← Back
Two family brick
597 6 STREET
BROOKLYN · BIN 3025657
💬 Discuss this project
1900Year Built
3Stories
B1Building Class
R7BZoning
4,032 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family brick · 1,875 sf lot · 2.15 FAR built · Flood zone X
Locations of Work
Architecture
Floor 32p · 1 filing · 18 docs
Floor 2
Floor 1
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/16/2020$4.3M—Private party → Private party$1,061/sf building
04/23/2019$4.2M—597 6TH ST LLC → Private party$1,054/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ANAT SOUDRY ARCHITECT506/13/2022
BARRY STRUCTURAL ENGINEERING, PLLC104/22/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JOSEPH FELLNER603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALMA PLBG SPRINKLER INCPlumbing807/08/2026
WULFING CONSTRUCTION LLCGeneral Contractor307/08/2026
STEVEN BURKEElectrical203/21/2026
ARC ELECTRICAL & MECH CONElectrical103/21/2026
ARC ELECTRICAL & MECH CONGeneral Contractor103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
O'ROURKE ENGINEERING, LLC5873206/13/2022
BARRY STRUCTURAL ENGINEER749104/22/2021
Building Lifecycle
All (31)Filed (6)Permit Issued (4)Signed Off (3)Violation (1)Special Inspection (17)
07/21/2022
Signed off — Alteration
REMOVE EXISTING WOOD PORCH. REPLACE WITH METAL PORCH. REPLACE WITH NEW THE EXISTING OUTDOOR CONDENSER UNITS FOR HVAC SYSTEM. REPLACE PAVERS IN THE REAR YARD. NO CHANGE TO USE, OCCUPANCY, OR EGRESS.
B00504293-I1
07/19/2022
Permit issued — General Construction
B00504293-I1-MS
06/13/2022
Filed — Alteration
REMOVE EXISTING WOOD PORCH. REPLACE WITH METAL PORCH. REPLACE WITH NEW THE EXISTING OUTDOOR CONDENSER UNITS FOR HVAC SYSTEM. REPLACE PAVERS IN THE REAR YARD. NO CHANGE TO USE, OCCUPANCY, OR EGRESS.
B00504293-P1
06/13/2022
Special inspection requirement — Final
Anat Soudry
06/13/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Anat Soudry
06/13/2022
Special inspection requirement — Mechanical Systems
BRIAN O'ROURKE
06/13/2022
Special inspection requirement — HVAC-R and service water heating equipment
Anat Soudry
06/13/2022
Special inspection requirement — Energy Code Compliance Inspections
Anat Soudry
06/10/2022
Signed off — Alteration
REMOVE EXISTING WOOD PORCH. REPLACE WITH METAL PORCH. REPLACE WITH NEW THE EXISTING OUTDOOR CONDENSER UNITS FOR HVAC SYSTEM. REPLACE PAVERS IN THE REAR YARD. NO CHANGE TO USE, OCCUPANCY, OR EGRESS.
B00504293-S1
08/12/2021
Permit issued — Structural
B00504293-S1-ST
06/23/2021
Permit issued — General Construction
B00504293-I1-GC
05/24/2021
Signed off — Alteration
PLUMBING WORK FILED IN CONJUNCTIN WITH #340796419
B00440142-I1
04/26/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
MICHAEL BARRY
04/22/2021
Filed — Alteration
REMOVE EXISTING WOOD PORCH. REPLACE WITH METAL PORCH. REPLACE WITH NEW THE EXISTING OUTDOOR CONDENSER UNITS FOR HVAC SYSTEM. REPLACE PAVERS IN THE REAR YARD. NO CHANGE TO USE, OCCUPANCY, OR EGRESS.
B00504293-S1
04/21/2021
Filed — Alteration
REMOVE EXISTING WOOD PORCH. REPLACE WITH METAL PORCH. REPLACE WITH NEW THE EXISTING OUTDOOR CONDENSER UNITS FOR HVAC SYSTEM. REPLACE PAVERS IN THE REAR YARD. NO CHANGE TO USE, OCCUPANCY, OR EGRESS.
