Condo, residential tower (mixed-use, multi-family elevator) [derived]
Sixty Court Condominium
60 COURT STREET · Brooklyn Heights · BIN 3002552
💬 Discuss this project
1852Year Built
6Stories
RMBuilding Class
C5-2AZoning
34,214 sfGross Floor Area
35Units
LL97 CoveredRent Stabilized0 Active Violations
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: Condo Association · 8,288 sf lot · 4.13 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofJust Salad10p · 3 filings · 16 docs
Floor 6John B. Lovett & Associates, LTD.9p · 2 filings · 20 docs
Floor 5John B. Lovett & Associates, LTD.9p · 2 filings · 20 docs
Floor 4John B. Lovett & Associates, LTD.9p · 2 filings · 20 docs
Floor 3John B. Lovett & Associates, LTD.9p · 2 filings · 20 docs
Floor 2John B. Lovett & Associates, LTD.11p · 3 filings · 20 docs
Floor 1Just Salad, Unit 1X145p · 10 filings · 20 docs
MezzanineGas infrastructure rehab and appliance valve installation10p · 2 filings · 20 docs
CellarJust Salad27p · 5 filings · 20 docs
Site & exteriorB Baileys22p · 4 filings · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
John B. Lovett & Associates3207/08/2026
60 Court Street Condominium1603/21/2026
Esquire Group703/21/2026
NYC Property Care503/21/2026
Bijur Properties407/08/2026
Okeefes403/21/2026
Sixty Court Condo303/21/2026
Secretary of Housing and103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Meszaros Engineering902/25/2026
Building Studio Architects105/23/2024
Versai101/24/2024
HC Engineering110/23/2023
Enthink Engineers107/31/2023
Jack Stone Engineers307/21/2023
Smartdesign Architecture107/21/2023
Sterling Engineering Services212/10/2021
TWO4DESIGN Architecture103/10/2021
Ashraf209/08/2020
Blue SKY Design110/24/2019
Royal T&E106/11/2019
Dooling & Company Architects105/17/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J A Expediting203/21/2026
AE Design Solution203/21/2026
George E Berger Associates203/21/2026
Mbe Code Zoning1003/21/2026
JP Expedite203/21/2026
Meszaros Engineering1803/21/2026
PS Engineers203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Platinum Services NYScaffold1803/21/2026
Ridge ConstructionGeneral Contractor407/08/2026
Stellar ContractingGeneral Contractor403/21/2026
RRP PlumbingPlumbing207/08/2026
Gallery Restorationspecialty_contractor203/21/2026
Yates Restoration GroupGeneral Contractor203/21/2026
Phoenix Sutton STRScaffold207/08/2026
Signs CadSign hanger207/08/2026
RRP PlumbingFire Protection207/08/2026
Everest ScaffoldingScaffold107/08/2026
M&M Plumbing & HeatingPlumbing106/28/2026
Harari DavidElectrical103/21/2026
Nycan BuildersGeneral Contractor107/08/2026
Skyler Property ServicesGeneral Contractor104/09/2026
Thomas ElectricElectrical103/21/2026
Borowide Elect'l ContractorsElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Meszaros Engineering963801/20/2026
Sandeep Gunnala Engineering8482105/23/2024
Versai8133101/24/2024
Special Testing & Consulting1688407/21/2023
Sterling Engineering Service1012212/10/2021
Blue SKY Design1908110/24/2019
Building Lifecycle
All (158)Filed (26)Permit Issued (25)Signed Off (7)Violation (60)Inspection (10)Special Inspection (30)
02/25/2026
Filed — Alteration
GAS INFRASTRUCTURE REHAB, INSTALLATION OF NEW APPLIANCE VALVES IN ALL APARTMENTS. NO CHANGEIN EGRESS OR OCCUPANCY.
