← Back
BuildNYC
Condo, residential unit in elevator building
595 WEST END AVENUE
MANHATTAN · BIN 1087679
💬 Discuss this project
1923Year Built
15Stories
R4Building Class
R10AZoning
52,487 sfGross Floor Area
54Units
LL97 CoveredRent Stabilized1 Active Violation ▸FISP: SAFE
Condo, residential unit in elevator building · Owner of record: 595 West End Avenue Condominum · 6,230 sf lot · 8.42 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsFacade repairs and replacements1 filing
RoofIndustrial rope access inspectionUnder Construction1p · 1 filing · 2 docs
Floor 12Unit 12A1 filing · 5 docs
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5Unit 5W3p · 4 filings · 13 docs
Floor 4Unit 4, Unit 4W4 filings · 13 docs
Floor 3
Floor 2
Floor 1
Site & exteriorHeavy duty sidewalk shed installation1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
595 West End Co1303/21/2026
595 West End Ave Condominium1203/21/2026
595Weacondoc Otudorrealtyservice603/21/2026
1560-1580 Pelham PKWY Assc603/21/2026
Samson Management LLC As Agent 595 Wea303/21/2026
Koppels Realty203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KZ Engineering510/09/2024
Ashraf111/10/2023
Howard L Zimmerman Arch & Engineering104/18/2023
Studio St Architects401/20/2022
Raymond Nerenberg PE108/18/2021
Silman108/17/2021
Tan Engineering111/13/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Synergy Building Consultants503/21/2026
Azar Associates603/21/2026
DVA Advisors103/21/2026
Hlzae103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Awr GroupGeneral Contractor403/21/2026
HP KleinGeneral Contractor307/08/2026
Andamio ScaffoldingScaffold207/08/2026
Aqua Plumbing & HeatingPlumbing207/08/2026
Borowide Elect'l ContractorsElectrical103/21/2026
Aranda Plumbing & HeatingPlumbing107/08/2026
Schlesinger Elect'l ContractingElectrical103/21/2026
Takos and K ElectricElectrical103/21/2026
All Makes Heating & A/CGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KZ Engineering4665510/09/2024
Howard L Zimmerman Architects1712104/18/2023
Chang Park Arch663501/20/2022
Amhac4867108/18/2021
Chen Engineering Services1826108/17/2021
Building Lifecycle
02/20/2028
Facade inspection report due (FISP Cycle 9, sub-cycle B)
The filing window opened 02/21/2026. No Cycle 9 filing on record yet
11/06/2026
Permit renewed — Suspended Scaffold
Renewed without changes
M01434214-I1-SC
09/16/2026
Elevator Category 1 inspection report filed
09/16/2026
Elevator Category 5 inspection report filed
08/10/2026
Apartment 7C sold
227 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedStreamline Consultants NY11/06/2026
DOB NOWSuspended ScaffoldPermit IssuedStreamline Consultants NY08/05/2026
DOB NOWSuspended ScaffoldSigned-offAwr Group01/02/2025
DOB NOWGeneral ConstructionSigned-offAwr Group11/21/2024
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding11/04/2024
DOB NOWSuspended ScaffoldSigned-offAwr Group02/26/2024
DOB NOWGeneral ConstructionSigned-offAwr Group12/20/2023
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding11/14/2023
DOB NOWMechanical SystemsSigned-offAll Makes Heating & A/C06/16/2023
DOB NOWPlumbingSigned-offAranda Plumbing & Heating10/04/2021
DOB NOWStructuralSigned-offHP Klein09/30/2021
DOB NOWGeneral ConstructionSigned-offHP Klein09/29/2021
DOB NOWPlumbingSigned-offAqua Plumbing & Heating02/24/2021
DOB NOWPlumbingSigned-offAqua Plumbing & Heating02/07/2020
BISOTISSUEDConstructomics09/24/2020
BISPLISSUEDAbr Plumbing & Heating Contracting08/02/2018