B00504293-I1
04/21/2021
Special inspection requirement — Structural Steel - Details
MICHAEL BARRY
04/21/2021
Special inspection requirement — Concrete - Cast-In-Place
MICHAEL BARRY
04/21/2021
Special inspection requirement — Structural Steel - High Strength Bolting
MICHAEL BARRY
04/21/2021
Special inspection requirement — Structural Steel - Welding
MICHAEL BARRY
04/21/2021
Special inspection requirement — Final
MICHAEL BARRY
02/05/2021
Special inspection requirement — Energy Code Compliance Inspections
Anat Soudry
02/05/2021
Special inspection requirement — HVAC insulation and sealing
Anat Soudry
02/04/2021
Filed — Alteration
PLUMBING WORK FILED IN CONJUNCTIN WITH #340796419
B00440142-P2
02/04/2021
Special inspection requirement — Energy Code Compliance Inspections
Anat Soudry
02/04/2021
Special inspection requirement — HVAC insulation and sealing
Anat Soudry
01/28/2021
Filed — Alteration
PLUMBING WORK FILED IN CONJUNCTIN WITH #340796419
B00440142-P1
01/26/2021
Special inspection requirement — Energy Code Compliance Inspections
Anat Soudry
01/26/2021
Special inspection requirement — HVAC insulation and sealing
Anat Soudry
12/23/2020
Permit issued — Plumbing
B00440142-I1-PL
12/15/2020
Filed — Alteration
PLUMBING WORK FILED IN CONJUNCTIN WITH #340796419
B00440142-I1
10/16/1996
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offWULFING CONSTRUCTION LLC07/19/2022
DOB NOWStructuralSigned-offWULFING CONSTRUCTION LLC08/12/2021
DOB NOWGeneral ConstructionSigned-offWULFING CONSTRUCTION LLC06/23/2021
DOB NOWPlumbingSigned-offSMART PLUMBING & HTG CORP12/23/2020
BISOTISSUEDWULFING CONSTRUCTION LLC06/21/2021
BISOTISSUEDBROOKLYN SOLARWORKS LLC03/04/2021
BISOTISSUEDWULFING CONSTRUCTION LLC12/18/2020
BISPLISSUEDALADDIN PLUMBING AND HEATING01/23/1995
BIS—ISSUEDT & L CONSTRUCTION CORP.01/17/1995
BIS—ISSUEDAPEX CONST.,INC,T/A CBS CONST.09/17/1993
1 project · most recent 04/14/2021
FiledStatusContractorScope
04/14/2021CompleteBROOKYLN SOLARWORKS, LLC—
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
06/13/2022FinalAnat Soudryprogress
06/13/2022HVAC-R and service water piping design and insulationAnat Soudryenergy_progress
06/13/2022Mechanical SystemsBRIAN O'ROURKEspecial
06/13/2022HVAC-R and service water heating equipmentAnat Soudryenergy_progress
06/13/2022Energy Code Compliance InspectionsAnat Soudryprogress
04/26/2021Structural Stability – Alterations of existing buildingsMICHAEL BARRYspecial
04/21/2021Structural Steel - DetailsMICHAEL BARRYspecial
04/21/2021Concrete - Cast-In-PlaceMICHAEL BARRYspecial
04/21/2021Structural Steel - High Strength BoltingMICHAEL BARRYspecial
04/21/2021Structural Steel - WeldingMICHAEL BARRYspecial
04/21/2021FinalMICHAEL BARRYprogress
02/05/2021Energy Code Compliance InspectionsAnat Soudryprogress
02/05/2021HVAC insulation and sealing Anat Soudryenergy_progress
02/04/2021Energy Code Compliance InspectionsAnat Soudryprogress
02/04/2021HVAC insulation and sealing Anat Soudryenergy_progress
01/26/2021Energy Code Compliance InspectionsAnat Soudryprogress
01/26/2021HVAC insulation and sealing Anat Soudryenergy_progress
▾Documents — 89 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch3
09/01/2026B00504293-S1Request digital key ↗
09/01/2026B00504293-P1Request digital key ↗
09/01/2026B00504293-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing3
09/01/2026B00440142-I1Request digital key ↗
08/15/2026B00440142-P1Request digital key ↗
08/15/2026B00440142-P2Request digital key ↗
▸Applications & Permits13
▸DOB NOWLPC Approval/Permit6
09/01/2026B00504293-P1Open ↗
08/13/2026B00440142-P1Open ↗
08/13/2026B00504293-S1Open ↗
Showing 3 of 6 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION4
05/26/2021340796419Open ↗
05/18/2021340796419Open ↗
02/26/2021340806220Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION3
03/04/2021340806220Open ↗
03/01/2021340806220Open ↗
12/18/2020340796419Open ↗
▸Seals & Professional Certifications27
▸DOB NOWProgress Inspector Seal & Signature11
08/29/2026B00440142-P2Open ↗
08/29/2026B00440142-P2Open ↗
08/28/2026B00440142-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/01/2026B00440142-P2Open ↗
09/01/2026B00440142-P1Open ↗
09/01/2026B00440142-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/27/2026B00504293-S1Open ↗
08/27/2026B00504293-S1Open ↗
08/27/2026B00504293-S1Open ↗
Showing 3 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
12/15/2020340796419Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
12/15/2020340796419Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
02/26/2021340806220Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/15/2020340796419Open ↗
▸Safety & Tenant Protection1
▸BISTPP1: TENANT PROTECTION PLAN1
05/18/2021340806220Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
09/01/2026B00440142-P1Open ↗
09/01/2026B00440142-P2Open ↗
09/01/2026B00440142-I1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
02/26/2021340806220Open ↗
12/15/2020340796419Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
07/22/2021340796419Open ↗
06/11/2021340806220Open ↗
02/26/2021340806220Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
07/22/2021340796419Open ↗
06/11/2021340806220Open ↗
▸BISSOLAR TAX ABATEMENT APPLICATION1
06/14/2021340806220Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
02/26/2021340806220Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
12/15/2020340796419Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00504293-I1Open ↗
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY8
07/22/2021340796419Open ↗
07/22/2021340796419Open ↗
06/11/2021340806220Open ↗
Showing 3 of 8 on file for this type
▸Approvals, Objections & Sign-offs8
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
07/22/2021340796419Open ↗
06/14/2021340806220Open ↗
06/14/2021340806220Open ↗
▸BISLANDMARKS APPROVAL2
02/26/2021340806220Open ↗
12/15/2020340796419Open ↗
▸BISLANDMARKS SIGNOFF2
07/22/2021340796419Open ↗
06/11/2021340806220Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
06/14/2021340806220Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
07/22/2021340796419Open ↗
06/11/2021340806220Open ↗
02/26/2021340806220Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms3
▸BISEFILING JOB APPLICATION COVER SHEET2
02/26/2021340806220Open ↗
12/15/2020340796419Open ↗
▸BISADDITIONAL INFORMATION1
05/26/2021340796419Open ↗