B01154876-P7
02/25/2026
Special inspection requirement — Tenant Protection Plan Compliance
Christian Meszaros
01/20/2026
Filed — Alteration
GAS INFRASTRUCTURE REHAB, INSTALLATION OF NEW APPLIANCE VALVES IN ALL APARTMENTS. NO CHANGEIN EGRESS OR OCCUPANCY.
B01154876-P6
01/16/2026
Special inspection requirement — Tenant Protection Plan Compliance
Christian Meszaros
10/06/2025
Filed — Alteration
GAS INFRASTRUCTURE REHAB, INSTALLATION OF NEW APPLIANCE VALVES IN ALL APARTMENTS. NO CHANGEIN EGRESS OR OCCUPANCY.
B01154876-P5
09/29/2025
Special inspection requirement — Tenant Protection Plan Compliance
Christian Meszaros
09/25/2025
Signed off — Alteration
INSTALL 24 NEW SPRINKLER HEADS AND PIPING.
B00880008-I1
09/08/2025
Filed — Alteration
GAS INFRASTRUCTURE REHAB, INSTALLATION OF NEW APPLIANCE VALVES IN ALL APARTMENTS. NO CHANGEIN EGRESS OR OCCUPANCY.
B01154876-P4
09/05/2025
Special inspection requirement — Tenant Protection Plan Compliance
Christian Meszaros
08/04/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/02/2025
Filed — Alteration
GAS INFRASTRUCTURE REHAB, INSTALLATION OF NEW APPLIANCE VALVES IN ALL APARTMENTS. NO CHANGEIN EGRESS OR OCCUPANCY.
B01154876-P3
07/02/2025
Special inspection requirement — Tenant Protection Plan Compliance
Christian Meszaros
06/28/2025
Inspection — Pass-Final PL - More than 10 Requested Floors
Pass
View inspection ↗
06/18/2025
Inspection — Fail-Final PL - More than 10 Requested Floors
Fail
View inspection ↗
06/01/2025
Special inspection requirement — Preliminary
Christian Meszaros
06/01/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christian Meszaros
06/01/2025
Special inspection requirement — Tenant Protection Plan Compliance
Christian Meszaros
06/01/2025
Special inspection requirement — Post-installed Anchors
Christian Meszaros
06/01/2025
Special inspection requirement — Final
Christian Meszaros
05/30/2025
Filed — Alteration
GAS INFRASTRUCTURE REHAB, INSTALLATION OF NEW APPLIANCE VALVES IN ALL APARTMENTS. NO CHANGEIN EGRESS OR OCCUPANCY.
B01154876-P1
05/30/2025
Filed — Alteration
GAS INFRASTRUCTURE REHAB, INSTALLATION OF NEW APPLIANCE VALVES IN ALL APARTMENTS. NO CHANGEIN EGRESS OR OCCUPANCY.
B01154876-P2
05/29/2025
Signed off — Alteration
REMOVE & CONSTRUCT INTERIOR PARTITIONS, CEILINGS, DOORS & FLOORS.
B00879978-I1
05/29/2025
Signed off — Alteration
INSTALL DUCTWORK AND UNITS.
B00879986-I1
05/28/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/28/2025
Special inspection requirement — Final
Christian Meszaros
05/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christian Meszaros
05/28/2025
Special inspection requirement — Tenant Protection Plan Compliance
Christian Meszaros
05/28/2025
Special inspection requirement — Post-installed Anchors
Christian Meszaros
05/28/2025
Special inspection requirement — Preliminary
Christian Meszaros
04/03/2025
Permit issued — General Construction
B01154876-I1-GC
03/13/2025
Permit issued — Plumbing
B01154876-S1-PL
02/14/2025
Filed — Alteration
GAS INFRASTRUCTURE REHAB, INSTALLATION OF NEW APPLIANCE VALVES IN ALL APARTMENTS. NO CHANGEIN EGRESS OR OCCUPANCY.
B01154876-I1
02/14/2025
Filed — Alteration
GAS INFRASTRUCTURE REHAB, INSTALLATION OF NEW APPLIANCE VALVES IN ALL APARTMENTS. NO CHANGEIN EGRESS OR OCCUPANCY.
