17
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter15
09/02/2026M00661018-I1Open ↗
09/01/2026M00652878-I1Open ↗
09/01/2026M00652875-I1Open ↗
Showing 3 of 15 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
09/21/2012121369704Open ↗
07/20/2011120762460Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
09/21/2012121369704Open ↗
07/20/2011120762460Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
09/21/2012121369704Open ↗
07/20/2011120762460Open ↗
▸Other Documents2
▸DOB NOWCalculations1
08/13/2026M01027532-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01027532-I1Open ↗