BISOTISSUEDTraditional Construction07/27/2018
BISOTISSUEDAccurate Contracting02/23/2018
BISMHISSUEDHamilton Air Company01/29/2018
BISPLISSUEDAqua Plumbing & Heating01/22/2018
BISOTISSUEDConstructomics12/21/2017
BISMHISSUEDConstructomics12/21/2017
BISMHISSUEDHamilton Air Company11/30/2017
BISPLISSUEDAbr Plumbing & Heating Contracting09/20/2017
BISOTISSUEDAggressive Heating08/31/2017
BISPLISSUEDWard Plumbing08/31/2017
BISOTISSUEDAccurate Contracting05/22/2017
BISOTISSUEDEuro Group Design Group11/17/2016
BISOTISSUEDEuro Group Design Group08/01/2016
BISOTISSUEDOptimum Construction03/11/2016
BISPLISSUEDAbr Plumbing & Heating Contracting08/11/2015
BISOTISSUEDCustom Dimensions07/31/2015
BISPLISSUEDAbr Plumbing & Heating Contracting07/31/2015
BISPLISSUEDSafety Plumbing & Heating07/23/2015
BISOTISSUEDOptimum Construction07/22/2015
BISOTISSUEDKLDNY07/20/2015
BISOTISSUEDOptimum Construction11/06/2013
BISPLISSUEDAbr Plumbing & Heating Contracting08/02/2013
BISOTISSUEDOptimum Construction07/10/2013
BISOTISSUEDAwr Group06/28/2013
+ 24 more permits on file
5 projects · most recent 09/14/2026
General Wiring
FiledStatusContractorScope
09/14/2026Permit IssuedPower Surge ElectricalGeneral Wiring
11/16/2023CompleteBorowide Elect'l Contractors—
06/12/2023CompletePK ElectricGeneral Wiring
10/01/2021CompleteGsa ElectricGeneral Wiring
07/29/2019CompleteVlashava Electric Contracting—
1 project · most recent 07/24/2026
FiledStatusContractorScope
07/24/2026Permit IssuedStreamline Consultants NY—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
10/21/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/21/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/19/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 46
DateRequirementInspectorRole
10/11/2024Post-installed AnchorsKarol Zdancewiczspecial
10/11/2024Alternative Materials - OTCR Buildings Bulletin NumberKarol Zdancewiczspecial
10/11/2024Structural Steel - WeldingKarol Zdancewiczspecial
10/09/2024Alternative Materials - OTCR Buildings Bulletin NumberKarol Zdancewiczspecial
10/09/2024Post-installed AnchorsKarol Zdancewiczspecial
10/09/2024Structural Steel - WeldingKarol Zdancewiczspecial
09/12/2024Alternative Materials - OTCR Buildings Bulletin NumberKarol Zdancewiczspecial
09/12/2024Structural Steel - WeldingKarol Zdancewiczspecial
09/12/2024Post-installed AnchorsKarol Zdancewiczspecial
06/10/2024Alternative Materials - OTCR Buildings Bulletin NumberKarol Zdancewiczspecial
06/10/2024Structural Steel - WeldingKarol Zdancewiczspecial
06/10/2024Post-installed AnchorsKarol Zdancewiczspecial
05/10/2024Structural Steel - WeldingKarol Zdancewiczspecial
05/10/2024Post-installed AnchorsKarol Zdancewiczspecial
05/10/2024Alternative Materials - OTCR Buildings Bulletin NumberKarol Zdancewiczspecial
01/13/2023Tenant Protection Plan ComplianceHoward Zimmermanspecial
01/13/2023Construction Operations Influencing Adjacent StructuresHoward Zimmermanspecial
01/04/2023MasonryHoward Zimmermanspecial
01/04/2023Post-installed AnchorsHoward Zimmermanspecial
01/04/2023Structural Stability – Alterations of existing buildingsHoward Zimmermanspecial
01/04/2023FinalHoward Zimmermanprogress
02/23/2022Lighting controlsEsther Sperberenergy_progress
02/23/2022Fire-Resistant Penetrations and JointsChang Parkspecial
02/23/2022FinalEsther Sperberprogress
02/23/2022Lighting in dwelling unitsEsther Sperberenergy_progress
Latest 25 of 46.
726 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account