B01154876-S1
12/16/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/11/2024
Filed — Alteration
CD5 RENEWAL
B01125658-I1
10/11/2024
Permit issued — Suspended Scaffold
B01125658-I1-SC
10/04/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/04/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/02/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/19/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/13/2024
Permit issued — Sign
B00948176-I1-SG
08/07/2024
Permit issued — Sprinklers
B00880008-I1-EW-SP
08/07/2024
Permit issued — Plumbing
B00879999-I1-PL
07/30/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/15/2024
Permit issued — General Construction
B01053983-I1-GC
05/23/2024
Filed — Alteration
IT IS PROPOSED TO REPLACE EXISTING STAIR AS SHOW ON PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01053983-I1
05/20/2024
Special inspection requirement — Fire-Resistance Rated Construction
Sandeep Gunnala
05/20/2024
Special inspection requirement — Tenant Protection Plan Compliance
Sandeep Gunnala
05/20/2024
Special inspection requirement — Final
John Field
02/02/2024
Permit issued — Structural
B00957619-I1-ST
01/24/2024
Filed — Alteration
REMOVE AND REPLACE WOOD JOISTS AND PLYWOOD SUB- FLOOR IN AREAS OF WORK.
B00957619-I1
01/24/2024
Special inspection requirement — Structural Wood Frame
Klodian Pepaj
12/05/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B00911164-I1
12/05/2023
Signed off — Alteration
B00178562-I1
11/03/2023
Special inspection requirement — Tenant Protection Plan Compliance
Klodian Pepaj
11/03/2023
Special inspection requirement — Final
Klodian Pepaj
11/03/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Klodian Pepaj
10/23/2023
Filed — Alteration
ERECT NON-ILLUMINATED ACCESSORY BUSINESS WALL SIGN WITH BACKER PANEL, INSIDE OF PROPERTY LINE, NO CHANGE IN USE, EGRESS, OR OCCUPANCY
B00948176-I1
10/23/2023
Permit issued — Sign
B00948176-I1-SG
10/14/2023
Special inspection requirement — Final
Hackjong Choi
Latest 60 of 158 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offSkyler Property Services04/03/2025
DOB NOWPlumbingSigned-offM&M Plumbing & Heating03/13/2025
DOB NOWSuspended ScaffoldPermit IssuedTribute Restoration10/11/2024
DOB NOWSignPermit IssuedSigns Cad09/13/2024
DOB NOWSprinklersSigned-offRalph W. Landolfi JR08/07/2024
DOB NOWPlumbingPermit IssuedRRP Plumbing08/07/2024
DOB NOWGeneral ConstructionPermit IssuedNycan Builders07/15/2024
DOB NOWStructuralPermit IssuedRidge Construction02/02/2024
DOB NOWSignPermit IssuedSigns Cad10/23/2023
DOB NOWSprinklersSigned-offRalph W. Landolfi JR08/07/2023
DOB NOWPlumbingPermit IssuedRRP Plumbing08/07/2023
DOB NOWSidewalk ShedSigned-offPhoenix Sutton STR07/31/2023
DOB NOWGeneral ConstructionSigned-offRidge Construction07/27/2023
DOB NOWMechanical SystemsSigned-offRidge Construction07/27/2023
DOB NOWMechanical SystemsPermit IssuedStellar Contracting12/17/2021
DOB NOWMechanical SystemsPermit IssuedStellar Contracting12/17/2021
DOB NOWGeneral ConstructionPermit IssuedYates Restoration Group03/15/2021
DOB NOWSupported ScaffoldPermit IssuedPlatinum Services NY02/12/2021
DOB NOWSidewalk ShedPermit IssuedPlatinum Services NY02/11/2021
DOB NOWSidewalk ShedPermit IssuedPlatinum Services NY09/22/2020
DOB NOWSidewalk ShedPermit IssuedPlatinum Services NY09/17/2020
DOB NOWSidewalk ShedPermit IssuedPlatinum Services NY07/16/2020
DOB NOWSupported ScaffoldPermit IssuedPlatinum Services NY07/16/2020
DOB NOWStructuralSigned-offGallery Restoration11/27/2019
DOB NOWSidewalk ShedSigned-offEverest Scaffolding05/20/2019
BISOTISSUEDGallery Restoration10/11/2019
BISOTISSUEDGenesis NYC Construction08/07/2019
BISOTISSUEDTraditional Waterproofing04/17/2019
BISPLISSUEDBMT Plumbing & Heating12/15/2016
BISOTISSUEDDefine USA12/09/2016
BIS—ISSUEDPaul Signs12/15/2015
BISOTISSUEDJRR Contracting10/21/2015
BISOTISSUEDJepol Construction07/27/2015
BISFPISSUEDUnique Fire Systems07/15/2015
BISSPISSUEDC.H.P.H. Co06/24/2015
BISPLISSUEDC.H.P.H. Co06/08/2015
BISPLISSUEDC.H.P.H. Co06/08/2015
BISOTISSUEDCooper Works06/04/2015
BISMHISSUEDCooper Works06/04/2015
BISEQISSUEDCooper Works06/01/2015
+ 35 more permits on file
1 project · most recent 12/10/2021
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
12/10/2021Permit IssuedStellar ContractingAir Conditioning Systems
Cooling
Mitsubishi Electric PKFY-P18-NLMU-E 1,800 BTU · Vrf Indoor ×2
PEFY-P24-NMAU-E4 883 CFM · Vrf Indoor ×1
PUMY-P60-NKMU3 60,000 BTU · Vrf Outdoor ×1
2 projects · most recent 02/25/2026
Gas Water/Sanitary
FiledStatusContractorScope
02/25/2026Signed-offM&M Plumbing & HeatingGas
07/21/2023Permit IssuedRRP PlumbingWater/Sanitary
7 projects · most recent 08/17/2023
General Wiring
FiledStatusContractorScope
08/17/2023CompleteAround ElectricGeneral Wiring
08/09/2023CompleteLebo ElectricGeneral Wiring
07/27/2023CompleteElpo Electrical Contg—
07/01/2020Permit IssuedIlluminous Electric—
08/14/2019Permit IssuedKJK ElectricGeneral Wiring
06/06/2019CompleteElpo Electrical Contg—
05/14/2019CompleteBorowide Elect'l Contractors—
1 project · most recent 01/24/2024
FiledStatusContractorScope
01/24/2024Permit IssuedRidge Construction1 scope_items
1 project · most recent 09/08/2020
Scaffold Sidewalk Shed
FiledStatusContractorScope
09/08/2020Permit IssuedPlatinum Services NYScaffold, Sidewalk Shed
1 project · most recent 10/11/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
10/11/2024Permit Issued—Suspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
08/04/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/28/2025Pass-Final PL - More than 10 Requested FloorsPassView ↗
06/18/2025Fail-Final PL - More than 10 Requested FloorsFailView ↗
05/28/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/16/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/04/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/04/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/02/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/19/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/30/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 46
DateRequirementInspectorRole
02/25/2026Tenant Protection Plan ComplianceChristian Meszarosspecial
01/16/2026Tenant Protection Plan ComplianceChristian Meszarosspecial
09/29/2025Tenant Protection Plan ComplianceChristian Meszarosspecial
09/05/2025Tenant Protection Plan ComplianceChristian Meszarosspecial
07/02/2025Tenant Protection Plan ComplianceChristian Meszarosspecial
06/01/2025PreliminaryChristian Meszarosprogress
06/01/2025Fire-Resistant Penetrations and JointsChristian Meszarosspecial
06/01/2025Tenant Protection Plan ComplianceChristian Meszarosspecial
06/01/2025Post-installed AnchorsChristian Meszarosspecial
06/01/2025FinalChristian Meszarosprogress
05/28/2025FinalChristian Meszarosprogress
05/28/2025Fire-Resistant Penetrations and JointsChristian Meszarosspecial
05/28/2025Tenant Protection Plan ComplianceChristian Meszarosspecial
05/28/2025Post-installed AnchorsChristian Meszarosspecial
05/28/2025PreliminaryChristian Meszarosprogress
05/20/2024Fire-Resistance Rated ConstructionSandeep Gunnalaprogress
05/20/2024Tenant Protection Plan ComplianceSandeep Gunnalaspecial
05/20/2024FinalJohn Fieldprogress
01/24/2024Structural Wood FrameKlodian Pepajprogress
11/03/2023Tenant Protection Plan ComplianceKlodian Pepajspecial
11/03/2023FinalKlodian Pepajprogress
11/03/2023Structural Stability – Alterations of existing buildingsKlodian Pepajspecial
10/14/2023FinalHackjong Choiprogress
05/26/2023Structural Stability – Alterations of existing buildingsSEBASTIAN SETTEDUCATE JR., P.Especial
05/24/2023Fire-Resistant Penetrations and JointsSEBASTIAN SETTEDUCATE JR., P.Especial
Latest 25 of 46.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Just SaladRestaurant / Food ServiceCellar, Floor 1, Roof
Project B00879978 Alteration · LOC Issued · 07/21/2023
Project B00879986 Alteration · LOC Issued · 07/21/2023
Project B00879999 Alteration · Permit Entire · 07/21/2023
Project B00880008 Alteration · LOC Issued · 07/21/2023
B BaileysRestaurant / Food Service—
Project B00166002 Alteration · LOC Issued · 05/17/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 389 on file (BIS + DOB NOW)
▸Plans & Drawings28
▸DOB NOWPlans/Sketch21
09/01/2026B00480433-I1Request digital key ↗
08/31/2026B00589046-I1Request digital key ↗
08/31/2026B00645825-I1Request digital key ↗
Showing 3 of 21 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed4
09/02/2026B00166002-I1Request digital key ↗
09/02/2026B00178562-I1Request digital key ↗
09/02/2026B00365555-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold2
09/02/2026B00365555-I1Request digital key ↗
08/15/2026B00365555-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/02/2026B00240675-I1Request digital key ↗
▸Applications & Permits66
▸BISWORK PERMIT APPLICATION23
10/12/2019321995613Open ↗
08/15/2019321935705Open ↗
08/08/2019321935705Open ↗
Showing 3 of 23 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION22
10/07/2019321995613Open ↗
06/13/2019321935705Open ↗
04/04/2019340670544Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWLPC Approval/Permit19
08/13/2026B00645825-I1Open ↗
08/13/2026B01053983-I1Open ↗
08/13/2026B00240675-I1Open ↗
Showing 3 of 19 on file for this type
▸BISPLACE OF ASSEMBLY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISADDRESS - NEW HOUSE NUMBER APPROVED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications115
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION29
10/08/2019340670544Open ↗
06/13/2019321935705Open ↗
03/21/2019321935705Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature25
09/02/2026B00166002-I1Open ↗
09/02/2026B00178562-I1Open ↗
08/31/2026B00589046-I1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature19
10/05/2026B01154876-P4Open ↗
09/28/2026B01053983-I1Open ↗
09/01/2026B00879986-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
09/28/2026B01053983-I1Open ↗
09/28/2026B01053983-I1Open ↗
09/01/2026B00879986-I1Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT12
10/07/2019321995613Open ↗
04/04/2019340670544Open ↗
12/21/2015321256868Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST10
10/07/2019321995613Open ↗
12/21/2015321256868Open ↗
07/09/2015321167937Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
04/04/2019340670544Open ↗
05/18/2015340261326Open ↗
05/18/2015340261273Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
04/04/2019340670544Open ↗
05/18/2015340261326Open ↗
05/18/2015340261273Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment10
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
03/21/2019321935705Open ↗
09/26/2016321437744Open ↗
06/02/2015321134535Open ↗
Showing 3 of 5 on file for this type
▸BISEQUIPMENT USE PERMITS1
11/06/2015321134544Open ↗
▸BISSCHEDULE B - PLUMBING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
10/06/2015321167937Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
06/15/2015321093099Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
11/06/2015321134544Open ↗
▸Safety & Tenant Protection6
▸BISTenant Protection Plan and Notes3
03/21/2019321935705Open ↗
09/09/2016321437744Open ↗
04/04/2019340670544Open ↗
▸DOB NOWTenant Protection Plan3
08/13/2026B00240675-I1Open ↗
08/13/2026B00365555-P1Open ↗
08/13/2026B00365555-I1Open ↗
▸Environmental & Asbestos33
▸DOB NOWDEP ACP-5: Asbestos Assessment Report19
08/31/2026B00589046-I1Open ↗
08/31/2026B00645825-I1Open ↗
08/27/2026B00879999-I1Open ↗
Showing 3 of 19 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)12
10/07/2019321995613Open ↗
04/04/2019340670544Open ↗
03/21/2019321935705Open ↗
Showing 3 of 12 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026B01053983-I1Open ↗
▸Energy Compliance27
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS17
10/08/2019340670544Open ↗
10/07/2019321995613Open ↗
03/21/2019321935705Open ↗
Showing 3 of 17 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS6
03/11/2021321995613Open ↗
10/08/2019340670544Open ↗
11/06/2015321134544Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
03/11/2021321995613Open ↗
04/04/2019340670544Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
04/04/2019340670544Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
05/18/2015340261273Open ↗
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY8
07/01/2022321995613Open ↗
07/01/2022321995613Open ↗
01/04/2022321995613Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION1
10/07/2019321995613Open ↗
▸Approvals, Objections & Sign-offs38
▸BISLANDMARKS APPROVAL13
10/08/2019340670544Open ↗
07/16/2019321935705Open ↗
06/28/2019321935705Open ↗
Showing 3 of 13 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST9
07/05/2022321995613Open ↗
10/08/2019340670544Open ↗
07/19/2016321134535Open ↗
Showing 3 of 9 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION8
07/16/2019321935705Open ↗
05/08/2015321113978Open ↗
Showing 2 of 8 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
07/09/2015321167937Open ↗
06/09/2015321141331Open ↗
04/28/2015321113978Open ↗
Showing 3 of 5 on file for this type
▸BISLANDMARKS SIGNOFF2
03/11/2021321995613Open ↗
05/19/2020321256868Open ↗
▸BISSUPERSEDING LETTER1
10/31/2015321113978Open ↗
▸Cost, Insurance & Ownership26
▸BISCOST AFFIDAVIT24
05/19/2020321256868Open ↗
10/08/2019340670544Open ↗
10/07/2019321995613Open ↗
Showing 3 of 24 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
03/18/2021321995613Open ↗
▸BISHIC LICENSE OR AFFIDAVIT1
03/26/2015321093099Open ↗
▸Filing & Intake Forms25
▸BISEFILING COVER SHEET14
10/08/2019321995613Open ↗
06/13/2019321935705Open ↗
03/21/2019321935705Open ↗
Showing 3 of 14 on file for this type
▸BISADDITIONAL INFORMATION7
01/27/2021321995613Open ↗
06/09/2017321437744Open ↗
09/02/2015321134544Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
04/04/2019340670544Open ↗
05/18/2015340261326Open ↗
05/18/2015340261273Open ↗
▸BISBOROUGH INTAKE FORM1
10/08/2019340670544Open ↗
▸Other Documents5
▸BISFIRE SUPP ANSUL APPROVL- FD-FSS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
09/27/2016321437744Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026B01125658-I1Open ↗
▸DOB NOWCalculations1
08/13/2026B01125658-I1Open ↗
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
08/13/2026B00178562-I1Open ↗